Vous êtes sur la page 1sur 45

Tabel 8.1.

Data Curah Hujan


No. Tahun Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 1999 163.5 102.7 176.9 95.8 88.4 69.2 267.4 344.4 200.3 87.3 64.4 106.8
2 2000 183.0 157.3 153.0 54.5 41.3 178.9 121.6 41.0 44.9 124.7 89.4 77.9
3 2001 132.7 71.5 106.4 87.1 154.4 157.4 129.6 109.4 41.6 67.7 451.1 73.8
4 2002 187.4 209.4 200.7 163.2 415.6 236.0 501.2 355.3 559.8 419.4 430.2 817.3
5 2003 326.7 316.9 494.8 289.4 147.7 221.3 258.6 87.3 343.8 182.1 159.8 150.3
6 2004 351.2 151.0 293.0 188.3 110.6 284.1 119.5 200.4 69.6 95.7 81.1 39.6
7 2005 85.5 24.5 65.2 72.5 175.2 174.0 67.0 107.8 10.4 58.2 47.6 182.6
8 2006 90.3 16.1 44.2 37.9 203.7 190.2 271.4 7.0 319.3 207.6 198.0 240.2
9 2007 231.3 159.9 163.2 145.3 332.4 230.1 131.7 84.8 129.4 132.7 164.6 172.1
10 2008 165.5 216.0 427.2 148.9 236.7 269.5 92.0 130.4 6.0 56.8 253.9 436.9
11 2009 203.7 351.4 168.5 237.9 175.7 290.4 284.6 412.0 202.6 113.1 257.5 199.4
12 2010 302.9 213.1 393.4 153.9 125.8 262.2 456.3 484.7 243.3 307.8 152.2 266.5
13 2011 146.7 200.4 240.5 251.3 131.0 82.2 120.2 7.6 66.4 37.2 278.8 198.0
14 2012 145.1 19.8 44.7 112.0 268.9 419.6 295.4 426.8 246.6 210.9 154.6 128.5
15 2013 172.3 151.0 178.9 220.7 248.5 299.8 265.4 413.6 282.3 201.1 153.7 128.6
16 2014 324.4 206.6 307.8 240.8 57.5 448.8 235.6 285.3 311.8 210.7 260.7 160.5
17 2015 317.1 232.7 197.4 135.1 249.7 313.1 201.4 69.0 364.2 335.1 268.5 173.0
18 2016 466.3 61.8 564.8 138.4 271.1 199.9 17.2 74.2 48.7 112.1 11.3 333.2
19 2017 173.9 250.3 263.3 182.8 79.4 168.1 91.2 26.0 307.0 156.1 156.4 292.7
20 2018 149.5 306.9 221.5 226.2 145.9 71.3 291.0 100.5 163.5 90.0 206.3 138.5
21 2019 190.5 330.1 274.4 168.3 373.3 272.9 126.1 126.8 107.1 325.2 116.7 202.5
Maksimal 466.3 351.4 564.8 289.4 415.6 448.8 501.2 484.7 559.8 419.4 451.1 817.3
Minimal 85.5 16.1 44.2 37.9 41.3 69.2 17.2 7.0 6.0 37.2 11.3 39.6
Rerata 214.7 178.5 237.1 159.5 192.0 230.4 206.9 185.4 193.7 168.2 188.4 215.2
Sumber : Hasil Perhitungan, 2018

Tabel 8.2 Data Jumlah Hari Hujan


No. Tahun Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 1999 13 15 20 9 19 14 21 23 23 13 11 16
2 2000 15 15 13 11 11 12 5 5 11 25 11 13
3 2001 19 11 11 12 22 15 11 19 7 12 15 5
4 2002 11 19 20 19 19 14 19 11 19 9 16 15
5 2003 16 15 11 9 6 7 8 10 15 7 11 9
6 2004 9 6 11 5 6 5 3 7 3 19 17 10
7 2005 14 5 13 12 20 9 12 9 3 7 6 12
8 2006 8 4 3 4 11 17 18 1 17 7 9 14
9 2007 11 9 16 8 17 18 15 5 16 13 15 11
10 2008 19 19 28 20 19 23 9 17 1 10 18 24
11 2009 19 19 12 17 14 24 27 31 19 13 23 14
12 2010 24 18 22 19 13 26 20 25 16 20 13 20
13 2011 18 16 22 16 12 9 9 1 9 6 17 20
14 2012 14 4 4 10 23 24 28 28 26 17 24 16
15 2013 22 16 17 25 21 17 24 28 26 17 24 16
16 2014 25 19 21 24 5 27 18 20 19 17 16 13
17 2015 24 16 13 14 14 19 15 5 26 16 14 9
18 2016 30 3 22 10 16 15 5 9 4 12 2 22
19 2017 11 17 15 16 5 14 12 4 14 14 10 18
20 2018 15 24 16 18 9 9 24 9 11 8 15 14
21 2019 12 16 17 12 18 20 21 8 8 23 12 18
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
1995
Luas DAS : 370 270 km2

Tabel 8.5 Perhitungan Debit Andalan Bulanan FJ Mock tahun 1995


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN

1 Curah Hujan (P) Data mm 163.50 102.70 176.90 95.80 88.40 69.20 267.40 344.40 200.30 87.30 64.40 106.80
2 Hari Hujan (h) Data hari 13 15 20 9 19 14 21 23 23 13 11 16
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30.00 30.00 30.00 30.00 30.00 40.00 40.00 50.00 50.00 50.00 40.00 30.00
5 (m/20) * (18 - h) Hitungan - 0.08 0.05 0.00 0.14 0.00 0.08 0.00 0.00 0.00 0.13 0.14 0.03
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 6.76 3.59 0.00 17.54 0.00 14.62 0.00 0.00 0.00 21.03 22.90 4.66
7 Et = (ETo) - (E) (3) - (6) mm 83.36 76.20 113.06 112.40 262.41 168.15 159.68 163.75 348.92 147.19 140.67 150.60

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 80.14 26.50 63.84 -16.60 -174.01 -98.95 107.72 180.65 -148.62 -59.89 -76.27 -43.80
9 Soil Storage mm 50.00 0.00 0.00 -16.60 -174.01 -98.95 0.00 0.00 -148.62 -59.89 -76.27 -43.80
10 Soil Moisture SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 30.14 26.50 63.84 0.00 0.00 0.00 107.72 180.65 0.00 0.00 0.00 0.00
IV ALIRAN DAN PENYIMPANAN
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 12.06 10.60 25.54 0.00 0.00 0.00 43.09 72.26 0.00 0.00 0.00 0.00
13 0.5 (1 + k) In Hitungan - 9.04 7.95 19.15 0.00 0.00 0.00 32.32 54.20 0.00 0.00 0.00 0.00
14 k * V (n - 1) Hitungan - 50.00 29.52 18.74 18.94 9.47 4.74 2.37 17.34 35.77 17.88 8.94 4.47
15 Volume Penyimpanan (Vn) (13) + (14) mm 59.04 37.47 37.89 18.94 9.47 4.74 34.68 71.54 35.77 17.88 8.94 4.47
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -40.96 -21.57 0.42 -18.94 -9.47 -4.74 29.95 36.85 -35.77 -17.88 -8.94 -4.47
17 Aliran Dasar (BF) (12) - (16) mm 53.01 32.17 25.12 18.94 9.47 4.74 13.14 35.41 35.77 17.88 8.94 4.47
18 Aliran Langsung (DR) (11) - (12) mm 18.08 15.90 38.31 0.00 0.00 0.00 64.63 108.39 0.00 0.00 0.00 0.00
19 Aliran (R) (17) + (18) mm 71.10 48.07 63.43 18.94 9.47 4.74 77.77 143.80 35.77 17.88 8.94 4.47
V DEBIT ALIRAN SUNGAI
20 Debit Aliran Sungai A * (19) m3/dtk 7.17 3.67 6.32 3.42 3.16 2.47 9.55 12.30 7.15 3.12 2.30 3.81
21 Debit Aliran Sungai lt/det 7167.10 3667.86 6317.86 3421.43 3157.14 2471.43 9550.00 12300.00 7153.57 3117.86 2300.00 3814.29
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 19.20 8.87 16.92 8.87 8.46 6.41 25.58 32.94 18.54 8.35 5.96 10.22

Sumber : Hasil perhitungan, 2019

Parameter terpakai :
Diasumsi : - m = 30 - 50% untuk lahan pertanian Diasumsi : - Koefisien infiltrasi i = 0.4
yang diolah. Diasumsi : - Faktor resesi aliran air tanah k = 0.5
Diasumsi : - Initial Soil Moisture = 100 mm Diasumsi : - Penyimpanan awal (initial storage) IS = 100 mm
Diasumsi : - Daerah Aliran Sungai = 370 km2 Diasumsi : Vn-1 (Desember 1994)
Diasumsi : - m ditentukan m= 30 %
Diasumsi : Maximum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 1995)
Metode Mock
50.0 500.00

45.0 450.00

40.0 400.00

35.0 350.00

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.00

25.0 250.00

20.0 200.00

15.0 150.00
12.30

9.55
10.0 100.00
7.17 7.15
6.32
5.0 3.67 3.42 3.16 3.81 50.00
2.47 3.12
2.30

0.0 0.00
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
Perode ke-
debit hujan

Gambar 8.1 Grafik Debit bulanan tahun 1995 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
1996
Luas DAS : 370 270 km2 :
Tabel 8.6 Perhitungan Debit Andalan Bulanan FJ Mock tahun 1996
No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 183.0 157.3 153.0 54.5 41.3 178.9 121.6 41.0 44.9 124.7 89.4 77.9
2 Hari Hujan (h) Data hari 15 15 13 11 11 12 5 5 11 25 11 13
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 0
5 (m/20) * (18 - h) Hitungan - 0.05 0.05 0.08 0.11 0.11 0.12 0.26 0.33 0.18 0.00 0.14 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 4.06 3.59 8.48 13.64 27.55 21.93 41.52 53.22 61.06 0.00 22.90 0.00
7 Et = (ETo) - (E) (3) - (6) mm 86.06 76.20 104.58 116.30 234.86 160.84 118.17 110.53 287.86 168.22 140.67 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 96.94 81.10 48.42 -61.80 -193.56 18.06 3.43 -69.53 -242.96 -43.52 -51.27 -77.36
9 Soil Storage mm 50.00 0.00 0.00 -61.80 -193.56 0.00 0.00 -69.53 -242.96 -43.52 -51.27 -77.36
10 Soil Moisture SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 46.94 81.10 48.42 0.00 0.00 18.06 3.43 0.00 0.00 0.00 0.00 0.00
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 18.77 32.44 19.37 0.00 0.00 7.22 1.37 0.00 0.00 0.00 0.00 0.00
13 0.5 (1 + k) In Hitungan - 14.08 24.33 14.53 0.00 0.00 5.42 1.03 0.00 0.00 0.00 0.00 0.00
14 k * V (n - 1) Hitungan - 2.24 8.16 16.24 15.39 7.69 3.85 4.63 2.83 1.42 0.71 0.35 0.18
15 Volume Penyimpanan (Vn) (13) + (14) mm 16.32 32.49 30.77 15.39 7.69 9.26 5.66 2.83 1.42 0.71 0.35 0.18
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm 11.85 16.17 -1.72 -15.39 -7.69 1.57 -3.60 -2.83 -1.42 -0.71 -0.35 -0.18
17 Aliran Dasar (BF) (12) - (16) mm 6.93 16.27 21.09 15.39 7.69 5.65 4.98 2.83 1.42 0.71 0.35 0.18
18 Aliran Langsung (DR) (11) - (12) mm 28.16 48.66 29.05 0.00 0.00 10.83 2.06 0.00 0.00 0.00 0.00 0.00
19 Aliran (R) (17) + (18) mm 35.09 64.93 50.14 15.39 7.69 16.49 7.04 2.83 1.42 0.71 0.35 0.18
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 3.537 3.041 2.957 1.053 0.798 3.458 2.351 0.793 0.868 2.410 1.728 1.506
21 Debit Aliran Sungai lt/det 3537.363 3040.586 2957.467 1053.477 798.323 3458.110 2350.510 792.524 867.910 2410.432 1728.089 1505.795
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 9.474 7.356 7.921 2.731 2.138 8.963 6.296 2.123 2.250 6.456 4.479 4.033
Sumber : Hasil perhitungan, 2018

Parameter terpakai :
Diasumsi : - m = 30 - 50% untuk lahan pertanian Diasumsi : - Koefisien infiltrasi i = 0.4
yang diolah. Diasumsi : - Faktor resesi aliran air tanah k = 0.5
Diasumsi : - Initial Soil Moisture = 100 mm Diasumsi : - Penyimpanan awal (initial storage) IS = 4.47 mm
Diasumsi : - Daerah Aliran Sungai = 270 km2 Diasumsi : Vn-1 (Desember 1995)
Diasumsi : - m ditentukan m= 30 %
Diasumsi : Maximum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 1996)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
Perode ke-
debit hujan

Gambar 8.2 Grafik Debit bulanan tahun 1996 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
1997
Luas DAS : 370 270 km2

Tabel 8.7 Perhitungan Debit Andalan Bulanan FJ Mock tahun 1997


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 132.7 71.5 106.4 87.1 154.4 157.4 129.6 109.4 41.6 67.7 451.1 73.8
2 Hari Hujan (h) Data hari 19 11 11 12 22 15 11 19 7 12 15 5
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 0
5 (m/20) * (18 - h) Hitungan - 0.00 0.11 0.11 0.09 0.00 0.06 0.14 0.00 0.28 0.15 0.06 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 8.38 11.87 11.70 0.00 10.97 22.36 0.00 95.95 25.23 9.81 0.00
7 Et = (ETo) - (E) (3) - (6) mm 90.12 71.41 101.19 118.25 262.41 171.81 137.33 163.75 252.97 142.98 153.76 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 42.58 0.09 5.21 -31.15 -108.01 -14.41 -7.73 -54.35 -211.37 -75.28 297.34 -81.46
9 Soil Storage mm 42.58 0.00 -150.00 -150.00 -150.00 -150.00 -150.00 -150.00 -211.37 -150.00 -150.00 -150.00
10 Soil Moisture SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 0.00 0.09 155.21 118.85 41.99 135.59 142.27 95.65 0.00 74.72 447.34 68.54
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 0.00 0.04 62.09 47.54 16.80 54.24 56.91 38.26 0.00 29.89 178.94 27.42
13 0.5 (1 + k) In Hitungan - 0.00 0.03 46.56 35.65 12.60 40.68 42.68 28.70 0.00 22.41 134.20 20.56
14 k * V (n - 1) Hitungan - 0.09 0.04 0.04 23.30 29.48 21.04 30.86 36.77 32.73 16.37 19.39 76.80
15 Volume Penyimpanan (Vn) (13) + (14) mm 0.09 0.07 46.60 58.95 42.07 61.71 73.54 65.46 32.73 38.78 153.59 97.36
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -0.09 -0.02 46.53 12.35 -16.88 19.64 11.82 -8.07 -32.73 6.05 114.81 -56.24
17 Aliran Dasar (BF) (12) - (16) mm 0.09 0.05 15.56 35.18 33.68 34.60 45.08 46.33 32.73 23.84 64.12 83.65
18 Aliran Langsung (DR) (11) - (12) mm 0.00 0.05 93.13 71.31 25.19 81.35 85.36 57.39 0.00 44.83 268.41 41.12
19 Aliran (R) (17) + (18) mm 0.09 0.11 108.69 106.49 58.87 115.95 130.45 103.72 32.73 68.67 332.53 124.77
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 0.009 3.250 4.836 3.959 7.018 7.155 5.891 4.973 1.891 3.077 20.505 3.355
21 Debit Aliran Sungai lt/det 8.918 3250.000 4836.364 3959.091 7018.182 7154.545 5890.909 4972.727 1890.909 3077.273 20504.545 3354.545
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 0.024 7.862 12.954 10.262 18.797 18.545 15.778 13.319 4.901 8.242 53.148 8.985
Sumber : Hasil perhitungan, 2018

Parameter terpakai :
Diasumsi : - m = 30 - 50% untuk lahan pertanian Diasumsi : - Koefisien infiltrasi i = 0.4
yang diolah. Diasumsi : - Faktor resesi aliran air tanah k = 0.5
Diasumsi : - Initial Soil Moisture = 100 mm Diasumsi : - Penyimpanan awal (initial storage) IS = 0.18 mm
Diasumsi : - Daerah Aliran Sungai = 270 km2 Diasumsi : Vn-1 (Desember 1995)
Diasumsi : - m ditentukan m= 30 %
Diasumsi : Maximum Soil Moisture 150 mm
Diasumsi : Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 1997)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
Perode ke-
debit hujan

Gambar 8.3 Grafik Debit bulanan tahun 1997 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
1998
Luas DAS : 370 270 km2 :

Tabel 8.8 Perhitungan Debit Andalan Bulanan FJ Mock tahun 1998


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 187.4 209.4 200.7 163.2 415.6 236.0 501.2 355.3 559.8 419.4 430.2 817.3
2 Hari Hujan (h) Data hari 11 19 20 19 19 14 19 11 19 9 16 15
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.11 0.00 0.00 0.00 0.00 0.08 0.00 0.18 0.00 0.23 0.04 0.05
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 9.46 0.00 0.00 0.00 0.00 14.62 0.00 28.66 0.00 37.85 6.54 6.99
7 Et = (ETo) - (E) (3) - (6) mm 80.66 79.79 113.06 129.95 262.41 168.15 159.68 135.09 348.92 130.37 157.03 148.28
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 106.74 129.61 87.64 33.25 153.19 67.85 341.52 220.21 210.88 289.03 273.17 669.02
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 106.74 129.61 87.64 33.25 153.19 67.85 341.52 220.21 210.88 289.03 273.17 669.02
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 42.70 51.85 35.06 13.30 61.28 27.14 136.61 88.08 84.35 115.61 109.27 267.61
13 0.5 (1 + k) In Hitungan - 32.02 38.88 26.29 9.98 45.96 20.35 102.46 66.06 63.26 86.71 81.95 200.71
14 k * V (n - 1) Hitungan - 50.00 41.01 39.95 33.12 21.55 33.75 27.05 64.75 65.41 64.34 75.52 78.74
15 Volume Penyimpanan (Vn) (13) + (14) mm 82.02 79.90 66.24 43.10 67.51 54.11 129.51 130.82 128.67 151.05 157.47 279.44
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -17.98 -2.13 -13.65 -23.14 24.41 -13.40 75.40 1.31 -2.14 22.37 6.43 121.97
17 Aliran Dasar (BF) (12) - (16) mm 60.67 53.97 48.71 36.45 36.87 40.54 61.20 86.77 86.50 93.24 102.84 145.64
18 Aliran Langsung (DR) (11) - (12) mm 64.05 77.77 52.59 19.95 91.91 40.71 204.91 132.12 126.53 173.42 163.90 401.41
19 Aliran (R) (17) + (18) mm 124.72 131.74 101.30 56.40 128.78 81.24 266.11 218.90 213.02 266.66 266.74 547.05
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 12.573 13.088 12.544 10.200 25.975 14.750 31.325 22.206 34.988 26.213 26.888 51.081
21 Debit Aliran Sungai lt/det 12572.59 13087.50 12543.75 10200.00 25975.00 14750.00 31325.00 22206.25 34987.50 26212.50 26887.50 51081.25
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 33.674 31.661 33.597 26.438 69.571 38.232 83.901 59.477 90.688 70.208 69.692 136.816

Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 230 km2 Maximum Soil Moisture 150
Minimum Soil Moisture 150
Grafik Debit Bulanan (Tahun 1998)
Metode Mock
200.0 1000.0

180.0 900.0

160.0 800.0

140.0 700.0

Curah Hujan (mm)


Debit (m3/dtk)

120.0 600.0

100.0 500.0

80.0 400.0

60.0 300.0

40.0 200.0

20.0 100.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke- debit hujan

Gambar 8.4 Grafik Debit bulanan tahun 1998 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
1999
Luas DAS : 370 270 km2 :

Tabel 8.9 Perhitungan Debit Andalan Bulanan FJ Mock tahun 1999


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 326.7 316.9 494.8 289.4 147.7 221.3 258.6 87.3 343.8 182.1 159.8 150.3
2 Hari Hujan (h) Data hari 16 15 11 9 6 7 8 10 15 7 11 9
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.03 0.05 0.11 0.14 0.18 0.22 0.20 0.20 0.08 0.28 0.14 0.14
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 2.70 3.59 11.87 17.54 47.23 40.21 31.94 32.75 26.17 46.26 22.90 20.96
7 Et = (ETo) - (E) (3) - (6) mm 87.42 76.20 101.19 112.40 215.18 142.57 127.75 131.00 322.75 121.96 140.67 134.30
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 239.28 240.70 393.61 177.00 -67.48 78.73 130.85 -43.70 21.05 60.14 19.13 16.00
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -67.48 0.00 0.00 -43.70 0.00 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 239.28 240.70 393.61 177.00 0.00 78.73 130.85 0.00 21.05 60.14 19.13 16.00
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 95.71 96.28 157.45 70.80 0.00 31.49 52.34 0.00 8.42 24.06 7.65 6.40
13 0.5 (1 + k) In Hitungan - 71.79 72.21 118.08 53.10 0.00 23.62 39.26 0.00 6.31 18.04 5.74 4.80
14 k * V (n - 1) Hitungan - 50.00 60.89 66.55 92.32 72.71 36.35 29.99 34.62 17.31 11.81 14.93 10.33
15 Volume Penyimpanan (Vn) (13) + (14) mm 121.79 133.10 184.64 145.42 72.71 59.97 69.24 34.62 23.62 29.86 20.67 15.13
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm 21.79 11.32 51.53 -39.22 -72.71 -12.73 9.27 -34.62 -11.00 6.23 -9.19 -5.53
17 Aliran Dasar (BF) (12) - (16) mm 73.93 84.96 105.91 110.02 72.71 44.23 43.07 34.62 19.42 17.83 16.84 11.93
18 Aliran Langsung (DR) (11) - (12) mm 143.57 144.42 236.17 106.20 0.00 47.24 78.51 0.00 12.63 36.09 11.48 9.60
19 Aliran (R) (17) + (18) mm 217.50 229.38 342.08 216.22 72.71 91.47 121.58 34.62 32.04 53.91 28.32 21.53
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 21.925 21.127 32.987 19.293 9.847 14.753 17.240 5.820 22.920 12.140 10.653 10.020
21 Debit Aliran Sungai lt/det 21925.29 21126.67 32986.67 19293.33 9846.67 14753.33 17240.00 5820.00 22920.00 12140.00 10653.33 10020.00
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 58.725 51.110 88.351 50.008 26.373 38.241 46.176 15.588 59.409 32.516 27.613 26.838
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Storage 150 mm
Minimum Soil Storage 150 mm
Grafik Debit Bulanan (Tahun 1999)
Metode Mock
100.0 500.0

90.0 450.0

80.0 400.0

70.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

60.0 300.0

50.0 250.0

40.0 200.0

30.0 150.0

20.0 100.0

10.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.5 Grafik Debit bulanan tahun 1999 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2000
Luas DAS : 370 270 km2 :

Tabel 8.10 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2000


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 351.2 151.0 293.0 188.3 110.6 284.1 119.5 200.4 69.6 95.7 81.1 39.6
2 Hari Hujan (h) Data hari 9 6 11 5 6 5 3 7 3 19 17 10
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.14 0.18 0.11 0.20 0.18 0.26 0.30 0.28 0.38 0.00 0.02 0.12
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 12.17 14.36 11.87 25.34 47.23 47.52 47.90 45.03 130.85 0.00 3.27 18.63
7 Et = (ETo) - (E) (3) - (6) mm 77.95 65.43 101.19 104.61 215.18 135.26 111.78 118.72 218.08 168.22 160.30 136.63
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 273.25 85.57 191.81 83.69 -104.58 148.84 7.72 81.68 -148.48 -72.52 -79.20 -97.03
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -104.58 0.00 0.00 0.00 -148.48 -72.52 -79.20 -97.03
10 Kapasitas Kelembaban Tanah (SMC) SMC P 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 273.25 85.57 191.81 83.69 0.00 148.84 7.72 81.68 0.00 0.00 0.00 0.00
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 109.30 34.23 76.73 33.48 0.00 59.54 3.09 32.67 0.00 0.00 0.00 0.00
13 0.5 (1 + k) In Hitungan - 81.97 25.67 57.54 25.11 0.00 44.65 2.32 24.50 0.00 0.00 0.00 0.00
14 k * V (n - 1) Hitungan - 50.00 65.99 45.83 51.69 38.40 19.20 31.93 17.12 20.81 10.41 5.20 2.60
15 Volume Penyimpanan (Vn) (13) + (14) mm 131.97 91.66 103.37 76.79 38.40 63.85 34.24 41.63 20.81 10.41 5.20 2.60
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm 31.97 -40.31 11.71 -26.58 -38.40 25.45 -29.61 7.38 -20.81 -30.88 -5.20 -9.91
17 Aliran Dasar (BF) (12) - (16) mm 77.32 74.54 65.01 60.06 38.40 34.08 32.70 25.29 20.81 30.88 5.20 9.91
18 Aliran Langsung (DR) (11) - (12) mm 163.95 51.34 115.09 50.22 0.00 89.31 4.63 49.01 0.00 0.00 0.00 0.00
19 Aliran (R) (17) + (18) mm 241.27 125.89 180.10 110.27 38.40 123.39 37.33 74.30 20.81 30.88 5.20 9.91
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 24.322 10.786 20.929 13.450 7.900 20.293 8.536 14.314 4.971 6.836 5.793 2.829
21 Debit Aliran Sungai lt/det 24321.84 10785.71 20928.57 13450.00 7900.00 20292.86 8535.71 14314.29 4971.43 6835.71 5792.86 2828.57
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 65.144 26.093 56.055 34.862 21.159 52.599 22.862 38.339 12.886 18.309 15.015 7.576
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Storage 150 mm
Minimum Soil Storage 150 mm
Grafik Debit Bulanan (Tahun 2000)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
Perode ke-
debit hujan

Gambar 8.6 Grafik Debit bulanan tahun 2000 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2001
Luas DAS : 370 270 km2 :

Tabel 8.11 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2001


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 85.5 24.5 65.2 72.5 175.2 174.0 67.0 107.8 10.4 58.2 47.6 182.6
2 Hari Hujan (h) Data hari 14 5 13 12 20 9 12 9 3 7 6 12
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.06 0.20 0.08 0.09 0.00 0.18 0.12 0.23 0.38 0.28 0.24 0.09
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 5.41 15.56 8.48 11.70 0.00 32.90 19.16 36.84 130.85 46.26 39.26 13.97
7 Et = (ETo) - (E) (3) - (6) mm 84.71 64.23 104.58 118.25 262.41 149.88 140.52 126.91 218.08 121.96 124.31 141.29
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 0.79 -39.73 -39.38 -45.75 -87.21 24.12 -73.52 -19.11 -207.68 -63.76 -76.71 41.31
9 Kandungan Air Tanah mm 0.00 -39.73 -39.38 -45.75 -87.21 0.00 -73.52 -19.11 -207.68 -63.76 -76.71 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 0.79 0.00 0.00 0.00 0.00 24.12 0.00 0.00 0.00 0.00 0.00 41.31
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 0.32 0.00 0.00 0.00 0.00 9.65 0.00 0.00 0.00 0.00 0.00 16.52
13 0.5 (1 + k) In Hitungan - 0.24 0.00 0.00 0.00 0.00 7.24 0.00 0.00 0.00 0.00 0.00 12.39
14 k * V (n - 1) Hitungan - 50.00 25.12 12.56 6.28 3.14 1.57 4.40 2.20 1.10 0.55 0.28 0.14
15 Volume Penyimpanan (Vn) (13) + (14) mm 50.24 25.12 12.56 6.28 3.14 8.81 4.40 2.20 1.10 0.55 0.28 12.53
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -49.76 -25.12 -6.18 -10.09 -3.14 5.67 -4.40 -17.48 -2.74 -4.87 -6.94 12.26
17 Aliran Dasar (BF) (12) - (16) mm 50.08 25.12 6.18 10.09 3.14 3.98 4.40 17.48 2.74 4.87 6.94 4.27
18 Aliran Langsung (DR) (11) - (12) mm 0.47 0.00 0.00 0.00 0.00 14.47 0.00 0.00 0.00 0.00 0.00 24.79
19 Aliran (R) (17) + (18) mm 50.55 25.12 6.18 10.09 3.14 18.46 4.40 17.48 2.74 4.87 6.94 29.06
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 3.590 1.029 2.738 3.044 7.356 7.306 2.813 4.526 0.437 2.444 1.999 7.667
21 Debit Aliran Sungai lt/det 3590.000 1028.713 2737.637 3044.152 7356.351 7305.965 2813.216 4526.339 436.678 2443.719 1998.643 7667.064
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 9.615 2.489 7.332 7.890 19.703 18.937 7.535 12.123 1.132 6.545 5.180 20.535
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2001)
Metode Mock
10.0 200.0

9.0 180.0

8.0 160.0

7.0 140.0

Curah Hujan (mm)


Debit (m3/dtk)

6.0 120.0

5.0 100.0

4.0 80.0

3.0 60.0

2.0 40.0

1.0 20.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.7 Grafik Debit bulanan tahun 2001 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2002
Luas DAS :370 270 km2

Tabel 8.12 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2002


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 90.3 16.1 44.2 37.9 203.7 190.2 271.4 7.0 319.3 207.6 198.0 240.2
2 Hari Hujan (h) Data hari 8 4 3 4 11 17 18 1 17 7 9 14
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.15 0.21 0.22 0.21 0.11 0.02 0.00 0.43 0.03 0.28 0.18 0.06
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 13.52 16.76 25.44 27.29 27.55 3.66 0.00 69.59 8.72 46.26 29.44 9.32
7 Et = (ETo) - (E) (3) - (6) mm 76.60 63.03 87.62 102.66 234.86 179.12 159.68 94.16 340.20 121.96 134.13 145.95
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 13.70 -46.93 -43.42 -64.76 -31.16 11.08 111.72 -87.16 -20.90 85.64 63.87 94.25
9 Kandungan Air Tanah mm 0.00 -46.93 -43.42 -64.76 -31.16 0.00 0.00 -87.16 -20.90 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 13.70 0.00 0.00 0.00 0.00 11.08 111.72 0.00 0.00 85.64 63.87 94.25
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 5.48 0.00 0.00 0.00 0.00 4.43 44.69 0.00 0.00 34.26 25.55 37.70
13 0.5 (1 + k) In Hitungan - 4.11 0.00 0.00 0.00 0.00 3.32 33.52 0.00 0.00 25.69 19.16 28.28
14 k * V (n - 1) Hitungan - 50.00 27.05 13.53 6.76 3.38 1.69 2.51 18.01 9.01 4.50 15.10 17.13
15 Volume Penyimpanan (Vn) (13) + (14) mm 54.11 27.05 13.53 6.76 3.38 5.01 36.02 18.01 9.01 30.20 34.26 45.41
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -10.52 -27.05 -12.13 -6.07 -3.38 1.63 31.01 -18.01 -9.01 21.19 4.06 11.15
17 Aliran Dasar (BF) (12) - (16) mm 16.00 27.05 12.13 6.07 3.38 2.80 13.68 18.01 9.01 13.07 21.48 26.55
18 Aliran Langsung (DR) (11) - (12) mm 8.22 0.00 0.00 0.00 0.00 6.65 67.03 0.00 0.00 51.39 38.32 56.55
19 Aliran (R) (17) + (18) mm 24.22 27.05 12.13 6.07 3.38 9.45 80.71 18.01 152.35 64.45 59.81 83.11
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 2.441 0.218 0.597 0.512 2.753 2.570 3.668 0.095 4.315 2.805 2.676 3.246
21 Debit Aliran Sungai lt/det 2441.374 217.568 597.297 512.162 2752.703 2570.270 3667.568 94.595 4314.865 2805.405 2675.676 3245.946
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 6.539 0.526 1.600 1.328 7.373 6.662 9.823 0.253 11.184 7.514 6.935 8.694
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2002)
Metode Mock
50.0 450.0

45.0 400.0

40.0 350.0

35.0 300.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 250.0

25.0 200.0

20.0 150.0

15.0 100.0

10.0 50.0

5.0 0.0

0.0 -50.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.8 Grafik Debit bulanan tahun 2002 metode F.J Mock
Sumber ; Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2003
Luas DAS : 370 270 km2 :

Tabel 8.13 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2003


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 231.3 159.9 163.2 145.3 332.4 230.1 131.7 84.8 129.4 132.7 164.6 172.1
2 Hari Hujan (h) Data hari 11 9 16 8 17 18 15 5 16 13 15 11
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.11 0.14 0.03 0.15 0.02 0.00 0.06 0.33 0.05 0.13 0.06 0.11
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 9.46 10.77 3.39 19.49 3.94 0.00 9.58 53.22 17.45 21.03 9.81 16.30
7 Et = (ETo) - (E) (3) - (6) mm 80.66 69.02 109.67 110.45 258.47 182.78 150.10 110.53 331.48 147.19 153.76 138.96
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 150.64 90.88 53.53 34.85 73.93 47.32 -18.40 -25.73 -202.08 -14.49 10.84 33.14
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 0.00 0.00 -18.40 -25.73 -202.08 -14.49 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 150.64 90.88 53.53 34.85 73.93 47.32 0.00 0.00 0.00 0.00 10.84 33.14
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 60.26 36.35 21.41 13.94 29.57 18.93 0.00 0.00 0.00 0.00 4.34 13.26
13 0.5 (1 + k) In Hitungan - 45.19 27.27 16.06 10.45 22.18 14.20 0.00 0.00 0.00 0.00 3.25 9.94
14 k * V (n - 1) Hitungan - 50.00 47.60 37.43 26.75 18.60 20.39 17.29 8.65 4.32 2.16 1.08 2.17
15 Volume Penyimpanan (Vn) (13) + (14) mm 95.19 74.86 53.49 37.20 40.78 34.59 17.29 8.65 4.32 2.16 4.33 12.11
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -4.81 -20.33 -21.37 -16.29 3.58 -6.19 -17.29 -8.65 -24.62 -14.81 2.17 7.78
17 Aliran Dasar (BF) (12) - (16) mm 65.06 56.68 42.78 30.23 25.99 25.12 17.29 8.65 24.62 14.81 2.17 5.48
18 Aliran Langsung (DR) (11) - (12) mm 90.39 54.53 32.12 20.91 44.36 28.39 0.00 0.00 0.00 0.00 6.51 19.88
19 Aliran (R) (17) + (18) mm 155.45 111.22 84.14 51.14 70.35 53.51 17.29 8.65 24.62 14.81 8.67 25.37
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 15.670 10.660 10.880 9.687 22.160 15.340 8.780 5.653 8.627 8.847 10.973 11.473
21 Debit Aliran Sungai lt/det 15670.38 10660.00 10880.00 9686.67 22160.00 15340.00 8780.00 5653.33 8626.67 8846.67 10973.33 11473.33
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 41.972 25.789 29.141 25.108 59.353 39.761 23.516 15.142 22.360 23.695 28.443 30.730
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2003)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.9 Grafik Debit bulanan tahun 2003 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2004
Luas DAS : 370 270 km2

Tabel 8.14 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2004


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 165.5 216.0 427.2 148.9 236.7 269.5 92.0 130.4 6.0 56.8 253.9 436.9
2 Hari Hujan (h) Data hari 19 19 28 20 19 23 9 17 1 10 18 24
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.00 0.00 0.00 0.00 0.00 0.18 0.03 0.43 0.20 0.00 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 0.00 0.00 0.00 0.00 0.00 28.74 4.09 148.29 33.64 0.00 0.00
7 Et = (ETo) - (E) (3) - (6) mm 90.12 79.79 113.06 129.95 262.41 182.78 130.94 159.66 200.63 134.57 163.57 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 75.38 136.21 314.14 18.95 -25.71 86.72 -38.94 -29.26 -194.63 -77.77 90.33 281.64
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -25.71 0.00 -38.94 -29.26 -194.63 -77.77 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 75.38 136.21 314.14 18.95 0.00 86.72 0.00 0.00 0.00 0.00 90.33 281.64
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 30.15 54.49 125.66 7.58 0.00 34.69 0.00 0.00 0.00 0.00 36.13 112.66
13 0.5 (1 + k) In Hitungan - 22.61 40.86 94.24 5.69 0.00 26.02 0.00 0.00 0.00 0.00 27.10 84.49
14 k * V (n - 1) Hitungan - 50.00 36.31 38.59 66.41 36.05 18.03 22.02 11.01 5.51 2.75 1.38 14.24
15 Volume Penyimpanan (Vn) (13) + (14) mm 72.61 77.17 132.83 72.10 36.05 44.04 22.02 11.01 5.51 2.75 28.47 98.73
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -27.39 4.56 55.66 -60.73 -36.05 7.99 -22.02 -47.35 -5.51 -14.34 25.72 70.25
17 Aliran Dasar (BF) (12) - (16) mm 57.54 49.93 70.00 68.31 36.05 26.70 22.02 47.35 5.51 14.34 10.41 42.40
18 Aliran Langsung (DR) (11) - (12) mm 45.23 81.73 188.49 11.37 0.00 52.03 0.00 0.00 0.00 0.00 54.20 168.98
19 Aliran (R) (17) + (18) mm 102.77 131.66 258.49 79.68 36.05 78.73 22.02 47.35 5.51 14.34 64.61 211.38
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 10.360 11.368 22.484 7.837 12.458 14.184 4.842 6.863 0.316 2.989 13.363 22.995
21 Debit Aliran Sungai lt/det 10359.5 11368.4 22484.2 7836.8 12457.9 14184.2 4842.1 6863.2 315.8 2989.5 13363.2 22994.7
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 27.747 27.502 60.222 20.313 33.367 36.765 12.969 18.382 0.819 8.007 34.637 61.589
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2004)
Metode Mock
50.0 540.0

45.0 480.0

40.0 420.0

35.0 360.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 240.0

20.0 180.0

15.0 120.0

10.0 60.0

5.0 0.0

0.0 -60.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.10 Grafik Debit bulanan tahun 2004 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2005
Luas DAS : 370 270 km2 :

Tabel 8.14 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2004


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 203.7 351.4 168.5 237.9 175.7 290.4 284.6 412.0 202.6 113.1 257.5 199.4
2 Hari Hujan (h) Data hari 19 19 12 17 14 24 27 31 19 13 23 14
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.00 0.09 0.02 0.06 0.00 0.00 0.00 0.00 0.13 0.00 0.06
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 0.00 10.18 1.95 15.74 0.00 0.00 0.00 0.00 21.03 0.00 9.32
7 Et = (ETo) - (E) (3) - (6) mm 90.12 79.79 102.88 128.00 246.66 182.78 159.68 163.75 348.92 147.19 163.57 145.95
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 113.58 271.61 65.62 109.90 -70.96 107.62 124.92 248.25 -146.32 -34.09 93.93 53.45
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -70.96 0.00 0.00 0.00 -146.32 -34.09 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 113.58 271.61 65.62 109.90 0.00 107.62 124.92 248.25 0.00 0.00 93.93 53.45
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 45.43 108.65 26.25 43.96 0.00 43.05 49.97 99.30 0.00 0.00 37.57 21.38
13 0.5 (1 + k) In Hitungan - 34.07 81.48 19.69 32.97 0.00 32.29 37.48 74.48 0.00 0.00 28.18 16.04
14 k * V (n - 1) Hitungan - 50.00 42.04 61.76 40.72 36.85 18.42 25.36 31.42 52.95 26.47 13.24 20.71
15 Volume Penyimpanan (Vn) (13) + (14) mm 84.07 123.52 81.45 73.69 36.85 50.71 62.83 105.89 52.95 26.47 41.41 36.74
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -15.93 39.45 -42.08 -7.75 -36.85 13.86 12.12 43.06 -52.95 -26.47 14.94 -4.67
17 Aliran Dasar (BF) (12) - (16) mm 61.36 69.20 68.32 51.71 36.85 29.19 37.85 56.24 52.95 26.47 22.63 26.05
18 Aliran Langsung (DR) (11) - (12) mm 68.15 162.97 39.37 65.94 0.00 64.57 74.95 148.95 0.00 0.00 56.36 32.07
19 Aliran (R) (17) + (18) mm 129.51 232.17 107.69 117.65 36.85 93.76 112.80 205.19 52.95 26.47 78.99 58.12
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 13.055 20.671 9.912 13.994 10.335 17.082 16.741 24.235 11.918 6.653 15.147 11.729
21 Debit Aliran Sungai lt/det 13055.1 20670.6 9911.8 13994.1 10335.3 17082.4 16741.2 24235.3 11917.6 6652.9 15147.1 11729.4
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 34.967 50.006 26.548 36.273 27.682 44.277 44.840 64.912 30.891 17.819 39.261 31.416
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2005)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.11 Grafik Debit bulanan tahun 2005 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2006
Luas DAS : 370 270 km2 :

Tabel 8.15 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2006


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 302.9 213.1 393.4 153.9 125.8 262.2 456.3 484.7 243.3 307.8 152.2 266.5
2 Hari Hujan (h) Data hari 24 18 22 19 13 26 20 25 16 20 13 20
II EVAPOTRANSPIRASI TERBATAS (Et)
3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.00 0.00 0.00 0.08 0.00 0.00 0.00 0.05 0.00 0.10 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 0.00 0.00 0.00 19.68 0.00 0.00 0.00 17.45 0.00 16.36 0.00
7 Et = (ETo) - (E) (3) - (6) mm 90.12 79.79 113.06 129.95 242.73 182.78 159.68 163.75 331.48 168.22 147.21 155.26

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 212.78 133.31 280.34 23.95 -116.93 79.42 296.62 320.95 -88.18 139.58 4.99 111.24
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -116.93 0.00 0.00 0.00 -88.18 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 212.78 133.31 280.34 23.95 0.00 79.42 296.62 320.95 0.00 139.58 4.99 111.24
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 85.11 53.33 112.14 9.58 0.00 31.77 118.65 128.38 0.00 55.83 1.99 44.50
13 0.5 (1 + k) In Hitungan - 63.83 39.99 84.10 7.19 0.00 23.83 88.99 96.29 0.00 41.87 1.50 33.37
14 k * V (n - 1) Hitungan - 50.00 56.92 48.46 66.28 36.73 18.37 21.10 55.04 75.66 37.83 39.85 20.67
15 Volume Penyimpanan (Vn) (13) + (14) mm 113.83 96.91 132.56 73.47 36.73 42.19 110.08 151.33 75.66 79.71 41.35 54.05
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm 13.83 -16.92 35.65 -59.09 -36.73 5.46 67.89 41.24 -75.66 4.04 -38.36 12.70
17 Aliran Dasar (BF) (12) - (16) mm 71.28 70.25 76.49 68.67 36.73 26.31 50.76 87.14 75.66 51.79 40.35 31.80
18 Aliran Langsung (DR) (11) - (12) mm 127.67 79.99 168.21 14.37 0.00 47.65 177.97 192.57 0.00 83.75 2.99 66.74
19 Aliran (R) (17) + (18) mm 198.95 150.24 244.70 83.05 36.73 73.96 228.73 279.71 75.66 135.54 43.34 98.54
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 20.055 14.207 26.227 10.260 8.387 17.480 30.420 32.313 16.220 20.520 10.147 17.767
21 Debit Aliran Sungai lt/det 20055.076 14206.667 26226.667 10260.000 8386.667 17480.000 30420.000 32313.333 16220.000 20520.000 10146.667 17766.667
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 53.716 34.369 70.246 26.594 22.463 45.308 81.477 86.548 42.042 54.961 26.300 47.586
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2006)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.12 Grafik Debit bulanan tahun 2006 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2007
Luas DAS : 370 270 km2

Tabel 8.16 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2007


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 146.7 200.4 240.5 251.3 131.0 82.2 120.2 7.6 66.4 37.2 278.8 198.0
2 Hari Hujan (h) Data hari 18 16 22 16 12 9 9 1 9 6 17 20
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.03 0.00 0.03 0.09 0.18 0.18 0.43 0.23 0.30 0.02 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 2.39 0.00 3.90 23.62 32.90 28.74 69.59 78.51 50.47 3.27 0.00
7 Et = (ETo) - (E) (3) - (6) mm 90.12 77.39 113.06 126.05 238.79 149.88 130.94 94.16 270.41 117.75 160.30 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 56.58 123.01 127.44 125.25 -107.79 -67.68 -10.74 -86.56 -204.01 -80.55 118.50 42.74
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -107.79 -67.68 -10.74 -86.56 -204.01 -80.55 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 56.58 123.01 127.44 125.25 0.00 0.00 0.00 0.00 0.00 0.00 118.50 42.74
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 22.63 49.20 50.98 50.10 0.00 0.00 0.00 0.00 0.00 0.00 47.40 17.10
13 0.5 (1 + k) In Hitungan - 16.97 36.90 38.23 37.58 0.00 0.00 0.00 0.00 0.00 0.00 35.55 12.82
14 k * V (n - 1) Hitungan - 50.00 33.49 35.19 36.71 37.14 18.57 9.29 4.64 2.32 1.16 0.58 18.07
15 Volume Penyimpanan (Vn) (13) + (14) mm 66.97 70.39 73.43 74.29 37.14 18.57 9.29 4.64 2.32 1.16 36.13 30.89
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -33.03 3.41 3.04 0.86 -37.14 -18.57 -12.46 -4.64 -13.45 -5.72 34.97 -5.24
17 Aliran Dasar (BF) (12) - (16) mm 55.66 45.79 47.94 49.24 37.14 18.57 12.46 4.64 13.45 5.72 12.43 22.34
18 Aliran Langsung (DR) (11) - (12) mm 33.95 73.80 76.47 75.15 0.00 0.00 0.00 0.00 0.00 0.00 71.10 25.64
19 Aliran (R) (17) + (18) mm 89.61 119.59 124.40 124.39 37.14 18.57 12.46 4.64 13.45 5.72 83.53 47.98
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 9.033 10.020 12.025 12.565 6.550 4.110 6.010 0.380 3.320 1.860 13.940 9.900
21 Debit Aliran Sungai lt/det 9032.899 10020.000 12025.000 12565.000 6550.000 4110.000 6010.000 380.000 3320.000 1860.000 13940.000 9900.000
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 24.194 24.240 32.208 32.568 17.544 10.653 16.097 1.018 8.605 4.982 36.132 26.516
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Mosture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2007)
Metode Mock
30.0 450.0

27.0 400.0

24.0 350.0

21.0 300.0

Curah Hujan (mm)


Debit (m3/dtk)

18.0 250.0

15.0 200.0

12.0 150.0

9.0 100.0

6.0 50.0

3.0 0.0

0.0 -50.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke- debit hujan

Gambar 8.13 Grafik Debit bulanan tahun 2007 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2008
Luas DAS : 370 270 km2 :

Tabel 8.17 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2008


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 145.1 19.8 44.7 112.0 268.9 419.6 295.4 426.8 246.6 210.9 154.6 128.5
2 Hari Hujan (h) Data hari 14 4 4 10 23 24 28 28 26 17 24 16
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.06 0.21 0.21 0.12 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.03
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 5.41 16.76 23.74 15.59 0.00 0.00 0.00 0.00 0.00 4.21 0.00 4.66
7 Et = (ETo) - (E) (3) - (6) mm 84.71 63.03 89.32 114.35 262.41 182.78 159.68 163.75 348.92 164.01 163.57 150.60
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 60.39 -43.23 -44.62 -2.35 6.49 236.82 135.72 263.05 -102.32 46.89 -8.97 -22.10
9 Kandungan Air Tanah mm 0.00 -43.23 -44.62 -2.35 0.00 0.00 0.00 0.00 -102.32 0.00 -8.97 -22.10
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 60.39 0.00 0.00 0.00 6.49 236.82 135.72 263.05 0.00 46.89 0.00 0.00
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 24.16 0.00 0.00 0.00 2.60 94.73 54.29 105.22 0.00 18.76 0.00 0.00
13 0.5 (1 + k) In Hitungan - 18.12 0.00 0.00 0.00 1.95 71.05 40.72 78.92 0.00 14.07 0.00 0.00
14 k * V (n - 1) Hitungan - 50.00 34.06 17.03 8.51 4.26 3.10 37.07 38.89 58.90 29.45 21.76 10.88
15 Volume Penyimpanan (Vn) (13) + (14) mm 68.12 34.06 17.03 8.51 6.20 74.15 77.79 117.81 58.90 43.52 21.76 10.88
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -31.88 -34.06 -15.04 -22.52 -2.31 67.94 3.64 40.02 -58.90 -15.39 -21.76 -10.88
17 Aliran Dasar (BF) (12) - (16) mm 56.04 34.06 15.04 22.52 4.91 26.78 50.65 65.20 58.90 34.14 21.76 10.88
18 Aliran Langsung (DR) (11) - (12) mm 36.23 0.00 0.00 0.00 3.89 142.09 81.43 157.83 0.00 28.13 0.00 0.00
19 Aliran (R) (17) + (18) mm 92.27 34.06 15.04 22.52 8.80 168.88 132.08 223.03 58.90 62.27 21.76 10.88
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 9.302 1.042 2.353 5.895 14.153 22.084 15.547 22.463 12.979 11.100 8.137 6.763
21 Debit Aliran Sungai lt/det 9301.550 1042.105 2352.632 5894.737 14152.632 22084.211 15547.368 22463.158 12978.947 11100.000 8136.842 6763.158
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 24.913 2.521 6.301 15.279 37.906 57.242 41.642 60.165 33.641 29.730 21.091 18.114
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture = 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai = 370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2008)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.14 Grafik Debit bulanan tahun 2008 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2009
Luas DAS : 370 270 km2 :

Tabel 8.18 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2009


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 172.3 151.0 178.9 220.7 248.5 299.8 265.4 413.6 282.3 201.1 153.7 128.6
2 Hari Hujan (h) Data hari 22 16 17 25 21 17 24 28 26 17 24 16
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.03 0.02 0.00 0.00 0.02 0.00 0.00 0.00 0.03 0.00 0.03
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 2.39 1.70 0.00 0.00 3.66 0.00 0.00 0.00 4.21 0.00 4.66
7 Et = (ETo) - (E) (3) - (6) mm 90.12 77.39 111.36 129.95 262.41 179.12 159.68 163.75 348.92 164.01 163.57 150.60
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 82.18 73.61 67.54 90.75 -13.91 120.68 105.72 249.85 -66.62 37.09 -9.87 -22.00
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -13.91 0.00 0.00 0.00 -66.62 0.00 -9.87 -22.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 82.18 73.61 67.54 90.75 0.00 120.68 105.72 249.85 0.00 37.09 0.00 0.00
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 32.87 29.44 27.02 36.30 0.00 48.27 42.29 99.94 0.00 14.84 0.00 0.00
13 0.5 (1 + k) In Hitungan - 24.65 22.08 20.26 27.23 0.00 36.20 31.72 74.96 0.00 11.13 0.00 0.00
14 k * V (n - 1) Hitungan - 50.00 37.33 29.70 24.98 26.10 13.05 24.63 28.17 51.56 25.78 18.45 9.23
15 Volume Penyimpanan (Vn) (13) + (14) mm 74.65 59.41 49.97 52.21 26.10 49.26 56.34 103.13 51.56 36.91 18.45 9.23
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -25.35 -15.25 -9.44 2.24 -26.10 23.15 7.09 46.78 -51.56 -14.66 -18.45 -9.23
17 Aliran Dasar (BF) (12) - (16) mm 58.22 44.69 36.46 34.06 26.10 25.12 35.20 53.16 51.56 29.49 18.45 9.23
18 Aliran Langsung (DR) (11) - (12) mm 49.31 44.16 40.52 54.45 0.00 72.41 63.43 149.91 0.00 22.25 0.00 0.00
19 Aliran (R) (17) + (18) mm 107.53 88.85 76.98 88.51 26.10 97.53 98.63 203.07 51.56 51.74 18.45 9.23
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 10.839 8.389 9.939 12.261 13.806 16.656 14.744 22.978 15.683 11.172 8.539 7.144
21 Debit Aliran Sungai lt/det 10839.350 8388.889 9938.889 12261.111 13805.556 16655.556 14744.444 22977.778 15683.333 11172.222 8538.889 7144.444
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 29.032 20.294 26.620 31.781 36.977 43.171 39.492 61.544 40.651 29.924 22.133 19.136
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2009)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.15 Grafik Debit bulanan tahun 2009 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2010
Luas DAS : 370 270 km2

Tabel 8.19 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2010


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 324.4 206.6 307.8 240.8 57.5 448.8 235.6 285.3 311.8 210.7 260.7 160.5
2 Hari Hujan (h) Data hari 25 19 21 24 5 27 18 20 19 17 16 13
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.00 0.00 0.00 0.20 0.00 0.00 0.00 0.00 0.03 0.04 0.08
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 0.00 0.00 0.00 51.17 0.00 0.00 0.00 0.00 4.21 6.54 11.64
7 Et = (ETo) - (E) (3) - (6) mm 90.12 79.79 113.06 129.95 211.24 182.78 159.68 163.75 348.92 164.01 157.03 143.62
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 234.28 126.81 194.74 110.85 -153.74 266.02 75.92 121.55 -37.12 46.69 103.67 16.88
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -153.74 0.00 0.00 0.00 -37.12 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 234.28 126.81 194.74 110.85 0.00 266.02 75.92 121.55 0.00 46.69 103.67 16.88
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 93.71 50.73 77.90 44.34 0.00 106.41 30.37 48.62 0.00 18.68 41.47 6.75
13 0.5 (1 + k) In Hitungan - 70.28 38.04 58.42 33.26 0.00 79.81 22.78 36.47 0.00 14.01 31.10 5.06
14 k * V (n - 1) Hitungan - 50.00 60.14 49.09 53.76 43.51 21.75 50.78 36.78 36.62 18.31 16.16 23.63
15 Volume Penyimpanan (Vn) (13) + (14) mm 120.28 98.19 107.52 87.01 43.51 101.56 73.56 73.24 36.62 32.32 47.26 28.69
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm 20.28 -22.10 9.33 -20.50 -43.51 58.05 -28.01 -0.31 -36.62 -4.30 14.94 -18.57
17 Aliran Dasar (BF) (12) - (16) mm 73.43 72.82 68.57 64.84 43.51 48.36 58.37 48.93 36.62 22.98 26.53 25.32
18 Aliran Langsung (DR) (11) - (12) mm 140.57 76.09 116.85 66.51 0.00 159.61 45.55 72.93 0.00 28.01 62.20 10.13
19 Aliran (R) (17) + (18) mm 214.00 148.91 185.41 131.36 43.51 207.97 103.92 121.86 36.62 50.99 88.73 35.45
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 21.572 13.773 20.520 16.053 3.833 29.920 15.707 19.020 20.787 14.047 17.380 10.700
21 Debit Aliran Sungai lt/det 21572.213 13773.333 20520.000 16053.333 3833.333 29920.000 15706.667 19020.000 20786.667 14046.667 17380.000 10700.000
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 57.779 33.320 54.961 41.610 10.267 77.553 42.069 50.943 53.879 37.623 45.049 28.659
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
-Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soail Moisture 150 mm
Grafik Debit Bulanan (Tahun 2010)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.16 Grafik Debit bulanan tahun 2010 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2011
Luas DAS : 370 270 km2 :

Tabel 8.20 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2011


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 317.1 232.7 197.4 135.1 249.7 313.1 201.4 69.0 364.2 335.1 268.5 173.0
2 Hari Hujan (h) Data hari 24 16 13 14 14 19 15 5 26 16 14 9
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.03 0.08 0.06 0.06 0.00 0.06 0.33 0.00 0.05 0.08 0.14
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 2.39 8.48 7.80 15.74 0.00 9.58 53.22 0.00 8.41 13.09 20.96
7 Et = (ETo) - (E) (3) - (6) mm 90.12 77.39 104.58 122.15 246.66 182.78 150.10 110.53 348.92 159.81 150.49 134.30
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 226.98 155.31 92.82 12.95 3.04 130.32 51.30 -41.53 15.28 175.29 118.01 38.70
9 Kandungan Air Tanah mm 226.98 0.00 0.00 0.00 0.00 0.00 0.00 -41.53 0.00 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 0.00 155.31 92.82 12.95 3.04 130.32 51.30 0.00 15.28 175.29 118.01 38.70
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 0.00 62.12 37.13 5.18 1.21 52.13 20.52 0.00 6.11 70.12 47.21 15.48
13 0.5 (1 + k) In Hitungan - 0.00 46.59 27.85 3.88 0.91 39.10 15.39 0.00 4.58 52.59 35.40 11.61
14 k * V (n - 1) Hitungan - 50.00 25.00 35.80 31.82 17.85 9.38 24.24 19.81 9.91 7.25 29.92 32.66
15 Volume Penyimpanan (Vn) (13) + (14) mm 50.00 71.59 63.64 35.71 18.76 48.48 39.63 19.81 14.49 59.83 65.32 44.27
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -50.00 21.59 -7.95 -27.94 -16.94 29.72 -8.85 -19.81 -5.32 45.34 5.49 -21.05
17 Aliran Dasar (BF) (12) - (16) mm 50.00 40.53 45.08 33.12 18.16 22.41 29.37 19.81 11.43 24.77 41.72 36.53
18 Aliran Langsung (DR) (11) - (12) mm 0.00 93.18 55.69 7.77 1.82 78.19 30.78 0.00 9.17 105.18 70.81 23.22
19 Aliran (R) (17) + (18) mm 50.00 133.71 100.77 40.89 19.98 100.61 60.15 19.81 20.60 129.95 112.53 59.75
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 5.040 4.231 3.589 2.456 4.540 5.693 3.662 1.255 6.622 6.093 4.882 3.145
21 Debit Aliran Sungai lt/det 5040.323 4230.909 3589.091 2456.364 4540.000 5692.727 3661.818 1254.545 6621.818 6092.727 4881.818 3145.455
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 13.500 10.235 9.613 6.367 12.160 14.756 9.808 3.360 17.164 16.319 12.654 8.425
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2011)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.17 Grafik Debit bulanan tahun 2011 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2012
Luas DAS : 370 270 km2 :

Tabel 8.21 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2012


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 466.3 61.8 564.8 138.4 271.1 199.9 17.2 74.2 48.7 112.1 11.3 333.2
2 Hari Hujan (h) Data hari 30 3 22 10 16 15 5 9 4 12 2 22
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.00 0.22 0.00 0.12 0.03 0.06 0.26 0.23 0.35 0.15 0.32 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 0.00 17.95 0.00 15.59 7.87 10.97 41.52 36.84 122.12 25.23 52.34 0.00
7 Et = (ETo) - (E) (3) - (6) mm 90.12 61.84 113.06 114.35 254.54 171.81 118.17 126.91 226.80 142.98 111.23 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 376.18 -0.04 451.74 24.05 16.56 28.09 -100.97 -52.71 -178.10 -30.88 -99.93 177.94
9 Kandungan Air Tanah mm 376.18 -0.04 0.00 0.00 0.00 0.00 -100.97 -52.71 -178.10 -30.88 -99.93 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 0.00 0.00 451.74 24.05 16.56 28.09 0.00 0.00 0.00 0.00 0.00 177.94
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 0.00 0.00 180.70 9.62 6.63 11.24 0.00 0.00 0.00 0.00 0.00 71.18
13 0.5 (1 + k) In Hitungan - 0.00 0.00 135.52 7.21 4.97 8.43 0.00 0.00 0.00 0.00 0.00 53.38
14 k * V (n - 1) Hitungan - 50.00 25.00 12.50 74.01 40.61 22.79 15.61 7.80 3.90 1.95 0.98 0.49
15 Volume Penyimpanan (Vn) (13) + (14) mm 50.00 25.00 148.02 81.23 45.58 31.22 15.61 7.80 3.90 1.95 0.98 53.87
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -50.00 -25.00 123.02 -66.80 -35.64 -14.36 -15.17 -27.58 -3.90 -34.40 -0.98 52.89
17 Aliran Dasar (BF) (12) - (16) mm 50.00 25.00 57.67 76.42 42.27 25.60 15.17 27.58 3.90 34.40 0.98 18.28
18 Aliran Langsung (DR) (11) - (12) mm 0.00 0.00 271.05 14.43 9.94 16.85 0.00 0.00 0.00 0.00 0.00 106.76
19 Aliran (R) (17) + (18) mm 50.00 25.00 328.72 90.84 52.21 42.45 15.17 27.58 3.90 34.40 0.98 125.04
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 5.040 0.763 6.973 1.709 3.347 2.468 0.212 0.916 0.601 1.384 0.140 4.114
21 Debit Aliran Sungai lt/det 5040.323 762.963 6972.840 1708.642 3346.914 2467.901 212.346 916.049 601.235 1383.951 139.506 4113.580
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 13.500 1.846 18.676 4.429 8.964 6.397 0.569 2.454 1.558 3.707 0.362 11.018
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2012)
Metode Mock
80.0 720.0

72.0 640.0

64.0 560.0

56.0 480.0

Curah Hujan (mm)


Debit (m3/dtk)

48.0 400.0

40.0 320.0

32.0 240.0

24.0 160.0

16.0 80.0

8.0 0.0

0.0 -80.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.18 Grafik Debit bulanan tahun 2012 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2013
Luas DAS : 370 270 km2 :

Tabel 8.22 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2013


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 173.9 250.3 263.3 182.8 79.4 168.1 91.2 26.0 307.0 156.1 156.4 292.7
2 Hari Hujan (h) Data hari 11 17 15 16 5 14 12 4 14 14 10 18
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.11 0.02 0.05 0.03 0.20 0.08 0.12 0.35 0.10 0.10 0.16 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 9.46 1.20 5.09 3.90 51.17 14.62 19.16 57.31 34.89 16.82 26.17 0.00
7 Et = (ETo) - (E) (3) - (6) mm 80.66 78.59 107.97 126.05 211.24 168.15 140.52 106.44 314.03 151.40 137.40 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 93.24 171.71 155.33 56.75 -131.84 -0.05 -49.32 -80.44 -7.03 4.70 19.00 137.44
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -131.84 -0.05 -49.32 -80.44 -7.03 0.00 0.00 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 93.24 171.71 155.33 56.75 0.00 0.00 0.00 0.00 0.00 4.70 19.00 137.44
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 37.30 68.68 62.13 22.70 0.00 0.00 0.00 0.00 0.00 1.88 7.60 54.98
13 0.5 (1 + k) In Hitungan - 27.97 51.51 46.60 17.03 0.00 0.00 0.00 0.00 0.00 1.41 5.70 41.23
14 k * V (n - 1) Hitungan - 50.00 38.99 45.25 45.92 31.47 15.74 7.87 3.93 1.97 0.98 1.20 3.45
15 Volume Penyimpanan (Vn) (13) + (14) mm 77.97 90.50 91.85 62.95 31.47 15.74 7.87 3.93 1.97 2.40 6.90 44.68
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -22.03 12.53 1.35 -28.90 -31.47 -15.74 -7.87 -3.93 -1.97 0.43 4.50 37.78
17 Aliran Dasar (BF) (12) - (16) mm 59.32 56.16 60.78 51.60 31.47 15.74 7.87 3.93 1.97 1.45 3.10 17.19
18 Aliran Langsung (DR) (11) - (12) mm 55.95 103.03 93.20 34.05 0.00 0.00 0.00 0.00 0.00 2.82 11.40 82.46
19 Aliran (R) (17) + (18) mm 115.27 159.18 153.98 85.65 31.47 15.74 7.87 3.93 1.97 4.28 14.50 99.66
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 11.620 15.644 16.456 11.425 4.963 10.506 5.700 1.625 19.188 9.756 9.775 18.294
21 Debit Aliran Sungai lt/det 11619.973 15643.750 16456.250 11425.000 4962.500 10506.250 5700.000 1625.000 19187.500 9756.250 9775.000 18293.750
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 31.123 37.845 44.076 29.614 13.292 27.232 15.267 4.352 49.734 26.131 25.337 48.998
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2013)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.19 Grafik Debit bulanan tahun 2013 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2014
Luas DAS : 370 270 km2

Tabel 8.22 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2013


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 149.5 306.9 221.5 226.2 145.9 71.3 291.0 100.5 163.5 90.0 206.3 138.5
2 Hari Hujan (h) Data hari 15 24 16 18 9 9 24 9 11 8 15 14
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.05 0.00 0.03 0.00 0.14 0.18 0.00 0.23 0.18 0.25 0.06 0.06
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 4.06 0.00 3.39 0.00 35.43 32.90 0.00 36.84 61.06 42.05 9.81 9.32
7 Et = (ETo) - (E) (3) - (6) mm 86.06 79.79 109.67 129.95 226.98 149.88 159.68 126.91 287.86 126.16 153.76 145.95
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 63.44 227.11 111.83 96.25 -81.08 -78.58 131.32 -26.41 -124.36 -36.16 52.54 -7.45
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 -81.08 -78.58 0.00 -26.41 -124.36 -36.16 0.00 -7.45
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 63.44 227.11 111.83 96.25 0.00 0.00 131.32 0.00 0.00 0.00 52.54 0.00
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 25.37 90.85 44.73 38.50 0.00 0.00 52.53 0.00 0.00 0.00 21.02 0.00
13 0.5 (1 + k) In Hitungan - 19.03 68.13 33.55 28.88 0.00 0.00 39.40 0.00 0.00 0.00 15.76 0.00
14 k * V (n - 1) Hitungan - 50.00 34.52 51.32 42.44 35.66 17.83 8.91 24.15 12.08 6.04 3.02 9.39
15 Volume Penyimpanan (Vn) (13) + (14) mm 69.03 102.65 84.87 71.31 35.66 17.83 48.31 24.15 12.08 6.04 18.78 9.39
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -30.97 33.62 -17.77 -13.56 -35.66 -17.83 30.48 -24.15 -12.08 -6.04 12.74 -9.39
17 Aliran Dasar (BF) (12) - (16) mm 56.34 57.23 62.51 52.06 35.66 17.83 22.05 24.15 12.08 6.04 8.27 9.39
18 Aliran Langsung (DR) (11) - (12) mm 38.06 136.27 67.10 57.75 0.00 0.00 78.79 0.00 0.00 0.00 31.53 0.00
19 Aliran (R) (17) + (18) mm 94.41 193.49 129.61 109.81 35.66 17.83 100.84 24.15 12.08 6.04 39.80 9.39
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 9.517 16.153 11.658 11.905 7.679 3.753 15.316 5.289 8.605 4.737 10.858 7.289
21 Debit Aliran Sungai lt/det 9516.64 16152.63 11657.89 11905.26 7678.95 3752.63 15315.79 5289.47 8605.26 4736.84 10857.89 7289.47
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 25.49 39.08 31.22 30.86 20.57 9.73 41.02 14.17 22.30 12.69 28.14 19.52
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2014)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan

Gambar 8.20 Grafik Debit bulanan tahun 2014 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock
2015
Luas DAS : 370 270 km2 :

Tabel 8.22 Perhitungan Debit Andalan Bulanan FJ Mock tahun 2013


No URAIAN Hitungan Satuan Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

I DATA HUJAN
1 Curah Hujan (P) Data mm 190.5 330.1 274.4 168.3 373.3 272.9 126.1 126.8 107.1 325.2 116.7 202.5
2 Hari Hujan (h) Data hari 12 16 17 12 18 20 21 8 8 23 12 18
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm 90.12 79.79 113.06 129.95 262.41 182.78 159.68 163.75 348.92 168.22 163.57 155.26
4 Permukaan Lahan Terbuka (m) Tentukan % 30 30 30 30 30 40 40 50 50 50 40 30
5 (m/20) * (18 - h) Hitungan - 0.09 0.03 0.02 0.09 0.00 0.00 0.00 0.25 0.25 0.00 0.12 0.00
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm 8.11 2.39 1.70 11.70 0.00 0.00 0.00 40.94 87.23 0.00 19.63 0.00
7 Et = (ETo) - (E) (3) - (6) mm 82.01 77.39 111.36 118.25 262.41 182.78 159.68 122.81 261.69 168.22 143.94 155.26
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm 108.49 252.71 163.04 50.05 110.89 90.12 -33.58 3.99 -154.59 156.98 -27.24 47.24
9 Kandungan Air Tanah mm 0.00 0.00 0.00 0.00 0.00 0.00 -33.58 0.00 -154.59 0.00 -27.24 0.00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00
11 Kelebihan Air (WS) (8)- (9) mm 108.49 252.71 163.04 50.05 110.89 90.12 0.00 3.99 0.00 156.98 0.00 47.24
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm 43.40 101.08 65.22 20.02 44.36 36.05 0.00 1.60 0.00 62.79 0.00 18.90
13 0.5 (1 + k) In Hitungan - 32.55 75.81 48.91 15.01 33.27 27.04 0.00 1.20 0.00 47.09 0.00 14.17
14 k * V (n - 1) Hitungan - 50.00 41.27 58.54 53.73 34.37 33.82 30.43 15.21 8.21 4.10 25.60 12.80
15 Volume Penyimpanan (Vn) (13) + (14) mm 82.55 117.09 107.45 68.74 67.64 60.86 30.43 16.41 8.21 51.20 25.60 26.97
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm -17.45 34.54 -9.63 -38.71 -1.10 -6.78 -30.43 -14.02 -8.21 42.99 -25.60 1.37
17 Aliran Dasar (BF) (12) - (16) mm 60.85 66.54 74.85 58.73 45.46 42.83 30.43 15.61 8.21 19.80 25.60 17.52
18 Aliran Langsung (DR) (11) - (12) mm 65.09 151.62 97.82 30.03 66.53 54.07 0.00 2.39 0.00 94.19 0.00 28.34
19 Aliran (R) (17) + (18) mm 125.94 218.17 172.67 88.76 111.99 96.91 30.43 49.26 8.21 113.99 25.60 45.87
V DEBIT ALIRAN SUNGAI

20 Debit Aliran Sungai A * (19) m3/dtk 12.696 20.631 17.150 10.519 23.331 17.056 7.881 7.925 6.694 20.325 7.294 12.656
21 Debit Aliran Sungai lt/det 12695.956 20631.250 17150.000 10518.750 23331.250 17056.250 7881.250 7925.000 6693.750 20325.000 7293.750 12656.250
22 Jumlah hari hari 31 28 31 30 31 30 31 31 30 31 30 31
23 Debit Aliran (dibaca : 10E^6) m3 34.005 49.911 45.935 27.265 62.490 44.210 21.109 21.226 17.350 54.438 18.905 33.899
Sumber : Hasil perhitungan, 2018
Parameter terpakai :
- m = 30 - 50% untuk lahan pertanian - Koefisien infiltrasi i = 0.4
yang diolah. - Faktor resesi aliran air tanah k = 0.5
- Initial Soil Moisture =100 100 mm - Penyimpanan awal (initial storage) mm IS = 100 mm
- m ditentukan m= 30
- Daerah Aliran Sungai =370 310 km2 Maximum Soil Moisture 150 mm
Minimum Soil Moisture 150 mm
Grafik Debit Bulanan (Tahun 2015)
Metode Mock
50.0 500.0

45.0 450.0

40.0 400.0

35.0 350.0

Curah Hujan (mm)


Debit (m3/dtk)

30.0 300.0

25.0 250.0

20.0 200.0

15.0 150.0

10.0 100.0

5.0 50.0

0.0 0.0
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des

Perode ke-
debit hujan
Gambar 8.21 Grafik Debit bulanan tahun 2015 metode F.J Mock
Sumber : Hasil Perhitungan, 2018
Tabel 8.23 Rekapitulasi Perhitungan Debit Metode FJ Mock
Debit (m3/dt)
No Tahun Jumlah Rerata Max Min
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 1999 7.167 3.668 6.318 3.421 3.157 2.471 9.550 12.300 7.154 3.118 2.300 3.814 64.439 5.370 12.300 2.300
2 2000 3.537 3.041 2.957 1.053 0.798 3.458 2.351 0.793 0.868 2.410 1.728 1.506 24.501 2.042 3.537 0.793
3 2001 0.009 3.250 4.836 3.959 7.018 7.155 5.891 4.973 1.891 3.077 20.505 3.355 65.918 5.493 20.505 0.009
4 2002 12.573 13.088 12.544 10.200 25.975 14.750 31.325 22.206 34.988 26.213 26.888 51.081 281.829 23.486 51.081 10.200
5 2003 21.925 21.127 32.987 19.293 9.847 14.753 17.240 5.820 22.920 12.140 10.653 10.020 198.725 16.560 32.987 5.820
6 2004 24.322 10.786 20.929 13.450 7.900 20.293 8.536 14.314 4.971 6.836 5.793 2.829 140.958 11.746 24.322 2.829
7 2005 3.590 1.029 2.738 3.044 7.356 7.306 2.813 4.526 0.437 2.444 1.999 7.667 44.948 3.746 7.667 0.437
8 2006 2.441 0.218 0.597 0.512 2.753 2.570 3.668 0.095 4.315 2.805 2.676 3.246 25.895 2.158 4.315 0.095
9 2007 15.670 10.660 10.880 9.687 22.160 15.340 8.780 5.653 8.627 8.847 10.973 11.473 138.750 11.563 22.160 5.653
10 2008 10.360 11.368 22.484 7.837 12.458 14.184 4.842 6.863 0.316 2.989 13.363 22.995 130.060 10.838 22.995 0.316
11 2009 13.055 20.671 9.912 13.994 10.335 17.082 16.741 24.235 11.918 6.653 15.147 11.729 171.473 14.289 24.235 6.653
12 2010 20.055 14.207 26.227 10.260 8.387 17.480 30.420 32.313 16.220 20.520 10.147 17.767 224.002 18.667 32.313 8.387
13 2011 9.033 10.020 12.025 12.565 6.550 4.110 6.010 0.380 3.320 1.860 13.940 9.900 89.713 7.476 13.940 0.380
14 2012 9.302 1.042 2.353 5.895 14.153 22.084 15.547 22.463 12.979 11.100 8.137 6.763 131.817 10.985 22.463 1.042
15 2013 10.839 8.389 9.939 12.261 13.806 16.656 14.744 22.978 15.683 11.172 8.539 7.144 152.150 12.679 22.978 7.144
16 2014 21.572 13.773 20.520 16.053 3.833 29.920 15.707 19.020 20.787 14.047 17.380 10.700 203.312 16.943 29.920 3.833
17 2015 5.040 4.231 3.589 2.456 4.540 5.693 3.662 1.255 6.622 6.093 4.882 3.145 51.208 4.267 6.622 1.255
18 2016 5.040 0.763 6.973 1.709 3.347 2.468 0.212 0.916 0.601 1.384 0.140 4.114 27.666 2.306 6.973 0.140
19 2017 11.620 15.644 16.456 11.425 4.963 10.506 5.700 1.625 19.188 9.756 9.775 18.294 134.951 11.246 19.188 1.625
20 2018 9.517 16.153 11.658 11.905 7.679 3.753 15.316 5.289 8.605 4.737 10.858 7.289 112.759 9.397 16.153 3.753
21 2019 12.696 20.631 17.150 10.519 23.331 17.056 7.881 7.925 6.694 20.325 7.294 12.656 164.16 13.680 23.331 6.694
Sumber : Hasil perhitungan, 2018
Gr afi k Debit Bulanan (Tahun 1995- 2015)
Metode Mock
200.0 0.0

180.0 200.0

160.0
400.0

140.0
600.0

Curah Hujan (mm)


Debit (m3/dtk)

120.0
800.0

100.0

1000.0
80.0

1200.0
60.0

1400.0
40.0

20.0 1600.0

0.0 1800.0
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Perode ke-

debit hujan

Gambar 8.22 Rekapitulasi Grafik Debit bulanan tahun 1995 - 2015 Metode F.J Mock
Sumber : Hasil Perhitungan, 2018

Vous aimerez peut-être aussi