Académique Documents
Professionnel Documents
Culture Documents
ABSTRACT ESTIMATE
Name of Work : Providing False Ceiling to workshop shed and sub. Division Office shed for utilizing
as class room and Mess respectively for 21st Century Gurukulam in T.G.P. Camp
colony at K.R.Dam.
3 (a): 22 Nos Painting to roof trushes with Metal 1,500.00 Each 33,000
Purlims Primary Coat and over that two coats Trusher
Roof of best enamel paint including cast
Trushes and conveyance of all materials and
labour charges, Centring, Scaffolding
etc, complete for finished Item of
work.
12 12 RMT Supplying and fixcing of 4" Dia Swg 85.00 1RM 1,020
pipes of ISI mark conforming to IS
1651
13 14 Nos Supplying and fixcing concealed stop 223.00 1No 3,122
cock 12.7mm Indian make seiko or
equeleant
14 8 Nos Supplying and fixcing CI floor traps 303.00 1No 2,424
1st Qulity ISI marked confroming to
IS 1729-1979 with cp grating Fixing
with white cement as per site
requriments with standered practice
100mm Dia inlet-100mm Dia outlet
pipe
1.10 sqm Rate as per SSR Item No.511/P27 of 363.00 1.00 sqm 399.30
Buildings
1.00 sqm Add Scaffolding Charges Vide Items 40.00 10.00 sqm 4.00
978/P60
403.30
OR Say 403
2 Painting to roof trushes with Metal
Primary Coat and over that two coats
of best enamel paint including cast
and conveyance of all materials and
labour charges, Centring, Scaffolding
etc, complete for finished Item of
work.
1.00 Trusha) For Trushes - Rate as per Local 1,500.00 1.00 Trurs 1,500.00
Quotation
ToTal Rate 1,500.00
1.00 1Rm a) For Per lines - Rate as per Local 15.00 1.00 RM 15.00
Quotation
OR Say 15.00
3 Providing tarfelting roof repairs duly
appling one coat of appropriate
grade of bitumen in hot condition @
1.2 kg/ 1 Sqm of roof area fixing tar
felt (manfaturers to IS 1322/1972
spcification) appling second coat of
appropriate grade of hot bitmin @
1.20 Kg/1 Sqm of roof area and
spreading course aggregate(Sand)
@0.063Cum/1 Sqm of roof area
finished item to a width of 0.90m and
repairs to G.I Sheet roofing holes
with bolts and nuts and washers
includng cost and converyance of all
meterials and labour charges
etc.complect
1.10 sqm Cost of Tar Felt vide SSR Item 143.00 157.3
No.214 P.14 of Building
1.00 sqm Cost of Labour Charges (Local Rate) 25.00 1.00 Sqm 25.00
including Tar solution
1.00 No Repairs to GI Sheet roof Holswith 5.00 1.00 No 5.00
Bolt Nut and Washers (Local Rate)
187.30
OR Say 187.00
4
Supplying and fixing of W.C Orissa
pan white glazed W.C Ist Qulity ISI
marcked, conforming to IS 2556-43-
1981with"P"OR "S" Trap of standard
company
1.00 1No Rate as per SSR item No:113/P:70 977.00 1No 977.00
5
Supplying and fixcing of European
water closet of Ist Qulity ISI
marcked, conforming to IS 2556-43-
1981with"P"OR "S" Trap of standard
company
1.00 1No Rate as per SSR item No:123/P:70 976.00 1No 976.00
6
Supplyign and fixing best indian
make plastic seat with lid for
European water closet with rubber or
plastic buffers as per IS 2548- 1996.
1.00 1No Rate as per SSR item No:125/P:70 308.00 1No 308.00
7
Name of Work : Providing False Ceiling to workshop shed and sub. Division Office shed for utilizing as class room and Mess respectively for
21st Century Gurukulam in T.G.P. Camp colony at K.R.Dam.
Add
LEAD Conveyan Deduct senari Add Total Remarks
Sl. Source of
Description of Item Unit Initial Cost ce Stocking age Blasteri Net Rate
No. Materials Charges charge
Charges ng
s
CT MR Total
Vide Item
No:183P.15
1 Cement At Site 1 MT - - - 4,300.00 - - - - 4300/MT
of Common
SSR
2 Steel Nellore 1 MT - 50.00 50.00 30,850.00 383.40 (-) 8.70 - - 31224.7/MT P16/193
Padugu
3 Bricks 1000 Nos - 60.00 60.00 2,000.00 607.00 (-) 6.80 - - 2600.2/MT /1000 P8/ I
Padu
4 Sand Sangam 1 Cum 3.00 50.00 54.00 89.00 318.90 (-) 4.60 36 - 439.30/Cum P15/179
5 F.P. Metal 40mm Local 1 Cum 10.00 - 11.00 33.50 155.90 (-) 7.60 45 - 226.80/Cum P15/172
7 Wood (Country Wood) Nellore 1 Cum - 50.00 50.00 15,000.00 222.30 (-) 4.50 - - 15217.80/Cum Local
8 HBG Mc 20mm Gilakapadu 1 Cum 2.00 15.00 18.00 650+162.50 190.00 (-) 7.60 - 55.50 1095.40/Cum P13/116
Item No.
9 Shell Lime Nellore 1 Cum - 55.00 50.00 671.00 327.30 (-) 4.50 - 993.80/Cum
187/P16
CERTIFIED THAT : 1. The leads provided in the lead statement are correct to my knowledge.
2. The seinarage Charges are payable at Quarries
3. There are sufficient material are available in the Quarries
4. Blasting Charges are requested for Blastering the materials
2