Vous êtes sur la page 1sur 79

ACKNOWLEDGEMENT

1
T1h1i1s1 1r1e1p1o1r1t1 1i1s1 1a1n1 1e1f1f1i1c1a1c1i1o1u1s1 1b1y1 1t1h1e1 1o1u1t1c1o1m1e1 1w1r1i1t1e1r1s1 1b1y1 W1e1 1 1c1o1 1f1r1o1m1 1 1a1r1e1 1M1r1.1 1

1o1f1 1t1h1e1 1 e1f1f1o1r1t1 1p1u1t1 i1n1 1s1u1p1p1o1r1t1e1d1 o1p1e1r1a1t1i1o1n1 1o1t1h1e1r1s1.1 1 o1u1r1

1s1i1n1c1e1r1e1l1y1 1g1r1a1te1f1u1l1 1t1o1 1H1.1O1.1D1 1R1a1s1h1i1d1 1H1u1s1s1a1i1n1 1a1n1d1

1o1u1r1 1m1e1n1t1o1r1s1 M1r1.1 1R1.1K1 1G1a1r1g1 1(1A1E1N1)1 1a1n1d1 1M1r1.1 1A1s1h1o1k1 1G1o1l1i1m1a1r1 1v1a1l1u1a1b1l1e1 1a1n1d1 1t1h1e1 1a1l1s1o1 1 1K1u1m1a1r1 (1i1n1 t1h1e1i1r1 1f1o1r1 1o1f1

1c1o1m1m1a1n1d1)1 1f1o1r1 1 m1o1t1i1v1a1t1i1o1n1

1g1u1i1d1a1n1c1e1

1d1e1v1e1l1o1p1m1e1n1t1 1 W1e1 use

1r1e1p1o1r1t1.1

1w1o1u1l1d1 1t1h1is1 1t1o1

1o1p1p1o1r1t1u1n1i1t1y1

1t1h1a1n1k1 1t1h1e1 1a1u1t1h1o1r1i1t1y1

2o2f2 2 t2h2e2 2l2i2b2r2a2r2y2 2a2n2d2 2c2o2m2p2u2t2e2r2 GVSET2,2 2 p2r2o2v2i2d2e2d2 2r2e2s2o2u2r2c2e2s2 2r2e2f2e2r2e2n2c2e2 c2o2n2c2e2r2n2i2n2g2 2r2e2p2o2r2t2.2 2t2h2a2n2k2 2a2d2v2i2c2e2 2a2n2d2 2W2e2 2u2s2 2c2e2n2t2r2e2,2 2w2h2o2 2 2a2m2p2l2e2 2f2o2r2 2 2t2h2e2 2a2l2s2o2 2o2u2r2 2c2o -2 2J2a2i2p2u2r2,2

2c2o2l2l2e2a2g2u2e2s2 2f2o2r2 2t2h2e2i2r2 o2p2e2r2a2t2i2o2n2 2t2o2 2i2m2p2r2o2v2e2 2t2h2e2 2s2t2r2u2c2t2u2r2e2 2o2f2 2t2h2e2 2r2e2p2o2r2t2.2

22

PREFACE
3 3
T3h3e3 3o3b3j3e3c3t3i3v3e3 3o3f3 3o3u3r3 3p3r3a3c3t3i3c3a3l3 3t3ra3i3n3i3n3g3 3i3s3 3t3o3 3l3e3a3r3n3 3s3o3m3e3t3h3i3n3g3 3a3b3o3u3t3 3i3n3d3u3s3t3r3i3e3s3,3 3p3r3a3c3t3i3c3a3l3l3y3 3a3n3d3 3t3o3 3b3e3 f3a3m3i3l3i3a3r3 3w3i3t3h3 3t3h3e3 3w3o3r3k3i3n3g3 3s3t3y3l3e3 3o3f3 3a3 3t3e3c3h3n3i3c3a3l3 3a3d3j3u3s3t3 3a3c3c3o3r3d3i3n3g3 3o3f3 3t3o3 3w3o3r3k3e3r3 3t3o3 3s3i3m3p3l3y3 3i3n3d3u3s3t3r3y3 3s3y3l3l3a3b3u3s3

3e3n3v3i3r3o3n3m3e3n3t3.33 A3s3 3a3 3p3a3r3t3 3a3c3a3d3e3m3i3c3 3i3n3 3o3f3 3f3o3u3r3 3y3e3a3r3s3 3 d3e3g3r3e3e3 3c3o3u3r3s3e3 3a3n3d3 3E3l3e3c3t3r3o3n3i3c3s3 33e3v3e3r3y3 3p3r3a3c3t3i3c3a3l3 345 3d3a3y3s3.3 3o3f3 3C3o3m3m3u3n3i3c3a3t3i3o3n3

E3n3g3i3n3e3e3r3i3n3g3,3 3u3n3d3e3r3g3o3 3t3r3a3i3n3i3n3g3 3W3e3 3a3r3e3 3a3 3f3o3r3

3s3t3u3d3e3n3t3 3i3s3 3r3e3q3u3i3r3e3d3 3t3o3

3s3t3u3d3e3n3t3

3t3h3i3r3d3 3y3e3a3r3 3E3l3e3c3t3r3o3n3i3c3s3 3a3n3d3 3C3o3m3m3u3n3i3c3a3t3i3o3n3 3a3n3d3 3t3h3i3s3 3r3e3p3o3r3t3 3i3s3 3w3r3i3t3t3e3n3 3o3n3 3t3h3e3 3b3a3s3i3s3 3o3f3 3p3r3a3c3t3i3c3a3l3 3k3n3o3w3l3e3d3g3e3

4a4c4q4u4i4r4e4d4 4b4y4 4o4u4r4 4b4a4t4c4h4 4o4f4 454 4s4t4u4d4e4n4t4s4 4d4u4r4i4n4g4 4t4h4e4 p4e4r4i4o4d4 4o4f4 4p4r4a4c4t4i4c4a4l4 4t4r4a4i4n4i4n4g4 4t4a4k4e4n4 4a4t4 4P4L4C4C4 4S4e4c4t4i4o4n4 4444444 T4h4i4s4 4r4e4l4a4t4i4o4n4 g4e4n4e4r4a4l4 4p4r4i4n4c4i4p4l4e4.4 4 4 4 4 4F4o4r4 4a4n4 4e4a4s4y4 4w4a4y4 4t4o4 4u4n4d4e4r4s4t4a4n4d4 w4o4r4k4i4n4g4,4 4t4o4p4i4c4 4o4f4 4P4L4C4C4 4a4 4i4s4 4t4h4e4 4P4L4C4C4 4s4e4p4a4r4a4t4e4 4P4r4i4n4c4i4p4l4e4 4a4d4d4e4d4 4i4n4 4r4e4p4o4r4t4 4a4n4d4 4d4e4a4l4s4 4t4h4e4i4r 4w4i4t4h4 4e4q4u4i4p4m4e4n4t4s4 4t4h4e4i4r4 4o4p4e4r4a4t4i4n4g4 4o4f4 4R4V4P4N4L4,4 4H4e4e4r4a4p4u4r4a4,4 4J4a4i4p4ur.4 4

4n4a4m4e4d4

4t4h4e4 4r4e4p4o4r4t4.4 4 4 W4e4 4f4o4r4 4t4h4e4 4h4o4p4e4 4a4 4t4h4a4t4 4t4o4 4t4h4i4s4 4g4e4t4

4r4e4p4o4r4t4 4w4i4l4l4 4b4e4 4u4s4e4f4u4l4l4 4p4e4r4s4o4n4 4t4h4e4 4b4a4s4i4c4 4k4n4o4w4l4e4d4g4e4 4P4L4C4C4

4a4b4o4u4t4

4p4h4e4n4o4m4e4n4o4n4.

INTRODUCTION OF R.S.E.B.
5
Rajasthan State Electricity Board started working from Ist July 1957. T5h5i5s5 5i5s5 5t5h5e5 5t5o5 5b5o5d5y5 5o5f5 5b5i5g5 5o5r5g5a5n5i5z5a5t5i5o5n5 5a5n5d5 5i5s5 5f5u5n5c5t5i5o5n5 5u5n5d5e5r5 5o5f5 5l5i5m5i5t5e5d5 5T5h5e5 5n5o5t5 5a5n5d5 5o5f5 5d5o5e5s5 5a5r5t5i5c5l5e5 5p5r5o5v5i5s5i5o5n5 5p5u5b5l5i5c5 5c5o5m5p5a5n5i5e5s5.5 5b5o5a55r5d5 5h5a5v5e5

5E5l5e5c5t5r5i5c5i5t5y5 5A5c5t5,5 5l5i5k5e5

5m5e5m5o5r5a5n5d5u5m5 5a5s5s5o5c5i5a5t5i5o5n5.5

5 5 5 5 5 5 5 5 5 55I5n5 5o5r5d5e5r5 5t5o5 5c5a5r5r5y5 5f5u5n5c5t5i5o5n5,5 5r5u5l5e5s5 5o5u5t5 5i5t5 5i5t5s5 5h5a5s5 5a5n5d5

6r6e6g6u6l6a6t6i6o6n6s6 6a6n6d6 6h6a6s6 6m6a6d6e6 6n6e6c6e6s6s6a6s6r6y6 6a6d6m6i6n6i6s6t6r6a6t6i6v6e6 6a6r6r6a6n6g6e6m6e6n6t6.6 6t6h6e6 6six6 6&6 6a6c6t6i6n6g6 6o6f6 6A6f6t6e6r6 6R6S6E6B6 6o6t6h6e6r6

6d6i6m6e6n6s6i6o6n6 6a6b6o6u6t6 6t6o6 6360606 6w6e6r6e6 6i6t6s6

6a6l6o6n6g6w6i6t6h6 66646 6o6f6f6i6c6e6s6 6e6m6p6l6o6y6e6e6s6 6t6r6a6n6s6f6e6r6r6e6d6 6G6o6v6e6r6n6m6e6n6t6.6 66 6 6 6 6 6 6 6T6h6e6 6a6i6m6 6o6f6 6R6S6E6B6 6i6s6 6t6o6 6s6u6p6p6l6y6 6t6o6 6m6o6s6t6 6w6a6y6.6 6n6o6 6o6f6 6o6r6 6E6l6e6c6t6r6i6c6i6t6y6 6e6n6t6i6r6e6 6S6t6a6t6e6 6T6h6e6r6e6 6s6t6a6k6i6n6g6 6i6n6 6t6h6e6 6i6s6

6c6o6n6t6r6o6l6 6b6y6 6t6h6e6 6S6t6a6t6e6

6R6a6j6a6s6t6h6a6n6

6e6c6o6n6o6m6i6c6a6l6 6p6o6s6s6i6b6i6l6i6t6y6

7e7l7e7c7t7r7i7c7i7t7y7 7t7a7r7g7e7t7 7t7o7 7a7s7 7t7h7e7 7p7r7o7f7i7t7 7l7o7s7s7e7s7.7 7o7f7

7s7o7

7t7h7e7 7i7s7 7t7h7e7 7T7h7e7

7b7o7a7r7d7

7d7i7s7t7r7i7b7u7t7e7 7p7o7s7s7i7b7l7e7.7 7h7a7s7 7t7o7 7b7u7s7i7n7e7s7s7

7e7n7e7r7g7y7 7i7n7 7n7e7w7 7a7r7e7a7 7b7o7a7r7d7 7c7a7r7r7y7 7o7n7

7w7i7t7h7o7u7t7

7 7 7 7 7 7 7 7 7 7 77A7f7t7e7r7 7a7n7 7e7f7f7i7c7i7e7n7t7 7a7s7 7f7r7o7m7 7y7e7a7r7s7 7f7a7r7 7s7t7a7r7t7i7n7g7,7 7l7a7s7t7 7m7a7n7y7 7n7o7t7 7S7o7 7o7f7 7h7a7s7 7i7s7

7R7S7E7B7

7e7a7r7n7i7n7g7 7f7o7r7

7p7r7o7f7i7t7s7.7

b7e7t7t7e7r7m7e7n7t7,7

7p7r7i7v7a7t7i7z7a7t7i7o7n7 7r7e7c7e7n7t7l7y7.7 7I7t7

7R7S7E7B7 7h7a7s7 7b7e7e7n7 7d7o7n7e7 7b7e7e7n7 7d7i7v7i7d7e7d7 7i7n7 7f7i7v7e7 7m7a7i7n7 7p7a7r7t7s7,7 7t7h7e7y7 7a7re7 7:7 7

(818)8

8E8l8e8c8t8r8i8c8i8t8y8 8:8 8 8

8P8r8o8d8u8c8t8i8o8n8 8A8u8t8h8o8r8i8t8y8 8 8 8 8 8 8 8R8R8V8U8N8L8 8 8 88(828)8 8E8l8e8c8t8r8i8c8i8t8y8 8 8:8 8 8 8 8T8r8a8n8s8m8i8s8s8i8o8n8 8A8u8t8h8o8r8i8t8y8 R8R8V8P8N8L8 8 88(838)8 8D8i8s8t8r8i8b8u8t8i8o8n8 8A8u8t8h8o8r8i8t8y8 8f8o8r8 8J8a8i8p8u8r8 8 8 8 8 8 8 8:8 8 8 J8V8V8N8L8 8 8 (848)8 8D8i8s8t8r8i8b8u8t8i8o8n8 8f8o8r8 8A8u8t8h8o8r8i8t8y8 8 8 8(858)8

8J8o8d8h8p8u8r8 8 8 8:8 8 8 J8D8V8V8N8L8 8D8i8s8t8r8i8b8u8t8i8o8n8 8A8u8t8h8o8r8i8t8y8 8f8o8r8 8A8j8m8e8r8 8 8 8 8 8 8 8:8 8 8 A8V8V8N8L8 88888

CONTENTS
9

TOPICS :
99 o I9N9T9R9O9D9U9C9T9I9O9N9 9O9F9 9P9L9C9C9 o G9E9N9E9R9A9L9 9D9S9C9R9I9P9T9I9O9N9 9O9F9 9P9L9C9C9 9E9Q9U9I9P9M9E9N9T9S9 9(9E9T9I9)9 o A9P9P9L9I9C9A9T9I9O9N9S9 9 9O9F9 9 9E9T9I9 9 9E9Q9U9I9P9M9E9N9T9S9 o C9O9N9S9T9R9U9C9T9I9O9N9

o M10O10D10E10 10O10F10 10O10P10E10R10A10T10I10O10N 10 10 o G10E10N10E10R10A10L10 10M10O10D10U10L10A10T10I1 0O10N10 10P10R10I10N10C10I10P10A10L1 0 o S10P10E10C10I10F10I10C10A10T 10I10O10N10S10 o P10R10E10C10A10U10T10I10O1 0N10S10 10&10 10M10A10I10N10T10A10N10A10N 10C10E10 10 o B10A10S10I10C10 10P10R10I10N10C10I10P10L10E1 0 10O10F10 10P10L10C10C10 o B10A10T10T10E10R10Y10 10C10H10A10R10G10E10R10 o A10D10V10A10N10T10A10G10E1 0 10A10N10D10 10D10I10S10A10D10V10A10N10A 10T10G10E10 10

111.

PLCC

INTRODUCTION

OF

(11P11O11W11E11R11 11L11I11N11E11 11C11A11R11R11I11E11R11 11C11O11M11M11U11N11I11C11A11T1 1I11O11N11)11 11 1111 A11s11


11e11l11e11c11t11r11o11n11i11c11s11 11p11l11a11y11 11r11o11t11e11 11a11 1111v11i11t11a11l11 11t11h11e11 11i11n11

11i11n11d11u11s11t11r11i11a11l11 11g11r11o11w11t11h11,11 11c11o11m11m11u11n11i11c11a11t11i11o11n11 11 11a11n11y11 11s11y11s11t11e11m11.11 11C11o11m11m11u11n11i11c11a11t11i11o11n11 11b11e11t11w11e11e11n11 11v11a11r11i11o11u11s11 11g11e11n11e11r11a11t11i11n11g11 11a11n11d11 11r11e11c11e11i11v11i11n11g11 11i11s11 11s11t11a11t11i11o11n11s11 11i11s11 11a11l11s11o11 11o11f11 11p11o11w11e11r11 11b11a11c11k11b11o11n11e11

12v12e12r12y12 12e12s12s12e12n12t12i12a12l12 12f12o12r12 12p12o12w12e12r12 12T12h12i12s12 12o12f12 2 12p12r12o12p12e12r12 12o12f12 12s12y12s12t12e12m12.12 12m12o12r12e12 12l12a12r12g12e12 12o12p12e12r12a12t12i12o12n12 12i12s12 12a12

12s12o12 12i12n12 12t12h12e12 12c12a12s12e12 12i12n12t12e12r12c12o12n12n12e12c12t12e12d1 12s12y12s12t12e12m12s12,12 12a12 12l12o12a12d12 12w12h12e12r12e12 12c12o12n12t12r12o12l12 1212d12i12s12p12a12t12c12h12 12s12t12a12t12i12o12n12 12h12a12s12 12t12o12 c12o12-12o12r12d12i12n12a12t12e12 12t12h12e12 12w12o12r12k12i12n12g12 12o12f12 12v12a12r12i12o12u12s12 12t12o12 12t12h12e12 12t12h12e12 12s12e12e12 12u12n12i12t12s12 12t12h12a12t12 12i12s12 12i12n12

12s12y12s12t12e12m12

12m12a12i12n12t12a12i12n12e12d12 12w12o12r12k12i12n12g12 12c12o12n12d12i12t12i12o12n12,12 12p12o12w12e12r12 12c12a12r12r12i12e12r12

12o12p12t12i12m12u12m12

12l12i12n12e12

12c12o12m12m12u12n12i12c12a12t12i12o12n12 12h12a12s12 12b12e12e12n12

13f13o13u13n13d13 13t13h13e13 13a13n13d13

13t13o13

13b13e13

13m13o13s13t13 13r13e13l13i13a13b13l13e13 13o13f13 13m13e13d13i13u13m13 13l13o13n13g1313i13n13 13a13

13e13c13o13n13o13m13i13c13a13l13 13m13e13t13h13o13d13 13f13o13r13 13a13n13d13 13d13i13s13t13a13n13c13e13 13p13o13w13e13r13 13n13e13t13w13o13r13k13.13 13t13h13e13 13F13o13r13 13s13h13o13r13t13 13d13i13s13t13a13n13c13e13 13o13r13d13i13n13a13r13y13 13i13s13 13O13p13e13n13 13o13r13 13a13n13d13 13i13n13 13t13e13l13e13p13h13o13n13e13 13s13y13s13t13e13m13 13u13s13i13n13g13.13 13w13i13r13e13s13 13c13a13b13l13e13s13 13s13o13m13e13 13V13H13F13 13a13r13e13 13b13e13 13t13h13e13y13 13d13o13

13c13o13m13m13u13n13i13c13a13t13i13o13n13

13u13n13d13e13r13g13r13o13u13n13d13 13c13a13s13e13s13 13w13i13r13e13l13e13s13s13 13f13o13u13n13d13 13t13o13 13a13s13

13c13o13m13m13u13n13i13c13a13t13i13o13n13 13m13o13r13e13 13n13o13t13

13e13c13o13n13o13m13i13c13a13l13

14i14n14v14o14l14v14e14 14u14s14e14 14o14f14 14h14i14g14h14

14t14h14e14 14c14o14s14t14l14y14

14v14o14l14t14a14g14e14

14c14o14u14p14l14i14n14g14 14e14q14u14i14p14m14e14n14t14.14 14 14 14 14 14 14 14 14 14 14 14 14 14I14n14 14t14h14e14 14e14a14r14l14y14 14d14a14y14s14 14o14f14 14a14n14d14 14u14t14i14l14i14z14a14t14i14o14n14 14e14l14e14c14t14r14i14c14 14p14o14w14e14r14,14 14g14e14n14e14r14a14t14i14n14g14 14s14t14a14t14i14o14n14 14i14n14v14a14r14i14a14b14l14y14 14t14h14e14r14m14a14l14 14w14a14s14 14a14 14o14n14e14 14t14h14e14 14o14f14 14g14e14n14e14r14a14t14i14o14n14

14l14o14c14a14t14e14d14 14w14i14t14h14i14n14 14o14r14 14v14e14r14y14 14n14e14a14r14 14a14 14c14i14t14y14 14a14c14t14i14n14g14 14t14h14e14 14t14h14e14 14h14a14v14i14n14g14 14a14s14 14t14h14e14 14o14f14 14i14n14d14u14s14t14r14i14e14s14 14c14o14n14s14u14m14e14r14s14 14H14o14w14e14v14e14r14,14

14p14o14w14e14r14.14 14w14i14t14h14

15i15n15t15r15o15d15u15c15t15i15o15n15 15o15f15 15h15y15d15r15o15e15l15e15c15t15r15i15c15 15g15e15n15e15r15a15t15i15n15g15 15s15t15a15t15i15o15n15s15 15e15x15t15e15n15s15i15o15n15 15e15l15e15c15t15r15i15c15i15t15y15 15s15u15b15 15t15h15e15 15u15r15b15a15n15 15r15u15r15a15l15 15a15n15d15 15o15f15 15t15o15 15a15n15d15

15a15r15e15a15s15,15 15p15i15c15t15u15r15e15 15T15h15e15

15r15a15d15i15c15a15l15l15y15 15c15h15a15n15g15e15d15.15 15v15a15r15i15o15u15s15 15g15e15n15e15r15a15t15i15n15g15 15s15t15a15t15i15o15n15s15,15 15l15o15c15a15t15e15d15 15g15r15e15a15s15t15 15d15i15s15t15a15n15c15e15s15 15a15m15o15n15g15 15t15h15e15m15s15e15l15v15e15s15 15c15o15u15l15d15 15l15o15n15g15e15r15 15s15e15l15f15 15d15i15s15t15a15n15c15e15s15 15a15m15o15n15g15 15i15s15o15l15a15t15e15d15 15n15o15 15r15e15m15a15i15n15 15a15n15d15 15-15 15 15a15t15

16t16h16e16m16s16e16l16v16e16s16 16c16o16u16l16d16 16l16o16n16g16e16r16 16s16e16l16f16 16s16u16f16f16i16c16i16e16n16t16 16e16n16t16i16t16l16e16s16.16 16t16h16e16 16h16a16n16d16 16s16o16o16n16 6 16,16 16O16n16 16t16h16e16y16 16o16t16h16e16r16 16b16e16c16a16m16e16 16r16i16s16e16 16i16s16 16t16h16e16 16i16s16o16l16a16t16e16d16 16n16o16 16r16e16m16a16i16n16 16a16n16d16 16-16

16i16n16t16e16r16c16o16n16n16e16c16t16e16d1 16g16i16v16i16n16g16 16w16h16a16t16 16a16s16 16t16o16

16k16n16o16w16n16 16p16o16w16e16r16 16T16h16i16s16

16g16r16i16d16.16

16n16e16c16e16s16s16i16t16a16t16e16d16 16a16n16 16e16c16o16n16o16m16i16c16a16l16 16a16n16d16 16d16e16p16e16n16d16a16b16l16e16 16m16e16a16n16s16 16t16i16o16n16,16 16o16f16 16b16e16t16w16e16e16n16 16i16n16t16e16r16c16o16m16m16u16n16i16c16a 16v16a16r16i16o16u16s16 16g16e16n16e16r16a16t16i16n16g16 16s16t16a16t16i16o16n16s16,16 16s16u16b16-

17s17t17a17t17i17o17n17s17 17A17m17o17n17g17 17t17h17a17t17 17m17e17a17n17s17 17 17a17r17e17

17a17n17d17 17m17a17n17y17 17s17u17c17h17 17o17f17

17c17o17n17t17r17o17l17 17r17o17o17m17s17.17 17f17a17c17i17l17i17t17i17e17s17

17c17o17m17m17u17n17i17c17a17t17i17o17n17s 17e17x17p17e17c17t17e17d17 17p17r17o17v17i17d17e17,17 17f17o17l17l17o17w17i17n17g17 17t17h17e17 17t17o17 17t17h17e17 17a17r17e17 17i17m17p17o17r17t17a17n17t17 17o17n17e17s17:171717 17 117.17 17 S17p17e17e17c17h17 17T17r17a17n17s17m17i17s17s17i17o17n17 17 217.17 17 R17e17m17o17t17e17 17c17o17n17t17r17o17l17 17a17n17d17 17T17e17l17e17m17e17t17e17r17i17n17g17 17 317.17 17 P17o17w17e17r17 17l17i17n17e17 17p17r17o17t17e17c17t17i17o17n17 17 417.17 D17i17r17e17c17t17 17b17r17e17a17k17e17r17 17t17r17i17p17p17i17n17g17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17M17a17n17y17 17d17i17f17f17e17r17e17n17t17

18m18e18t18h18o18d18 18p18o18s18s18i18b18l18e18 18s18e18n18d18i18n18g18 18s18p18e18e18c18h18 18o18t18h18e18r18 18f18r18o18m18 18p18o18i18n18t18 8 18p18o18w18e18r18

18a18r18e18 18f18o18r18 18o18r18

18s18i18g18n18a18l18s18 18t18o18 18a18n18 18 18i18n18

18p18o18i18n18t18

18i18n18t18e18r18c18o18n18n18e18c18t18e18d1 18g18r18i18d18.18 S18o18m18e18 18a18r18e18 18b18e18t18w18e18e18n18:18 18 118.18 18P18u18b18l18i18c18 18T18e18l18e18p18h18o18n18e18 18N18e18t18w18o18r18k18 18 218.18 18D18i18r18e18c18t18 18L18i18n18e18s18 18 318.18 18R18a18d18i18o18 18C18i18r18c18u18i18t18s18 18418.1818 P18o18w18e18r18 18L18i18n18e18 18C18a18r18r18i18e18r18 18C18o18m18m18u18n18i18c18a18t18i18o18n18 18(18P18L18C18C18)18 1818 18 18 18 18 18 18 18 18I18n18 18P18L18C18C18 18h18i18g18h18e18r18 18t18h18e18 18o18f18 18t18h18e18m18 18a18s18

19m19e19c19h19a19n19i19c19a19l19 19s19t19r19e19n19g19t19h19 19i19n19s19u19l19a19t19i19o19n19 19l19e19v19e19l19 19o19f19 19h19i19g19h19 19v19o19l19t19a19g19e19 19v19o19l19t19a19g19e19 19l19i19n19e19s19 19i19n19 19p19o19w19e19r19 19r19e19s19u19l19t19s19 19o19f19 19 19a19n19d19

19i19n19c19r19e19a19s19e19d19

19r19e19l19i19a19b19i19l19i19t19y19 19a19n19d19 19o19v19e19r19 19i19d19e19a19 19o19f19 19p19o19w19e19r19

19c19o19m19m19u19n19i19c19a19t19i19o19n19 a19t19t19e19n19u19a19t19i19o19n19 19l19o19n19g19 19u19s19i19n19g19 1919d19i19s19t19a19n19c19e19.19 19T19h19e19 19p19o19w19e19r19 19l19i19n19e19s19 19a19s19 19t19r19a19n19s19m19i19s19s19i19o19n19 19l19i19n19e19s19 19p19u19r19p19o19s19e19 19t19h19e19 19t19h19o19u19g19h19t19 19a19b19o19u19t19 19b19e19g19i19n19n19i19n19g19 19t19h19e19 19a19n19d19 19f19o19r19 19w19a19s19 19f19i19r19s19t19 19o19f19 19a19t19 19o19f19 19t19h19e19 19t19h19e19 19c19e19n19t19u19r19y19 19c19o19m19m19u19n19i19c19a19t19i19o19n19

20p20r20a20t20i20c20a20l20 20a20p20p20l20i20c20a20t20i20o20n20s20 20w20e20r20e20 20m20a20d20e20 20i20n20 20 s20e20v20e20r20a20l20 20c20o20u20n20t20r20i20e20s20 20f20r20o20m20 20120920220020 20 20o20n20w20a20r20d20s20.20 20s20y20s20t20e20m20s20 20n20o20w20 20T20h20e20s20e20

h20a20v20e20

20d20e20v20e20l20o20p20e20d20 20i20n20t20o20 20e20x20t20r20e20m20e20l20y20 20s20o20p20h20i20s20t20i20c20a20t20e20d20 20a20n20d20 20c20o20m20p20l20i20c20a20t20e20d20 20P20L20C20C20 20a20n20d20 20u20s20e20d20 m20o20d20e20r20n20 20s20y20s20t20e20m20s20 20w20i20d20e20l20y20 20i20n20 20a20l20l20 20 20p20o20w20e20r20

20s20y20s20t20e20m20s20.20 2020 20 20 20 20W20h20e20n20 20t20h20e20 20d20i20s20t20q20n20c20e20s20 20i20n20v20o20l20v20e20d20 20l20a20r20g20e20,20 20n20o20t20 20e20c20o20n20o20m20i20c20a20l20 20p20r20o20v20i20d20e20 20t20o20 20i20t20 20a20r20e20 20w20i20l20l20

21s21e21p21a21r21a21t21e21 21w21i21r21e21s21 21p21u21r21p21o21s21e21.21 21l21a21r21g21e21 21d21i21s21t21a21n21c21e21s21,21 21t21h21e21 21p21o21w21e21r21 21l21i21n21e21 21t21h21e21m21s21e21l21v21e21s21 21p21r21o21v21i21d21e21 21a21 21v21e21r21y21 21g21o21o21d21 21o21f21 21t21r21a21n21s21m21i21s21s21i21o21n21 21o21f21 21i21n21f21o21r21m21a21t21i21o21n21.21 21S21o21 21t21h21e21 21P21O21W21E21R21 21L21I21N21E21 1 21C21A21R21R21I21E21R21 21i21s21 21m21e21d21i21u21m21 21f21o21r21 21I21n21 21 c21o21m21m21u21n21i21c21a21t21i21o21n21 21f21a21c21t21,21 21f21o21r21 21s21u21c21h21

21C21O21M21M21U21N21I21C21A21T21I21O21N2 21(21P21L21C21C21)21 21m21o21s21t21l21y21 21u21s21e21d21.21

222.22 22GENERAL DESCRIPTION


OF PLCC EQUIPMENTS (ETI) 22
T22h22e22 22m22u22l22t22i22p22u22r22p22o22s22e22 22e22q22u22i22p22m22e22n22t22t22y22p22e22 22E22T22I22 22E22T22I22 2222222122 2222a22n22d22 222222 22 22a22n22d22

22t22r22a22n22s22m22i22t22 2 22s22p22e22e22c22h22

22s22i22m22u22l22t22a22n22e22o22u22s22l22y2 multiplexed Tele-operation signals in SSB technique over high voltage lines 22cables.22 The transmitted intelligence is suitable for : Telephony Tele operations
22

- Telemetry

- Remote Control Remote

analogue Metering - Tele printer

Tele protection signals for

High voltage power

Equipments - High voltage power lines

While

the

telephone

and

Tele

operation

facilities are typically used for economics control and supervision of energy network. The Teleprotection channels are kept continuously on hot stand by and are used only in rare cases of a power fault for the planning of new network and the extension of existing equipment, the ETI series offer a complete range of variation made possible by a combination of tiers and plug in PCB.

The equipment is built of 3 main parts.


(1) THE LOW FREQUENCY MULTIPLEX SECTION With the speech and upto five Tele-operation channels, together with an optional speech commander. (2) THE CARRIER FREQUENCY SECTION

Designed for single channels duplex or double channel duplex working in a 4 KHz or 2.5 KHz raster. The carrier frequency range is from 24 KHz to 500KHz and with transmitted power of 20 watts or a variant 100 watts. (3) POWER SUPPLY UNIT Which can be operated from 110/220v, 50/60Hz or a separate battery or charges unit of 24v, 48v or 60v. The techniques of simple side band modulation with double conversion provides frequency equalization, automatic gain control and frequency synchronization and ensures perfect reproduction of the transmitted intelligence, proper distribution of the transmitting power in normal operation and for the boosting of protection trip signals enables optimum distance to be converted. The front panel arrangement of operational and servicing elements such as switches, potentiometer, lambs etc. allows the non specialist to carry out maintenance of the equipment with the aid of a built in test oscillator and handy audio test

instrument, a quick test and level adjustment can be carried out so that with the local transmitter and receiver connection back to back a complete stimulation of the PLC link is establish.

3.

APPLICATION

OF

ETI

EQUIPMENTS

The power line carrier (PLC) equipments and the associated protection signaling units are required to be situated in the area of the high voltage apparatus, thereby facilitating connections equipment. usually to In the PLCs line the coupling telephone in a contrast, conveniently

exchange and Tele - control equipments are more situated control building some distance from the high voltage equipment. According to the type of installation

various arrangements are possible. These are briefly explained in the following : (1) PLC EQUIPMENT AND AF MULTIPLEXER AS A COMBINED UNIT The majority of electricity authorities

adopt this arrangement since the complete PLC is contained in a single cabinet or rack and is easily placed in a suitable telecommunication room. From this room the

individual connections are taken directly to the associated HV protection circuits and via an appropriate distribution frame, connection to the telephone and Tele control equipments. REMOTE AT MULTIPLEXER CONNECTED BY A LONG CABLE The case here is that the high voltage lines are terminated in the sub- stations as the edge of the city while the associated control building or load dispatching office is situated some KM. away in the center of the city. A long 4-wire interconnection cable (Zo=600 chms) connects the parent PLC equipment with the remote multiplexer.

(2)

BRIEF CHARACTERISTICS :
Cable Attenuation maximum : Planning value 26 dB : Permitted 32 dB

Frequency band

: 300 to 3700 HZ : 300 to 3400 HZ

Optional
-

Adjustable attenuation equalizes for loaded lines, located at both ends.

The Facilities Available are


-

4 wire duplex speech, from remote location. Duplex Tele-operational channels, from remote Location. Duplex pilot/signaling channel, from remote location. Possibilities connections of Tele-operation signals from PLC for input and output

equipments.
-

Optional parent PLC

Service

telephone

from

equipment to opposite PLC station.

(3) REMOTE

AT

MULTIPIXER

CONNECTIED BY A SHORT LINE :

When the distance between the PLC and remote multiplexer is relatively short, i.e. up to about 3 Kms. and in connected by a 4 wire pilot cable (Zo=600 ohm). Due to the lower cable attenuation the line amplifier unnecessary terminated with and on line the the equalizer cable will is be

Tele-operation

input/output circuit (03EA/S respectively).

BRIEF CHARACTERISTICS :
Remote AF Multiplexer Cable Terminal Type KTI :
-

Cable attenuation :

Permitted < / = 7 dB with a cable distortion loss of, / = 2 dB in the frequency band 3003700 Hz. This is equivalent to a distance of 3 Km. Maximum with an unloaded 600 ohms cable. - Frequency band : 300 to 3700 Hz

: optional

300 to 3400 Hz

(4) PROTECTION PLC

SIGNALING

OVER AF

EQUIPMENTS

WHERE

MULTIPLEXER IS REMOTE
In addition to the remote AF multiplexer, Teleprotection signaling equipment can be coupled directly to the PLC equipment. Such an arrangement must of course be reliable and safe so that even with a possible favour of the remote multiplexer or connection cable the protection equipment continues to work perfectly. This means the PLC equipment has to function fully independently of the transmit signals from the remote multiplexer. This will be the case when a pilot signal P-1 is used from AF multiplexer to PLC equipment. A further pilot tone P-2 of the same frequency is transferred from the PLC equipment to the opposite PLC station. The signaling impulses carried by the pilot tones are looped from P-1 to p2 in DC from at the PLC equipment. The pilot tone P3 from the opposite station is received directly at the remote multiplexer.

(5) REPEATER
When several transmission section are joined together to form a long transmission path, the ETI equipment the carrier can serve be as repeater at the intermediate stations. In each transmission section signals at each individually regulated, will be synchronized and equalized and the transmitted intelligence repeater station demodulated and passed on to the next section. The method allow the insertion of Tele-operation signals at the repeater station provided, of course, free space in the 4 KHz band is available. The transit filter E3ET prevents the tone P-1 entering the neighbouring section.

4. CONSTRUCTION
The PLC equipments, built in MODULE

ELECTRONIC SYSTEM (MES) is especially compact. For all equipment, the single channel equipment ETI 21 can be accommodated in 3 tiers, the double channel equipment ETI-22 in 4 and the double

channel, 40W equipment ETI-22(s) in 6 tiers. Further more, a mechanical coding system ensures all plug in units can only be inserted in their correct position.

The ABB free standing cabinet type E-35 can for example, accommodate two single channel PLC equipments with the associated protection signaling units and an electronic trunk-dialing unit for eight (8) telephone subscribers.

A nameplate on the front door of the carrier cabinet carriers relevant information of the PLC link, such as equipment type, station name, carrier frequency etc.

To

enable

printed any

circuit

boards

to

be

exchanged

without

re-adjustment

being

required, there is on the rear side a strapping field for the initial programming of the system variant

and also for the adjustment of the PLC equalizer. Further of course, all terminal strips and connectors are easily accessible on the rear side.

5. MODE OF OPERATION

The PLC equipment is suitable for connecting to a telephone exchange and further more, a 4 wire remote/emergency call station can be created by operating it in parallel with the built in service telephone equipment. The transmission facilities for Tele operation working (telemetry), tele-control & protection signals) use separate input and separate output circuit according to their classifications. When 4 the kHz speech equipment and carries

simultaneously

Tele-operation

signals, they are transmitted in frequency multiplex and accordingly the audio frequency band is divided into two parts. The lower part of the band is used for speech and the upper part for Tele-operation signals.

(1)TELEPHONE FACILITIES
The associated automatic telephone exchange (PAX) is suitable for a network with a limited number of subscribers. Between the PAX and P:LC channels, controls circuit give out signals for the setting up, dialing and later releasing a telephone connection and the switching criteria between PAX and PLC equipment is performed by potential free

contracts. The PAX sending contract will, via the PLC signaling channel close an output contract in the PLC received and the distant end of the link. The dialing impulses are transmitted over the combined pilot and signaling channel which has a maximum transmitted speech of 50 baud. It should be noted that because of the various possibilities of telephone switching, more functions are built into the speech circuit than are actually needed by some PAX types.

(2)COMPRESSOR
(COMPANDER)

AND

EXPANDER

The inclusion of a compander improves the carrier signal equality of the speech and in normally reserved for use over lines with high noise. The improvement in the signals to noise ratios is approximately 12 dB. When the speech is carried over several PLC links in series, it is recommended that only one compander be used, the compressor being installed at the sending end of the line and the expander in the farthest receiving station.

The ETI series is fully wired for a later inclusion of the compander equipment when required.

(4) WIRE HAND/EMERGENCY CALL


The equipment, especially in the extension phases can, without additional units in the HF equipment is equipped throughout with hand/emergency call telephone. This telephone with DC bell can be connected directly via a 6 wire extension cable. The calling of the opposite station is accomplished lifting the handset and pressing the calling button in the opposite station after a two second delay the bell rings as long as the push button is pressed. By lifting the handset the called station, the bell is automatically disconnected. After the Call is completed both handsets must be replaced. The calling tone is fixed at 1 kHz in the speech band.

(4) SERVICE TELEPHONE


With the help of the built in speech facilities, service calls can be carried out in 4 wire from the

front panel associated equipment, including the DC belt and the plug in 4 wire handset are supplied.

(5) TELE-OPERATION SIGNALS


Individual and adjustable Tele operation inputs are the essential requirement of the PLC equipment for the interfacing with the various manufactures low frequency transmission channels and for PLC through switching/transit working. The 5 input and 3 output possibilities, each individually adjustable and fully the de-coupled necessary for together flexibility. choosing with A the separated field is of terminals. For protection signaling equipment, offer strapping various provided operation. the modes

(6) SIGNAL BOOSTING


The equipment offer the possibility of signal boosting of one or two especially important signals, for example protection signals for high voltage lines

or

equipment.

This

is

advantageous

during During as

unfavourable transmission conditions caused by perhaps fault condition on the power line. the speech are disconnected boosting, the less importing channels, for example (known disconnected channels) whereas other channel can be allowed to work normally (non-disconnectable channels). The period of disconnection by which more power is switched to the boosting channel, occurs for an extremely short period of time and id typically of the order of approximately 100 milliseconds. The arrangement of speech and Tele operation channels falls into one of three categories and is achieved by connecting to one of the following input : - The disconnectable bus (D) - The non-disconnectable bus (ND) - Signal boosting bus (B) with a predetermined amplification.

6.

GENERAL

MODULATION

PRINCIPLE
The carrier frequency techniques with single side band transmission is, due to the high quality band filters and converters, free from disturbing by products and spurious signals. Optimum selectivity is achieved only in the intermediate frequency (IF) stages by the filtering are out of the required side band. Here, therefore lines the task of the carrier frequency section to move the AF intelligence from its low frequency position of 300 to 300 HZ (respectively 300 to 2200 and HZ) first to the IF stage and then into carrier frequency (HF) band.

The carrier frequencies are spaced on a 4 KHZ (respectively 2.5 KHZ) raster. This arrangement required the use of two conversions in each of transmit and receive direction so that the intermediate frequency is fixed at 16 KHZ and the carrier channel has a variable frequency which can be programmed to provided a large number of HF carriers. In the single channel equipment and channel 1 of the twin channel equipment, the lower side band is used throughout all frequency conversions. The useful band is inverted in the IF stage and the HF stage placed in the erect position. Contrary to this channel 2 of the twin channel equipment is erect in the IF stage and inverted in the HF stage.

7. SPECIFICATION OF PLCC
(1) GENERAL
- Carrier frequency range - Gross channel bandwidth - Useful AF band KHZ : 40 to 512 KHZ : 4 KHZ : 300 to 3,700

(2) IN

PERMISSIBLE ROOM TEMPERATURE CLIMATES


Data guaranteed within reliable : 0 to 45

degree Centigrade
-

Operation guarantee degree

: 20 to 45

Centigrade Frequency stability of R.F. oscillator : 5 HZ

(3) TRANSMITTER
R.F. transmitting power : Peak envelope power Side band power : 25 W : 15 W

Auxiliary carrier frequency : 16 KHZ

At frequency 250 KHZ their power lower by 2 dB.


I.F. carrier frequency : 16 KHZ

Pilot tone Test tone

: :

3600 HZ 1000 HZ

- Synthesizer reference frequency : 8 KHZ - Dummy load : 20 OHMS

(4)

TRUNK DIALING Shifting the pilot oscillator frequency of 3600

+/- 30 transmits dialing criterions of a speed of normally 1 pulses per second. (5) POWER SUPPLY DC Supply : 49 TO 60(-10/+25%), 180 W

Approximate maximum supply 2 percent - Capacity - A.C. Supply HZ - Power consumption : < 80 W : 800 AH. : 220 +/-15%, 50

8.

PRECAUTIONS

AND

MAINTENANCE

In normal rooms the ETI equipment generally erected on an open rack or on a frame of freestanding cabinet. The room for the erection of the equipment should have a dust free floor, which is washable. The room should be well ventilated and of normal temperature & humidity and where necessary provided with a ventilator fan having a dust filters. The cabinets should prevent from titling when opened. Cabinets should prevent from titling when opened.

CAUTION
Before opening the hinged frame, make sure that the cabinet can not tip forward.

FAULT ANALYSIS, TEST EQUIPMENTS AND TEST PROCEDURE


TEST EQUIPMENTS

(a) TEST OSCILLATOR

Test oscillator enables the commissioning of the PLC link without aid of external signals, pressing the CALL button intimate a test tone of 1 KHZ which is fed to the voice amplifier and passes through all transmit stages of the PLC equipments with the exception of the telephone adapter. It is possible to check at any test point the dBr value printed in the front side of the equipment is against the measured dB reading. It simplifies also. The following signals can be checked in the AG section of the equipment : Speech, Teleoperation/data dialing.

(b)

FAULT ANALYSIS
In fault analysis the faulty devices are checked

in this serial or manner : - Telephone or Tele operation signals - Cabling low frequency circuits power supplies - PLC equipments - HF transmission path or DC

Comparisons with the transmission levels and working voltages measured under healthy conditions are valuable aids to fault analysis. The back to back testing of the equipment using the dummy load is also a very useful aid. The presence of AF signals in the various stages of the equipment can be checked using the telephone handset and test load connected

between the associated measuring point audio testing.

9. BASIC PRINCIPLE OF PLCC


In PLCC the higher mechanical strength and insulations level of high voltage power result in increased reliability of communication and lower attenuation over long-distance. The idea of using power lines of transmission lines for communication purpose was the first thought of at about the beginning of the century and the practical applications were made in several countries from 1920 onwards. These systems have now developed into extremely sophisticated and complicated systems and widely used in all modern power systems. Since telephone communication system can not be directly connected to the high voltage lines, suitably designed coupling devices have therefore to the employed. These usually consists of high

voltage capacitors or capacitor with polaritical devices used in conjunction with suitable line matching units 9LMUs for matching the impedance of line to that of the co-axial cable connecting the unit to the PLC transmit receive equipment.

Also

the

carrier

currents

used

for

communication have to be prevented from entering the power equipment used in GSS as this would result in high attenuation of even complete loss of communication signals when earthed at isolator. To prevent this loss, wave traps or line traps are employed. These consist of suitably designed choke coils connected in series with the line, which offer negligible impedance to RF carrier currents. Wave traps also usual have one or more suitably designed capacitors connected in parallel with the choke coils so as to resonate at carrier frequencies and thus offer even higher impedance to the flow of RF currents. The basis arrangement of connecting the WT and coupling capacitor in PLCC communication is shown in the above figure :

As can be seen from the sketch, the power frequency and radio frequency component are sorted out by this arrangement. The RF is prevented from entering the stations bus and the power frequency is blocked of coupling capacitor.

(1) COUPLE DEVICE


Earlier coupling devices used were antenna as similar to these used in radio work. This was because capacitor capable of withstanding the high voltages used in transmission of electrical power were not available at that time. The antennas used for coupling the PLC equipment to the transmission line were usually erected below the line and parallel

to it. They were usually more than 300 ft long and were tuned to the carrier frequency employed. These were rather inefficient and the systems were affected but interference from nearby long wave radio transmitters. By about 1930, suitably paper and oil capacitor were developed which could withstand the high voltage and serve as affective coupling units to PLC equipments.

A modern coupling capacitor consists of a stack of flat would elements of pure cellulose paper and aluminum coils held between insulating roads under optimum pressure to minimize capacitance the changes with time and temperature. The interconnection are designed to obtain highest possible range withstand capacity and highest cut off frequency. The entire stack assembly as placed in a suitable pro claim insulating shall fill with insulating coils and hermetically sealed by metallic flanges and gaskets of synthetic rubber with a dry

nitrogen gas cushion. The mechanical strength of the shell and flanges are carefully matched. Coupling capacitors are designed for outdoors use and withstand normal atmospheric phenomenon such as temperature and humidity rain, show etc. The capacitors used in modern PLCC systems have a capacity between 2000 and 8000 ft. The usual value is between 3000 and 5000 ft. The units are designed to have a very low loss (<0.5dB). They are usually mounted on pedestals below the line conductors. In many cases the capacitive voltage dividers are used for communication system and voltage is used for synchronizing purpose or voltage measurement.

TYPE OF COUPLING
(a) PHASE TO GROUND COUPLING

WT = wave trap. LMU = line matching unit. TR = transmission and receiving equipments. CC = coupling capacitor As can be seen from the figure, the wave traps and coupling capacitors are all connected to one conductor of the power line. The remaining two conductor, through not directly connected to the line carry a portion of the returning carrier current because these two conductors do not have wave traps, a portion of the carrier energy is 1 lost. Also radiation losses are goes high as earth forms a part of the circuit and the noise pickup is correspondingly higher. The method of connecting is inefficient and the connection at the receiving and can not be made to match the line perfectly. This is because the impendence of the line can not be calculated correctly as it depends partly on the soil conductivity enrote the line which varies from place to place and time to time and partly on station switching condition. (b) PHASE TO PHASE COUPLING

This type of coupling was formally being used to improve the reliability of communication case of breakage of one of the coupled conductors. The system used double the number of wave traps and coupling capacitors used in phase to ground and hence is costlier. This coupling capacitor at each and have the line are connected in parallel to the LMUs as shown in this sketch figure

Through reliability of

this

type

coupling the

increase

the

communication,

attenuation,

therefore from radio transmission and monitoring possibilities are all higher than those of phase to ground coupling. Hence this type of coupling has been discontinued and super sided by the phase to - phase coupling system.

(c) PHASE TO PHASE COUPLING

This type of coupling uses the same number of wave traps and the capacitor as two phase coupling but the capacitance are not connected in parallel as in the case of that type of coupling. The two power conductors used in this case may be considered as metallic go and return lines for the carrier currents. The conductor has no appreciable influence on the carrier currents. The third on the conductor the carrier switching has no appreciable transmission. influence Hence current

conditions

attention is less because two conductors are used instead of one conductor and earth. This type of coupling is more reliable over longer distance and is

generally used load dispatch work, though it is lightly costlier than the two - phase system. (d) INTERLINE OR INTER CIRCUIT COUPLING This is the same as phase to phase coupling but with the difference that the two conductors used for communication belong to two difference power circuits carrier on common towers. This type of coupling is not employed where the two circuits are carrier on two separate sets of towers as it then behaves more like a double phase to ground coupling and is found to be impracticable.

This type of coupling is even more reliable than phase to phase coupling on the same circuit in that it permits operation with one of the two circuits opened out and founded for maintenance purpose. Inter-phase or inter systems coupling are

always employed on 220 KV and 400 KV lines where the interference levels are therefore also used on very long 100 KV lines where attenuation become a problem. This type of coupling permit higher reliability of operation under breaker conductor conditions and are always employed where carrier line protection systems are employed. COMPARISON OF PHASE TO PHASE AND

PHASE TO GOUND COUPLING The phase to ground coupling has the advantage of requiring only half the number of wave traps and coupling capacitors in comparison to phase to phase coupling. But it is inferior to many as would be evident from the following points. The phase - to - ground coupling has higher attenuation and unlike phase - to - phase

1.

coupling, the attenuation varies with station switching conditions. 2. The variation of attenuation function with changes in weather condition is greater in phase to grounds coupling.
3.

Reflection and echoes due to mismatch difficulties are much greater in phase - to coupling. grounds

4. Signal to noise ratio is poorer due to longitudinal noise voltages induced in the line. In phase to phase coupling the noise voltages tend to cancel themselves as equal voltages are induced in the coupled circuit. conductors, which oppose each other in the

5. Radiation from phase to ground case is about double than that in the other case. A break or fault of some other kind will hamper the transmission in phase to ground coupling much more seriously than in phase to phase coupling. Hence, phase to ground due to coupling is used

6.

its cheapness, especially when frequency

used and distances to be covered are suitable, and radiation not particularly objectionable, as may be the situation in sparsely populated areas.

(2) WAVE TRAPS


Wave traps (WTs) are used between the transmission line and the power stations to avoid carrier power dislocation in the power plant and cross talk with other power line carrier circuits

connected to the same power station. WTs also ensure proper operating conditions and signal levels at the PLCC transmit receive equipment irrespective of switching conditions of the power circuits and equipment in the station.

A wave trap must satisfy the following requirements :

(1) It must block the carrier currents. By blocking, we mean that the track should attenuate the H.F. signals by at least 8 to 10 dB. (2) It must carry the power frequency current safely during normal operation as well as short circuit fault conditions.

CONSTRUCTIONS OF WAVE TRAPS


All wave traps have a choke as a main part. This choke may be a single layer or a multi-layer coils made of special aluminum alloy and is

designed to carry the full load current the power circuit continuously and also to withstand normal short circuit currents in the event of a fault on that line for a short time until the current in the event of a fault on circuit breakers clears the fault without suffering any mechanical or thermal damages. The inductance of the choke varies from 100 Micro Henrys to 2 milli Henrys depending on the pass band required. The 100 or 200 Micro Henry wave trap will in conjunction with a suitable tuning capacitor block a band of a few tens of KHz, the blocked land width being dependent on the carry frequency. The one milli Henry traps will clock periodically the whole range of carrier frequency employed in PLCC a 2.o mH traps can be used without a tuning capacitor across it. It will still blocked almost all carrier frequency in use effectively, but its inherent capacitance of about 100PF, will cause it to resonate at the high end of the PLCC band (250 to 500 KHZ). The low inductance respant types of traps are usually wound as a narrow cylindrical single layer, whereas the high inductance broadband traps are invariably wound as large diameter discoshed coils.

The cost of the wave trap increased with the rated power current to be carrier by it as well as with the inductance required. A trap with a nominal rated current of 1600n Amp. Designed to withstand a short circuit current of look. A may cost 10 times as much as trap rated for a nominal current of 400 Amp and a short circuit current of 50 KA. Similarly a 2.0 mH trap may cost several times as much as 100 micro Henry traps for the same nominal power current. Therefore, wherever the nominal load currents and expected short circuit currents are high smaller inductances are used with tuning arrangement to obtain broadband trap. Suspension mounting of wave trap is preferred to rigid mounting on coupling capacitors as this arrangement enables it to withstand the dynamic stresses created by short circuits better and because it is more economical but high current, high inductance traps, which are very heavy may have to be mounted on pedestals insulators or coupling capacitors. Wave traps are made in various is a standard sizes and rating and to various specifications.

Standard 2.0 mH.

inductances

for

wave

trap

recommended by IEC are 0.2, 0.25, 0.4, 0.5, 1.0 and

LIGHTNING ARRESTER
Lightning is one of the most serious causes of over voltage. It the power equipment especially at out doors is not protected, the over voltage will cause burning of insulations. The ground wires running over the towers provides an adequate protection against lighting and also reduced the induced electrostatic or electromagnetic voltage but such a shield is inadequate to protect any travelling which reaches terminals of electrical equipment and such waves can cause internal flash over between inter-turns of transformers and the high peak voltage of surge may cause external flash over between terminals of the electrical equipment which results in damage of insulators.

A good light arrester must pass the following properties:

It should not absorb any current during normal operation, but during over voltage surge it must provided an easy way to the earth. After the first discharge of current has taken place through then must be capable of carrying the discharge current for same interval of time without any damage to them. After the over voltage discharge, it must be capable of interrupting the normal frequency of current from flowing to ground as soon as voltages reaches below break down value. In addition to tuning devices, which usually consist of a capacitor or capacitor, a lightning arrester is invariably connected across the choke coils of the wave traps.

The lightning arrester used may be vacuum type arrester whose are over voltage lies below the rated voltage of the tuning capacitors, but about the voltage produced across the coils during a short circuit current over surge. The lightning by arrester travelling therefore protects the turning capacitors against momentary voltage caused waves. Sustained over voltage resulting from short circuits currents are not high enough to case the lightning arrester to be over. Hence, a sustained are and consequent destruction of the arrester are avoided.

THE TUNING CAPACITORS


Used are high voltage, high stability mica capacitors with low losses. For lower voltage class of tuning units (with impulse test voltage rating upto 40 KV) polystyrene capacitors are used by some manufactures. For higher voltage class of tuning units with impulse test voltage rating upto 150 KV), capacitors with mineral oil impregnated paper dies electric are used which are similar in

construction to coupling capacitors. All types are moulded in epoxy resin. Single frequency traps have a single and double frequency traps have a double tuned parallel reasonant circuit. All the elements belonging to the tuning circuit are usually mounted in a common housing, which can be revolved and substituted with another similar tuning device to reasonate trap to a different frequency.

1. WAVE TRAP 2. COUPLING CAPACITOR 3. DRAINAGE COIL 4. VOLTAGE ARRESTER 5. GROUNDING SWITCH 6. MATCHING TRANSFORMERS 7. TUNING CAPACITOR 8. VACCUM ARRESTER

66

10.BATTERY CHARGER :
PLCC (Power Line Carrier Communication) works on rectified AC or main, when make supply goes off. We use of a device for proper functioning supply to of the PLCC, PLCC called BATTERY for CHARGER. This is the device that provides equipment uninterrupted working. It provides DC to the

panel by battery of 48 V. In this type 24 batteries capacities. are connected in series and individually per battery has approximately 2 V

1. GENERAL DESCRIPTION
Battery charges mainly consists of 4 sections :Float charges Boost charges section Control section

1.

2.

3.

Alarm section All the four sections are situated in


4.

mounted sheet steel. The sides and tops of the frame are provided with removable panel suitable recess has been provided in front panel to prevent the component from projection out. All meters indicating lamps, push buttons have been counted on from panel.

2.

TECHNICAL SPECIFICATIONS
- Normal input 415 V AC 3 phase +/- 20% of voltage

- Input variation -

FLOAT CHARGES DC Output Output current ampere 50 v+/- 1 % 20 to 40

Line regulation & load regulation - +/-1% Individual Ripple to Efficiency peak ) - > 70 % 0.6 Vpp (peak

BOOST CHARGES
68 DC Output V 43.2 TO 67.2

Output current Amps Over load Efficiency -

25 70

10 % > 80 %

1.FLOAT CHARGER
The float charges is basically static type 3 phase charger with stabilized output DC voltage. The charges output DC voltage is constantly compared with standard DC reference voltage and error voltage is again amplified. This amplified voltage control the triggering signals of all the 3 thyristors of 3 phase bridge control rectifier, as the output voltage tends to decrease than its selected value, it makes the triggering signals of each thyristor of all 3 phase, to advance for firing them, so that the output voltage remains within the specified accuracy. If the output voltage tends to increase more than the selected value, the triggering pulses of these

thyristors of all 3 phase are delayed in firing operations in such a way so that the output DC voltage is again brought back to its stabilized voltage. CIRCUIT DESCRIPTION :

The 3 phase AC input is applied through the 3 poles 2 way switch (RS-1) and fuse F-18 to F-20 to the float input contractor (CON-1) Resistance R-3, capacitor C-2 and also resistance R-2, capacitor C-1 are incorporated to remove the instabilities like hunting. Operational amplifier IC-2 I liner amplifier the mv drop across shunt. The ratio of R-14/R-15 determine the gain of the amplifier and RV-2 on sub assembly sets the charging current. When charging current increases the mv drop across pin No. 2 & 3 of IC 2 will increased. This voltage is applied to the base of TR-4 through R-11. Transistor TR-4 will be the base current of TR-3 and TR-3 will increase the

voltage from D-2 will control the voltage correcting operational amplifier IC-1. This will result in decrease in DC output voltage to keep the battery current at set level, which can be adjusted by potentiometer RV-2. It is desired that output of the rectifier attain its steady state value slowly rather than by step. Fuse Fail Alarm : Fuse fail alarm is also available in float charges. In the event of any HRC fuse failure. Corresponding types fuse blows and trip the corresponding relay.

2.BOOST CHARGES SECTION


Description of Circuit

Boost charges is used to charge the batteries after power resumption. The input supply is switched on mains of rotatory switch RS 1, three numbers HRC fuses. F-21 to F-23 has been provided for over current protection AC contractor CON-2 has also been provided. Transformer 6 steps down the input AC voltage to suitable level. Necessary taps are provided in the primary of transformer to cater for varying input voltage that may prevail at sub-station. The secondary voltage of transformer-6 is applied to a bridge rectifier, which consists of 6 silicon diodes D-6 to D-11, for rectification of AC to DC. These diodes are mounted on individual heat sinks for cooling so that junction temperature of the device is within specified limit. The diodes are protected by capacitors and resistances against have storage effects and transit over voltage in also by HRC fuses F-10 to F-15.

The battery can be charged by using the two rotatory switches provided on front panel for coarse and fine control and that charging current can be read by ammeter A-3 provided on the front panel. The operator must ensure that the rotatory switches are in minimum position charges. before switching on the boost

3. OPERATION OF CHARGER
The float or boost charges can be

switches ON by means of selector switch RS1. Thus at a time only one charger either float or boost can be operated. When the charges is operated in float mode the battery is on float charge and all the VDDs are by passed through the contracts of DC contractor. This enables complete voltage appearing on the load. In case of mains fall also the entire battery voltage is available on

load through contracts of DC contractor. When the charger is operated on boost mode, the contracts of DC contractor opens. Load voltage can be adjusted by VDD switch RS-8 as per the requirement main switch RS-9 have been provided to isolate the charger from load and battery. When the selector switch RS-9 is in charger mode then it will supplying load as well as trickle charger. The batteries in float and boost charger, the batteries mode when the switch RS-9 is in main mode, then the load will be supplied by the battery and the charges is totally isolated from battery for charger main purpose.
3.

MAINTENANCE TRACING PROCEDURE


checked. The

AND

FAULT

1.All connections should be thoroughly control circuit boards should be inserted far firmly in their respective sockets before energizing the battery charger.

2.

All

mounting

bolt/screws energizing

should as

be

checked

before

loose

mounting will cause vibrations. 3.The charger should be switched off once in every month and the connections and mounting should be checked. 4.The that. battery terminals should be

connected first and the AC input after

ADVANTAGES DISADVANTAGES OF PLCC


11. 1. ADVANTAGES
1.

&

No

separate

wires

are

needed

for

communication purpose, as the power lines

themselves constructing saved.

carry

power

as

well lines

as is

communication signals. Hence the cost of separate telephone

2.

When compared with ordinary lines the power remain lines. lines have appreciably under the higher mechanical strength. They would normally unaffected conditions, which might seriously damage telephone

3.

Power lines usually provide the shortest route between the power stations.

4. Power lines have large cross-sectional areas resulting in very low resistance per unit length. Consequently the carrier signals suffer much less attenuation than when they travel on usual telephone lines of equal lengths.

5. Power lines are well insulated to provide only negligible leakage between conductors and ground even in adverse weather conditions.

6. Largest spacing between conductors reduces capacitance, which results in smaller attenuation at high frequencies. The large spacing also reduces the cross talk to a considerable extent.

2. DISADVANTAGES
1. Proper care has to be taken to guard carrier equipment and persons using them against high voltages and currents on the lines. 2. Reflections connected increases problems. 3. High voltage lines have transformer are to produced high and on spur lines. lines This other

voltage

attenuation

creates

connections, attenuate carrier currents. Sub station equipments adversely affect the carrier currents.

4. Noise introduced by power lines is far more than in case of telephone lines. This is due to

the noise generated by discharge across insulators, corona and switching processes. It is obvious that an effective power lines carrier system must overcome these and many other difficulties.

REFERENCES

1. PRINCIPLE OF COMMUNICATION

CARRIER

N.N. BISWAS
MANUAL OF ETI EQUIPMENTS

2.

ABB (ASEA BROWN BOVERI)


MANNUAL OF BATTERY CHARGES

3.

R.S.E.B.

Vous aimerez peut-être aussi