Vous êtes sur la page 1sur 199

LABORATORIUM ILMU UKUR TANAH

PROGRAM STUDI SI TEKNIK GEOLOGI


DATA UKUR POLYGON
DAY 1
Diukur oleh : Data Keseluruhan
Hari : Mingu
Tanggal : 25 Maret 2018

Pembacaan Sudut
Tinggi Bacaan
Titik Alat Target Hrz-Biasa Vertikal
Alat (m) Rambu
° " ° "
0.940
P0 1.45 p15 341 36 26 92 42 24 0.800
0.660
0.960
P0 P1 145 14 55 86 48 30 0.700
0.440
2.655
P0 A1 3 32 9 92 04 19 2.600
2.545
3.185
P0 A2 338 2 47 87 08 31 3.100
3.025
3.090
P0 A3 330 21 2 87 21 20 3.000
2.925
2.315
P0 A4 308 28 44 87 15 02 2.200
2.085
1.690
P0 A5 301 9 2 90 28 55 1.500
1.310
0.885
P0 A6 290 22 23 89 09 56 0.700
0.525
3.282
P0 A7 278 28 42 86 35 02 3.200
3.124
1.750
P0 A8 260 51 43 84 11 17 1.600
1.450
1.680
P0 A9 244 55 52 95 16 45 1.600
1.525
0.785
P0 A10 220 50 7 90 36 11 0.600
0.440
2.731
P1 1.445 P2 124 24 7 80 47 28 2.522
2.292
0.858
P1 1.445 B1 118 31 30 97 20 5 0.737
0.616
3.188
P1 1.445 B2 125 40 35 90 9 49 3.059
2.930
2.079
P1 1.445 B3 107 8 14 92 20 14 2.008
1.937
1.064
P1 1.445 B4 100 8 2 87 37 32 1.023
0.982
1.467
P1 1.445 B5 75 59 27 85 49 55 1.443
1.419
3.756
P1 1.445 B6 90 52 50 89 24 38 3.682
3.100
1.451
P1 1.445 B7 74 33 21 90 38 18 1.372
1.293
1.307
P1 1.445 B8 49 10 31 84 23 57 1.198
1.089
1.159
P2 1.441 P3 168 51 20 85 11 38 0.938
0.717
1.946
P2 1.441 C1 156 12 52 91 42 20 1.876
1.806
2.016
P2 1.441 C2 134 23 13 91 44 5 1.928
1.840
2.017
P2 1.441 C3 109 4 29 90 35 8 1.954
1.891
1.524
P2 1.441 C4 36 11 6 87 10 45 1.473
1.422
2.642
P2 1.441 C5 22 40 44 84 55 21 2.538
2.434
1.320
P3 1.374 P4 139 50 55 88 45 14 1.131
0.942
2.609
P3 1.374 D1 134 23 24 93 46 11 2.441
2.273
1.232
P3 1.374 D2 125 36 46 96 58 44 1.119
1.006
1.529
P3 1.374 D3 101 30 31 97 0 35 1.425
1.321
1.498
P3 1.374 D4 84 29 23 96 48 53 1.398
1.242
1.656
P3 1.374 D5 71 34 10 96 17 12 1.525
1.494
1.605
P3 1.374 D6 69 50 18 90 17 0 1.524
1.443
1.375
P3 1.374 D7 32 23 53 94 54 25 1.336
1.297
1.885
P3 1.374 D8 53 19 19 94 5 21 1.792
1.699
0.751
P3 1.374 D9 36 21 44 93 54 40 0.622
0.493
1.189
P3 1.374 D10 17 22 14 90 27 22 1.095
1.000
0.880
P4 1.459 P5 146 39 46 88 0 25 0.736
0.592
1.362
P4 1.459 E1 37 46 20 103 59 20 1.324
1.286
0.832
P4 1.459 E2 53 33 31 93 6 39 0.748
0.664
1.056
P4 1.459 E3 77 27 9 98 27 5 1.009
0.995
1.089
P4 1.459 E4 108 14 41 92 32 34 1.012
0.935
1.914
P4 1.459 E5 104 56 11 92 11 25 1.873
1.832
1.486
P4 1.459 E6 116 36 13 93 44 40 1.442
1.396
1.239
P4 1.459 E7 139 54 20 95 8 59 1.189
1.139
1.311
P4 1.459 E8 18 40 44 95 9 42 1.255
1.199
1.612
P4 1.459 E9 36 57 31 95 9 27 1.445
1.278
1.551
P4 1.459 E10 141 2 51 93 6 56 1.482
1.453
1.524
P5 1.66 P6 159 5 50 87 17 47 1.354
1.184
0.929
P5 1.66 F1 110 28 32 100 28 58 0.865
0.801
1.639
P5 1.66 F2 107 37 45 92 15 37 1.555
1.471
1.333
P5 1.66 F3 99 50 11 114 33 16 1.312
1.290
1.253
P5 1.66 F4 24 18 48 87 28 34 1.240
1.226
1.072
P5 1.66 F5 43 34 56 93 42 52 1.017
0.962
1.755
P6 1.4 P7 201 21 33 86 38 3 1.660
1.565
0.798
P6 1.4 G1 114 52 29 101 48 21 0.768
0.738
0.825
P6 1.4 G2 74 31 28 96 37 34 0.750
0.675
1.631
P6 1.4 G3 140 37 3 95 52 29 1.481
1.331
1.369
P6 1.4 G4 150 15 16 96 13 28 1.252
1.135
0.807
P6 1.4 G5 168 5 53 96 23 54 0.739
0.671
1.632
P7 1.52 P8 166 17 16 91 44 21 1.482
1.332
1.445
P7 1.52 H1 218 32 38 89 53 42 1.400
1.355
1.075
P7 1.52 H2 102 25 12 98 44 38 1.003
0.930
0.510
P7 1.52 H3 54 34 45 98 41 32 0.434
0.358
1.105
P7 1.52 H4 33 9 10 95 57 2 1.030
0.955
1.834
P7 1.52 H5 105 1 32 95 44 57 1.700
1.565
0.451
P8 1.44 P9 167 32 38 91 24 31 0.282
0.112
0.825
P8 1.44 I1 99 14 11 95 36 39 0.795
0.765
0.640
P8 1.44 I2 159 14 14 91 58 17 0.596
0.551
0.534
P8 1.44 I3 45 32 14 97 27 45 0.484
0.434
0.465
P8 1.44 I4 46 4 29 96 50 36 0.370
0.275
0.875
P8 1.44 I5 67 14 11 95 36 39 0.824
0.772
1.400
P9 1.43 P10 105 16 60 88 38 10 1.300
1.200
1.425
P9 J1 13 53 30 90 5 10 1.400
1.375
1.535
P9 J2 40 20 50 31 47 10 1.500
1.465
1.965
P9 J3 38 29 50 92 3 0 1.900
1.835
1.836
P9 J4 70 29 10 91 52 50 1.800
1.764
0.963
P9 J5 85 52 50 97 59 50 0.900
0.837
0.920
P10 1.16 P11 212 4 50 112 22 50 0.700
0.480
1.357
P10 K1 204 26 20 94 36 0 1.300
1.243
1.042
P10 K2 200 51 20 97 47 20 1.000
0.958
1.515
P10 K3 184 55 40 91 8 20 1.500
1.485
1.520
P10 K4 156 44 40 90 37 40 1.500
1.480
1.527
P10 K5 151 50 0 31 12 30 1.500
1.473
0.932
P10 K6 145 48 0 98 51 10 0.900
0.868
1.375
P10 K7 144 59 40 98 58 30 1.300
1.225
2.360
P11 1.65 P12 92 3 60 91 0 30 2.000
1.640
1.242
P11 L1 57 57 60 91 11 10 1.200
1.158
1.460
P11 L2 50 5 20 9 11 10 1.400
1.340
2.810
P11 L3 48 32 40 91 14 10 2.400
2.319
1.368
P11 L4 31 1 20 91 24 0 1.300
1.232
1.381
P11 L5 21 2 8.953E-11 91 29 0 1.300
1.219
1.700
P11 L6 32 29 5.116E-11 91 15 50 1.600
1.500
1.508
P11 L7 20 24 40 91 15 40 1.000
1.292
1.674
P11 L8 25 6 50 91 13 40 1.550
1.426
1.934
P11 L9 8 26 10 91 18 20 1.800
1.666
2.061
P11 L10 6 38 10 91 17 40 1.900
1.390
2.000
P12 1.53 P13 188 35 0 90 20 50 1.800
1.600
1.372
P12 M1 100 43 50 93 2 30 1.300
1.228
1.561
P12 M2 61 44 40 93 12 10 1.500
1.439
1.451
P12 M3 44 4 20 88 36 40 1.400
1.349
1.540
P12 M4 19 27 20 90 19 10 1.500
1.455
1.277
P12 M5 24 0 20 90 29 10 1.200
1.123
0.982
P12 M6 15 37 60 89 15 30 0.900
0.818
1.391
P12 M7 8 37 60 89 16 50 1.300
1.209
1.411
P12 M8 8 48 3.837E-11 89 49 50 1.300
1.189
1.375
P12 M9 36 45 40 91 51 40 1.200
1.025
2.270
P12 M10 40 23 20 90 57 40 2.100
1.930
1.620
P13 1.42 P14 170 32 10 93 03 42 1.500
1.405
2.250
P13 N1 128 28 52 92 03 03 2.200
2.140
0.950
P13 N2 121 13 20 92 13 20 0.900
0.800
1.370
P13 N3 110 43 45 87 49 27 1.200
1.030
2.740
P13 N4 106 13 33 84 45 08 2.600
2.450
0.430
P13 N5 98 35 16 91 55 31 0.300
0.170
1.000
P13 N6 93 33 20 90 53 48 0.900
0.800
1.000
P13 N7 96 4 11 94 45 19 0.900
0.800
1.700
P13 N8 92 15 27 92 12 31 1.600
1.500
1.345
P14 1.52 P15 190 53 31 96 27 19 1.280
1.215
1.238
P14 O1 145 7 46 99 09 46 1.200
1.160
0.540
P14 O2 131 46 3 90 57 33 0.400
0.270
0.755
P14 O3 126 45 0 88 07 40 0.600
0.450
0.995
P14 O4 114 58 3 88 13 49 0.850
0.700
1.580
P14 O5 100 14 18 85 19 34 1.450
1.335
1.535
P14 O6 93 1 24 86 16 40 1.400
1.270
0.510
P14 O7 83 43 1 90 08 58 0.400
0.290
0.940
P14 O8 74 3 45 93 49 23 0.800
0.693
1.030
P14 O9 62 29 28 92 53 36 0.900
0.840
2.030
P14 O10 67 28 48 86 10 23 1.900
1.780
1.150
P15 1.36 P0 123 33 20 85 27 47 1.000
0.860
1.345
P15 Q1 106 1 42 90 26 28 1.280
1.215
2.070
P15 Q2 85 9 17 86 33 55 1.900
1.740
1.775
P15 Q3 75 29 8 85 48 18 1.600
1.434
0.930
P15 Q4 68 28 42 85 18 04 0.800
0.670
0.918
P15 Q5 62 52 13 88 32 11 0.800
0.700
2.315
P15 Q6 54 46 49 86 48 45 2.200
2.075
1.090
P15 Q7 47 35 37 86 53 11 1.000
0.915
1.785
P15 Q8 30 57 19 82 13 20 1.690
1.600
1.275
P15 Q9 13 19 39 90 48 54 1.200
1.130
1.000
P15 Q10 6 27 28 84 04 58 0.900
0.810
TANAH
EOLOGI

Alat Ukur : Theodolith


Lokasi : Gumbasa

Jarak
Sketsa
Optis (m)

27.93756 Perhitungan Azimuth :


P0 -P1

51.83881

10.98562

00*SIN(RADIANS(G22+(H22/60)+(I22/3600)))^2

16.46488
0
0
22.94708
0
0
37.99731
0
0
35.99236
0
0
15.7439
0
0
29.69237
0
0
15.36878
0
0
34.49618
0
0
42.77568
0
#REF!
23.80558
0
0
25.79979
0
0
14.17638
0
0
8.185925
0
0
4.774643
0
0
65.59306
0
0
15.79804
0
0
21.59235
0
0
43.88973
0
0
13.9876
0
0
17.58387
0
0
12.59868
0
0
10.1753
0
0
20.63708
0
0
37.78212
0
0
33.45476
0
0
22.26635
0
0
20.49022
0
0
25.23955
0
0
16.00575
0
0
16.1996
0
0
7.74293
0
0
18.50542
0
0
25.67997
0
0
18.8988
0
0
28.76517
0
0
7.155893
0
0
16.75052
0
0
5.968238
0
0
15.36969
0
0
8.188023
0
0
8.961616
0
0
9.919434
0
0
11.10935
0
0
33.1301
0
0
9.771052
0
0
33.92435
0
0
12.37629
0
0
16.77387
0
0
3.557441
0
0
2.694764
0
0
10.95383
0
0
18.93451
0
0
5.748844
0
0
14.80028
0
0
29.68571
0
0
23.12492
0
0
13.4311
0
0
29.97237
0
0
8.99997
0
0
14.16491
0
0
14.85284
0
0
14.83879
0
0
26.63007
0
0
33.87951
0
0
5.942645
0
0
8.889468
0
0
9.831319
0
0
18.73024
0
0
10.20154
0
0
19.98867
0
0
4.999989
0
0
1.942257
0
0
12.98337
0
0
7.192246
0
0
12.35612
0
0
37.62107
0
0
11.32668
0
0
8.245721
0
0
2.998815
0
0
3.99952
0
0
1.449797
0
0
6.248422
0
0
14.63494
0
0
71.9777
0
0
8.396401
0
0
0.305826
0
0
49.07715
0
0
13.59188
0
0
16.18914
0
0
19.99027
0
0
21.58954
0
0
24.78861
0
0
26.78609
0
0
67.06576
0
0
39.99853
0
0
14.35946
0
0
12.16192
0
0
10.19401
0
0
8.499736
0
0
15.39889
0
0
16.39725
0
0
18.19713
0
0
22.19981
0
0
34.96308
0
0
33.99043
0
0
21.43867
0
0
10.98591
0
0
14.97745
0
0
33.95099
0
0
28.7574
0
0
25.97065
0
0
19.9951
0
0
19.86255
0
0
19.9703
0
0
12.83568
0
0
7.602213
0
0
26.99243
0
0
30.46745
0
0
29.47186
0
0
24.33733
0
0
26.38832
0
0
21.99985
0
0
24.59019
0
0
18.95159
0
0
24.88863
0
0
28.81854
0
0
12.99923
0
0
32.88155
0
0
33.91753
0
0
25.82552
0
0
21.78578
0
0
23.9258
0
0
17.44837
0
0
18.16118
0
0
14.49707
0
0
18.79807
0
CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Pembacaan Sudut
Tinggi
Patok Target Hrz - Biasa
Alat (m)
⁰ ′ ʺ

P0 1.450 P15 341 36 26

P1 145 14 55

P1 1.445 P0 0 0 0

P2 124 24 7

P2 1.441 P1 0 0 0

P3 168 51 20

P3 1.374 P2 0 0 0

P4 139 50 55

P4 1.459 P3 0 0 0

P5 146 39 46

P5 1.660 P4 0 0 0

P6 159 5 50

P6 1.400 P5 0 0 0

P7 201 21 33

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P7 1.520 P6 0 0 0

P8 166 17 16

P8 1.440 P7 0 0 0

P9 167 32 38

P9 1.430 P8 0 0 0

P10 105 16 60

P10 1.160 P9 0 0 0

P11 212 4 50

P11 1.650 P10 0 0 0

P12 92 3 60

P12 1.530 P11 0 0 0

P13 188 35 0

P13 1.420 P12 0 0 0

P14 170 32 10

P14 1.520 P13 0 0 0

P15 190 53 31

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P15 190 53 31

P15 1.360 P14 0 0 0

P0 123 33 20

A Patok Utama
1 Menentukan Sudut Datar
⁰ ′ ₺
P0 = 145 14 55 -
P1 = 124 24 7 -
P2 = 168 51 20 -
P3 = 139 50 55 -
P4 = 146 39 46 -
P5 = 159 5 50 -
P6 = 201 21 33 -
P7 = 166 17 16 -
P8 = 167 32 38 -
P9 = 105 16 60 -
P10 = 212 4 50 -
P11 = 92 3 60 -
P12 = 188 35 0 -
P13 = 170 32 10 -
P14 = 190 53 31 -
P15 = 123 33 20 -

2 Menentukan Koreksi Sudut Datar


⁰ ′
Sudut Terkoreksi (Sudut Dalam) = 2520 0
Jumlah Sudut Terkoreksi = 2520 41
0 41

Koreksi Perpatok
P0 = 0.045 = 0 2
P1 = 0.034 = 0 2
P2 = 0.047 = 0 2
P3 = 0.039 = 0 2
P4 = 0.040 = 0 2
P5 = 0.044 = 0 2
P6 = 0.056 = 0 3
P7 = 0.046 = 0 2
P8 = 0.046 = 0 2
P9 = 0.029 = 0 1

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P10 = 0.059 = 0 3
P11 = 0.025 = 0 1
P12 = 0.052 = 0 3
P13 = 0.047 = 0 2
P14 = 0.053 = 0 3
P15 = 0.034 = 0 2
∑ = 0.696 = 0 41

3 Menentukan Sudut Terkoreksi


P0 = 163.641 - 0.045 =
P1 = 124.402 - 0.034 =
P2 = 168.856 - 0.047 =
P3 = 139.849 - 0.039 =
P4 = 146.663 - 0.040 =
P5 = 159.097 - 0.044 =
P6 = 201.359 - 0.056 =
P7 = 166.288 - 0.046 =
P8 = 167.544 - 0.046 =
P9 = 105.283 - 0.029 =
P10 = 212.081 - 0.059 =
P11 = 92.067 - 0.025 =
P12 = 188.583 - 0.052 =
P13 = 170.536 - 0.047 =
P14 = 190.892 - 0.053 =
P15 = 123.556 - 0.034 =
∑ =

4 Azimuth
Azimuth Awal = 341 36
P0 - P1 = 341.607 +
P1 - P2 = 325.203 +
P2 - P3 = 269.571 +
P3 - P4 = 258.380 +
P4 - P5 = 218.190 +
P5 - P6 = 184.812 +
P6 - P7 = 163.866 +
P7 - P8 = 185.169 +
P8 - P9 = 171.411 +
P9 - P10 = 158.909 +
P10 - P11 = 84.163 +
P11 - P12 = 116.185 +
P12 - P13 = 28.226 +
P13 - P14 = 36.757 +
P14 - P15 = 27.246 +

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P15 - P0 = 38.086 +

5 Menentukan Jarak Optis

P1 - P2 = 0.439 x
P2 - P3 = 0.442 x
P3 - P4 = 0.378 x
P4 - P5 = 0.288 x
P5 - P6 = 0.340 x
P6 - P7 = 0.190 x
P7 - P8 = 0.300 x
P8 - P9 = 0.339 x
P9 - P10 = 0.200 x
P10 - P11 = 0.440 x
P11 - P12 = 0.720 x
P12 - P13 = 0.400 x
P13 - P14 = 0.215 x
P14 - P15 = 0.130 x
P15 - P0 = 0.290 x
P0 - P1 = 0.520 x

6 Menentukan Selisih Koordinat

a Selisih Koordinat X

P1 - P2 = 42.776
P2 - P3 = 43.890
P3 - P4 = 37.782
P4 - P5 = 28.765
P5 - P6 = 33.924
P6 - P7 = 18.935
P7 - P8 = 29.972
P8 - P9 = 33.880
P9 - P10 = 19.989
P10 - P11 = 37.621
P11 - P12 = 71.978
P12 - P13 = 39.999
P13 - P14 = 21.439
P14 - P15 = 12.836
P15 - P0 = 28.819
P0 - P1 = 51.839

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

7 Menentukan Koreksi Koordinat

a Koreksi Koordinat X

P1 - P2 = -0.273
P2 - P3 = -0.280
P3 - P4 = -0.241
P4 - P5 = -0.183
P5 - P6 = -0.216
P6 - P7 = -0.121
P7 - P8 = -0.191
P8 - P9 = -0.216
P9 - P10 = -0.127
P10 - P11 = -0.240
P11 - P12 = -0.459
P12 - P13 = -0.255
P13 - P14 = -0.137
P14 - P15 = -0.082
P15 - P0 = -0.184
P0 - P1 = -0.330
∑ = -3.532

8 Selisih Koordinat Terkoreksi

a Absis Terkoreksi

P1 - P2 = -43.047
P2 - P3 = -43.270
P3 - P4 = -23.600
P4 - P5 = -2.596
P5 - P6 = 9.211
P6 - P7 = -1.827
P7 - P8 = 4.285
P8 - P9 = 11.976
P9 - P10 = 19.758
P10 - P11 = 33.521
P11 - P12 = 33.583
P12 - P13 = 23.681
P13 - P14 = 9.678
P14 - P15 = 7.836
P15 - P0 = -9.277
P0 - P1 = -29.913
∑ = 0.000

9 Koordinat Poligon

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koordinat Awal = 0.000

a Koordinat X

P0 - P1 = 0.000
P1 - P2 = -29.913
P2 - P3 = -72.960
P3 - P4 = -116.230
P4 - P5 = -139.830
P5 - P6 = -142.426
P6 - P7 = -133.215
P7 - P8 = -135.042
P8 - P9 = -130.756
P9 - P10 = -118.780
P10 - P11 = -99.023
P11 - P12 = -65.502
P12 - P13 = -31.919
P13 - P14 = -8.237
P14 - P15 = 1.441
P15 - P0 = 9.277

10 Perhitungan Beda Tinggi

P0 - P1 = 2.891 +
P1 - P2 = 6.935 +
P2 - P3 = 3.690 +
P3 - P4 = 0.822 +
P4 - P5 = 1.001 +
P5 - P6 = 1.602 +
P6 - P7 = 1.114 +
P7 - P8 = -0.910 +
P8 - P9 = -0.833 +
P9 - P10 = 0.476 +
P10 - P11 = -15.491 +
P11 - P12 = -1.267 +
P12 - P13 = -0.242 +
P13 - P14 = -1.147 +
P14 - P15 = -1.452 +
P15 - P0 = 2.287 +

11 Menentukan Koreksi

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koreksi = 2.342
16
= 0.146

12 Beda Tinggi Terkoreksi

P0 - P1 = 3.494
P1 - P2 = 5.722
P2 - P3 = 4.047
P3 - P4 = 0.918
P4 - P5 = 1.578
P5 - P6 = 1.762
P6 - P7 = 0.707
P7 - P8 = -1.018
P8 - P9 = 0.179
P9 - P10 = 0.460
P10 - P11 = -15.178
P11 - P12 = -1.763
P12 - P13 = -0.659
P13 - P14 = -1.386
P14 - P15 = -1.359
P15 - P0 = 2.495
∑ = 0.000

13 Tinggi Titik

Tinggi Titik Awal = 191

P0 = 191
P1 = 191 + 5.722 =
P2 = 196.722 + 4.047 =
P3 = 200.769 + 0.918 =
P4 = 201.687 + 1.578 =
P5 = 203.265 + 1.762 =
P6 = 205.027 + 0.707 =
P7 = 205.734 + -1.018 =
P8 = 204.716 + 0.179 =
P9 = 204.895 + 0.460 =
P10 = 205.354 + -15.178 =
P11 = 190.176 + -1.763 =
P12 = 188.413 + -0.659 =
P13 = 187.754 + -1.386 =
P14 = 186.369 + -1.359 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P15 = 185.010 + 2.495 =


P0 = 187.506 + 3.494 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

n= 16
Pembacaan Sudut
Bacaan
Vertikal
Rambu
⁰ ′ ʺ
0.940
92 42 24 0.800 92.707 = 0.999
0.660
0.960
86 48 30 0.700 86.808 = 0.998
0.440

0 0 0

2.731
80 47 28 2.512 80.791 = 0.987
2.292

0 0 0

1.159
85 11 38 0.938 85.194 = 0.996
0.717

0 0 0

1.320
88 45 14 1.131 88.754 = 1.000
0.942

0 0 0

0.880
88 0 25 0.736 88.007 = 0.999
0.592

0 0 0

1.524
87 17 47 1.354 87.296 = 0.999
1.184

0 0 0

1.755
86 38 3 1.660 86.634 = 0.998
1.565

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

0 0 0

1.632
91 44 21 1.482 91.739 = 1.000
1.332

0 0 0

0.451
91 24 31 0.282 91.409 = 1.000
0.112

0 0 0

1.400
88 38 10 1.300 88.636 = 1.000
1.200

0 0 0

0.920
112 22 50 0.700 112.381 = 0.925
0.480

0 0 0

2.360
91 0 30 2.000 91.008 = 1.000
1.640

0 0 0

2.000
90 20 50 1.800 90.347 = 1.000
1.600

0 0 0

1.620
93 03 42 1.513 93.062 = 0.999
1.405

0 0 0

1.345
96 27 19 1.280 96.455 = 0.994

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

96 27 19 96.455 = 0.994
1.215

0 0 0

1.150
85 27 47 1.005 85.463 = 0.997
0.860

⁰ ′ ₺ ⁰ ′ ₺
341 36 26 = -196 -22 29 =
0 0 0 = 124 24 7 =
0 0 0 = 168 51 20 =
0 0 0 = 139 50 55 =
0 0 0 = 146 39 46 =
0 0 0 = 159 5 50 =
0 0 0 = 201 21 33 =
0 0 0 = 166 17 16 =
0 0 0 = 167 32 38 =
0 0 0 = 105 16 60 =
0 0 0 = 212 4 50 =
0 0 0 = 92 3 60 =
0 0 0 = 188 35 0 =
0 0 0 = 170 32 10 =
0 0 0 = 190 53 31 =
0 0 0 = 123 33 20 =
∑ =


0 = 2520.000 = 2520 0 0
45 = 2520.696
45 = 0.6958 = 0 41 45

42.67
3.66
47.85
19.02
25.79
38.15
20.16
45.30
46.55
44.66

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

30.82
31.52
7.46
49.52
9.76
2.82
46

163.60 = 163 35 46.33


124.37 = 124 22 3.34
168.81 = 168 48 32.15
139.81 = 139 48 35.98
146.62 = 146 37 20.21
159.05 = 159 3 11.85
201.30 = 201 18 12.84
166.24 = 166 14 30.70
167.50 = 167 29 51.45
105.25 = 105 15 15.34
212.02 = 212 1 19.18
92.04 = 92 2 28.48
188.53 = 188 31 52.54
170.49 = 170 29 20.48
190.84 = 190 50 21.24
123.52 = 123 31 17.18
2520.00 = 2519 59 59

26 0 341 36 26 =
163.596 - 180 = 325.203 = 325 12
124.368 - 180 = 269.571 = 269 34
168.809 - 180 = 258.380 = 258 22
139.810 - 180 = 218.190 = 218 11
146.622 - 180 = 184.812 = 184 48
159.053 - 180 = 163.866 = 163 51
201.304 - 180 = 185.169 = 185 10
166.242 - 180 = 171.411 = 171 24
167.498 - 180 = 158.909 = 158 54
105.254 - 180 = 84.163 = 84 9
212.022 - 180 = 116.185 = 116 11
92.041 - 180 = 28.226 = 28 13
188.531 - 180 = 36.757 = 36 45
170.489 - 180 = 27.246 = 27 14
190.839 - 180 = 38.086 = 38 5

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

123.521 - 180 = 341.607 = 341 36

100 x 0.974 = 42.78


100 x 0.993 = 43.89
100 x 1.000 = 37.78
100 x 0.999 = 28.77
100 x 0.998 = 33.92
100 x 0.997 = 18.93
100 x 0.999 = 29.97
100 x 0.999 = 33.88
100 x 0.999 = 19.99
100 x 0.855 = 37.62
100 x 1.000 = 71.98
100 x 1.000 = 40.00
100 x 0.997 = 21.44
100 x 0.987 = 12.84
100 x 0.994 = 28.82
100 x 0.997 = 51.84
∑ = 554.44

b Selisih Koordinat Y

x -1.000 = -42.774 P1 -
x -0.980 = -42.990 P2 -
x -0.618 = -23.360 P3 -
x -0.084 = -2.413 P4 -
x 0.278 = 9.427 P5 -
x -0.090 = -1.706 P6 -
x 0.149 = 4.476 P7 -
x 0.360 = 12.192 P8 -
x 0.995 = 19.885 P9 -
x 0.897 = 33.760 P10 -
x 0.473 = 34.042 P11 -
x 0.598 = 23.936 P12 -
x 0.458 = 9.815 P13 -
x 0.617 = 7.918 P14 -
x -0.316 = -9.093 P15 -
x -0.571 = -29.583 P0 -
∑ = 3.532

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

b Koreksi Koordinat Y

P1 - P2 = 0.018
P2 - P3 = 0.019
P3 - P4 = 0.016
P4 - P5 = 0.012
P5 - P6 = 0.014
P6 - P7 = 0.008
P7 - P8 = 0.013
P8 - P9 = 0.014
P9 - P10 = 0.009
P10 - P11 = 0.016
P11 - P12 = 0.031
P12 - P13 = 0.017
P13 - P14 = 0.009
P14 - P15 = 0.005
P15 - P0 = 0.012
P0 - P1 = 0.022
∑ = 0.237

b Ordinat Terkoreksi

P1 - P2 = -0.302
P2 - P3 = -8.822
P3 - P4 = -29.679
P4 - P5 = -28.651
P5 - P6 = -32.574
P6 - P7 = -18.849
P7 - P8 = -29.623
P8 - P9 = -31.595
P9 - P10 = 2.041
P10 - P11 = -16.585
P11 - P12 = 63.449
P12 - P13 = 32.063
P13 - P14 = 19.069
P14 - P15 = 10.108
P15 - P0 = 27.359
P0 - P1 = 42.591
∑ = 0.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

b Koordinat Y

+ -29.913 = -29.913 P0 -
+ -43.047 = -72.960 P1 -
+ -43.270 = -116.230 P2 -
+ -23.600 = -139.830 P3 -
+ -2.596 = -142.426 P4 -
+ 9.211 = -133.215 P5 -
+ -1.827 = -135.042 P6 -
+ 4.285 = -130.756 P7 -
+ 11.976 = -118.780 P8 -
+ 19.758 = -99.023 P9 -
+ 33.521 = -65.502 P10 -
+ 33.583 = -31.919 P11 -
+ 23.681 = -8.237 P12 -
+ 9.678 = 1.441 P13 -
+ 7.836 = 9.277 P14 -
+ -9.277 = 0.000 P15 -

1.450 - 0.700 = 3.641


1.445 - 2.512 = 5.868
1.441 - 0.938 = 4.193
1.374 - 1.131 = 1.065
1.459 - 0.736 = 1.724
1.660 - 1.354 = 1.908
1.400 - 1.660 = 0.854
1.520 - 1.482 = -0.872
1.440 - 0.282 = 0.325
1.430 - 1.300 = 0.606
1.160 - 0.700 = -15.031
1.650 - 2.000 = -1.617
1.530 - 1.800 = -0.512
1.420 - 1.513 = -1.239
1.520 - 1.280 = -1.212
1.360 - 1.005 = 2.642
∑ = 2.342

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

196.722
200.769
201.687
203.265
205.027
205.734
204.716
204.895
205.354
190.176
188.413
187.754
186.369
185.010

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

187.506
191.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Jumlah Patok

= Sin
= Tan 341.607
= -21.153
27.938

= 17.933
28.000

= 6.168

= 11.893

= 45.972

= 28.736

= 21.177

= 17.003

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

= -32.934

= -40.667

= 42.001

= -2.429

= -56.816

= -165.010

= -18.696

= -8.838

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

= -8.838

= 12.602

163.641
124.402
168.856
139.849
146.663
159.097
201.359
166.288
167.544
105.283
212.081
92.067
188.583
170.536
190.892
123.556
2520.696
⁰ ′ ₺
2520 41 45

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

341.607
12.33
15.67
47.82
23.80
44.01
55.86
8.70
39.41
30.86
46.20
5.38
33.87
26.41
46.88
8.13

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

25.31

Koordinat Y

P2 = 42.776 x -0.007 = -0.320


P3 = 43.890 x -0.201 = -8.840
P4 = 37.782 x -0.786 = -29.695
P5 = 28.765 x -0.996 = -28.664
P6 = 33.924 x -0.961 = -32.588
P7 = 18.935 x -0.996 = -18.858
P8 = 29.972 x -0.989 = -29.636
P9 = 33.880 x -0.933 = -31.610
P10 = 19.989 x 0.102 = 2.033
P11 = 37.621 x -0.441 = -16.601
P12 = 71.978 x 0.881 = 63.419
P13 = 39.999 x 0.801 = 32.046
P14 = 21.439 x 0.889 = 19.060
P15 = 12.836 x 0.787 = 10.103
P0 = 28.819 x 0.949 = 27.346
P1 = 51.839 x 0.821 = 42.569
∑ = -0.237

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

ordinat Y

P1 = 0.000 + 42.591 = 42.591


P2 = 42.591 + -0.302 = 42.289
P3 = 42.289 + -8.822 = 33.468
P4 = 33.468 + -29.679 = 3.788
P5 = 3.788 + -28.651 = -24.863
P6 = -24.863 + -32.574 = -57.437
P7 = -57.437 + -18.849 = -76.286
P8 = -76.286 + -29.623 = -105.910
P9 = -105.910 + -31.595 = -137.505
P10 = -137.505 + 2.041 = -135.464
P11 = -135.464 + -16.585 = -152.048
P12 = -152.048 + 63.449 = -88.599
P13 = -88.599 + 32.063 = -56.536
P14 = -56.536 + 19.069 = -37.467
P15 = -37.467 + 10.108 = -27.359
P0 = -27.359 + 27.359 = 0.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

JARAK SUDUT
P1-P2 42.776 124.402
P2-P3 43.890 168.856
P3-P4 37.782 139.849
P4-P5 28.765 146.663
P5-P6 33.924 159.097
P6-P7 18.935 201.359
P7-P8 29.972 166.288
P8-P9 #REF! 167.544
P9-P10 #REF! 105.283
P10-P0 37.621 212.081
P0-P1 33.880 145.249 1419.306
-20.694

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Pembacaan Sudut
Tinggi
Patok Target Hrz - Biasa Vertikal
Alat (m)
⁰ ′ ₺ ⁰

P0 1.450 a 3 32 9 92

b 338 2 47 87

c 330 21 2 87

d 308 28 44 87

e 301 9 2 90

f 290 22 23 89

g 278 28 42 86

h 260 51 43 84

i 244 55 52 95

j 220 50 7 90

P1 1.445 a 118 31 30 97

b 125 40 35 90

c 107 8 14 92

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

d 100 8 2 87

e 75 59 27 85

f 90 52 50 89

g 74 33 21 90

h 49 10 31 84

P2 1.441 a 156 12 52 91

b 134 23 13 91

c 109 4 29 90

d 36 11 6 87

e 22 40 44 84

P3 1.374 a 134 23 24 93

b 125 36 46 96

c 101 30 31 97

d 84 29 23 96

e 71 34 10 96

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

e 71 34 10 96

f 69 50 18 90

g 32 23 53 94

h 53 19 19 94

i 36 21 44 93

j 17 22 14 90

P4 1.459 a 37 46 20 103

b 53 33 31 93

c 77 27 9 98

d 108 14 41 92

e 104 56 11 92

f 116 36 13 93

g 139 54 20 95

h 18 40 44 95

i 36 57 31 95

j 141 2 51 93
A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091
CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

j 141 2 51 93

P5 1.660 a 110 28 32 100

b 107 37 45 92

c 99 50 11 114

d 24 18 48 87

e 43 34 56 93

P6 1.400 a 114 52 29 101

b 74 31 28 96

c 140 37 3 95

d 150 15 16 96

e 168 5 53 96

P7 1.520 a 218 32 38 89

b 102 25 12 98

c 54 34 45 98

d 33 9 10 95

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

e 105 1 32 95

P8 1.440 a 99 14 11 95

b 159 14 14 91

c 45 32 14 97

d 46 4 29 96

e 67 14 11 95

P9 1.430 a 13 53 30 90

b 40 20 50 31

c 38 29 50 92

d 70 29 10 91

e 85 52 50 97

P10 1.160 a 204 26 20 94

b 200 51 20 97

c 184 55 40 91

d 156 44 40 90

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

d 156 44 40 90

e 151 50 0 31

f 145 48 0 98

g 144 59 40 98

P11 1.650 a 57 57 60 91

b 50 5 20 9

c 48 32 40 91

d 31 1 20 91

e 21 2 0.00 91

f 32 29 0.00 91

g 20 24 40 91

h 25 6 50 91

i 8 26 10 91

j 6 38 10 91

P12 1.530 a 100 43 50 93

b 61 44 40 93
A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091
CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

b 61 44 40 93

c 44 4 20 88

d 19 27 20 90

e 24 0 20 90

f 15 37 60 89

g 8 37 60 89

h 8 48 0.00 89

i 36 45 40 91

j 40 23 20 90

P13 1.420 a 128 28 52 92

b 121 13 20 92

c 110 43 45 87

d 106 13 33 84

e 98 35 16 91

f 93 33 20 90

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

g 96 4 11 94

h 92 15 27 92

P14 1.520 a 145 7 46 99

b 131 46 3 90

c 126 45 0 88

d 114 58 3 88

e 100 14 18 85

f 93 1 24 86

g 83 43 1 90

h 74 3 45 93

i 62 29 28 92

j 67 28 48 86

P15 1.360 a 106 1 42 90

b 85 9 17 86

c 75 29 8 85

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

c 75 29 8 85

d 68 28 42 85

e 62 52 13 88

f 54 46 49 86

g 47 35 37 86

h 30 57 19 82

i 13 19 39 90

j 6 27 28 84

B Patok Detail
1 Menentukan Sudut Datar
P0 a = 3 32 9 -
b = 338 2 47 -
c = 330 21 2 -
d = 308 28 44 -
e = 301 9 2 -
f = 290 22 23 -
g = 278 28 42 -
h = 260 51 43 -
i = 244 55 52 -
j = 220 50 7 -

P1 a = 118 31 30 -
b = 125 40 35 -
c = 107 8 14 -
d = 36 11 6 -
e = 75 59 27 -
f = 90 52 50 -
g = 74 33 21 -
h = 49 10 31 -

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P2 a = 156 12 52 -
b = 134 23 13 -
c = 109 4 29 -
d = 36 11 6 -
e = 22 40 44 -

P3 a = 134 23 24 -
b = 125 36 46 -
c = 101 30 31 -
d = 84 29 23 -
e = 71 34 10 -
f = 69 50 18 -
g = 32 23 53 -
h = 53 19 19 -
i = 36 21 44 -
j = 17 22 14 -

P4 a = 37 46 20 -
b = 53 33 31 -
c = 77 27 9 -
d = 108 14 41 -
e = 104 56 11 -
f = 116 36 13 -
g = 139 54 20 -
h = 18 40 44 -
i = 36 57 31 -
j = 141 2 51 -

P5 a = 110 28 32 -
b = 107 37 45 -
c = 99 50 11 -
d = 24 18 48 -
e = 43 34 56 -

P6 a = 114 52 29 -
b = 74 31 28 -
c = 140 37 3 -
d = 150 15 16 -
e = 168 5 53 -

P7 a = 218 32 38 -
b = 102 25 12 -
c = 54 34 45 -

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

d = 33 9 10 -
e = 105 1 32 -

P8 a = 99 14 11 -
b = 159 14 14 -
c = 45 32 14 -
d = 46 4 29 -
e = 67 14 11 -

P9 a = 13 53 30 -
b = 40 20 50 -
c = 38 29 50 -
d = 70 29 10 -
e = 85 52 50 -

P10 a = 204 26 20 -
b = 200 51 20 -
c = 184 55 40 -
d = 156 44 40 -
e = 151 50 0 -
f = 145 48 0 -
g = 144 59 40 -

P11 a = 57 57 60 -
b = 50 5 20 -
c = 48 32 40 -
d = 31 1 20 -
e = 21 2 0 -
f = 32 29 0 -
g = 20 24 40 -
h = 25 6 50 -
i = 8 26 10 -
j = 6 38 10 -

P12 a = 100 43 50 -
b = 61 44 40 -
c = 44 4 20 -
d = 19 27 20 -
e = 24 0 20 -
f = 15 37 60 -
g = 8 37 60 -
h = 8 48 0 -
i = 36 45 40 -
j = 40 23 20 -

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P13 a = 128 28 52 -
b = 121 13 20 -
c = 110 43 45 -
d = 106 13 33 -
e = 98 35 16 -
f = 93 33 20 -
g = 96 4 11 -
h = 92 15 27 -

P14 a = 145 7 46 -
b = 131 46 3 -
c = 126 45 0 -
d = 114 58 3 -
e = 100 14 18 -
f = 93 1 24 -
g = 83 43 1 -
h = 74 3 45 -
i = 62 29 28 -
j = 67 28 48 -

P15 a = 106 1 42 -
b = 85 9 17 -
c = 75 29 8 -
d = 68 28 42 -
e = 62 52 13 -
f = 54 46 49 -
g = 47 35 37 -
h = 30 57 19 -
i = 13 19 39 -
j = 6 27 28 -

2 Azimuth Patok Detail


P0 = 341 36 26
a = 341.607222 + 21.929 =
b = 341.607222 + 356.439 =
c = 341.607222 + 348.743 =
d = 341.607222 + 326.872 =
e = 341.607222 + 319.543 =
f = 341.607222 + 308.766 =
g = 341.607222 + 296.871 =
h = 341.607222 + 279.255 =
i = 341.607222 + 263.324 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

j = 341.607222 + 239.228 =

P1 = 325 12 12
a = 325.203426 + 118.525 =
b = 325.203426 + 125.676 =
c = 325.203426 + 107.137 =
d = 325.203426 + 36.185 =
e = 325.203426 + 75.991 =
f = 325.203426 + 90.881 =
g = 325.203426 + 74.556 =
h = 325.203426 + 49.175 =

P2 = 269 34 15.67
a = 269.57102 + 156 =
b = 269.57102 + 134 =
c = 269.57102 + 109 =
d = 269.57102 + 36 =
e = 269.57102 + 23 =

P3 = 258 22 48
a = 258.37995 + 134 =
b = 258.37995 + 126 =
c = 258.37995 + 102 =
d = 258.37995 + 84 =
e = 258.37995 + 72 =
f = 258.37995 + 70 =
g = 258.37995 + 32 =
h = 258.37995 + 53 =
i = 258.37995 + 36 =
j = 258.37995 + 17 =

P4 = 218 11 24
a = 218.189946 + 38 =
b = 218.189946 + 54 =
c = 218.189946 + 77 =
d = 218.189946 + 108 =
e = 218.189946 + 105 =
f = 218.189946 + 117 =
g = 218.189946 + 140 =
h = 218.189946 + 19 =
i = 218.189946 + 37 =
j = 218.189946 + 141 =

P5 = 184 48 44

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

a = 184.812226 + 110 =
b = 184.812226 + 108 =
c = 184.812226 + 100 =
d = 184.812226 + 24 =
e = 184.812226 + 44 =

P6 = 163 51 56
a = 163.865518 + 115 =
b = 163.865518 + 75 =
c = 163.865518 + 141 =
d = 163.865518 + 150 =
e = 163.865518 + 168 =

P7 = 185 10 8.70
a = 185.169 + 219 =
b = 185.169 + 102 =
c = 185.169 + 55 =
d = 185.169 + 33 =
e = 185.169 + 105 =

P8 = 171 24 39
a = 171.411 + 99 =
b = 171.411 + 159 =
c = 171.411 + 46 =
d = 171.411 + 46 =
e = 171.411 + 67 =

P9 = 158 54 31
a = 158.909 + 14 =
b = 158.909 + 40 =
c = 158.909 + 38 =
d = 158.909 + 70 =
e = 158.909 + 86 =

P10 = 84 9 46
a = 84.163 + 204 =
b = 84.163 + 201 =
c = 84.163 + 185 =
d = 84.163 + 157 =
e = 84.163 + 152 =
f = 84.163 + 146 =
g = 84.163 + 145 =

P11 = 116 11 5

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

a = 116.185 + 58 =
b = 116.185 + 50 =
c = 116.185 + 49 =
d = 116.185 + 31 =
e = 116.185 + 21 =
f = 116.185 + 32 =
g = 116.185 + 20 =
h = 116.185 + 25 =
i = 116.185 + 8 =
j = 116.185 + 7 =

P12 = 28 13 34
a = 28.226 + 101 =
b = 28.226 + 62 =
c = 28.226 + 44 =
d = 28.226 + 19 =
e = 28.226 + 24 =
f = 28.226 + 16 =
g = 28.226 + 9 =
h = 28.226 + 9 =
i = 28.226 + 37 =
j = 28.226 + 40 =

P13 = 36 45 26
a = 36.757 + 128 =
b = 36.757 + 121 =
c = 36.757 + 111 =
d = 36.757 + 106 =
e = 36.757 + 99 =
f = 36.757 + 94 =
g = 36.757 + 96 =
h = 36.757 + 92 =

P14 = 27 14 47
a = 27.246 + 145 =
b = 27.246 + 132 =
c = 27.246 + 127 =
d = 27.246 + 115 =
e = 27.246 + 100 =
f = 27.246 + 93 =
g = 27.246 + 84 =
h = 27.246 + 74 =
i = 27.246 + 62 =
j = 27.246 + 67 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P15 = 38 5 8
a = 38.086 + 106 =
b = 38.086 + 85 =
c = 38.086 + 75 =
d = 38.086 + 68 =
e = 38.086 + 63 =
f = 38.086 + 55 =
g = 38.086 + 48 =
h = 38.086 + 31 =
i = 38.086 + 13 =
j = 38.086 + 6 =

3 Jarak Datar Optis

P0 a = 0.110 x 100 x
b = 0.160 x 100 x
c = 0.165 x 100 x
d = 0.230 x 100 x
e = 0.380 x 100 x
f = 0.360 x 100 x
g = 0.158 x 100 x
h = 0.300 x 100 x
i = 0.155 x 100 x
j = 0.345 x 100 x

P1 a = 0.242 x 100 x
b = 0.258 x 100 x
c = 0.142 x 100 x
d = 0.082 x 100 x
e = 0.048 x 100 x
f = 0.656 x 100 x
g = 0.158 x 100 x
h = 0.109 x 100 x

P2 a = 0.140 x 100 x
b = 0.176 x 100 x
c = 0.126 x 100 x
d = 0.102 x 100 x
e = 0.208 x 100 x

P3 a = 0.336 x 100 x
b = 0.226 x 100 x

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

c = 0.208 x 100 x
d = 0.256 x 100 x
e = 0.162 x 100 x
f = 0.162 x 100 x
g = 0.078 x 100 x
h = 0.186 x 100 x
i = 0.258 x 100 x
j = 0.189 x 100 x

P4 a = 0.076 x 100 x
b = 0.168 x 100 x
c = 0.061 x 100 x
d = 0.154 x 100 x
e = 0.082 x 100 x
f = 0.090 x 100 x
g = 0.100 x 100 x
h = 0.112 x 100 x
i = 0.334 x 100 x
j = 0.098 x 100 x

P5 a = 0.128 x 100 x
b = 0.168 x 100 x
c = 0.043 x 100 x
d = 0.027 x 100 x
e = 0.110 x 100 x

P6 a = 0.060 x 100 x
b = 0.150 x 100 x
c = 0.300 x 100 x
d = 0.234 x 100 x
e = 0.136 x 100 x

P7 a = 0.090 x 100 x
b = 0.145 x 100 x
c = 0.152 x 100 x
d = 0.150 x 100 x
e = 0.269 x 100 x

P8 a = 0.060 x 100 x
b = 0.089 x 100 x
c = 0.100 x 100 x
d = 0.190 x 100 x
e = 0.103 x 100 x

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P9 a = 0.050 x 100 x
b = 0.070 x 100 x
c = 0.130 x 100 x
d = 0.072 x 100 x
e = 0.126 x 100 x

P10 a = 0.114 x 100 x


b = 0.084 x 100 x
c = 0.030 x 100 x
d = 0.040 x 100 x
e = 0.054 x 100 x
f = 0.064 x 100 x
g = 0.150 x 100 x

P11 a = 0.084 x 100 x


b = 0.120 x 100 x
c = 0.491 x 100 x
d = 0.136 x 100 x
e = 0.162 x 100 x
f = 0.200 x 100 x
g = 0.216 x 100 x
h = 0.248 x 100 x
i = 0.268 x 100 x
j = 0.671 x 100 x

P12 a = 0.144 x 100 x


b = 0.122 x 100 x
c = 0.102 x 100 x
d = 0.085 x 100 x
e = 0.154 x 100 x
f = 0.164 x 100 x
g = 0.182 x 100 x
h = 0.222 x 100 x
i = 0.350 x 100 x
j = 0.340 x 100 x

P13 a = 0.110 x 100 x


b = 0.150 x 100 x
c = 0.340 x 100 x
d = 0.290 x 100 x
e = 0.260 x 100 x
f = 0.200 x 100 x
g = 0.200 x 100 x
h = 0.200 x 100 x

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P14 a = 0.078 x 100 x


b = 0.270 x 100 x
c = 0.305 x 100 x
d = 0.295 x 100 x
e = 0.245 x 100 x
f = 0.265 x 100 x
g = 0.220 x 100 x
h = 0.247 x 100 x
i = 0.190 x 100 x
j = 0.250 x 100 x

P15 a = 0.130 x 100 x


b = 0.330 x 100 x
c = 0.341 x 100 x
d = 0.260 x 100 x
e = 0.218 x 100 x
f = 0.240 x 100 x
g = 0.175 x 100 x
h = 0.185 x 100 x
i = 0.145 x 100 x
j = 0.190 x 100 x

4 Selisih Koordinat

Koordinat X
P0 a = 10.986 x -0.062 =
b = 15.960 x 0.374 =
c = 16.465 x 0.495 =
d = 22.947 x 0.783 =
e = 37.997 x 0.856 =
f = 35.992 x 0.937 =
g = 15.744 x 0.989 =
h = 29.692 x 0.987 =
i = 15.369 x 0.906 =
j = 34.496 x 0.654 =

P1 a = 23.806 x -0.994 =
b = 25.800 x -1.000 =
c = 14.176 x -0.953 =
d = 8.186 x -0.024 =
e = 4.775 x -0.659 =
f = 65.593 x -0.830 =
g = 15.798 x -0.640 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

h = 10.796 x -0.248 =

P2 a = 13.988 x -0.912 =
b = 17.584 x -0.694 =
c = 12.599 x -0.320 =
d = 10.175 x 0.812 =
e = 20.637 x 0.926 =

P3 a = 33.455 x -0.541 =
b = 22.266 x -0.407 =
c = 20.490 x 0.002 =
d = 25.240 x 0.295 =
e = 16.006 x 0.501 =
f = 16.200 x 0.527 =
g = 7.743 x 0.935 =
h = 18.505 x 0.747 =
i = 25.680 x 0.908 =
j = 18.899 x 0.995 =

P4 a = 7.156 x 0.970 =
b = 16.751 x 1.000 =
c = 5.968 x 0.902 =
d = 15.370 x 0.553 =
e = 8.188 x 0.600 =
f = 8.962 x 0.426 =
g = 9.919 x 0.033 =
h = 11.109 x 0.837 =
i = 33.130 x 0.967 =
j = 9.771 x 0.013 =

P5 a = 12.376 x 0.904 =
b = 16.774 x 0.924 =
c = 3.557 x 0.967 =
d = 2.695 x 0.487 =
e = 10.954 x 0.748 =

P6 a = 5.749 x 0.988 =
b = 14.800 x 0.852 =
c = 29.686 x 0.824 =
d = 23.125 x 0.718 =
e = 13.431 x 0.470 =

P7 a = 9.000 x -0.691 =
b = 14.165 x 0.953 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

c = 14.853 x 0.864 =
d = 14.839 x 0.620 =
e = 26.630 x 0.939 =

P8 a = 5.943 x 1.000 =
b = 8.889 x 0.490 =
c = 9.831 x 0.601 =
d = 18.730 x 0.609 =
e = 10.202 x 0.854 =

P9 a = 5.000 x -0.125 =
b = 1.942 x 0.330 =
c = 12.983 x 0.299 =
d = 7.192 x 0.759 =
e = 12.356 x 0.905 =

P10 a = 11.327 x 0.948 =


b = 8.246 x 0.966 =
c = 2.999 x 1.000 =
d = 4.000 x 0.874 =
e = 1.450 x 0.829 =
f = 6.248 x 0.766 =
g = 14.635 x 0.757 =

P11 a = 8.396 x -0.102 =


b = 0.306 x -0.237 =
c = 49.077 x -0.263 =
d = 13.592 x -0.542 =
e = 16.189 x -0.679 =
f = 19.990 x -0.520 =
g = 21.590 x -0.687 =
h = 24.789 x -0.625 =
i = 26.786 x -0.823 =
j = 67.066 x -0.840 =

P12 a = 14.359 x -0.778 =


b = 12.162 x -1.000 =
c = 10.194 x -0.953 =
d = 8.500 x -0.739 =
e = 15.399 x -0.790 =
f = 16.397 x -0.693 =
g = 18.197 x -0.600 =
h = 22.200 x -0.602 =
i = 34.963 x -0.906 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

j = 33.990 x -0.931 =

P13 a = 10.986 x -0.255 =


b = 14.977 x -0.375 =
c = 33.951 x -0.537 =
d = 28.757 x -0.602 =
e = 25.971 x -0.703 =
f = 19.995 x -0.763 =
g = 19.863 x -0.733 =
h = 19.970 x -0.777 =

P14 a = 7.602 x -0.133 =


b = 26.992 x -0.358 =
c = 30.467 x -0.438 =
d = 29.472 x -0.613 =
e = 24.337 x -0.794 =
f = 26.388 x -0.864 =
g = 22.000 x -0.934 =
h = 24.590 x -0.981 =
i = 18.952 x -1.000 =
j = 24.889 x -0.997 =

P15 a = 12.999 x -0.586 =


b = 32.882 x -0.836 =
c = 33.918 x -0.917 =
d = 25.826 x -0.959 =
e = 21.786 x -0.982 =
f = 23.926 x -0.999 =
g = 17.448 x -0.997 =
h = 18.161 x -0.934 =
i = 14.497 x -0.782 =
j = 18.798 x -0.701 =

5 Koordinat Poligon Detail

Koordinat X
P0 a = -29.913 + -0.678 =
b = -29.913 + 5.967 =
c = -29.913 + 8.145 =
d = -29.913 + 17.964 =
e = -29.913 + 32.519 =
f = -29.913 + 33.741 =
g = -29.913 + 15.572 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

h = -29.913 + 29.316 =
i = -29.913 + 13.921 =
j = -29.913 + 22.557 =

P1 a = -72.960 + -23.663 =
b = -72.960 + -25.797 =
c = -72.960 + -13.508 =
d = -72.960 + -0.198 =
e = -72.960 + -3.145 =
f = -72.960 + -54.433 =
g = -72.960 + -10.104 =
h = -72.960 + -2.681 =

P2 a = -116.230 + -12.757 =
b = -116.230 + -12.206 =
c = -116.230 + -4.028 =
d = -116.230 + 8.257 =
e = -116.230 + 19.100 =

P3 a = -139.830 + -18.108 =
b = -139.830 + -9.054 =
c = -139.830 + 0.040 =
d = -139.830 + 7.434 =
e = -139.830 + 8.015 =
f = -139.830 + 8.532 =
g = -139.830 + 7.239 =
h = -139.830 + 13.816 =
i = -139.830 + 23.323 =
j = -139.830 + 18.804 =

P4 a = -142.426 + 6.942 =
b = -142.426 + 16.743 =
c = -142.426 + 5.380 =
d = -142.426 + 8.498 =
e = -142.426 + 4.913 =
f = -142.426 + 3.817 =
g = -142.426 + 0.330 =
h = -142.426 + 9.303 =
i = -142.426 + 32.023 =
j = -142.426 + 0.130 =

P5 a = -133.215 + 11.190 =
b = -133.215 + 15.504 =
c = -133.215 + 3.442 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

d = -133.215 + 1.312 =
e = -133.215 + 8.191 =

P6 a = -135.042 + 5.682 =
b = -135.042 + 12.604 =
c = -135.042 + 24.470 =
d = -135.042 + 16.601 =
e = -135.042 + 6.313 =

P7 a = -130.756 + -6.219 =
b = -130.756 + 13.503 =
c = -130.756 + 12.830 =
d = -130.756 + 9.201 =
e = -130.756 + 24.993 =

P8 a = -118.780 + 5.942 =
b = -118.780 + 4.357 =
c = -118.780 + 5.910 =
d = -118.780 + 11.399 =
e = -118.780 + 8.712 =

P9 a = -99.023 + -0.627 =
b = -99.023 + 0.641 =
c = -99.023 + 3.884 =
d = -99.023 + 5.460 =
e = -99.023 + 11.179 =

P10 a = -65.502 + 10.735 =


b = -65.502 + 7.964 =
c = -65.502 + 2.998 =
d = -65.502 + 3.495 =
e = -65.502 + 1.202 =
f = -65.502 + 4.784 =
g = -65.502 + 11.071 =

P11 a = -31.919 + -0.856 =


b = -31.919 + -0.073 =
c = -31.919 + -12.926 =
d = -31.919 + -7.361 =
e = -31.919 + -10.996 =
f = -31.919 + -10.395 =
g = -31.919 + -14.835 =
h = -31.919 + -15.499 =
i = -31.919 + -22.043 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

j = -31.919 + -56.360 =

P12 a = -8.237 + -11.166 =


b = -8.237 + -12.162 =
c = -8.237 + -9.711 =
d = -8.237 + -6.285 =
e = -8.237 + -12.173 =
f = -8.237 + -11.362 =
g = -8.237 + -10.916 =
h = -8.237 + -13.368 =
i = -8.237 + -31.684 =
j = -8.237 + -31.650 =

P13 a = 1.441 + -2.799 =


b = 1.441 + -5.616 =
c = 1.441 + -18.249 =
d = 1.441 + -17.313 =
e = 1.441 + -18.253 =
f = 1.441 + -15.247 =
g = 1.441 + -14.567 =
h = 1.441 + -15.517 =

P14 a = 9.277 + -1.009 =


b = 9.277 + -9.667 =
c = 9.277 + -13.358 =
d = 9.277 + -18.058 =
e = 9.277 + -19.312 =
f = 9.277 + -22.791 =
g = 9.277 + -20.544 =
h = 9.277 + -24.113 =
i = 9.277 + -18.951 =
j = 9.277 + -24.804 =

P15 a = 0.000 + -7.620 =


b = 0.000 + -27.501 =
c = 0.000 + -31.088 =
d = 0.000 + -24.754 =
e = 0.000 + -21.389 =
f = 0.000 + -23.896 =
g = 0.000 + -17.399 =
h = 0.000 + -16.960 =
i = 0.000 + -11.332 =
j = 0.000 + -13.186 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

6 Beda Tinggi
P0 a = 1.450 - 2.600 +
b = 1.450 - 3.100 +
c = 1.450 - 3.000 +
d = 1.450 - 2.200 +
e = 1.450 - 1.500 +
f = 1.450 - 0.700 +
g = 1.450 - 3.200 +
h = 1.450 - 1.600 +
i = 1.450 - 1.600 +
j = 1.450 - 0.600 +

P1 a = 1.445 - 0.737 +
b = 1.445 - 3.059 +
c = 1.445 - 2.008 +
d = 1.445 - 1.023 +
e = 1.445 - 1.443 +
f = 1.445 - 3.682 +
g = 1.445 - 1.372 +
h = 1.445 - 1.198 +

P2 a = 1.441 - 1.876 +
b = 1.441 - 1.928 +
c = 1.441 - 1.954 +
d = 1.441 - 1.473 +
e = 1.441 - 2.538 +

P3 a = 1.374 - 2.441 +
b = 1.374 - 1.119 +
c = 1.374 - 1.425 +
d = 1.374 - 1.398 +
e = 1.374 - 1.525 +
f = 1.374 - 1.524 +
g = 1.374 - 1.336 +
h = 1.374 - 1.792 +
i = 1.374 - 0.622 +
j = 1.374 - 1.095 +

P4 a = 1.459 - 1.324 +
b = 1.459 - 0.748 +
c = 1.459 - 1.009 +
d = 1.459 - 1.012 +
e = 1.459 - 1.873 +
f = 1.459 - 1.442 +

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

g = 1.459 - 1.189 +
h = 1.459 - 1.255 +
i = 1.459 - 1.445 +
j = 1.459 - 1.482 +

P5 a = 1.660 - 0.865 +
b = 1.660 - 1.555 +
c = 1.660 - 1.312 +
d = 1.660 - 1.240 +
e = 1.660 - 1.017 +

P6 a = 1.400 - 0.768 +
b = 1.400 - 0.750 +
c = 1.400 - 1.481 +
d = 1.400 - 1.252 +
e = 1.400 - 0.739 +

P7 a = 1.520 - 1.400 +
b = 1.520 - 1.003 +
c = 1.520 - 0.434 +
d = 1.520 - 1.030 +
e = 1.520 - 1.700 +

P8 a = 1.440 - 0.795 +
b = 1.440 - 0.596 +
c = 1.440 - 0.484 +
d = 1.440 - 0.370 +
e = 1.440 - 0.824 +

P9 a = 1.430 - 1.400 +
b = 1.430 - 1.500 +
c = 1.430 - 1.900 +
d = 1.430 - 1.800 +
e = 1.430 - 0.900 +

P10 a = 1.160 - 1.300 +


b = 1.160 - 1.000 +
c = 1.160 - 1.500 +
d = 1.160 - 1.500 +
e = 1.160 - 1.500 +
f = 1.160 - 0.900 +
g = 1.160 - 1.300 +

P11 a = 1.650 - 1.200 +

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

b = 1.650 - 1.400 +
c = 1.650 - 2.400 +
d = 1.650 - 1.300 +
e = 1.650 - 1.300 +
f = 1.650 - 1.600 +
g = 1.650 - 1.000 +
h = 1.650 - 1.550 +
i = 1.650 - 1.800 +
j = 1.650 - 1.900 +

P12 a = 1.530 - 1.300 +


b = 1.530 - 1.500 +
c = 1.530 - 1.400 +
d = 1.530 - 1.500 +
e = 1.530 - 1.200 +
f = 1.530 - 0.900 +
g = 1.530 - 1.300 +
h = 1.530 - 1.300 +
i = 1.530 - 1.200 +
j = 1.530 - 2.100 +

P13 a = 1.420 - 2.200 +


b = 1.420 - 0.900 +
c = 1.420 - 1.200 +
d = 1.420 - 2.600 +
e = 1.420 - 0.300 +
f = 1.420 - 0.900 +
g = 1.420 - 0.900 +
h = 1.420 - 1.600 +

P14 a = 1.520 - 1.200 +


b = 1.520 - 0.400 +
c = 1.520 - 0.600 +
d = 1.520 - 0.850 +
e = 1.520 - 1.450 +
f = 1.520 - 1.400 +
g = 1.520 - 0.400 +
h = 1.520 - 0.800 +
i = 1.520 - 0.900 +
j = 1.520 - 1.900 +

P15 a = 1.360 - 1.280 +


b = 1.360 - 1.900 +
c = 1.360 - 1.600 +

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

d = 1.360 - 0.800 +
e = 1.360 - 0.800 +
f = 1.360 - 2.200 +
g = 1.360 - 1.000 +
h = 1.360 - 1.690 +
i = 1.360 - 1.200 +
j = 1.360 - 0.900 +

7 Tinggi Titik Detail


P0 a = 191 + -1.547 =
b = 191 + -0.853 =
c = 191 + -0.790 =
d = 191 + 0.352 =
e = 191 + -0.370 =
f = 191 + 1.274 =
g = 191 + -0.810 =
h = 191 + 2.872 =
i = 191 + -1.570 =
j = 191 + 0.487 =

P1 a = 196.722101 + -2.356 =
b = 196.722101 + -1.688 =
c = 196.722101 + -1.142 =
d = 196.722101 + 0.761 =
e = 196.722101 + 0.350 =
f = 196.722101 + -1.562 =
g = 196.722101 + -0.103 =
h = 196.722101 + 1.306 =

P2 a = 200.768981 + -0.851 =
b = 200.768981 + -1.020 =
c = 200.768981 + -0.642 =
d = 200.768981 + 0.469 =
e = 200.768981 + 0.737 =

P3 a = 201.687467 + -3.271 =
b = 201.687467 + -2.471 =
c = 201.687467 + -2.570 =
d = 201.687467 + -3.040 =
e = 201.687467 + -1.914 =
f = 201.687467 + -0.230 =
g = 201.687467 + -0.627 =
h = 201.687467 + -1.741 =
i = 201.687467 + -1.004 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

j = 201.687467 + 0.129 =

P4 a = 203.265121 + -1.648 =
b = 203.265121 + -0.199 =
c = 203.265121 + -0.437 =
d = 203.265121 + -0.236 =
e = 203.265121 + -0.727 =
f = 203.265121 + -0.570 =
g = 203.265121 + -0.624 =
h = 203.265121 + -0.800 =
i = 203.265121 + -2.976 =
j = 203.265121 + -0.555 =

P5 a = 205.026739 + -1.495 =
b = 205.026739 + -0.557 =
c = 205.026739 + -1.277 =
d = 205.026739 + 0.539 =
e = 205.026739 + -0.068 =

P6 a = 205.733968 + -0.570 =
b = 205.733968 + -1.069 =
c = 205.733968 + -3.135 =
d = 205.733968 + -2.374 =
e = 205.733968 + -0.845 =

P7 a = 204.715544 + 0.136 =
b = 204.715544 + -1.661 =
c = 204.715544 + -1.185 =
d = 204.715544 + -1.057 =
e = 204.715544 + -2.861 =

P8 a = 204.894595 + 0.061 =
b = 204.894595 + 0.539 =
c = 204.894595 + -0.332 =
d = 204.894595 + -1.178 =
e = 204.894595 + -0.386 =

P9 a = 205.354145 + 0.022 =
b = 205.354145 + 3.064 =
c = 205.354145 + -0.935 =
d = 205.354145 + -0.606 =
e = 205.354145 + -1.206 =

P10 a = 190.176434 + -1.051 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

b = 190.176434 + -0.968 =
c = 190.176434 + -0.400 =
d = 190.176434 + -0.384 =
e = 190.176434 + 2.053 =
f = 190.176434 + -0.713 =
g = 190.176434 + -2.451 =

P11 a = 188.413229 + 0.276 =


b = 188.413229 + 2.141 =
c = 188.413229 + -1.809 =
d = 188.413229 + 0.018 =
e = 188.413229 + -0.069 =
f = 188.413229 + -0.391 =
g = 188.413229 + 0.175 =
h = 188.413229 + -0.431 =
i = 188.413229 + -0.760 =
j = 188.413229 + -1.765 =

P12 a = 187.754471 + -0.533 =


b = 187.754471 + -0.651 =
c = 187.754471 + 0.377 =
d = 187.754471 + -0.017 =
e = 187.754471 + 0.199 =
f = 187.754471 + 0.842 =
g = 187.754471 + 0.459 =
h = 187.754471 + 0.296 =
i = 187.754471 + -0.806 =
j = 187.754471 + -1.140 =

P13 a = 186.368922 + -1.173 =


b = 186.368922 + -0.061 =
c = 186.368922 + 1.510 =
d = 186.368922 + 1.461 =
e = 186.368922 + 0.247 =
f = 186.368922 + 0.207 =
g = 186.368922 + -1.132 =
h = 186.368922 + -0.950 =

P14 a = 185.010272 + -0.906 =


b = 185.010272 + 0.668 =
c = 185.010272 + 1.916 =
d = 185.010272 + 1.581 =
e = 185.010272 + 2.060 =
f = 185.010272 + 1.837 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

g = 185.010272 + 1.063 =
h = 185.010272 + -0.923 =
i = 185.010272 + -0.338 =
j = 185.010272 + 1.285 =

P15 a = 187.505681 + -0.020 =


b = 187.505681 + 1.434 =
c = 187.505681 + 2.248 =
d = 187.505681 + 2.683 =
e = 187.505681 + 1.117 =
f = 187.505681 + 0.492 =
g = 187.505681 + 1.309 =
h = 187.505681 + 2.151 =
i = 187.505681 + -0.046 =
j = 187.505681 + 2.408 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

an Sudut
Bacaan
Vertikal
Rambu
′ ₺
2.655
04 19 2.600 92.072 = 0.999 = -27.641
2.545
3.185
08 31 3.100 87.142 = 0.999 = 20.030
3.025
3.090
21 20 3.000 87.356 = 0.999 = 21.651
2.925
2.315
15 02 2.200 87.251 = 0.999 = 20.823
2.085
1.690
28 55 1.500 90.482 = 1.000 = -118.882
1.310
0.885
09 56 0.700 89.166 = 1.000 = 68.659
0.525
3.282
35 02 3.200 86.584 = 0.998 = 16.752
3.124
1.750
11 17 1.600 84.188 = 0.995 = 9.824
1.450
1.680
16 45 1.600 95.279 = 0.996 = -10.822
1.525
0.785
36 11 0.600 90.603 = 1.000 = -95.006
0.440
0.858
20 5 0.737 97.335 = 0.992 = -7.769
0.616
3.188
9 49 3.059 90.164 = 1.000 = -350.194
2.930
2.079
20 14 2.008 92.337 = 0.999 = -24.501
1.937

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

1.064
37 32 1.023 87.626 = 0.999 = 24.116
0.982
1.467
49 55 1.443 85.832 = 0.997 = 13.722
1.419
3.756
24 38 3.682 89.411 = 1.000 = 97.200
3.100
1.451
38 18 1.372 90.638 = 1.000 = -89.755
1.293
1.307
23 57 1.198 84.399 = 0.995 = 10.197
1.089
1.946
42 20 1.876 91.706 = 1.000 = -33.584
1.806
2.016
44 5 1.928 91.735 = 1.000 = -33.019
1.840
2.017
35 8 1.954 90.586 = 1.000 = -97.845
1.891
1.524
10 45 1.473 87.179 = 0.999 = 20.295
1.422
2.642
55 21 2.538 84.923 = 0.996 = 11.255
2.434
2.609
46 11 2.441 93.770 = 0.998 = -15.177
2.273
1.232
58 44 1.119 96.979 = 0.993 = -8.169
1.006
1.529
0 35 1.425 97.010 = 0.993 = -8.133
1.321
1.498
48 53 1.398 96.815 = 0.993 = -8.368
1.242
1.656
17 12 1.525 96.287 = 0.994 = -9.077

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

17 12 96.287 = 0.994 = -9.077


1.494
1.605
17 0 1.524 90.283 = 1.000 = -202.219
1.443
1.375
54 25 1.336 94.907 = 0.996 = -11.648
1.297
1.885
5 21 1.792 94.089 = 0.997 = -13.988
1.699
0.751
54 40 0.622 93.911 = 0.998 = -14.627
0.493
1.189
27 22 1.095 90.456 = 1.000 = -125.615
1.000
1.362
59 20 1.324 103.989 = 0.970 = -4.014
1.286
0.832
6 39 0.748 93.111 = 0.999 = -18.400
0.664
1.056
27 5 1.009 98.451 = 0.989 = -6.730
0.995
1.089
32 34 1.012 92.543 = 0.999 = -22.518
0.935
1.914
11 25 1.873 92.190 = 0.999 = -26.146
1.832
1.486
44 40 1.442 93.744 = 0.998 = -15.280
1.396
1.239
8 59 1.189 95.150 = 0.996 = -11.096
1.139
1.311
9 42 1.255 95.162 = 0.996 = -11.070
1.199
1.612
9 27 1.445 95.158 = 0.996 = -11.079
1.278
1.551
6 56 93.116 = 0.999 = -18.372
A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091
CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

6 56 1.482 93.116 = 0.999 = -18.372


1.453
0.929
28 58 0.865 100.483 = 0.983 = -5.405
0.801
1.639
15 37 1.555 92.260 = 0.999 = -25.336
1.471
1.333
33 16 1.312 114.554 = 0.910 = -2.189
1.290
1.253
28 34 1.240 87.476 = 0.999 = 22.687
1.226
1.072
42 52 1.017 93.714 = 0.998 = -15.404
0.962
0.798
48 21 0.768 101.806 = 0.979 = -4.784
0.738
0.825
37 34 0.750 96.626 = 0.993 = -8.608
0.675
1.631
52 29 1.481 95.875 = 0.995 = -9.719
1.331
1.369
13 28 1.252 96.224 = 0.994 = -9.169
1.135
0.807
23 54 0.739 96.398 = 0.994 = -8.918
0.671
1.445
53 42 1.400 89.895 = 1.000 = 545.673
1.355
1.075
44 38 1.003 98.744 = 0.988 = -6.502
0.930
0.510
41 32 0.434 98.692 = 0.989 = -6.541
0.358
1.105
57 2 1.030 95.951 = 0.995 = -9.594
0.955

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

1.834
44 57 1.700 95.749 = 0.995 = -9.932
1.565
0.825
36 39 0.795 95.611 = 0.995 = -10.179
0.765
0.640
58 17 0.596 91.971 = 0.999 = -29.052
0.551
0.534
27 45 0.484 97.463 = 0.992 = -7.634
0.434
0.465
50 36 0.370 96.843 = 0.993 = -8.333
0.275
0.875
36 39 0.824 95.611 = 0.995 = -10.179
0.772
1.425
5 10 1.400 90.086 = 1.000 = -665.370
1.375
1.535
47 10 1.500 31.786 = 0.527 = 0.620
1.465
1.965
3 0 1.900 92.050 = 0.999 = -27.937
1.835
1.836
52 50 1.800 91.881 = 0.999 = -30.457
1.764
0.963
59 50 0.900 97.997 = 0.990 = -7.118
0.837
1.357
36 0 1.300 94.600 = 0.997 = -12.429
1.243
1.042
47 20 1.000 97.789 = 0.991 = -7.311
0.958
1.515
8 20 1.500 91.139 = 1.000 = -50.302
1.485
1.520
37 40 1.500 90.628 = 1.000 = -91.264

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

37 40 90.628 = 1.000 = -91.264


1.480
1.527
12 30 1.500 31.208 = 0.518 = 0.606
1.473
0.932
51 10 0.900 98.853 = 0.988 = -6.420
0.868
1.375
58 30 1.300 98.975 = 0.988 = -6.332
1.225
1.242
11 10 1.200 91.186 = 1.000 = -48.299
1.158
1.460
11 10 1.400 9.186 = 0.160 = 0.162
1.340
2.810
14 10 2.400 91.236 = 1.000 = -46.344
2.319
1.368
24 0 1.300 91.400 = 1.000 = -40.917
1.232
1.381
29 0 1.300 91.483 = 1.000 = -38.618
1.219
1.700
15 50 1.600 91.264 = 1.000 = -45.326
1.500
1.508
15 40 1.000 91.261 = 1.000 = -45.425
1.292
1.674
13 40 1.550 91.228 = 1.000 = -46.659
1.426
1.934
18 20 1.800 91.306 = 1.000 = -43.879
1.666
2.061
17 40 1.900 91.294 = 1.000 = -44.255
1.390
1.372
2 30 1.300 93.042 = 0.999 = -18.819
1.228
1.561
12 10 93.203 = 0.998 = -17.871
A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091
CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

12 10 1.500 93.203 = 0.998 = -17.871


1.439
1.451
36 40 1.400 88.611 = 1.000 = 41.245
1.349
1.540
19 10 1.500 90.319 = 1.000 = -179.359
1.455
1.277
29 10 1.200 90.486 = 1.000 = -117.863
1.123
0.982
15 30 0.900 89.258 = 1.000 = 77.248
0.818
1.391
16 50 1.300 89.281 = 1.000 = 79.635
1.209
1.411
49 50 1.300 89.831 = 1.000 = 338.138
1.189
1.375
51 40 1.200 91.861 = 0.999 = -30.775
1.025
2.270
57 40 2.100 90.961 = 1.000 = -59.609
1.930
2.250
03 03 2.200 92.051 = 0.999 = -27.926
2.140
0.950
13 20 0.900 92.222 = 0.999 = -25.770
0.800
1.370
49 27 1.200 87.824 = 0.999 = 26.320
1.030
2.740
45 08 2.600 84.752 = 0.996 = 10.888
2.450
0.430
55 31 0.300 91.925 = 0.999 = -29.749
0.170
1.000
53 48 0.900 90.897 = 1.000 = -63.893
0.800

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

1.000
45 19 0.900 94.755 = 0.997 = -12.021
0.800
1.700
12 31 1.600 92.209 = 0.999 = -25.929
1.500
1.238
09 46 1.200 99.163 = 0.987 = -6.200
1.160
0.540
57 33 0.400 90.959 = 1.000 = -59.729
0.270
0.755
07 40 0.600 88.128 = 0.999 = 30.592
0.450
0.995
13 49 0.850 88.230 = 1.000 = 32.365
0.700
1.580
19 34 1.450 85.326 = 0.997 = 12.231
1.335
1.535
16 40 1.400 86.278 = 0.998 = 15.371
1.270
0.510
08 58 0.400 90.149 = 1.000 = -383.391
0.290
0.940
49 23 0.800 93.823 = 0.998 = -14.965
0.693
1.030
53 36 0.900 92.893 = 0.999 = -19.786
0.840
2.030
10 23 1.900 86.173 = 0.998 = 14.949
1.780
1.345
26 28 1.280 90.441 = 1.000 = -129.887
1.215
2.070
33 55 1.900 86.565 = 0.998 = 16.661
1.740
1.775
48 18 1.600 85.805 = 0.997 = 13.634

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

48 18 85.805 = 0.997 = 13.634


1.434
0.930
18 04 0.800 85.301 = 0.997 = 12.166
0.670
0.918
32 11 0.800 88.536 = 1.000 = 39.138
0.700
2.315
48 45 2.200 86.813 = 0.998 = 17.957
2.075
1.090
53 11 1.000 86.886 = 0.999 = 18.384
0.915
1.785
13 20 1.690 82.222 = 0.991 = 7.321
1.600
1.275
48 54 1.200 90.815 = 1.000 = -70.297
1.130
1.000
04 58 0.900 84.083 = 0.995 = 9.648
0.810

341 36 26 = 4 - 342 = 21.929


341 36 26 = 338 - 342 = 356.439
341 36 26 = 330 - 342 = 348.743
341 36 26 = 308 - 342 = 326.872
341 36 26 = 301 - 342 = 319.543
341 36 26 = 290 - 342 = 308.766
341 36 26 = 278 - 342 = 296.871
341 36 26 = 261 - 342 = 279.255
341 36 26 = 245 - 342 = 263.324
341 36 26 = 221 - 342 = 239.228

0 0 0 = 119 - 0 = 119
0 0 0 = 126 - 0 = 126
0 0 0 = 107 - 0 = 107
0 0 0 = 36 - 0 = 36
0 0 0 = 76 - 0 = 76
0 0 0 = 91 - 0 = 91
0 0 0 = 75 - 0 = 75
0 0 0 = 49 - 0 = 49

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

0 0 0 = 156 - 0 = 156
0 0 = 134 - 0 = 134
0 0 0 = 109 - 0 = 109
0 0 0 = 36 - 0 = 36
0 0 0 = 23 - 0 = 23

0 0 0 = 134 - 0 = 134
0 0 0 = 126 - 0 = 126
0 0 0 = 102 - 0 = 102
0 0 0 = 84 - 0 = 84
0 0 0 = 72 - 0 = 72
0 0 0 = 70 - 0 = 70
0 0 0 = 32 - 0 = 32
0 0 0 = 53 - 0 = 53
0 0 0 = 36 - 0 = 36
0 0 0 = 17 - 0 = 17

0 0 0 = 38 - 0 = 38
0 0 0 = 54 - 0 = 54
0 0 0 = 77 - 0 = 77
0 0 0 = 108 - 0 = 108
0 0 0 = 105 - 0 = 105
0 0 0 = 117 - 0 = 117
0 0 0 = 140 - 0 = 140
0 0 0 = 19 - 0 = 19
0 0 0 = 37 - 0 = 37
0 0 0 = 141 - 0 = 141

0 0 0 = 110 - 0 = 110
0 0 0 = 108 - 0 = 108
0 0 0 = 100 - 0 = 100
0 0 0 = 24 - 0 = 24
0 0 0 = 44 - 0 = 44

0 0 0 = 115 - 0 = 115
0 0 0 = 75 - 0 = 75
0 0 0 = 141 - 0 = 141
0 0 0 = 150 - 0 = 150
0 0 0 = 168 - 0 = 168

0 0 0 = 219 - 0 = 219
0 0 0 = 102 - 0 = 102
0 0 0 = 55 - 0 = 55

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

0 0 0 = 33 - 0 = 33
0 0 0 = 105 - 0 = 105

0 0 0 = 99 - 0 = 99
0 0 0 = 159 - 0 = 159
0 0 0 = 46 - 0 = 46
0 0 0 = 46 - 0 = 46
0 0 0 = 67 - 0 = 67

0 0 0 = 14 - 0 = 14
0 0 0 = 40 - 0 = 40
0 0 0 = 38 - 0 = 38
0 0 0 = 70 - 0 = 70
0 0 0 = 86 - 0 = 86

0 0 0 = 204 - 0 = 204
0 0 0 = 201 - 0 = 201
0 0 0 = 185 - 0 = 185
0 0 0 = 157 - 0 = 157
0 0 0 = 152 - 0 = 152
0 0 0 = 146 - 0 = 146
0 0 0 = 145 - 0 = 145

0 0 0 = 58 - 0 = 58
0 0 0 = 50 - 0 = 50
0 0 0 = 49 - 0 = 49
0 0 0 = 31 - 0 = 31
0 0 0 = 21 - 0 = 21
0 0 0 = 32 - 0 = 32
0 0 0 = 20 - 0 = 20
0 0 0 = 25 - 0 = 25
0 0 0 = 8 - 0 = 8
0 0 0 = 7 - 0 = 7

0 0 0 = 101 - 0 = 101
0 0 0 = 62 - 0 = 62
0 0 0 = 44 - 0 = 44
0 0 0 = 19 - 0 = 19
0 0 0 = 24 - 0 = 24
0 0 0 = 16 - 0 = 16
0 0 0 = 9 - 0 = 9
0 0 0 = 9 - 0 = 9
0 0 0 = 37 - 0 = 37
0 0 0 = 40 - 0 = 40

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

0 0 0 = 128 - 0 = 128
0 0 0 = 121 - 0 = 121
0 0 0 = 111 - 0 = 111
0 0 0 = 106 - 0 = 106
0 0 0 = 99 - 0 = 99
0 0 0 = 94 - 0 = 94
0 0 0 = 96 - 0 = 96
0 0 0 = 92 - 0 = 92

0 0 0 = 145 - 0 = 145
0 0 0 = 132 - 0 = 132
0 0 0 = 127 - 0 = 127
0 0 0 = 115 - 0 = 115
0 0 0 = 100 - 0 = 100
0 0 0 = 93 - 0 = 93
0 0 0 = 84 - 0 = 84
0 0 0 = 74 - 0 = 74
0 0 0 = 62 - 0 = 62
0 0 0 = 67 - 0 = 67

0 0 0 = 106 - 0 = 106
0 0 0 = 85 - 0 = 85
0 0 0 = 75 - 0 = 75
0 0 0 = 68 - 0 = 68
0 0 0 = 63 - 0 = 63
0 0 0 = 55 - 0 = 55
0 0 0 = 48 - 0 = 48
0 0 0 = 31 - 0 = 31
0 0 0 = 13 - 0 = 13
0 0 0 = 6 - 0 = 6

183.536 183 32 9
518.046 518 2 47
510.351 510 21 2
488.479 488 28 44
481.151 481 9 2
470.373 470 22 23
458.478 458 28 42
440.862 440 51 43
424.931 424 55 52

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

400.835 400 50 7

263.728 263 43 42.33267


270.880 270 52 47.33267
252.341 252 20 26.33267
181.388 181 23 18.33267
221.194 221 11 39.33267
236.084 236 5 2.332667
219.759 219 45 33.33267
194.379 194 22 43.33267

245.785 245 47 7.67121


223.958 223 57 28.67121
198.646 198 38 44.67121
125.756 125 45 21.67121
112.250 112 14 59.67121

212.770 212 46 11.82075


203.993 203 59 33.82075
179.889 179 53 18.82075
162.870 162 52 10.82075
149.949 149 56 57.82075
148.218 148 13 5.820747
110.778 110 46 40.82075
131.702 131 42 6.820747
114.742 114 44 31.82075
95.751 95 45 1.820747

75.962 75 57 43.80457
91.749 91 44 54.80457
115.642 115 38 32.80457
146.435 146 26 4.804568
143.126 143 7 34.80457
154.794 154 47 36.80457
178.096 178 5 43.80457
56.869 56 52 7.804568
75.149 75 8 54.80457
179.237 179 14 14.80457

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

115.288 115 17 16.01478


112.441 112 26 29.01478
104.649 104 38 55.01478
29.126 29 7 32.01478
48.394 48 23 40.01478

98.740 98 44 24.86457
58.390 58 23 23.86457
124.483 124 28 58.86457
134.120 134 7 11.86457
151.964 151 57 48.86457

223.713 223 42 46.70397


107.589 107 35 20.70397
59.748 59 44 53.70397
38.322 38 19 18.70397
110.195 110 11 40.70397

90.647 90 38 50.406
150.648 150 38 53.406
36.948 36 56 53.406
37.486 37 29 8.405999
58.647 58 38 50.406

352.800 352 48 0.859395


19.256 19 15 20.85939
17.406 17 24 20.85939
49.395 49 23 40.85939
64.789 64 47 20.85939

108.602 108 36 6.202748


105.018 105 1 6.202748
89.091 89 5 26.20275
60.907 60 54 26.20275
55.996 55 59 46.20275
49.963 49 57 46.20275
49.157 49 9 26.20275

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

354.151 354 9 5.384577


346.274 346 16 25.38458
344.729 344 43 45.38458
327.207 327 12 25.38458
317.218 317 13 5.384577
328.668 328 40 5.384577
316.596 316 35 45.38458
321.299 321 17 55.38458
304.621 304 37 15.38458
302.821 302 49 15.38458

308.957 308 57 23.86593


269.971 269 58 13.86593
252.298 252 17 53.86593
227.682 227 40 53.86593
232.232 232 13 53.86593
223.859 223 51 33.86593
216.859 216 51 33.86593
217.026 217 1 33.86593
244.987 244 59 13.86593
248.615 248 36 53.86593

345.238 345 14 18.40511


337.980 337 58 46.40511
327.487 327 29 11.40511
322.983 322 58 59.40511
315.345 315 20 42.40511
310.313 310 18 46.40511
312.827 312 49 37.40511
309.015 309 0 53.40511

352.376 352 22 32.8841


339.014 339 0 49.8841
333.996 333 59 46.8841
322.214 322 12 49.8841
307.485 307 29 4.884097
300.270 300 16 10.8841
290.963 290 57 47.8841
281.309 281 18 31.8841
269.737 269 44 14.8841
274.726 274 43 34.8841

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

324.114 324 6 50.12841


303.240 303 14 25.12841
293.571 293 34 16.12841
286.564 286 33 50.12841
280.956 280 57 21.12841
272.866 272 51 57.12841
265.679 265 40 45.12841
249.041 249 2 27.12841
231.413 231 24 47.12841
224.543 224 32 36.12841

0.999 = 10.986
0.998 = 15.960
0.998 = 16.465
0.998 = 22.947
1.000 = 37.997
1.000 = 35.992
0.996 = 15.744
0.990 = 29.692
0.992 = 15.369
1.000 = 34.496

0.984 = 23.806
1.000 = 25.800
0.998 = 14.176
0.998 = 8.186
0.995 = 4.775
1.000 = 65.593
1.000 = 15.798
0.990 = 10.796

0.999 = 13.988
0.999 = 17.584
1.000 = 12.599
0.998 = 10.175
0.992 = 20.637

0.996 = 33.455
0.985 = 22.266

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

0.985 = 20.490
0.986 = 25.240
0.988 = 16.006
1.000 = 16.200
0.993 = 7.743
0.995 = 18.505
0.995 = 25.680
1.000 = 18.899

0.942 = 7.156
0.997 = 16.751
0.978 = 5.968
0.998 = 15.370
0.999 = 8.188
0.996 = 8.962
0.992 = 9.919
0.992 = 11.109
0.992 = 33.130
0.997 = 9.771

0.967 = 12.376
0.998 = 16.774
0.827 = 3.557
0.998 = 2.695
0.996 = 10.954

0.958 = 5.749
0.987 = 14.800
0.990 = 29.686
0.988 = 23.125
0.988 = 13.431

1.000 = 9.000
0.977 = 14.165
0.977 = 14.853
0.989 = 14.839
0.990 = 26.630

0.990 = 5.943
0.999 = 8.889
0.983 = 9.831
0.986 = 18.730
0.990 = 10.202

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

1.000 = 5.000
0.277 = 1.942
0.999 = 12.983
0.999 = 7.192
0.981 = 12.356

0.994 = 11.327
0.982 = 8.246
1.000 = 2.999
1.000 = 4.000
0.268 = 1.450
0.976 = 6.248
0.976 = 14.635

1.000 = 8.396
0.025 = 0.306
1.000 = 49.077
0.999 = 13.592
0.999 = 16.189
1.000 = 19.990
1.000 = 21.590
1.000 = 24.789
0.999 = 26.786
0.999 = 67.066

0.997 = 14.359
0.997 = 12.162
0.999 = 10.194
1.000 = 8.500
1.000 = 15.399
1.000 = 16.397
1.000 = 18.197
1.000 = 22.200
0.999 = 34.963
1.000 = 33.990

0.999 = 10.986
0.998 = 14.977
0.999 = 33.951
0.992 = 28.757
0.999 = 25.971
1.000 = 19.995
0.993 = 19.863
0.999 = 19.970

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

0.975 = 7.602
1.000 = 26.992
0.999 = 30.467
0.999 = 29.472
0.993 = 24.337
0.996 = 26.388
1.000 = 22.000
0.996 = 24.590
0.997 = 18.952
0.996 = 24.889

1.000 = 12.999
0.996 = 32.882
0.995 = 33.918
0.993 = 25.826
0.999 = 21.786
0.997 = 23.926
0.997 = 17.448
0.982 = 18.161
1.000 = 14.497
0.989 = 18.798

Koordinat Y
-0.677514 P0 a = 10.986 x -0.998 =
5.966821 b = 15.960 x -0.927 =
8.145043 c = 16.465 x -0.869 =
17.96383 d = 22.947 x -0.622 =
32.51852 e = 37.997 x -0.517 =
33.74089 f = 35.992 x -0.348 =
15.57185 g = 15.744 x -0.147 =
29.31553 h = 29.692 x 0.159 =
13.92103 i = 15.369 x 0.424 =
22.55659 j = 34.496 x 0.757 =

-23.66311 P1 a = 23.806 x -0.109 =


-25.79675 b = 25.800 x 0.015 =
-13.50835 c = 14.176 x -0.303 =
-0.198347 d = 8.186 x -1.000 =
-3.144647 e = 4.775 x -0.752 =
-54.43281 f = 65.593 x -0.558 =
-10.10384 g = 15.798 x -0.769 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-2.681013 h = 10.796 x -0.969 =

-12.75691 P2 a = 13.988 x -0.410 =


-12.2055 b = 17.584 x -0.720 =
-4.027999 c = 12.599 x -0.948 =
8.257381 d = 10.175 x -0.584 =
19.10046 e = 20.637 x -0.379 =

-18.10797 P3 a = 33.455 x -0.841 =


-9.05396 b = 22.266 x -0.914 =
0.039853 c = 20.490 x -1.000 =
7.434214 d = 25.240 x -0.956 =
8.015113 e = 16.006 x -0.866 =
8.532081 f = 16.200 x -0.850 =
7.239345 g = 7.743 x -0.355 =
13.81645 h = 18.505 x -0.665 =
23.32256 i = 25.680 x -0.419 =
18.8037 j = 18.899 x -0.100 =

6.942187 P4 a = 7.156 x 0.243 =


16.74272 b = 16.751 x -0.031 =
5.38044 c = 5.968 x -0.433 =
8.497708 d = 15.370 x -0.833 =
4.913244 e = 8.188 x -0.800 =
3.816582 f = 8.962 x -0.905 =
0.329659 g = 9.919 x -0.999 =
9.303207 h = 11.109 x 0.547 =
32.02334 i = 33.130 x 0.256 =
0.13004 j = 9.771 x -1.000 =

11.19032 P5 a = 12.376 x -0.427 =


15.50359 b = 16.774 x -0.382 =
3.441806 c = 3.557 x -0.253 =
1.311609 d = 2.695 x 0.874 =
8.190551 e = 10.954 x 0.664 =

5.682085 P6 a = 5.749 x -0.152 =


12.60444 b = 14.800 x 0.524 =
24.46975 c = 29.686 x -0.566 =
16.601 d = 23.125 x -0.696 =
6.313059 e = 13.431 x -0.883 =

-6.219394 P7 a = 9.000 x -0.723 =


13.50268 b = 14.165 x -0.302 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

12.83018 c = 14.853 x 0.504 =


9.201212 d = 14.839 x 0.785 =
24.99299 e = 26.630 x -0.345 =

5.942266 P8 a = 5.943 x -0.011 =


4.357361 b = 8.889 x -0.872 =
5.90953 c = 9.831 x 0.799 =
11.39853 d = 18.730 x 0.794 =
8.711921 e = 10.202 x 0.520 =

-0.626644 P9 a = 5.000 x 0.992 =


0.640529 b = 1.942 x 0.944 =
3.883809 c = 12.983 x 0.954 =
5.460432 d = 7.192 x 0.651 =
11.17915 e = 12.356 x 0.426 =

10.73496 P10 a = 11.327 x -0.319 =


7.964069 b = 8.246 x -0.259 =
2.998437 c = 2.999 x 0.016 =
3.494916 d = 4.000 x 0.486 =
1.201882 e = 1.450 x 0.559 =
4.783963 f = 6.248 x 0.643 =
11.07145 g = 14.635 x 0.654 =

-0.855581 P11 a = 8.396 x 0.995 =


-0.072568 b = 0.306 x 0.971 =
-12.92595 c = 49.077 x 0.965 =
-7.361428 d = 13.592 x 0.841 =
-10.99581 e = 16.189 x 0.734 =
-10.39482 f = 19.990 x 0.854 =
-14.83501 g = 21.590 x 0.727 =
-15.49933 h = 24.789 x 0.780 =
-22.04304 i = 26.786 x 0.568 =
-56.35995 j = 67.066 x 0.542 =

-11.16623 P12 a = 14.359 x 0.629 =


-12.16192 b = 12.162 x -0.001 =
-9.711346 c = 10.194 x -0.304 =
-6.284834 d = 8.500 x -0.673 =
-12.17272 e = 15.399 x -0.612 =
-11.36151 f = 16.397 x -0.721 =
-10.91561 g = 18.197 x -0.800 =
-13.36824 h = 22.200 x -0.798 =
-31.68401 i = 34.963 x -0.423 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-31.65023 j = 33.990 x -0.365 =

-2.799177 P13 a = 10.986 x 0.967 =


-5.615605 b = 14.977 x 0.927 =
-18.2486 c = 33.951 x 0.843 =
-17.31338 d = 28.757 x 0.798 =
-18.25308 e = 25.971 x 0.711 =
-15.24672 f = 19.995 x 0.647 =
-14.56737 g = 19.863 x 0.680 =
-15.51658 h = 19.970 x 0.630 =

-1.008624 P14 a = 7.602 x 0.991 =


-9.667129 b = 26.992 x 0.934 =
-13.35779 c = 30.467 x 0.899 =
-18.05788 d = 29.472 x 0.790 =
-19.31206 e = 24.337 x 0.609 =
-22.79059 f = 26.388 x 0.504 =
-20.54368 g = 22.000 x 0.358 =
-24.11276 h = 24.590 x 0.196 =
-18.95139 i = 18.952 x -0.005 =
-24.804 j = 24.889 x 0.082 =

-7.61983 P15 a = 12.999 x 0.810 =


-27.50143 b = 32.882 x 0.548 =
-31.08759 c = 33.918 x 0.400 =
-24.75382 d = 25.826 x 0.285 =
-21.38871 e = 21.786 x 0.190 =
-23.89587 f = 23.926 x 0.050 =
-17.39878 g = 17.448 x -0.075 =
-16.95956 h = 18.161 x -0.358 =
-11.33182 i = 14.497 x -0.624 =
-13.18589 j = 18.798 x -0.713 =

Koordinat Y
-30.590 P0 a = 42.591 + -10.965 =
-23.946 b = 42.591 + -14.803 =
-21.768 c = 42.591 + -14.309 =
-11.949 d = 42.591 + -14.278 =
2.606 e = 42.591 + -19.656 =
3.828 f = 42.591 + -12.530 =
-14.341 g = 42.591 + -2.321 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-0.597 h = 42.591 + 4.716 =


-15.992 i = 42.591 + 6.512 =
-7.356 j = 42.591 + 26.100 =

-96.623 P1 a = 42.289 + -2.601 =


-98.757 b = 42.289 + 0.396 =
-86.468 c = 42.289 + -4.301 =
-73.158 d = 42.289 + -8.184 =
-76.104 e = 42.289 + -3.593 =
-127.393 f = 42.289 + -36.599 =
-83.064 g = 42.289 + -12.145 =
-75.641 h = 42.289 + -10.458 =

-128.987 P2 a = 33.468 + -5.737 =


-128.435 b = 33.468 + -12.658 =
-120.258 c = 33.468 + -11.937 =
-107.972 d = 33.468 + -5.946 =
-97.129 e = 33.468 + -7.814 =

-157.938 P3 a = 3.788 + -28.130 =


-148.884 b = 3.788 + -20.342 =
-139.790 c = 3.788 + -20.490 =
-132.396 d = 3.788 + -24.120 =
-131.815 e = 3.788 + -13.854 =
-131.298 f = 3.788 + -13.771 =
-132.591 g = 3.788 + -2.747 =
-126.013 h = 3.788 + -12.311 =
-116.507 i = 3.788 + -10.748 =
-121.026 j = 3.788 + -1.894 =

-135.484 P4 a = -24.863 + 1.736 =


-125.684 b = -24.863 + -0.511 =
-137.046 c = -24.863 + -2.583 =
-133.929 d = -24.863 + -12.807 =
-137.513 e = -24.863 + -6.550 =
-138.610 f = -24.863 + -8.108 =
-142.097 g = -24.863 + -9.914 =
-133.123 h = -24.863 + 6.072 =
-110.403 i = -24.863 + 8.492 =
-142.296 j = -24.863 + -9.770 =

-122.025 P5 a = -57.437 + -5.287 =


-117.712 b = -57.437 + -6.403 =
-129.773 c = -57.437 + -0.900 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-131.903 d = -57.437 + 2.354 =


-125.025 e = -57.437 + 7.273 =

-129.360 P6 a = -76.286 + -0.874 =


-122.437 b = -76.286 + 7.757 =
-110.572 c = -76.286 + -16.807 =
-118.441 d = -76.286 + -16.099 =
-128.729 e = -76.286 + -11.855 =

-136.976 P7 a = -105.910 + -6.505 =


-117.254 b = -105.910 + -4.280 =
-117.926 c = -105.910 + 7.483 =
-121.555 d = -105.910 + 11.642 =
-105.763 e = -105.910 + -9.193 =

-112.838 P8 a = -137.505 + -0.067 =


-114.423 b = -137.505 + -7.748 =
-112.871 c = -137.505 + 7.857 =
-107.382 d = -137.505 + 14.863 =
-110.068 e = -137.505 + 5.308 =

-99.649 P9 a = -135.464 + 4.961 =


-98.382 b = -135.464 + 1.834 =
-95.139 c = -135.464 + 12.389 =
-93.562 d = -135.464 + 4.681 =
-87.844 e = -135.464 + 5.263 =

-54.767 P10 a = -152.048 + -3.613 =


-57.538 b = -152.048 + -2.137 =
-62.504 c = -152.048 + 0.048 =
-62.007 d = -152.048 + 1.945 =
-64.300 e = -152.048 + 0.811 =
-60.718 f = -152.048 + 4.020 =
-54.431 g = -152.048 + 9.571 =

-32.774 P11 a = -88.599 + 8.353 =


-31.991 b = -88.599 + 0.297 =
-44.845 c = -88.599 + 47.344 =
-39.280 d = -88.599 + 11.426 =
-42.915 e = -88.599 + 11.882 =
-42.314 f = -88.599 + 17.075 =
-46.754 g = -88.599 + 15.685 =
-47.418 h = -88.599 + 19.345 =
-53.962 i = -88.599 + 15.218 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-88.279 j = -88.599 + 36.351 =

-19.404 P12 a = -56.536 + 9.028 =


-20.399 b = -56.536 + -0.006 =
-17.949 c = -56.536 + -3.100 =
-14.522 d = -56.536 + -5.722 =
-20.410 e = -56.536 + -9.431 =
-19.599 f = -56.536 + -11.823 =
-19.153 g = -56.536 + -14.560 =
-21.606 h = -56.536 + -17.723 =
-39.921 i = -56.536 + -14.783 =
-39.888 j = -56.536 + -12.394 =

-1.358 P13 a = -37.467 + 10.623 =


-4.175 b = -37.467 + 13.885 =
-16.808 c = -37.467 + 28.630 =
-15.872 d = -37.467 + 22.962 =
-16.812 e = -37.467 + 18.474 =
-13.806 f = -37.467 + 12.936 =
-13.126 g = -37.467 + 13.502 =
-14.076 h = -37.467 + 12.572 =

8.268 P14 a = -27.359 + 7.535 =


-0.390 b = -27.359 + 25.202 =
-4.081 c = -27.359 + 27.383 =
-8.781 d = -27.359 + 23.292 =
-10.035 e = -27.359 + 14.810 =
-13.514 f = -27.359 + 13.302 =
-11.267 g = -27.359 + 7.871 =
-14.836 h = -27.359 + 4.822 =
-9.675 i = -27.359 + -0.087 =
-15.527 j = -27.359 + 2.051 =

-7.620 P15 a = 0.000 + 10.532 =


-27.501 b = 0.000 + 18.024 =
-31.088 c = 0.000 + 13.563 =
-24.754 d = 0.000 + 7.362 =
-21.389 e = 0.000 + 4.140 =
-23.896 f = 0.000 + 1.196 =
-17.399 g = 0.000 + -1.315 =
-16.960 h = 0.000 + -6.496 =
-11.332 i = 0.000 + -9.042 =
-13.186 j = 0.000 + -13.398 =

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-0.397 = -1.547
0.797 = -0.853
0.760 = -0.790
1.102 = 0.352
-0.320 = -0.370
0.524 = 1.274
0.940 = -0.810
3.022 = 2.872
-1.420 = -1.570
-0.363 = 0.487

-3.064 = -2.3562
-0.074 = -1.688
-0.579 = -1.142
0.339 = 0.7614
0.348 = 0.350
0.675 = -1.562
-0.176 = -0.1030
1.059 = 1.306

-0.416 = -0.851
-0.533 = -1.020
-0.129 = -0.642
0.501 = 0.469
1.834 = 0.737

-2.204 = -3.271
-2.726 = -2.471
-2.519 = -2.570
-3.016 = -3.040
-1.763 = -1.914
-0.080 = -0.230
-0.665 = -0.627
-1.323 = -1.741
-1.756 = -1.004
-0.150 = 0.129

-1.783 = -1.648
-0.910 = -0.199
-0.887 = -0.437
-0.683 = -0.236
-0.313 = -0.727
-0.587 = -0.570

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-0.894 = -0.624
-1.004 = -0.800
-2.990 = -2.976
-0.532 = -0.555

-2.290 = -1.495
-0.662 = -0.557
-1.625 = -1.277
0.119 = 0.539
-0.711 = -0.068

-1.202 = -0.570
-1.719 = -1.069
-3.054 = -3.135
-2.522 = -2.374
-1.506 = -0.845

0.016 = 0.136
-2.179 = -1.661
-2.271 = -1.185
-1.547 = -1.057
-2.681 = -2.861

-0.584 = 0.061
-0.306 = 0.539
-1.288 = -0.332
-2.248 = -1.178
-1.002 = -0.386

-0.008 = 0.022
3.134 = 3.064
-0.465 = -0.935
-0.236 = -0.606
-1.736 = -1.206

-0.911 = -1.051
-1.128 = -0.968
-0.060 = -0.400
-0.044 = -0.384
2.393 = 2.053
-0.973 = -0.713
-2.311 = -2.451

-0.174 = 0.276

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

1.891 = 2.141
-1.059 = -1.809
-0.332 = 0.018
-0.419 = -0.069
-0.441 = -0.391
-0.475 = 0.175
-0.531 = -0.431
-0.610 = -0.760
-1.515 = -1.765

-0.763 = -0.533
-0.681 = -0.651
0.247 = 0.377
-0.047 = -0.017
-0.131 = 0.199
0.212 = 0.842
0.229 = 0.459
0.066 = 0.296
-1.136 = -0.806
-0.570 = -1.140

-0.393 = -1.173
-0.581 = -0.061
1.290 = 1.510
2.641 = 1.461
-0.873 = 0.247
-0.313 = 0.207
-1.652 = -1.132
-0.770 = -0.950

-1.226 = -0.906
-0.452 = 0.668
0.996 = 1.916
0.911 = 1.581
1.990 = 2.060
1.717 = 1.837
-0.057 = 1.063
-1.643 = -0.923
-0.958 = -0.338
1.665 = 1.285

-0.100 = -0.020
1.974 = 1.434
2.488 = 2.248

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

2.123 = 2.683
0.557 = 1.117
1.332 = 0.492
0.949 = 1.309
2.481 = 2.151
-0.206 = -0.046
1.948 = 2.408

189.453
190.147
190.210
191.352
190.630
192.274
190.190
193.872
189.430
191.487

194.366
195.034
195.580
197.484
197.072
195.160
196.619
198.028

199.917
199.749
200.127
201.238
201.506

198.416
199.217
199.117
198.647
199.773
201.457
201.061
199.946
200.684

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

201.817

201.617
203.066
202.828
203.030
202.538
202.696
202.641
202.466
200.289
202.710

203.532
204.470
203.750
205.566
204.959

205.164
204.665
202.598
203.360
204.889

204.852
203.054
203.531
203.659
201.855

204.956
205.433
204.563
203.717
204.509

205.377
208.418
204.419
204.748
204.148

189.125

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

189.209
189.777
189.793
192.230
189.463
187.725

188.689
190.554
186.604
188.431
188.344
188.022
188.588
187.982
187.653
186.648

187.221
187.104
188.132
187.737
187.954
188.597
188.213
188.050
186.948
186.614

185.196
186.308
187.879
187.830
186.616
186.576
185.237
185.419

184.104
185.678
186.926
186.591
187.070
186.847

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

186.073
184.087
184.672
186.295

187.486
188.939
189.753
190.188
188.622
187.998
188.815
189.656
187.459
189.914

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

21 55 43.0000000001
356 26 21
348 44 36
326 52 18
319 32 36
308 45 56.9999999999
296 52 16.0000000001
279 15 16.9999999999
263 19 26.0000000001
239 13 41

118 31 30
125 40 35
107 8 14
36 11 6.00000000002
75 59 27
90 52 49.9999999999
74 33 21
49 10 31.0000000001

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

156 12 52
134 23 13.0000000001
109 4 29
36 11 6.00000000002
22 40 44

134 23 24.0000000001
125 5 1906
101 6 1471
84 7 1343
71 8 1570
69 9 2478
32 10 833
53 11 499
36 12 584
17 13 554

37 46 20.0000000001
53 33 31.0000000001
77 27 8.99999999994
108 14 40.9999999999
104 56 10.9999999999
116 36 13.0000000001
139 54 19.9999999999
18 40 44
36 57 31
141 2 51.0000000001

110 35 -388
107 31 405
99 50 11.0000000001
24 18 48
43 34 55.9999999999

114 34 1109
74 31 28.0000000002
140 37 2.99999999989
150 15 16.0000000001
168 5 53

218 32 38
102 25 12
54 34 44.9999999999

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

33 9 9.99999999998
105 1 32

99 14 11
159 14 14
45 32 14
46 4 28.9999999999
67 14 11

13 53 29.9999999999
40 20 50
38 29 49.9999999999
70 29 9.99999999991
85 52 49.9999999999

204 26 19.9999999999
200 51 20
184 55 40
156 44 40
151 50 0
145 48 0
144 59 40

57 57 59.9999999999
50 5 20
48 32 40.0000000001
31 1 20.0000000001
21 2 0
32 29 0
20 24 40.0000000002
25 6 50
8 26 9.99999999987
6 38 9.99999999983

100 43 50
61 44 40.0000000001
44 4 19.9999999999
19 27 19.9999999999
24 0 19.9999999999
15 37 60
8 37 60
8 48 0
36 45 40
40 23 19.9999999999

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

128 28 51.9999999999
121 13 19.9999999999
110 43 45
106 13 33
98 35 16
93 33 20
96 4 10.9999999999
92 15 27

145 7 45.9999999999
131 46 2.99999999989
126 45 0
114 58 2.99999999989
100 14 18
93 1 24.0000000001
83 43 0.99999999996
74 3 45
62 29 28.0000000001
67 28 48.0000000001

106 1 42
85 9 17
75 29 7.99999999998
68 28 42.0000000001
62 52 12.9999999999
54 46 49.0000000002
47 35 37.0000000002
30 57 18.9999999998
13 19 39
6 27 28

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-10.9647095
-14.8028949
-14.3091029
-14.2782738
-19.6555785
-12.5300664
-2.32120822
4.715560096
6.511871129
26.09955286

-2.60054895
0.396157282
-4.3005072
-8.1835218
-3.59282773
-36.5994266
-12.1445606

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-10.4579904

-5.73707525
-12.6577367
-11.9374228
-5.94578116
-7.81417046

-28.130455
-20.3424752
-20.4901824
-24.1198562
-13.85431
-13.7706483
-2.7467895
-12.3108239
-10.7479822
-1.89360035

1.735751347
-0.51111439
-2.58277741
-12.8068841
-6.55009516
-8.10828318
-9.91395446
6.071897994
8.491698619
-9.77018629

-5.28671973
-6.40322658
-0.89964245
2.354025283
7.273330837

-0.87356567
7.757345235
-16.8069203
-16.0987111
-11.8549491

-6.50527439
-4.28047078

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

7.482867552
11.64161968
-9.19297553

-0.06713933
-7.7482931
7.856989604
14.86255009
5.307905262

4.960564913
1.833598901
12.38885786
4.681035247
5.263100196

-3.6130718
-2.13670577
0.047594642
1.944664031
0.810796468
4.019512539
9.571031594

8.352695735
0.297092127
47.34433952
11.42578791
11.88194499
17.07508889
15.6853598
19.34544114
15.21836943
36.35067183

9.028248327
-0.00625795
-3.09960412
-5.72244393
-9.43137086
-11.8231106
-14.5597033
-17.7234715
-14.7831247

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-12.3940552

10.62331816
13.88484434
28.62967688
22.96159649
18.47430459
12.93605818
13.50231879
12.57173268

7.535006149
25.20194673
27.38310903
23.29170964
14.81046645
13.30157939
7.870884316
4.822080962
-0.08683685
2.050747874

10.53176932
18.02408256
13.56319593
7.362466356
4.140449348
1.196241924
-1.31457227
-6.49628948
-9.04183499
-13.3977553

31.627
27.788
28.282
28.313
22.936
30.061
40.270

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

47.307
49.103
68.691

39.689
42.685
37.989
34.106
38.696
5.690
30.145
31.831

27.731
20.810
21.530
27.522
25.654

-24.342
-16.554
-16.702
-20.331
-10.066
-9.982
1.042
-8.522
-6.960
1.895

-23.127
-25.374
-27.446
-37.670
-31.413
-32.971
-34.777
-18.791
-16.371
-34.633

-62.723
-63.840
-58.336

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-55.083
-50.163

-77.160
-68.529
-93.093
-92.385
-88.141

-112.415
-110.190
-98.427
-94.268
-115.103

-137.572
-145.253
-129.648
-122.642
-132.197

-130.503
-133.630
-123.075
-130.783
-130.200

-155.662
-154.185
-152.001
-150.104
-151.238
-148.029
-142.477

-80.246
-88.302
-41.255
-77.173
-76.717
-71.524
-72.914
-69.254
-73.381

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

-52.248

-47.508
-56.542
-59.636
-62.259
-65.967
-68.359
-71.096
-74.260
-71.319
-68.930

-26.844
-23.582
-8.837
-14.505
-18.993
-24.531
-23.965
-24.895

-19.824
-2.157
0.024
-4.067
-12.548
-14.057
-19.488
-22.537
-27.445
-25.308

10.532
18.024
13.563
7.362
4.140
1.196
-1.315
-6.496
-9.042
-13.398

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Perhitungan Theodolite 2

Perhitungan Patok Utama

1 Menentukan Sudut Datar


Rumus : Sudut Datar = Sudut Muka - Sudut belakang

P0 = 145 ° 14 ʹ 55 ʺ - 341 ° 36 ʹ 26 ʺ = 163 ° 38 ʹ 29 ʺ


P1 = 124 ° 24 ʹ 7 ʺ - 0 ° 0 ʹ 0 ʺ = 124 ° 24 ʹ 7 ʺ
P2 = 168 ° 51 ʹ 20 ʺ - 0 ° 0 ʹ 0 ʺ = 168 ° 51 ʹ 20 ʺ
P3 = 139 ° 50 ʹ 55 ʺ - 0 ° 0 ʹ 0 ʺ = 139 ° 50 ʹ 55 ʺ
P4 = 146 ° 39 ʹ 46 ʺ - 0 ° 0 ʹ 0 ʺ = 146 ° 39 ʹ 46 ʺ
P5 = 159 ° 5 ʹ 50 ʺ - 0 ° 0 ʹ 0 ʺ = 159 ° 5 ʹ 50 ʺ
P6 = 201 ° 21 ʹ 33 ʺ - 0 ° 0 ʹ 0 ʺ = 201 ° 21 ʹ 33 ʺ
P7 = 166 ° 17 ʹ 16 ʺ - 0 ° 0 ʹ 0 ʺ = 166 ° 17 ʹ 16 ʺ
P8 = 167 ° 32 ʹ 38 ʺ - 0 ° 0 ʹ 0 ʺ = 167 ° 32 ʹ 38 ʺ
P9 = 105 ° 16 ʹ 60 ʺ - 0 ° 0 ʹ 0 ʺ = 105 ° 16 ʹ 60 ʺ
P10 = 212 ° 4 ʹ 50 ʺ - 0 ° 0 ʹ 0 ʺ = 212 ° 4 ʹ 50 ʺ
P11 = 92 ° 3 ʹ 60 ʺ - 0 ° 0 ʹ 0 ʺ = 92 ° 3 ʹ 60 ʺ
P12 = 188 ° 35 ʹ 0 ʺ - 0 ° 0 ʹ 0 ʺ = 188 ° 35 ʹ 0 ʺ
P13 = 170 ° 32 ʹ 10 ʺ - 0 ° 0 ʹ 0 ʺ = 170 ° 32 ʹ 10 ʺ
P14 = 190 ° 53 ʹ 31 ʺ - 0 ° 0 ʹ 0 ʺ = 190 ° 53 ʹ 31 ʺ
P15 = 123 ° 33 ʹ 20 ʺ - 0 ° 0 ʹ 0 ʺ = 123 ° 33 ʹ 20 ʺ

∑ = 2520 ° 41 ʹ 45 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koreksi Sudut Datar 3


Rumus : Sudut dalam = (2n - 4) x 90
Sudut luar = (2n + 4) x 90

Jumlah sudut terkoreksi = (2n - 4) x 90°


= (2(16) - 4) x 90°
= 2520 ° 0 ʹ 0 ʺ

Koreks= Sudut koreksi - Sudut datar


= 2520 ° 0 ʹ 0 ʺ - 2520 ° 41 ʹ 45 ʺ
= 0 ° 41 ʹ 45 ʺ

Koreksi tiap sudut


163 ° 38 ʹ 29 ʺ
P0 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 42.67 ʺ
2520 ° 41 ʹ 45 ʺ
124 ° 24 ʹ 7 ʺ
P1 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 3.66 ʺ
2520 ° 41 ʹ 45 ʺ
168 ° 51 ʹ 20 ʺ
P2 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 47.85 ʺ
2520 ° 41 ʹ 45 ʺ
139 ° 50 ʹ 55 ʺ
P3 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 19.02 ʺ
2520 ° 41 ʹ 45 ʺ
146 ° 39 ʹ 46 ʺ
P4 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 25.79 ʺ
2520 ° 41 ʹ 45 ʺ
159 ° 5 ʹ 50 ʺ
P5 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 38.15 ʺ
2520 ° 41 ʹ 45 ʺ
201 ° 21 ʹ 33 ʺ
P6 = x 0 ° ° ʹ 41 ʺ = 0 ° 3 ʹ 20.16 ʺ
2520 ° 41 ʹ 45 ʺ
166 ° 17 ʹ 16 ʺ
P7 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 45.30 ʺ
2520 ° 41 ʹ 45 ʺ
167 ° 32 ʹ 38 ʺ
P8 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 46.55 ʺ
2520 ° 41 ʹ 45 ʺ
105 ° 16 ʹ 60 ʺ
P9 = x 0 ° ° ʹ 41 ʺ = 0 ° 1 ʹ 44.66 ʺ
2520 ° 41 ʹ 45 ʺ
212 ° 4 ʹ 50 ʺ
P10 = x 0 ° ° ʹ 41 ʺ = 0 ° 3 ʹ 30.82 ʺ
2520 ° 41 ʹ 45 ʺ
92 ° 3 ʹ 60 ʺ
P11 = x 0 ° ° ʹ 41 ʺ = 0 ° 1 ʹ 31.52 ʺ
2520 ° 41 ʹ 45 ʺ
188 ° 35 ʹ 0 ʺ
P12 = x 0 ° ° ʹ 41 ʺ = 0 ° 3 ʹ 7.46 ʺ
2520 ° 41 ʹ 45 ʺ
170 ° 32 ʹ 10 ʺ
P13 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 49.52 ʺ
2520 ° 41 ʹ 45 ʺ
190 ° 53 ʹ 31 ʺ
P14 = x 0 ° ° ʹ 41 ʺ = 0 ° 3 ʹ 9.76 ʺ
2520 ° 41 ʹ 45 ʺ
123 ° 33 ʹ 20 ʺ
P15 = x 0 ° ° ʹ 41 ʺ = 0 ° 2 ʹ 2.82 ʺ
2520 ° 41 ʹ 45 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Sudut Terkoreksi 4


Rumus : Sudut datar - Koreksi

P0 = 163 ° 38 ʹ 29 ʺ - 0 ° 2 ʹ 42.67 ʺ = 163 ° 35 ʹ 46.33 ʺ


P1 = 124 ° 24 ʹ 7 ʺ - 0 ° 2 ʹ 3.66 ʺ = 124 ° 22 ʹ 3.34 ʺ
P2 = 168 ° 51 ʹ 20 ʺ - 0 ° 2 ʹ 47.85 ʺ = 168 ° 48 ʹ 32.15 ʺ
P3 = 139 ° 50 ʹ 55 ʺ - 0 ° 2 ʹ 19.02 ʺ = 139 ° 48 ʹ 35.98 ʺ
P4 = 146 ° 39 ʹ 46 ʺ - 0 ° 2 ʹ 25.79 ʺ = 146 ° 37 ʹ 20.21 ʺ
P5 = 159 ° 5 ʹ 50 ʺ - 0 ° 2 ʹ 38.15 ʺ = 159 ° 3 ʹ 11.85 ʺ
P6 = 201 ° 21 ʹ 33 ʺ - 0 ° 3 ʹ 20.16 ʺ = 201 ° 18 ʹ 12.84 ʺ
P7 = 166 ° 17 ʹ 16 ʺ - 0 ° 2 ʹ 45.30 ʺ = 166 ° 14 ʹ 30.70 ʺ
P8 = 167 ° 32 ʹ 38 ʺ - 0 ° 2 ʹ 46.55 ʺ = 167 ° 29 ʹ 51.45 ʺ
P9 = 105 ° 16 ʹ 60 ʺ - 0 ° 1 ʹ 44.66 ʺ = 105 ° 15 ʹ 15.34 ʺ
P10 = 212 ° 4 ʹ 50 ʺ - 0 ° 3 ʹ 30.82 ʺ = 212 ° 1 ʹ 19.18 ʺ
P11 = 92 ° 3 ʹ 60 ʺ - 0 ° 1 ʹ 31.52 ʺ = 92 ° 2 ʹ 28.48 ʺ P10
P12 = 188 ° 35 ʹ 0 ʺ - 0 ° 3 ʹ 7.46 ʺ = 188 ° 31 ʹ 52.54 ʺ P11
P13 = 170 ° 32 ʹ 10 ʺ - 0 ° 2 ʹ 49.52 ʺ = 170 ° 29 ʹ 20.48 ʺ P12
P14 = 190 ° 53 ʹ 31 ʺ - 0 ° 3 ʹ 9.76 ʺ = 190 ° 50 ʹ 21.24 ʺ P13
P15 = 123 ° 33 ʹ 20 ʺ - 0 ° 2 ʹ 2.82 ʺ = 123 ° 31 ʹ 17.18 ʺ P14
P15
∑ = 2519 ° 59 ʹ 59 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Azimuth (α) 5
RumusAzimuth = Azimuth awal + Sudut Pn - 180°
azimuth awal =341 ° 36 ʹ 26 ʺ

P0 - P1 = 341 ° 36 ʹ 26.00 ʺ + 163 ° 35 ʹ 46.33 ʺ - 180 ° = 325 ° 12 ʹ 12.33 ʺ


P1 - P2 = 325 ° 12 ʹ 12.33 ʺ + 124 ° 22 ʹ 3.34 ʺ - 180 ° = 269 ° 34 ʹ 15.67 ʺ
P2 - P3 = 269 ° 34 ʹ 15.67 ʺ + 168 ° 48 ʹ 32.15 ʺ - 180 ° = 258 ° 22 ʹ 47.82 ʺ
P3 - P4 = 258 ° 22 ʹ 47.82 ʺ + 139 ° 48 ʹ 35.98 ʺ - 180 ° = 218 ° 11 ʹ 23.80 ʺ
P4 - P5 = 218 ° 11 ʹ 23.80 ʺ + 146 ° 37 ʹ 20.21 ʺ - 180 ° = 184 ° 48 ʹ 44.01 ʺ
P5 - P6 = 184 ° 48 ʹ 44.01 ʺ + 159 ° 3 ʹ 11.85 ʺ - 180 ° = 163 ° 51 ʹ 55.86 ʺ
P6 - P7 = 163 ° 51 ʹ 55.86 ʺ + 201 ° 18 ʹ 12.84 ʺ - 180 ° = 185 ° 10 ʹ 8.70 ʺ
P7 - P8 = 185 ° 10 ʹ 8.70 ʺ + 166 ° 14 ʹ 30.70 ʺ - 180 ° = 171 ° 24 ʹ 39.41 ʺ
P8 - P9 = 171 ° 24 ʹ 39.41 ʺ + 167 ° 29 ʹ 51.45 ʺ - 180 ° = 158 ° 54 ʹ 30.86 ʺ
P9 - P10 = 158 ° 54 ʹ 30.86 ʺ + 105 ° 15 ʹ 15.34 ʺ - 180 ° = 84 ° 9 ʹ 46.20 ʺ
P10 - P11 = 84 ° 9 ʹ 46.20 ʺ + 212 ° 1 ʹ 19.18 ʺ - 180 ° = 116 ° 11 ʹ 5.38 ʺ
P11 - P12 = 116 ° 11 ʹ 5.38 ʺ + 92 ° 2 ʹ 28.48 ʺ - 180 ° = 28 ° 13 ʹ 33.87 ʺ
P12 - P13 = 28 ° 13 ʹ 33.87 ʺ + 188 ° 31 ʹ 52.54 ʺ - 180 ° = 36 ° 45 ʹ 26.41 ʺ
P13 - P14 = 36 ° 45 ʹ 26.41 ʺ + 170 ° 29 ʹ 20.48 ʺ - 180 ° = 27 ° 14 ʹ 46.88 ʺ
P14 - P15 = 27 ° 14 ʹ 46.88 ʺ + 190 ° 50 ʹ 21.24 ʺ - 180 ° = 38 ° 5 ʹ 8.13 ʺ
P15 - P0 = 38 ° 5 ʹ 8.13 ʺ + 123 ° 31 ʹ 17.18 ʺ 181 ° = 341 ° 36 ʹ 25.31 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Jarak Optis (D) 6


Rumus : D = (BA-BB) x 100 sin2 v

P0 - P1 = 0.940 - 0.660 x sin2 86 ° 48 ʹ 30 ʺ = 51.839


P1 - P2 = 2.731 - 2.292 x sin2 80 ° 47 ʹ 28 ʺ = 42.776
P2 - P3 = 1.159 - 0.717 x sin2 85 ° 11 ʹ 38 ʺ = 43.890
P3 - P4 = 1.320 - 0.942 x sin2 88 ° 45 ʹ 14 ʺ = 37.782
P4 - P5 = 0.880 - 0.592 x sin2 88 ° 0 ʹ 25 ʺ = 28.765
P5 - P6 = 1.524 - 1.184 x sin2 87 ° 17 ʹ 47 ʺ = 33.924
P6 - P7 = 1.755 - 1.565 x sin2 86 ° 38 ʹ 3 ʺ = 18.935
P7 - P8 = 1.632 - 1.332 x sin2 91 ° 44 ʹ 21 ʺ = 29.972
P8 - P9 = 0.451 - 0.112 x sin2 91 ° 24 ʹ 31 ʺ = 33.880
P9 - P10 = 1.400 - 1.200 x sin2 88 ° 38 ʹ 10 ʺ = 19.989
P10 - P11 = 0.920 - 0.480 x sin2 112 ° 22 ʹ 50 ʺ = 37.621
P11 - P12 = 2.360 - 1.640 x sin2 91 ° 0 ʹ 30 ʺ = 71.978
P12 - P13 = 2.000 - 1.600 x sin2 90 ° 20 ʹ 50 ʺ = 39.999
P13 - P14 = 1.620 - 1.405 x sin2 93 ° 03 ʹ 42 ʺ = 21.439
P14 - P15 = 1.345 - 1.215 x sin2 96 ° 27 ʹ 19 ʺ = 12.836
P15 - P0 = 1.150 - 0.860 x sin2 85 ° 27 ʹ 47 ʺ = 28.819

∑ = 554.441

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Selisih Koordinat 7


Rumus : ∆x = Jarak optis x sin α azimuth
∆y = Jarak optis x cos α azimuth

Selisih Koordinat x (∆x)


P0 - P1 = 51.839 x sin 325 ° 12 ʹ 12 ʺ = -29.583
P1 - P2 = 42.776 x sin 269 ° 34 ʹ 16 ʺ = -42.774
P2 - P3 = 43.890 x sin 258 ° 22 ʹ 48 ʺ = -42.990
P3 - P4 = 37.782 x sin 218 ° 11 ʹ 24 ʺ = -23.360
P4 - P5 = 28.765 x sin 184 ° 48 ʹ 44 ʺ = -2.413
P5 - P6 = 33.924 x sin 163 ° 51 ʹ 56 ʺ = 9.427
P6 - P7 = 18.935 x sin 185 ° 10 ʹ 9 ʺ = -1.706
P7 - P8 = 29.972 x sin 171 ° 24 ʹ 39 ʺ = 4.476
P8 - P9 = 33.880 x sin 158 ° 54 ʹ 31 ʺ = 12.192
P9 - P10 = 19.989 x sin 84 ° 9 ʹ 46 ʺ = 19.885
P10 - P11 = 37.621 x sin 116 ° 11 ʹ 5 ʺ = 33.760
P11 - P12 = 71.978 x sin 28 ° 13 ʹ 34 ʺ = 34.042
P12 - P13 = 39.999 x sin 36 ° 45 ʹ 26 ʺ = 23.936
P13 - P14 = 21.439 x sin 27 ° 14 ʹ 47 ʺ = 9.815
P14 - P15 = 12.836 x sin 38 ° 5 ʹ 8 ʺ = 7.918
P15 - P0 = 28.819 x sin 341 ° 36 ʹ 25 ʺ = -9.093

∑ = 3.53

Selisih Koordinat y (∆y)


P0 - P1 = 51.839 x cos 325 ° 12 ʹ 12 ʺ = 42.5692
P1 - P2 = 42.776 x cos 269 ° 34 ʹ 16 ʺ = -0.32026
P2 - P3 = 43.890 x cos 258 ° 22 ʹ 48 ʺ = -8.8403
P3 - P4 = 37.782 x cos 218 ° 11 ʹ 24 ʺ = -29.6954
P4 - P5 = 28.765 x cos 184 ° 48 ʹ 44 ʺ = -28.6638
P5 - P6 = 33.924 x cos 163 ° 51 ʹ 56 ʺ = -32.5881
P6 - P7 = 18.935 x cos 185 ° 10 ʹ 9 ʺ = -18.8575
P7 - P8 = 29.972 x cos 171 ° 24 ʹ 39 ʺ = -29.6362
P8 - P9 = 33.880 x cos 158 ° 54 ʹ 31 ʺ = -31.6098
P9 - P10 = 19.989 x cos 84 ° 9 ʹ 46 ʺ = 2.03288
P10 - P11 = 37.621 x cos 116 ° 11 ʹ 5 ʺ = -16.601
P11 - P12 = 71.978 x cos 28 ° 13 ʹ 34 ʺ = 63.4187
P12 - P13 = 39.999 x cos 36 ° 45 ʹ 26 ʺ = 32.0459
P13 - P14 = 21.439 x cos 27 ° 14 ʹ 47 ʺ = 19.06
P14 - P15 = 12.836 x cos 38 ° 5 ʹ 8 ʺ = 10.1028
P15 - P0 = 28.819 x cos 341 ° 36 ʹ 25 ʺ = 27.3463

∑ = -0.24

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Koreksi Koordinat 8


Rumus :

Koordinat x
P0 - P1 = - 3.532 x 51.839 = -0.330
554.44
P1 - P2 = - 3.532 x 42.776 = -0.273
554.44
P2 - P3 = - 3.532 x 43.890 = -0.280
554.44
3.532
P3 - P4 = - x 37.782 = -0.241
554.44
3.532
P4 - P5 = - x 28.765 = -0.183
554.44
P5 - P6 = - 3.532 x 33.924 = -0.216
554.44
3.532
P6 - P7 = - x 18.935 = -0.121
554.44
3.532
P7 - P8 = - x 29.972 = -0.191
554.44
3.532
P8 - P9 = - x 33.880 = -0.216
554.44
3.532
P9 - P10 = - x 19.989 = -0.127
554.44
3.532
P10 - P11 = - x 37.621 = -0.240
554.44
3.532
P11 - P12 = - x 71.978 = -0.459
554.44
3.532
P12 - P13 = - x 39.999 = -0.255
554.44
3.532
P13 - P14 = - x 21.439 = -0.137
554.44
3.532
P14 - P15 = - x 12.836 = -0.082
554.44
3.532
P15 - P0 = - x 28.819 = -0.184
554.44

∑ = -3.532

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koordinat y
-0.237
P0 - P1 = - x 51.839 = 0.022
554.44
-0.237
P1 - P2 = - x 42.776 = 0.018
554.44
-0.237
P2 - P3 = - x 43.890 = 0.019
554.44
P3 - P4 = - -0.237 x 37.782 = 0.016
554.44
-0.237
P4 - P5 = - x 28.765 = 0.012
554.44
-0.237
P5 - P6 = - x 33.924 = 0.014
554.44
-0.237
P6 - P7 = - x 18.935 = 0.008
554.44
-0.237
P7 - P8 = - x 29.972 = 0.013
554.44
-0.237
P8 - P9 = - x 33.880 = 0.014
554.44
-0.237
P9 - P10 = - x 19.989 = 0.009
554.44
-0.237
P10 - P11 = - x 37.621 = 0.016
554.44
-0.237
P11 - P12 = - x 71.978 = 0.031
554.44
-0.237
P12 - P13 = - x 39.999 = 0.017
554.44
-0.237
P13 - P14 = - x 21.439 = 0.009
554.44
-0.237
P14 - P15 = - x 12.836 = 0.005
554.44
-0.237
P15 - P0 = - x 28.819 = 0.012
554.44

∑ = 0.237

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koordinat Terkoreksi 9
Rumus :

Koordinat Terkoreksi x
P0 - P1 = -29.583 + -0.330 = -29.913
P1 - P2 = -42.774 + -0.273 = -43.047
P2 - P3 = -42.990 + -0.280 = -43.270
P3 - P4 = -23.360 + -0.241 = -23.600
P4 - P5 = -2.413 + -0.183 = -2.596
P5 - P6 = 9.427 + -0.216 = 9.211
P6 - P7 = -1.706 + -0.121 = -1.827
P7 - P8 = 4.476 + -0.191 = 4.285
P8 - P9 = 12.192 + -0.216 = 11.976
P9 - P10 = 19.885 + -0.127 = 19.758
P10 - P11 = 33.760 + -0.240 = 33.521
P11 - P12 = 34.042 + -0.459 = 33.583
P12 - P13 = 23.936 + -0.255 = 23.681
P13 - P14 = 9.815 + -0.137 = 9.678
P14 - P15 = 7.918 + -0.082 = 7.836
P15 - P0 = -9.093 + -0.184 = -9.277

∑ = 0.000
Koordinat y
Koordinat Terkoreksi y
P0 - P1 = 42.569 + 0.022 = 42.591
P1 - P2 = -0.320 + 0.018 = -0.302
P2 - P3 = -8.840 + 0.019 = -8.822
P3 - P4 = -29.695 + 0.016 = -29.679
P4 - P5 = -28.664 + 0.012 = -28.651
P5 - P6 = -32.588 + 0.014 = -32.574
P6 - P7 = -18.858 + 0.008 = -18.849
P7 - P8 = -29.636 + 0.013 = -29.623
P8 - P9 = -31.610 + 0.014 = -31.595
P9 - P10 = 2.033 + 0.009 = 2.041
P10 - P11 = -16.601 + 0.016 = -16.585
P11 - P12 = 63.419 + 0.031 = 63.449
P12 - P13 = 32.046 + 0.017 = 32.063
P13 - P14 = 19.060 + 0.009 = 19.069
P14 - P15 = 10.103 + 0.009 = 10.108
P15 - P0 = 27.346 + 0.005 = 27.359

∑ = 0.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koordinat Poligon 10
Rumusx = x0 + ∆x
y = y0 + ∆x
Koordinat awal = (0,0)

Koordinat x
P0 - P1 = 0.000 + -29.913 = -29.913
P1 - P2 = -29.913 + -43.047 = -72.960
P2 - P3 = -72.960 + -43.270 = -116.230
P3 - P4 = -116.230 + -23.600 = -139.830
P4 - P5 = -139.830 + -2.596 = -142.426
P5 - P6 = -142.426 + 9.211 = -133.215
P6 - P7 = -133.215 + -1.827 = -135.042
P7 - P8 = -135.042 + 4.285 = -130.756
P8 - P9 = -130.756 + 11.976 = -118.780
P9 - P10 = -118.780 + 19.758 = -99.023
P10 - P11 = -99.023 + 33.521 = -65.502
P11 - P12 = -65.502 + 33.583 = -31.919
P12 - P13 = -31.919 + 23.681 = -8.237
P13 - P14 = -8.237 + 9.678 = 1.441
P14 - P15 = 1.441 + 7.836 = 9.277
P15 - P0 = 9.277 + -9.277 = 0.000

Koordinat y
P0 - P1 = 0.000 + 42.591 = 42.591
P1 - P2 = 42.591 + -0.302 = 42.289
P2 - P3 = 42.289 + -8.822 = 33.468
P3 - P4 = 33.468 + -29.679 = 3.788
P4 - P5 = 3.788 + -28.651 = -24.863
P5 - P6 = -24.863 + -32.574 = -57.437
P6 - P7 = -57.437 + -18.849 = -76.286
P7 - P8 = -76.286 + -29.623 = -105.910
P8 - P9 = -105.910 + -31.595 = -137.505
P9 - P10 = -137.505 + 2.041 = -135.464
P10 - P11 = -135.464 + -16.585 = -152.048
P11 - P12 = -152.048 + 63.449 = -88.599
P12 - P13 = -88.599 + 32.063 = -56.536
P13 - P14 = -56.536 + 19.069 = -37.467
P14 - P15 = -37.467 + 10.108 = -27.359
P15 - P0 = -27.359 + 27.359 = 0.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Perhitungan Beda Tinggi 11


Rumus
Beda Tinggi = D + TA - BT
tan v

51.839
P0 - P1 = + 1.450 - 0.800 = 3.641
tan 86 ° 48 ʹ 30 ʺ
= 42.776 + 1.445 - 2.512 = 5.868
P1 - P2
tan 80 ° 47 ʹ 28 ʺ
= 43.890 + 1.441 - 0.938 = 4.193 12
P2 - P3
tan 85 ° 11 ʹ 38 ʺ
= 37.782 + 1.374 - 1.131 = 1.065
P3 - P4
tan 88 ° 45 ʹ 14 ʺ
28.765
P4 - P5 = + 1.459 - 0.736 = 1.724
tan 88 ° 0 ʹ 25 ʺ
33.924
P5 - P6 = + 1.660 - 1.354 = 1.908
tan 87 ° 17 ʹ 47 ʺ
18.935
P6 - P7 = + 1.400 - 1.660 = 0.854
tan 86 ° 38 ʹ 3 ʺ
29.972
P7 - P8 = + 1.520 - 1.482 = -0.872
tan 91 ° 44 ʹ 21 ʺ
33.880
P8 - P9 = + 1.440 - 0.282 = 0.325
tan 91 ° 24 ʹ 31 ʺ
19.989
P9 - P10 = + 1.430 - 1.300 = 0.606
tan 88 ° 38 ʹ 10 ʺ
37.621
P10 - P11 = + 1.160 - 0.700 = -15.031
tan 112 ° 22 ʹ 50 ʺ
71.978
P11 - P12 = + 1.650 - 2.000 = -1.617
tan 91 ° 0 ʹ 30 ʺ
39.999
P12 - P13 = + 1.530 - 1.800 = -0.512
tan 90 ° 20 ʹ 50 ʺ
21.439
P13 - P14 = + 1.420 - 1.513 = -1.239
tan 93 ° 03 ʹ 42 ʺ
12.836
P14 - P15 = + 1.520 - 1.280 = -1.212
tan 96 ° 27 ʹ 19 ʺ
28.819
P15 - P0 = + 1.360 - 1.005 = 2.642
tan 85 ° 27 ʹ 47 ʺ

∑ = 2.342

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koreksi Beda Tinggi 13


Rumus : Koreksi = ∑ beda tinggi
jumlah patok
Koreksi = 2.342
16
= 0.1464

Beda Tinggi Terkoreksi


Rumus : Beda Tinggi Terkoreksi = Beda Tinggi - Koreksi

P0 - P1 = 3.641 + 0.146 = 3.494


P1 - P2 = 5.868 + 0.146 = 5.722
P2 - P3 = 4.193 + 0.146 = 4.047
P3 - P4 = 1.065 + 0.146 = 0.918
P4 - P5 = 4.193 + 0.146 = 1.578
P5 - P6 = 1.724 + 0.146 = 1.762
P6 - P7 = 1.908 + 0.146 = 0.707
P7 - P8 = 0.854 + 0.146 = -1.018
P8 - P9 = -0.872 + 0.146 = 0.179
P9 - P10 = 0.325 + 0.146 = 0.460
P10 - P11 = 0.606 + 0.146 = -15.178
P11 - P12 = -15.031 + 0.146 = -1.763
P12 - P13 = -1.617 + 0.146 = -0.659
P13 - P14 = -0.512 + 0.146 = -1.386
P14 - P15 = -1.239 + 0.146 = -1.359
P15 - P0 = -1.212 + 0.146 = 2.495

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Tinggi Titik
Rumus : Beda Tinggi Terkoreksi = Beda Tinggi + Koreksi
Tinggi titik awal = 191

P0 = 191.000
P1 = 191.000 + 5.722 = 196.722
P2 = 196.722 + 4.047 = 200.769
P3 = 200.769 + 0.918 = 201.687
P4 = 201.687 + 1.578 = 203.265
P5 = 203.265 + 1.762 = 205.027
P6 = 205.027 + 0.707 = 205.734
P7 = 205.734 + -1.018 = 204.716
P8 = 204.716 + 0.179 = 204.895
P9 = 204.895 + 0.460 = 205.354
P10 = 205.354 + -15.178 = 190.176
P11 = 190.176 + -1.763 = 188.413
P12 = 188.413 + -0.659 = 187.754
P13 = 187.754 + -1.386 = 186.369
P14 = 186.369 + -1.359 = 185.010
P15 = 185.010 + 2.495 = 187.506
P0 = 187.506 + 3.494 = 191.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


TINGGI PEMBACAAN SUDUT
PATOK ALAT TARGET HORIZONTAL
(m) ⁰ ′ ʺ

P0 1.450 P15 341 36 26

P1 145 14 55

a 3 32 9

b 338 2 47

c 330 21 2

d 308 28 44

e 301 9 2

f 290 22 23

g 278 28 42

h 260 51 43

i 244 55 52

j 220 50 7
P1 1.445 P0 0 0 0

P2 124 24 7

a 118 31 30

b 125 40 35

c 107 8 14

d 100 8 2

e 75 59 27

f 90 52 50

g 74 33 21

h 49 10 31

P2 1.441 P1 0 0 0

P3 168 51 20

a 156 12 52

b 134 23 13

c 109 4 29
d 36 11 6

e 22 40 44

P3 1.374 P2 0 0 0

P4 139 50 55

a 134 23 24

b 125 36 46

c 101 30 31

d 84 29 23

e 71 34 10

f 69 50 18

g 32 23 53

h 53 19 19

i 36 21 44

j 17 22 14

P4 1.459 P3 0 0 0
P5 146 39 46

a 37 46 20

b 53 33 31

c 77 27 9

d 108 14 41

e 104 56 11

f 116 36 13

g 139 54 20

h 18 40 44

i 36 57 31

j 141 2 51

P5 1.660 P4 0 0 0

P6 159 5 50

a 110 28 32

b 107 37 45
c 99 50 11

d 24 18 48

e 43 34 56

P6 1.400 P5 0 0 0

P7 201 21 33

a 114 52 29

b 74 31 28

c 140 37 3

d 150 15 16

e 168 5 53

P7 1.520 P6 0 0 0

P8 166 17 16

a 218 32 38

b 102 25 12

c 54 34 45
d 33 9 10

e 105 1 32

P8 1.440 P7 0 0 0

P9 167 32 38

a 99 14 11

b 159 14 14

c 45 32 14

d 46 4 29

e 67 14 11

P9 1.430 P8 0 0 0

P10 105 16 60

a 13 53 30

b 40 20 50

c 38 29 50

d 70 29 10
e 85 52 50

P10 1.160 P9 0 0 0

P11 212 4 50

a 204 26 20

b 200 51 20

c 184 55 40

d 156 44 40

e 151 50 0

f 145 48 0

g 144 59 40

P11 1.650 P10 0 0 0

P12 92 3 60

a 57 57 60

b 50 5 20

c 48 32 40
d 31 1 20

e 21 2 0

f 32 29 0

g 20 24 40

h 25 6 50

i 8 26 10

j 6 38 10

P12 1.530 P11 0 0 0

P13 188 35 0

a 100 43 50

b 61 44 40

c 44 4 20

d 19 27 20

e 24 0 20

f 15 37 60
g 8 37 60

h 8 48 0

i 36 45 40

j 40 23 20

P13 1.420 P12 0 0 0

P14 170 32 10

a 128 28 52

b 121 13 20

c 110 43 45

d 106 13 33

e 98 35 16

f 93 33 20

g 96 4 11

h 92 15 27

P14 1.520 P13 0 0 0


P15 190 53 31

a 145 7 46

b 131 46 3

c 126 45 0

d 114 58 3

e 100 14 18

f 93 1 24

g 83 43 1

h 74 3 45

i 62 29 28

j 67 28 48

P15 1.360 P14 0 0 0

P0 123 33 20

a 106 1 42

b 85 9 17
c 75 29 8

d 68 28 42

e 62 52 13

f 54 46 49

g 47 35 37

h 30 57 19

i 13 19 39

j 6 27 28
EMBACAAN SUDUT
BACAAN JARAK OPTIS (m) AZIMUTH
VERTIKAL
RAMBU
⁰ ′ ʺ ⁰ ′ ʺ
0.940
92 42 24 0.800
0.660
0.960
86 48 30 0.700 51.839 325 12 12.33
0.440
2.655
92 04 19 2.600 10.986 183 32 9
2.545
3.185
87 08 31 3.100 15.960 518 2 47
3.025
3.090
87 21 20 3.000 16.465 510 21 2
2.925
2.315
87 15 02 2.200 22.947 488 28 44
2.085
1.690
90 28 55 1.500 37.997 481 9 2
1.310
0.885
89 09 56 0.700 35.992 470 22 23
0.525
3.282
86 35 02 3.200 15.744 458 28 42
3.124
1.750
84 11 17 1.600 29.692 440 51 43
1.450
1.680
95 16 45 1.600 15.369 424 55 52
1.525
0.785
90 36 11 0.600 34.496 400 50 7
0.440
0 0 0

2.731
80 47 28 2.512 42.776 269 34 15.67
2.292
0.858
97 20 5 0.737 23.806 263 43 42
0.616
3.188
90 9 49 3.059 25.800 270 52 47
2.930
2.079
92 20 14 2.008 14.176 252 20 26
1.937
1.064
87 37 32 1.023 8.186 181 23 18
0.982
1.467
85 49 55 1.443 4.775 221 11 39
1.419
3.756
89 24 38 3.682 65.593 236 5 2
3.100
1.451
90 38 18 1.372 15.798 219 45 33
1.293
1.307
84 23 57 1.198 21.592 194 22 43
1.089

0 0 0

1.159
85 11 38 0.938 43.890 258 22 47.82
0.717
1.946
91 42 20 1.876 13.988 245 47 8
1.806
2.016
91 44 5 1.928 17.584 223 57 29
1.840
2.017
90 35 8 1.954 12.599 198 38 45
1.891
1.524
87 10 45 1.473 10.175 125 45 22
1.422
2.642
84 55 21 2.538 20.637 112 14 60
2.434

0 0 0

1.320
88 45 14 1.131 37.782 218 11 23.80
0.942
2.609
93 46 11 2.441 33.455 212 46 12
2.273
1.232
96 58 44 1.119 22.266 203 59 34
1.006
1.529
97 0 35 1.425 20.490 179 53 19
1.321
1.498
96 48 53 1.398 25.240 162 52 11
1.242
1.656
96 17 12 1.525 16.006 149 56 58
1.494
1.605
90 17 0 1.524 16.200 148 13 6
1.443
1.375
94 54 25 1.336 7.743 110 46 41
1.297
1.885
94 5 21 1.792 18.505 131 42 7
1.699
0.751
93 54 40 0.622 25.680 114 44 32
0.493
1.189
90 27 22 1.095 18.899 95 45 2
1.000

0 0 0
0.880
88 0 25 0.736 28.765 184 48 44.01
0.592
1.362
103 59 20 1.324 7.156 75 57 44
1.286
0.832
93 6 39 0.748 16.751 91 44 55
0.664
1.056
98 27 5 1.009 5.968 115 38 33
0.995
1.089
92 32 34 1.012 15.370 146 26 5
0.935
1.914
92 11 25 1.873 8.188 143 7 35
1.832
1.486
93 44 40 1.442 8.962 154 47 37
1.396
1.239
95 8 59 1.189 9.919 178 5 44
1.139
1.311
95 9 42 1.255 11.109 56 52 8
1.199
1.612
95 9 27 1.445 33.130 75 8 55
1.278
1.551
93 6 56 1.482 9.771 179 14 15
1.453

0 0 0

1.524
87 17 47 1.354 33.924 163 51 55.86
1.184
0.929
100 28 58 0.865 12.376 115 17 16
0.801
1.639
92 15 37 1.555 16.774 112 26 29
1.471
1.333
114 33 16 1.312 3.557 104 38 55
1.290
1.253
87 28 34 1.240 2.695 29 7 32
1.226
1.072
93 42 52 1.017 10.954 48 23 40
0.962

0 0 0

1.755
86 38 3 1.660 18.935 185 10 8.70
1.565
0.798
101 48 21 0.768 5.749 98 44 25
0.738
0.825
96 37 34 0.750 14.800 58 23 24
0.675
1.631
95 52 29 1.481 29.686 124 28 59
1.331
1.369
96 13 28 1.252 23.125 134 7 12
1.135
0.807
96 23 54 0.739 13.431 151 57 49
0.671

0 0 0

1.632
91 44 21 1.482 29.972 171 24 39.41
1.332
1.445
89 53 42 1.400 9.000 223 42 47
1.355
1.075
98 44 38 1.003 14.165 107 35 21
0.930
0.510
98 41 32 0.434 14.853 59 44 54
0.358
1.105
95 57 2 1.030 14.839 38 19 19
0.955
1.834
95 44 57 1.700 26.630 110 11 41
1.565

0 0 0

0.451
91 24 31 0.282 33.880 158 54 30.86
0.112
0.825
95 36 39 0.795 5.943 90 38 50
0.765
0.640
91 58 17 0.596 8.889 150 38 53
0.551
0.534
97 27 45 0.484 9.831 36 56 53
0.434
0.465
96 50 36 0.370 18.730 37 29 8
0.275
0.875
95 36 39 0.824 10.202 58 38 50
0.772

0 0 0

1.400
88 38 10 1.300 19.989 84 9 46.20
1.200
1.425
90 5 10 1.400 5.000 352 48 1
1.375
1.535
31 47 10 1.500 1.942 19 15 21
1.465
1.965
92 3 0 1.900 12.983 17 24 21
1.835
1.836
91 52 50 1.800 7.192 49 23 41
1.764
0.963
97 59 50 0.900 12.356 64 47 21
0.837

0 0 0

0.920
112 22 50 0.700 37.621 116 11 5.38
0.480
1.357
94 36 0 1.300 11.327 108 36 6
1.243
1.042
97 47 20 1.000 8.246 105 1 6
0.958
1.515
91 8 20 1.500 2.999 89 5 26
1.485
1.520
90 37 40 1.500 4.000 60 54 26
1.480
1.527
31 12 30 1.500 1.450 55 59 46
1.473
0.932
98 51 10 0.900 6.248 49 57 46
0.868
1.375
98 58 30 1.300 14.635 49 9 26
1.225

0 0 0

2.360
91 0 30 2.000 71.978 28 13 33.87
1.640
1.242
91 11 10 1.200 8.396 354 9 5
1.158
1.460
9 11 10 1.400 0.306 346 16 25
1.340
2.810
91 14 10 2.400 49.077 344 43 45
2.319
1.368
91 24 0 1.300 13.592 327 12 25
1.232
1.381
91 29 0 1.300 16.189 317 13 5
1.219
1.700
91 15 50 1.600 19.990 328 40 5
1.500
1.508
91 15 40 1.000 21.590 316 35 45
1.292
1.674
91 13 40 1.550 24.789 321 17 55
1.426
1.934
91 18 20 1.800 26.786 304 37 15
1.666
2.061
91 17 40 1.900 67.066 302 49 15
1.390

0 0 0

2.000
90 20 50 1.800 39.999 36 45 26.41
1.600
1.372
93 2 30 1.300 14.359 308 57 24
1.228
1.561
93 12 10 1.500 12.162 269 58 14
1.439
1.451
88 36 40 1.400 10.194 252 17 54
1.349
1.540
90 19 10 1.500 8.500 227 40 54
1.455
1.277
90 29 10 1.200 15.399 232 13 54
1.123
0.982
89 15 30 0.900 16.397 223 51 34
0.818
1.391
89 16 50 1.300 18.197 216 51 34
1.209
1.411
89 49 50 1.300 22.200 217 1 34
1.189
1.375
91 51 40 1.200 34.963 244 59 14
1.025
2.270
90 57 40 2.100 33.990 248 36 54
1.930

0 0 0

1.620
93 03 42 1.513 21.439 27 14 46.88
1.405
2.250
92 03 03 2.200 10.986 345 14 18
2.140
0.950
92 13 20 0.900 14.977 337 58 46
0.800
1.370
87 49 27 1.200 33.951 327 29 11
1.030
2.740
84 45 08 2.600 28.757 322 58 59
2.450
0.430
91 55 31 0.300 25.971 315 20 42
0.170
1.000
90 53 48 0.900 19.995 310 18 46
0.800
1.000
94 45 19 0.900 19.863 312 49 37
0.800
1.700
92 12 31 1.600 19.970 309 0 53
1.500

0 0 0
1.345
96 27 19 1.280 12.836 38 5 8.13
1.215
1.238
99 09 46 1.200 7.602 352 22 33
1.160
0.540
90 57 33 0.400 26.992 339 0 50
0.270
0.755
88 07 40 0.600 30.467 333 59 47
0.450
0.995
88 13 49 0.850 29.472 322 12 50
0.700
1.580
85 19 34 1.450 24.337 307 29 5
1.335
1.535
86 16 40 1.400 26.388 300 16 11
1.270
0.510
90 08 58 0.400 22.000 290 57 48
0.290
0.940
93 49 23 0.800 24.590 281 18 32
0.693
1.030
92 53 36 0.900 18.952 269 44 15
0.840
2.030
86 10 23 1.900 24.889 274 43 35
1.780

0 0 0

1.150
85 27 47 1.005 28.819 341 36 25.31
0.860
1.345
90 26 28 1.280 12.999 324 6 50
1.215
2.070
86 33 55 1.900 32.882 303 14 25
1.740
1.775
85 48 18 1.600 33.918 293 34 16
1.434
0.930
85 18 04 0.800 25.826 286 33 50
0.670
0.918
88 32 11 0.800 21.786 280 57 21
0.700
2.315
86 48 45 2.200 23.926 272 51 57
2.075
1.090
86 53 11 1.000 17.448 265 40 45
0.915
1.785
82 13 20 1.690 18.161 249 2 27
1.600
1.275
90 48 54 1.200 14.497 231 24 47
1.130
1.000
84 04 58 0.900 18.798 224 32 36
0.810
BEDA
BEDA TINGGI
TINGGI
TINGGI TITIK
TERKOREKSI

3.641 3.494 191.000

-1.547 189.45256

-0.853 190.1468

-0.790 190.21046

0.352 191.352

-0.370 190.63038

1.274 192.27422

-0.810 190.1898

2.872 193.87229

-1.570 189.42992

0.487 191.4869
5.868 5.722 196.722

-2.356 194.366

-1.688 195.034

-1.142 195.580

0.761 197.484

0.350 197.072

-1.562 195.160

-0.103 196.619

1.306 198.028

4.193 4.047 200.769

-0.851 199.917

-1.020 199.749

-0.642 200.127
0.469 201.238

0.737 201.506

1.065 0.918 201.687

-3.271 198.416

-2.471 199.217

-2.570 199.117

-3.040 198.647

-1.914 199.773

-0.230 201.457

-0.627 201.061

-1.741 199.946

-1.004 200.684

0.129 201.817
1.724 1.578 203.265

-1.648 201.617

-0.199 203.066

-0.437 202.828

-0.236 203.030

-0.727 202.538

-0.570 202.696

-0.624 202.641

-0.800 202.466

-2.976 200.289

-0.555 202.710

1.908 1.762 205.027

-1.495 203.532

-0.557 204.470
-1.277 203.750

0.539 205.566

-0.068 204.959

0.854 0.707 205.734

-0.570 205.164

-1.069 204.665

-3.135 202.598

-2.374 203.360

-0.845 204.889

-0.872 -1.018 204.716

0.136 204.852

-1.661 203.054

-1.185 203.531
-1.057 203.659

-2.861 201.855

0.325 0.179 204.895

0.061 204.956

0.539 205.433

-0.332 204.563

-1.178 203.717

-0.386 204.509

0.606 0.460 205.354

0.022 205.377

3.064 208.418

-0.935 204.419

-0.606 204.748
-1.206 204.148

-15.031 -15.178 190.176

-1.051 189.125

-0.968 189.209

-0.400 189.777

-0.384 189.793

2.053 192.230

-0.713 189.463

-2.451 187.725

-1.617 -1.763 188.413

0.276 188.689

2.141 190.554

-1.809 186.604
0.018 188.431

-0.069 188.344

-0.391 188.022

0.175 188.588

-0.431 187.982

-0.760 187.653

-1.765 186.648

-0.512 -0.659 187.754

-0.533 187.221

-0.651 187.104

0.377 188.132

-0.017 187.737

0.199 187.954

0.842 188.597
0.459 188.213

0.296 188.050

-0.806 186.948

-1.140 186.614

-1.239 -1.386 186.369

-1.173 185.196

-0.061 186.308

1.510 187.879

1.461 187.830

0.247 186.616

0.207 186.576

-1.132 185.237

-0.950 185.419
-1.212 -1.359 185.010

-0.906 184.104

0.668 185.678

1.916 186.926

1.581 186.591

2.060 187.070

1.837 186.847

1.063 186.073

-0.923 184.087

-0.338 184.672

1.285 186.295

2.642 2.495 187.506

-0.020 187.486

1.434 188.939
2.248 189.753

2.683 190.188

1.117 188.622

0.492 187.998

1.309 188.815

2.151 189.656

-0.046 187.459

2.408 189.914
CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Contoh Perhitungan Theodolite 2

Perhitungan Patok Utama

1 Menentukan Sudut Datar


Rumus : Sudut Datar = Sudut Muka - Sudut belakang

P0 = 145 ° 14 ʹ 55 ʺ - 341 ° 36 ʹ 26 ʺ = 163 ° 38 ʹ 29 ʺʺ


P1 = 124 ° 24 ʹ 7 ʺ - 0 ° 0 ʹ 0 ʺ = 124 ° 24 ʹ 7 ʺʺ
P2 = 168 ° 51 ʹ 20 ʺ - 0 ° 0 ʹ 0 ʺ = 168 ° 51 ʹ 20 ʺʺ
P3 = 139 ° 50 ʹ 55 ʺ - 0 ° 0 ʹ 0 ʺ = 139 ° 50 ʹ 55 ʺʺ
P4 = 146 ° 39 ʹ 46 ʺ - 0 ° 0 ʹ 0 ʺ = 146 ° 39 ʹ 46 ʺʺ
P5 = 159 ° 5 ʹ 50 ʺ - 0 ° 0 ʹ 0 ʺ = 159 ° 5 ʹ 50 ʺʺ
P6 = 201 ° 21 ʹ 33 ʺ - 0 ° 0 ʹ 0 ʺ = 201 ° 21 ʹ 33 ʺʺ
P7 = 166 ° 17 ʹ 16 ʺ - 0 ° 0 ʹ 0 ʺ = 166 ° 17 ʹ 16 ʺʺ
P8 = 167 ° 32 ʹ 38 ʺ - 0 ° 0 ʹ 0 ʺ = 167 ° 32 ʹ 38 ʺʺ
P9 = 105 ° 16 ʹ 60 ʺ - 0 ° 0 ʹ 0 ʺ = 105 ° 16 ʹ 60 ʺʺ
P10 = 212 ° 4 ʹ 50 ʺ - 0 ° 0 ʹ 0 ʺ = 212 ° 4 ʹ 50 ʺʺ
P11 = 92 ° 3 ʹ 60 ʺ - 0 ° 0 ʹ 0 ʺ = 92 ° 3 ʹ 60 ʺʺ
P12 = 188 ° 35 ʹ 0 ʺ - 0 ° 0 ʹ 0 ʺ = 188 ° 35 ʹ 0 ʺʺ
P13 = 170 ° 32 ʹ 10 ʺ - 0 ° 0 ʹ 0 ʺ = 170 ° 32 ʹ 10 ʺʺ
P14 = 190 ° 53 ʹ 31 ʺ - 0 ° 0 ʹ 0 ʺ = 190 ° 53 ʹ 31 ʺʺ
P15 = 123 ° 33 ʹ 20 ʺ - 0 ° 0 ʹ 0 ʺ = 123 ° 33 ʹ 20 ʺʺ

∑ = 2520 ° 41 ʹ 45 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koreksi Sudut Datar 3


RumusSudut dalam = (2n - 4) x 90
Sudut luar = (2n + 4) x 90

Jumlah sud = (2n - 4) x 90


= (2(16) - 4) x 90
= 2520 ° 0ʹ 0ʺ

Koreksi = Sudut koreksi - Sudut datar


= 2520 ° 0ʹ 0ʺ - 2520 ° 41 ʹ 45 ʺ
= 0° 41 ʹ 45 ʺ

Koreksi tiap sudut

P0 = 163 ° 38 ʹ 29 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 42.67 ʺ
### ° 41 ʹ 45 ʺ
P1 = 124 ° 24 ʹ 7ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 3.66 ʺ
### ° 41 ʹ 45 ʺ
P2 = 168 ° 51 ʹ 20 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 47.85 ʺ
### ° 41 ʹ 45 ʺ
P3 = 139 ° 50 ʹ 55 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 19.02 ʺ
### ° 41 ʹ 45 ʺ
P4 = 146 ° 39 ʹ 46 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 25.79 ʺ
### ° 41 ʹ 45 ʺ
P5 = 159 ° 5ʹ 50 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 38.15 ʺ
### ° 41 ʹ 45 ʺ
P6 = 201 ° 21 ʹ 33 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 3 ʹ 20.16 ʺ
### ° 41 ʹ 45 ʺ
P7 = 166 ° 17 ʹ 16 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 45.30 ʺ
### ° 41 ʹ 45 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P8 = 167 ° 32 ʹ 38 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 46.55 ʺ
### ° 41 ʹ 45 ʺ
P9 = 105 ° 16 ʹ 60 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 1 ʹ 44.66 ʺ
### ° 41 ʹ 45 ʺ
P10 = 212 ° 4ʹ 50 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 3 ʹ 30.82 ʺ
### ° 41 ʹ 45 ʺ
P11 = 92 ° 3ʹ 60 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 1 ʹ 31.52 ʺ
### ° 41 ʹ 45 ʺ
P12 = 188 ° 35 ʹ 0ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 3 ʹ 7.46 ʺ
### ° 41 ʹ 45 ʺ
P13 = 170 ° 32 ʹ 10 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 49.52 ʺ
### ° 41 ʹ 45 ʺ
P14 = 190 ° 53 ʹ 31 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 3 ʹ 9.76 ʺ
### ° 41 ʹ 45 ʺ
P15 = 123 ° 33 ʹ 20 ʺ
x 0 ° 41 ʹ 45 ʺ = 0 ° 2 ʹ 2.82 ʺ
### ° 41 ʹ 45 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Sudut Terkoreksi 4


Rumus : Sudut datar - Koreksi

P0 = 163 ° 38 ʹ 29 ʺ - 0 ° 2 ʹ 43 ʺ = 163 ° 35 ʹ 46.33 ʺ


P1 = 124 ° 24 ʹ 7 ʺ - 0 ° 2 ʹ 3.7 ʺ = 124 ° 22 ʹ 3.34 ʺ
P2 = 168 ° 51 ʹ 20 ʺ - 0 ° 2 ʹ 48 ʺ = 168 ° 48 ʹ 32.15 ʺ
P3 = 139 ° 50 ʹ 55 ʺ - 0 ° 2 ʹ 19 ʺ = 139 ° 48 ʹ 35.98 ʺ
P4 = 146 ° 39 ʹ 46 ʺ - 0 ° 2 ʹ 26 ʺ = 146 ° 37 ʹ 20.21 ʺ
P5 = 159 ° 5 ʹ 50 ʺ - 0 ° 2 ʹ 38 ʺ = 159 ° 3 ʹ 11.85 ʺ
P6 = 201 ° 21 ʹ 33 ʺ - 0 ° 3 ʹ 20 ʺ = 201 ° 18 ʹ 12.84 ʺ
P7 = 166 ° 17 ʹ 16 ʺ - 0 ° 2 ʹ 45 ʺ = 166 ° 14 ʹ 30.70 ʺ
P8 = 167 ° 32 ʹ 38 ʺ - 0 ° 2 ʹ 47 ʺ = 167 ° 29 ʹ 51.45 ʺ
P9 = 105 ° 16 ʹ 60 ʺ - 0 ° 1 ʹ 45 ʺ = 105 ° 15 ʹ 15.34 ʺ
P10 = 212 ° 4 ʹ 50 ʺ - 0 ° 3 ʹ 31 ʺ = 212 ° 1 ʹ 19.18 ʺ
P11 = 92 ° 3 ʹ 60 ʺ - 0 ° 1 ʹ 32 ʺ = 92 ° 2 ʹ 28.48 ʺ
P12 = 188 ° 35 ʹ 0 ʺ - 0 ° 3 ʹ 7.5 ʺ = 188 ° 31 ʹ 52.54 ʺ
P13 = 170 ° 32 ʹ 10 ʺ - 0 ° 2 ʹ 50 ʺ = 170 ° 29 ʹ 20.48 ʺ
P14 = 190 ° 53 ʹ 31 ʺ - 0 ° 3 ʹ 9.8 ʺ = 190 ° 50 ʹ 21.24 ʺ
P15 = 123 ° 33 ʹ 20 ʺ - 0 ° 2 ʹ 2.8 ʺ = 123 ° 31 ʹ 17.18 ʺ

∑ = 2519 ° 59 ʹ 59.31 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Azimuth (α) 5
Rumus : Azimuth = Azimuth awal + Sudut Pn - 180°
azimuth awal = 341 ° 36 ʹ 26 ʺ

P0 - P1 = 341 ° 36 ʹ 26.00 ʺ + 163 ° 35 ʹ 46.33 ʺ - 180 ° = 325 ° 12 ʹ 12.33 ʺ


P1 - P2 = 325 ° 12 ʹ 12.33 ʺ + 124 ° 22 ʹ 3.34 ʺ - 180 ° = 269 ° 34 ʹ 15.67 ʺ
P2 - P3 = 269 ° 34 ʹ 15.67 ʺ + 168 ° 48 ʹ 32.15 ʺ - 180 ° = 258 ° 22 ʹ 47.82 ʺ
P3 - P4 = 258 ° 22 ʹ 47.82 ʺ + 139 ° 48 ʹ 35.98 ʺ - 180 ° = 218 ° 11 ʹ 23.80 ʺ
P4 - P5 = 218 ° 11 ʹ 23.80 ʺ + 146 ° 37 ʹ 20.21 ʺ - 180 ° = 184 ° 48 ʹ 44.01 ʺ
P5 - P6 = 184 ° 48 ʹ 44.01 ʺ + 159 ° 3 ʹ 11.85 ʺ - 180 ° = 163 ° 51 ʹ 55.86 ʺ
P6 - P7 = 163 ° 51 ʹ 55.86 ʺ + 201 ° 18 ʹ 12.84 ʺ - 180 ° = 185 ° 10 ʹ 8.70 ʺ
P7 - P8 = 185 ° 10 ʹ 8.70 ʺ + 166 ° 14 ʹ 30.70 ʺ - 180 ° = 171 ° 24 ʹ 39.41 ʺ
P8 - P9 = 171 ° 24 ʹ 39.41 ʺ + 167 ° 29 ʹ 51.45 ʺ - 180 ° = 158 ° 54 ʹ 30.86 ʺ
P9 - P10 = 158 ° 54 ʹ 30.86 ʺ + 105 ° 15 ʹ 15.34 ʺ - 180 ° = 84 ° 9 ʹ 46.20 ʺ
P10 - P11 = 84 ° 9 ʹ 46.20 ʺ + 212 ° 1 ʹ 19.18 ʺ - 180 ° = 116 ° 11 ʹ 5.38 ʺ
P11 - P12 = 116 ° 11 ʹ 5.38 ʺ + 92 ° 2 ʹ 28.48 ʺ - 180 ° = 28 ° 13 ʹ 33.87 ʺ
P12 - P13 = 28 ° 13 ʹ 33.87 ʺ + 188 ° 31 ʹ 52.54 ʺ - 180 ° = 36 ° 45 ʹ 26.41 ʺ
P13 - P14 = 36 ° 45 ʹ 26.41 ʺ + 170 ° 29 ʹ 20.48 ʺ - 180 ° = 27 ° 14 ʹ 46.88 ʺ
P14 - P15 = 27 ° 14 ʹ 46.88 ʺ + 190 ° 50 ʹ 21.24 ʺ - 180 ° = 38 ° 5 ʹ 8.13 ʺ
P15 - P0 = 38 ° 5 ʹ 8.13 ʺ + 123 ° 31 ʹ 17.18 ʺ - 181 ° = 341 ° 36 ʹ 25.31 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Jarak Optis (D) 6


Rumus : D = (BA-BB) x 100 sin2 v

P0 - P1 = 0.940 - 0.660 x sin2 86 ° 48 ʹ 30 ʺ = 27.938


P1 - P2 = 2.731 - 2.292 x sin2 80 ° 47 ʹ 28 ʺ = 42.776
P2 - P3 = 1.159 - 0.717 x sin2 85 ° 11 ʹ 38 ʺ = 43.890
P3 - P4 = 1.320 - 0.942 x sin2 88 ° 45 ʹ 14 ʺ = 37.782
P4 - P5 = 0.880 - 0.592 x sin2 88 ° 0 ʹ 25 ʺ = 28.765
P5 - P6 = 1.524 - 1.184 x sin2 87 ° 17 ʹ 47 ʺ = 33.924
P6 - P7 = 1.755 - 1.565 x sin2 86 ° 38 ʹ 3 ʺ = 18.935
P7 - P8 = 1.632 - 1.332 x sin2 91 ° 44 ʹ 21 ʺ = 29.972
P8 - P9 = 0.451 - 0.112 x sin2 91 ° 24 ʹ 31 ʺ = 33.880
P9 - P10 = 1.400 - 1.200 x sin2 88 ° 38 ʹ 10 ʺ = 19.989
P10 - P11 = 0.920 - 0.480 x sin2 112 ° 22 ʹ 50 ʺ = 37.621
P11 - P12 = 2.360 - 1.640 x sin2 91 ° 0 ʹ 30 ʺ = 71.978
P12 - P13 = 2.000 - 1.600 x sin2 90 ° 20 ʹ 50 ʺ = 39.999
P13 - P14 = 1.620 - 1.405 x sin2 93 ° 03 ʹ 42 ʺ = 21.439
P14 - P15 = 1.345 - 1.215 x sin2 96 ° 27 ʹ 19 ʺ = 12.836
P15 - P0 = 1.150 - 0.860 x sin2 85 ° 27 ʹ 47 ʺ = 28.819

∑ = 530.540

Selisih Koordinat y (∆y)

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Selisih Koordinat 7


Rumus
∆x = Jarak optis x sin α azimuth
∆y = Jarak optis x cos α azimuth

Selisih Koordinat x (∆x)


P0 - P1 = 27.938 x sin 325 ° 12 ʹ 12.33 ʺ = -15.943
P1 - P2 = 42.776 x sin 269 ° 34 ʹ 15.67 ʺ = -42.774
P2 - P3 = 43.890 x sin 258 ° 22 ʹ 47.82 ʺ = -42.990
P3 - P4 = 37.782 x sin 218 ° 11 ʹ 23.80 ʺ = -23.360
P4 - P5 = 28.765 x sin 184 ° 48 ʹ 44.01 ʺ = -2.413
P5 - P6 = 33.924 x sin 163 ° 51 ʹ 55.86 ʺ = 9.427
P6 - P7 = 18.935 x sin 185 ° 10 ʹ 8.70 ʺ = -1.706
P7 - P8 = 29.972 x sin 171 ° 24 ʹ 39.41 ʺ = 4.476
P8 - P9 = 33.880 x sin 158 ° 54 ʹ 30.86 ʺ = 12.192
P9 - P10 = 19.989 x sin 84 ° 9 ʹ 46.20 ʺ = 19.885
P10 - P11 = 37.621 x sin 116 ° 11 ʹ 5.38 ʺ = 33.760
P11 - P12 = 71.978 x sin 28 ° 13 ʹ 33.87 ʺ = 34.042
P12 - P13 = 39.999 x sin 36 ° 45 ʹ 26.41 ʺ = 23.936
P13 - P14 = 21.439 x sin 27 ° 14 ʹ 46.88 ʺ = 9.815
P14 - P15 = 12.836 x sin 38 ° 5 ʹ 8.13 ʺ = 7.918
P15 - P0 = 28.819 x sin 341 ° 36 ʹ 25.31 ʺ = -9.093

∑ = 17.172

Selisih Koordinat y (∆y)


P0 - P1 = 27.938 x cos 325 ° 12 ʹ 12.33 ʺ = 22.942
P1 - P2 = 42.776 x cos 269 ° 34 ʹ 15.67 ʺ = -0.320
P2 - P3 = 43.890 x cos 258 ° 22 ʹ 47.82 ʺ = -8.840
P3 - P4 = 37.782 x cos 218 ° 11 ʹ 23.80 ʺ = -29.695
P4 - P5 = 28.765 x cos 184 ° 48 ʹ 44.01 ʺ = -28.664
P5 - P6 = 33.924 x cos 163 ° 51 ʹ 55.86 ʺ = -32.588
P6 - P7 = 18.935 x cos 185 ° 10 ʹ 8.70 ʺ = -18.858

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P7 - P8 = 29.972 x cos 171 ° 24 ʹ 39.41 ʺ = -29.636


P8 - P9 = 33.880 x cos 158 ° 54 ʹ 30.86 ʺ = -31.610
P9 - P10 = 19.989 x cos 84 ° 9 ʹ 46.20 ʺ = 2.033
P10 - P11 = 37.621 x cos 116 ° 11 ʹ 5.38 ʺ = -16.601
P11 - P12 = 71.978 x cos 28 ° 13 ʹ 33.87 ʺ = 63.419
P12 - P13 = 39.999 x cos 36 ° 45 ʹ 26.41 ʺ = 32.046
P13 - P14 = 21.439 x cos 27 ° 14 ʹ 46.88 ʺ = 19.060
P14 - P15 = 12.836 x cos 38 ° 5 ʹ 8.13 ʺ = 10.103
P15 - P0 = 28.819 x cos 341 ° 36 ʹ 25.31 ʺ = 27.346

∑ = -19.864

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Menentukan Koreksi Koordinat 8


Rumus :

Koordinat x
17.172
P0 - P1 = - x 27.938 = -0.904
530.540
17.172
P1 - P2 = - x 42.776 = -1.385
530.540
17.172
P2 - P3 = - x 43.890 = -1.421
530.540
17.172
P3 - P4 = - x 37.782 = -1.223
530.540
17.172
P4 - P5 = - x 28.765 = -0.931
530.540
17.172
P5 - P6 = - x 33.924 = -1.098
530.540
17.172
P6 - P7 = - x 18.935 = -0.613
530.540
17.172
P7 - P8 = - x 29.972 = -0.970
530.540
17.172
P8 - P9 = - x 33.880 = -1.097
530.540
17.172
P9 - P10 = - x 19.989 = -0.647
530.540
17.172
P10 - P11 = - x 37.621 = -1.218
530.540
17.172
P11 - P12 = - x 71.978 = -2.330
530.540
17.172
P12 - P13 = - x 39.999 = -1.295
530.540
17.172
P13 - P14 = - x 21.439 = -0.694

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P13 - P14 = - x 21.439 = -0.694


530.540

17.172
P14 - P15 = - x 12.836 = -0.415
530.540
17.172
P15 - P16 = - x 28.819 = -0.933
530.540

∑ = -17.172

Koordinat y
-19.864
P0 - P1 = - x 27.938 = 1.046
530.540
-19.864
P1 - P2 = - x 42.776 = 1.602
530.540
-19.864
P2 - P3 = - x 43.890 = 1.643
530.540
-19.864
P3 - P4 = - x 37.782 = 1.415
530.540
-19.864
P4 - P5 = - x 28.765 = 1.077
530.540
-19.864
P5 - P6 = - x 33.924 = 1.270
530.540
-19.864
P6 - P7 = - x 18.935 = 0.709
530.540
-19.864
P7 - P8 = - x 29.972 = 1.122
530.540
-19.864
P8 - P9 = - x 33.880 = 1.268
530.540
-19.864
P9 - P10 = - x 19.989 = 0.748
530.540
-19.864
P10 - P11 = - x 37.621 = 1.409

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P10 - P11 = - x 37.621 = 1.409


530.540
-19.864
P11 - P12 = - x 71.978 = 2.695
530.540

-19.864
P12 - P13 = - x 39.999 = 1.498
530.540
-19.864
P13 - P14 = - x 21.439 = 0.803
530.540
-19.864
P14 - P15 = - x 12.836 = 0.481
530.540
-19.864
P15 - P16 = - x 28.819 = 1.079
530.540

∑ = 19.864

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koordinat Terkoreksi 9
Rumus :

Koordinat Terkoreksi x
P0 - P1 = -15.943 + -0.904 = -16.847 Koordinat x
P1 - P2 = -42.774 + -1.385 = -44.159
P2 - P3 = -42.990 + -1.421 = -44.411
P3 - P4 = -23.360 + -1.223 = -24.582
P4 - P5 = -2.413 + -0.931 = -3.344
P5 - P6 = 9.427 + -1.098 = 8.329
P6 - P7 = -1.706 + -0.613 = -2.319
P7 - P8 = 4.476 + -0.970 = 3.506
P8 - P9 = 12.192 + -1.097 = 11.095
P9 - P10 = 19.885 + -0.647 = 19.238
P10 - P11 = 33.760 + -1.218 = 32.543
P11 - P12 = 34.042 + -2.330 = 31.712
P12 - P13 = 23.936 + -1.295 = 22.642
P13 - P14 = 9.815 + -0.694 = 9.121
P14 - P15 = 7.918 + -0.415 = 7.502
P15 - P0 = -9.093 + -0.933 = -10.026

∑ = 0.000
Koordinat y
Koordinat Terkoreksi y
P0 - P1 = 22.942 + 1.046 = 23.988
P1 - P2 = -0.320 + 1.602 = 1.281
P2 - P3 = -8.840 + 1.643 = -7.197
P3 - P4 = -29.695 + 1.415 = -28.281
P4 - P5 = -28.664 + 1.077 = -27.587
P5 - P6 = -32.588 + 1.270 = -31.318
P6 - P7 = -18.858 + 0.709 = -18.149

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P7 - P8 = -29.636 + 1.122 = -28.514


P8 - P9 = -31.610 + 1.268 = -30.341
P9 - P10 = 2.033 + 0.748 = 2.781
P10 - P11 = -16.601 + 1.409 = -15.192
P11 - P12 = 63.419 + 2.695 = 66.114
P12 - P13 = 32.046 + 1.498 = 33.543
P13 - P14 = 19.060 + 0.803 = 19.863
P14 - P15 = 10.103 + 0.803 = 10.583
P15 - P0 = 27.346 + 0.481 = 28.425

∑ = 0.000

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Koordinat Poligon 10
Rumus : x = x0 + ∆x
y = y0 + ∆x
Koordinat awal = (0,0)

Koordinat x
P0 - P1 = 0.000 + -16.847 = -16.847
P1 - P2 = -16.847 + -44.159 = -61.006
P2 - P3 = -61.006 + -44.411 = -105.417
P3 - P4 = -105.417 + -24.582 = -129.999
P4 - P5 = -129.999 + -3.344 = -133.344
P5 - P6 = -133.344 + 8.329 = -125.014
P6 - P7 = -125.014 + -2.319 = -127.333
P7 - P8 = -127.333 + 3.506 = -123.827
P8 - P9 = -123.827 + 11.095 = -112.732
P9 - P10 = -112.732 + 19.238 = -93.494
P10 - P11 = -93.494 + 32.543 = -60.951
P11 - P12 = -60.951 + 31.712 = -29.239
P12 - P13 = -29.239 + 22.642 = -6.597
P13 - P14 = -6.597 + 9.121 = 2.524
P14 - P15 = 2.524 + 7.502 = 10.026
P15 - P0 = 10.026 + -10.026 = 0.000

Koordinat y
P0 - P1 = 0.000 + 23.988 = 23.988
P1 - P2 = 23.988 + 1.281 = 25.269
P2 - P3 = 25.269 + -7.197 = 18.072
P3 - P4 = 18.072 + -28.281 = -10.209
P4 - P5 = -10.209 + -27.587 = -37.795
P5 - P6 = -37.795 + -31.318 = -69.113
P6 - P7 = -69.113 + -18.149 = -87.262
P7 - P8 = -87.262 + -28.514 = -115.776

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

P8 - P9 = -115.776 + -30.341 = -146.117


P9 - P10 = -146.117 + 2.781 = -143.336
P10 - P11 = -143.336 + -15.192 = -158.529
P11 - P12 = -158.529 + 66.114 = -92.415
P12 - P13 = -92.415 + 33.543 = -58.871
P13 - P14 = -58.871 + 19.863 = -39.009
P14 - P15 = -39.009 + 10.583 = -28.425
P15 - P0 = -28.425 + 28.425 = 0.000
11

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Perhitungan Beda Tinggi 12


D
Rumus : Beda Tinggi = + TA - BT
tan v

27.938
P0 - P1 = + 1.450 - 0.800 = 2.308
tan 86 ° 48 ʹ 30 ʺ
42.776
P1 - P2 = + 1.445 - 2.512 = 5.868
tan 80 ° 47 ʹ 28 ʺ
43.890
P2 - P3 = + 1.441 - 0.938 = 4.193
tan 85 ° 11 ʹ 38 ʺ
37.782
P3 - P4 = + 1.374 - 1.131 = 1.065
tan 88 ° 45 ʹ 14 ʺ
28.765
P4 - P5 = + 1.459 - 0.736 = 1.724
tan 88 ° 0 ʹ 25 ʺ
33.924
P5 - P6 = + 1.660 - 1.354 = 1.908
tan 87 ° 17 ʹ 47 ʺ
18.935
P6 - P7 = + 1.400 - 1.660 = 0.854
tan 86 ° 38 ʹ 3 ʺ
29.972
P7 - P8 = + 1.520 - 1.482 = -0.872
tan 91 ° 44 ʹ 21 ʺ
33.880
P8 - P9 = + 1.440 - 0.282 = 0.325
tan 91 ° 24 ʹ 31 ʺ
19.989
P9 - P10 = + 1.430 - 1.300 = 0.606
tan 88 ° 38 ʹ 10 ʺ
37.621
P10 - P11 = + 1.160 - 0.700 = -15.031
tan 112 ° 22 ʹ 50 ʺ
71.978
P11 - P12 = + 1.650 - 2.000 = -1.617
tan 91 ° 0 ʹ 30 ʺ
39.999
P12 - P13 = + 1.530 - 1.800 = -0.512
tan 90 ° 20 ʹ 50 ʺ
21.439
P13 - P14 = + 1.420 - 1.513 = -1.239
tan 93 ° 03 ʹ 42 ʺ

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

12.836
P14 - P15 = + 1.520 - 1.280 = -1.212
tan 96 ° 27 ʹ 19 ʺ
28.819
P15 - P16 = + 1.360 - 1.005 = 2.642
tan 85 ° 27 ʹ 47 ʺ

∑ = 1.009

Koreksi Beda Tinggi


Rumus : Koreksi = ∑ beda tinggi
jumlah patok

Koreksi = 1.009
16
= 0.063

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Beda Tinggi Terkoreksi 13


RumuBeda Tinggi Terkoreksi = Beda Tinggi - Koreksi

P0 - P1 = 2.308 + 0.063 = 2.245


P1 - P2 = 5.868 + 0.063 = 5.805
P2 - P3 = 4.193 + 0.063 = 4.130
P3 - P4 = 1.065 + 0.063 = 1.002
P4 - P5 = 4.193 + 0.063 = 1.661
P5 - P6 = 1.724 + 0.063 = 1.845
P6 - P7 = 1.908 + 0.063 = 0.791
P7 - P8 = 0.854 + 0.063 = -0.935
P8 - P9 = -0.872 + 0.063 = 0.262
P9 - P10 = 0.325 + 0.063 = 0.543
P10 - P11 = 0.606 + 0.063 = -15.094
P11 - P12 = -15.031 + 0.063 = -1.680
P12 - P13 = -1.617 + 0.063 = -0.575
P13 - P14 = -0.512 + 0.063 = -1.302
P14 - P15 = -1.239 + 0.063 = -1.275
P15 - P0 = -1.212 + 0.063 = 2.579

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


CIVIL ENGINEERING
SURVEY DAN PEMETAAN UNIVERSITAS TADULAKO

Tinggi Titik
Rumus : Beda Tinggi Terkoreksi = Beda Tinggi + Koreksi
Tinggi titik awal = 191

P0 = 191.000
P1 = 191.000 + 5.805401 = 196.8054
P2 = 196.722 + 4.13018 = 200.9356
P3 = 200.769 + 1.001786 = 201.9374
P4 = 201.687 + 1.660954 = 203.5983
P5 = 203.265 + 1.844917 = 205.4432
P6 = 205.027 + 0.790529 = 206.2338
P7 = 205.734 + -0.93512 = 205.2986
P8 = 204.716 + 0.26235 = 205.561
P9 = 204.895 + 0.54285 = 206.1038
P10 = 205.354 + -15.0944 = 191.0094
P11 = 190.176 + -1.6799 = 189.3295
P12 = 188.413 + -0.57546 = 188.7541
P13 = 187.754 + -1.30225 = 187.4518
P14 = 186.369 + -1.27535 = 186.1765
P15 = 185.010 + 2.57871 = 188.7552
P0 = 187.506 + 2.244819 = 191

A.A. JOTHYSA MAHESWARI KUMARA / F 111 17 091


Pembacaan Sudut
Tinggi Alat Bacaan
Titik Alat Target Hrz-Biasa Vertikal
(m) Rambu
° " ° "
0.960
P0 1.450 P1 145 14 55 86 48 30 0.700
0.440
2.731
P1 1.445 P2 124 24 7 80 47 28 2.522
2.292
Jarak Sudut Azimuth
Optis (m) Datar (α)

51.839 145.249

42.776 124.402
PE

LOKASI : BUKIT JABAL NUR


PEKERJAAN :
PROYEK :

Sudut Horisontal Azimuth


STA TARGET. Tinggi Alat
º ' " º
P7 196 10 12 196.17 z
P0 1.490
P1 53 12 5 53.20 53.20
p0-a 176 12 24 176.21 176.21
p0-b 182 37 48 182.63 182.63
p0-c 95 34 58 95.58 95.58
p0-d 140 8 42 140.14 140.14

P0 0 0 0 0.00 53.20
P1 1.460
P2 277 45 30 277.76 150.96
p1-a 292 29 11 292.49 165.69
p1-b 116 26 2 116.43 349.64
p1-c 356 25 7 356.42 229.62
PERHITUNGAN POLYGON / SITUASI

Sudut Sudut
Bacaan benang Jarak
Vertikal Jarak Optis
Vertikal Datar
(meter)
(meter)
Tengah Atas Bawah O
' " º
#NAME? 0.700 0.925 0.475 72 16 22 72.273 42.86 40.83
#NAME?
#NAME? 1.300 1.585 1.015 95 42 53 95.715 56.72 56.43
#NAME? 1.794 1.850 1.738 89 14 54 89.248 11.20 11.20
#NAME? 0.480 0.550 0.410 73 39 58 73.666 13.43 12.89
#NAME? 2.820 2.900 2.740 80 25 57 80.433 15.78 15.56
#NAME? 1.277 1.400 1.154 89 9 10 89.153 24.60 24.59
#NAME?
#NAME? 1.415 1.700 1.130 84 24 34 84.409 56.73 56.46
#NAME?
#NAME? 2.662 2.900 2.424 85 27 27 85.458 47.45 47.30
#NAME? 1.425 1.500 1.350 85 40 58 85.683 14.96 14.91
#NAME? 1.410 1.500 1.320 96 19 2 96.317 17.89 17.78
#NAME? 1.580 1.650 1.510 85 30 59 85.516 13.96 13.91
ALAT YANG DIGUNAK : THEODOLIT
TANGGAL : 06 APRIL 2014
CUACA : CERAH
Selisih KOORDINATE ELEVASI
d sin Dx d cos DX Tinggi/(DH) X Y Z Nomor Patok
(meter)

#VALUE! #VALUE! 11.141 #VALUE! #VALUE! 97.641 P7


86.500 86.500 86.500 P0
45.190 33.805 (6.892) 45.190 33.805 79.608 P1
0.741 (11.174) (1.647) 0.741 (11.174) 77.961 p0-a
(0.592) (12.879) 3.000 (0.592) (12.879) 80.961 p0-b
15.484 (1.514) (0.270) 15.484 (1.514) 80.691 p0-c
15.761 (18.881) (0.913) 15.761 (18.881) 79.777 p0-d

45.209 33.819 4.059 P0


45.190 33.805 79.608 P1
22.961 (41.355) 1.072 22.961 (41.355) 1.072 P2
3.687 (14.452) (0.305) 3.687 (14.452) (0.305) p1-a
(3.199) 17.492 (3.355) (3.199) 17.492 (3.355) p1-b
(10.600) (9.015) (0.496) (10.600) (9.015) (0.496) p1-c
PERHITUNGAN DATA UKUR THEODOLITE

LOKASI S. BULU BETE ALAT YANG DIGUNAKAN : THEODOLITE


PEKERJAAN : TIPE : RUIDE ET 02
PROYEK : TANGGAL : 16 FEBRUARI 2022
DIUKUR OLEH : CUACA : CERAH

Sudut Selisih KOORDINATE


Sudut Horisontal Azimuth Bacaan benang Sudut Vertikal Jarak Optis Jarak Datar
STA TARGET. Tinggi Alat Vertikal d sin Dx d cos DX Tinggi/(DH) X Y
(meter) (meter)
º ' " º Tengah Atas Bawah O
' " º (meter)

227023.000 98871131.000
D 167 2 34 167.04 167.04 1.000 1.410 0.590 90 43 57 90.733 81.99 81.99 18.38 -79.90 -2.048 227,041.383 98,871,051.101
D 178 43 12 178.72 178.72 1.000 1.420 0.580 90 44 41 90.745 83.99 83.99 1.88 -83.96 -2.092 227,024.876 98,871,047.035
D 191 24 33 191.41 191.41 1.000 1.460 0.540 90 41 0 90.683 91.99 91.99 -18.20 -90.17 -2.097 227,004.804 98,871,040.831
AL4 176 37 26 176.62 176.62 1.000 1.685 0.315 90 39 15 90.654 136.99 136.98 8.07 -136.74 -2.564 227,031.067 98,870,994.256

AL3 0 0 0 0.00 176.62 1.200 1.890 0.510 89 34 42 89.578 138.00 137.99 8.13 -137.75 1.271
AL4 1.455 227,031.067 98,870,994.256
D 68 19 7 68.32 64.94 0.800 0.982 0.618 90 39 42 90.66 36.40 36.40 32.97 15.41 0.235 227,064.037 98,871,009.670
D 55 36 48 55.61 52.24 1.200 1.294 1.106 90 41 35 90.693 18.80 18.80 14.86 11.51 0.028 227,045.927 98,871,005.767
0+600 5 9 8 5.15 1.78 1.400 1.446 1.354 90 40 49 90.680 9.20 9.20 0.29 9.19 -0.054 227,031.352 98,871,003.450
D' 336 30 53 336.51 333.14 1.400 1.451 1.349 90 24 6 90.402 10.20 10.20 -4.61 9.10 -0.017 227,026.458 98,871,003.355
D' 298 52 1 298.87 295.49 1.200 1.300 1.100 90 28 42 90.478 20.00 20.00 -18.05 8.61 0.088 227,013.015 98,871,002.862
D' 285 12 29 285.21 281.83 1.100 1.250 0.950 90 30 55 90.515 30.00 30.00 -29.36 6.15 0.085 227,001.707 98,871,000.406
D 179 18 27 179.31 175.93 1.300 1.500 1.100 90 35 21 90.589 40.00 40.00 2.84 -39.89 -0.256 227,033.905 98,870,954.361
D 190 32 43 190.55 187.17 1.400 1.590 1.210 90 34 2 90.567 38.00 38.00 -4.74 -37.70 -0.321 227,026.325 98,870,956.556
D 202 12 28 202.21 198.83 1.500 1.580 1.420 90 32 31 90.542 16.00 16.00 -5.16 -15.14 -0.196 227,025.903 98,870,979.113
0+650 203 19 58 203.33 199.96 1.600 1.780 1.420 90 35 25 90.590 36.00 36.00 -12.29 -33.83 -0.516 227,018.781 98,870,960.421
D' 209 40 10 209.67 206.29 1.500 1.685 1.315 90 34 1 90.567 37.00 37.00 -16.39 -33.17 -0.411 227,014.679 98,870,961.087
D' 210 27 55 210.47 207.09 1.400 1.590 1.210 90 30 53 90.515 38.00 38.00 -17.30 -33.83 -0.286 227,013.764 98,870,960.427
D' 224 6 18 224.11 220.73 1.400 1.624 1.176 90 29 51 90.498 44.80 44.80 -29.23 -33.95 -0.334 227,001.838 98,870,960.308
AL5 185 37 22 185.62 182.25 1.400 1.880 0.920 90 22 50 90.381 96.00 96.00 -3.76 -95.92 -0.583 227,027.304 98,870,898.334

AL4 0 0 0 0.00 182.25 1.200 1.680 0.720 89 51 0 89.850 96.00 96.00 -3.76 -95.93 0.536
AL5 1.485 227,027.304 98,870,898.334
D' 289 3 57 1.600 1.685 91 2 32
D' 312 27 2 1.300 1.390 91 11 45
0+700 336 59 13 1.100 1.222 91 15 22
D 346 1 56 1.100 1.248 91 6 53
D 78 47 35 1.000 1.170 91 29 46
0+750 90 0 38 1.000 1.171 91 29 20
D' 111 34 54 1.000 1.185 91 28 29
D' 113 50 40 0.800 0.985 91 27 0
AL6 101 19 53 101.33 103.58 1.500 1.780 1.220 90 18 46 90.313 56.00 56.00 54.43 -13.15 -0.321 227,081.737 98,870,885.187

AL5 0 0 0 0.00 103.58 1.000 1.250 0.750 90 2 29 90.041 50.00 50.00 48.60 -11.74 0.314
AL6 1.350 227,081.737 98,870,885.187
D 191 5 50 191.10 114.68 3.500 3.670 3.330 86 55 22 86.92 33.95 33.90 30.81 -14.15 -0.333 227,112.543 98,870,871.034
D 191 54 1 191.90 115.48 3.500 3.665 3.335 86 58 18 86.972 32.95 32.91 29.71 -14.16 -0.414 227,111.444 98,870,871.031
0+800 199 33 10 199.55 123.13 2.100 2.275 1.925 89 33 56 89.566 35.00 35.00 29.31 -19.13 -0.485 227,111.045 98,870,866.059
D' 200 23 49 200.40 123.98 3.100 3.280 2.920 87 42 52 87.714 35.97 35.94 29.81 -20.09 -0.318 227,111.544 98,870,865.101
AL7 194 35 46 194.60 118.17 1.000 1.255 0.745 90 36 26 90.607 51.00 50.99 44.95 -24.08 -0.190 227,126.689 98,870,861.110
AL6 0 0 0 0.00 118.17 1.200 1.455 0.945 90 10 43 90.179 51.00 51.00 44.96 -24.08 0.121
AL7 1.480 227,126.689 98,870,861.110
AL8 154 39 6 154.65 92.83 1.200 1.310 1.090 90 7 22 90.123 22.00 22.00 21.97 -1.08 0.233 227,148.662 98,870,860.025

AL7 0 0 0 0.00 92.83 1.800 1.910 1.690 89 38 25 89.640 22.00 22.00 21.97 -1.08 -0.242
AL8 1.420 227,148.662 98,870,860.025
D' 270 53 17 1.700 1.806 90 36 29
D' 263 5 54 1.800 1.890 90 36 29
0+850 250 11 36 1.500 1.576 92 5 50
D 220 3 58 1.800 1.862 91 5 25
D 211 5 28 1.200 1.260 90 55 36
AL9 213 50 15 213.84 126.66 1.500 1.650 1.350 91 2 38 91.044 30.00 29.99 24.06 -17.91 -0.626 227,172.719 98,870,842.118

AL8 0 0 0 0.00 126.66 1.500 1.650 1.350 88 45 50 88.764 29.99 29.99 24.05 -17.91 0.607
AL9 1.460 227,172.719 98,870,842.118
D' 147 53 32 147.89 94.56 2.300 2.454 2.146 88 47 1 88.78 30.79 30.79 30.69 -2.45 -0.187 227,203.408 98,870,839.673
0+900 130 11 35 130.19 76.86 1.700 1.851 1.549 90 8 44 90.146 30.20 30.20 29.41 6.87 -0.317 227,202.128 98,870,848.985
D 128 45 6 128.75 75.41 1.400 1.552 1.248 90 11 29 90.191 30.40 30.40 29.42 7.66 -0.042 227,202.139 98,870,849.773
D' 113 32 30 113.54 60.20 2.500 2.655 2.345 88 24 16 88.404 30.99 30.98 26.88 15.39 -0.178 227,199.600 98,870,857.510
D 118 27 3 118.45 65.11 0.700 1.090 0.310 90 54 57 90.916 77.99 77.98 70.74 32.81 -0.486 227,243.459 98,870,874.933
D' 145 59 23 145.99 92.65 1.400 1.840 0.960 90 22 10 90.369 88.00 88.00 87.90 -4.07 -0.507 227,260.621 98,870,838.045
0+950 128 43 18 128.72 75.38 1.500 1.900 1.100 90 23 9 90.386 80.00 80.00 77.41 20.18 -0.579 227,250.127 98,870,862.303
D' 133 15 23 133.26 79.92 1.500 1.900 1.100 90 23 5 90.385 80.00 80.00 78.76 14.00 -0.577 227,251.481 98,870,856.119
D' 137 8 48 137.15 83.81 1.500 1.906 1.094 90 21 48 90.363 81.20 81.20 80.72 8.76 -0.555 227,253.442 98,870,850.873
AL10 120 23 25 120.39 67.05 1.200 1.905 0.495 90 22 39 90.378 141.00 140.99 129.84 54.97 -0.669 227,302.556 98,870,897.087
-
AL9 0 0 0 0.00 67.05 1.600 1.705 1.495 89 59 36 89.993 21.00 21.00 19.34 8.19 -0.133
AL10 1.465 - 227,302.556 98,870,897.087
D 32 54 34 32.91 (80.04) 1.600 1.690 1.510 90 26 46 90.45 18.00 18.00 -17.73 3.11 -0.275 227,284.829 98,870,900.201
D 4 55 42 1.700 1.765 1.635 90 24 4
1+000 348 32 20 1.500 1.561 1.439 90 37 13
D' 331 22 22 1.200 1.264 1.136 90 32 52
D' 299 9 12 1.300 1.395 1.205 90 30 16
D' 169 31 3 169.52 56.57 1.300 1.485 1.115 90 29 59 90.500 37.00 37.00 30.88 20.38 -0.158 227,333.433 98,870,917.469
D' 163 48 17 163.80 50.86 1.400 1.483 1.317 90 29 25 90.490 16.60 16.60 12.87 10.48 -0.077 227,315.430 98,870,907.565
1+050 161 53 24 161.89 48.94 1.700 1.783 1.617 90 24 46 90.413 16.60 16.60 12.52 10.90 -0.355 227,315.073 98,870,907.989
D 152 42 9 152.70 39.76 1.700 1.885 1.515 90 27 59 90.466 37.00 37.00 23.66 28.44 -0.536 227,326.217 98,870,925.530
D 129 48 37 129.81 16.86 1.400 1.615 1.185 90 28 24 90.473 43.00 43.00 12.47 41.15 -0.290 227,315.030 98,870,938.235
D 124 32 7 124.54 11.59 1.600 1.830 1.370 90 29 10 90.486 46.00 46.00 9.24 45.06 -0.525 227,311.796 98,870,942.146
D 121 17 47 121.30 8.35 1.200 1.435 0.965 90 26 47 90.446 47.00 47.00 6.82 46.50 -0.101 227,309.381 98,870,943.586
D' 170 15 4 170.25 57.30 1.100 1.540 0.660 90 25 59 90.433 88.00 87.99 74.05 47.53 -0.300 227,376.609 98,870,944.619
1+100 167 58 16 167.97 55.02 1.300 1.735 0.865 90 26 47 90.446 87.00 86.99 71.28 49.87 -0.513 227,373.840 98,870,946.954
D 161 44 56 161.75 48.80 1.400 1.850 0.950 90 29 43 90.495 90.00 89.99 67.71 59.27 -0.713 227,370.271 98,870,956.362
D 155 2 14 155.04 42.09 1.300 1.790 0.810 90 31 14 90.521 98.00 97.99 65.68 72.72 -0.725 227,368.241 98,870,969.805
D 153 2 45 153.05 40.10 1.200 1.710 0.690 90 32 23 90.540 102.00 101.99 65.69 78.02 -0.696 227,368.250 98,870,975.103
D 152 57 13 152.95 40.01 0.500 1.010 (0.010) 90 31 35 90.526 102.00 101.99 65.57 78.12 0.028 227,368.125 98,870,975.209
AL11 173 13 8 173.22 60.27 0.700 1.270 0.130 90 40 39 90.678 113.99 113.98 98.98 56.52 -0.583 227,401.539 98,870,953.609

AL10 0 0 0 0.00 60.27 1.400 1.960 0.840 89 50 14 89.837 112.00 112.00 97.26 55.54 0.398
AL11 1.480 227,401.539 98,870,953.609
D 240 57 17 240.95 121.23 1.200 1.350 1.050 90 22 6 90.37 30.00 30.00 25.65 -15.55 0.087 227,427.192 98,870,938.057
1+150 205 36 52 205.61 85.89 1.400 1.518 1.282 90 14 38 90.244 23.60 23.60 23.54 1.69 -0.020 227,425.078 98,870,955.302
D 203 38 28 203.64 83.91 1.700 1.820 1.580 90 24 3 90.401 24.00 24.00 23.86 2.54 -0.388 227,425.403 98,870,956.153
D 183 27 57 183.47 63.74 1.800 1.955 1.645 90 27 35 90.460 31.00 31.00 27.80 13.72 -0.569 227,429.338 98,870,967.325
D 189 7 54 189.13 69.40 1.000 1.156 0.844 90 30 45 90.513 31.20 31.20 29.20 10.97 0.201 227,430.743 98,870,964.583
D' 236 34 50 236.58 116.85 1.100 1.460 0.740 90 28 52 90.481 72.00 71.99 64.23 -32.52 -0.225 227,465.771 98,870,921.089
D' 232 33 20 232.56 112.83 1.200 1.554 0.846 90 27 12 90.453 70.80 70.80 65.25 -27.47 -0.280 227,466.790 98,870,926.143
D' 231 36 5 231.60 111.87 1.300 1.654 0.946 90 28 7 90.469 70.80 70.80 65.70 -26.38 -0.399 227,467.238 98,870,927.233
1+200 222 11 24 222.19 102.46 1.300 1.650 0.950 90 30 34 90.509 70.00 69.99 68.35 -15.10 -0.442 227,469.884 98,870,938.504
D 216 14 17 216.24 96.51 0.300 0.600 - 91 18 2 91.301 59.98 59.97 59.58 -6.80 -0.181 227,461.122 98,870,946.809
D 213 39 45 213.66 93.93 1.200 1.560 0.840 89 53 25 89.890 72.00 72.00 71.83 -4.94 0.418 227,473.369 98,870,948.668
AL12 223 22 42 223.38 170.04 0.900 1.465 0.335 90 26 24 90.440 113.00 112.99 19.54 -111.29 -0.308 227,192.259 98,870,730.827

AL11 0 0 0 0.00 170.04 1.000 1.565 1.000 90 7 38 90.127 113.00 113.00 19.54 -111.30 0.214
AL12 1.510 227,192.259 98,870,730.827
D' 215 33 12 215.55 205.59 1.300 1.332 1.268 91 39 41 91.66 6.40 6.39 -2.76 -5.77 0.025 227,189.497 98,870,725.060
D' 158 33 9 158.55 148.59 1.400 1.430 1.370 91 43 58 91.733 6.00 5.99 3.12 -5.12 -0.071 227,195.383 98,870,725.711
1+250 150 7 16 150.12 140.16 1.700 1.730 1.670 92 2 50 92.047 6.00 5.99 3.84 -4.60 -0.404 227,196.098 98,870,726.225
D 120 40 49 120.68 110.72 1.300 1.367 1.233 92 11 24 92.190 13.39 13.38 12.51 -4.73 -0.301 227,204.774 98,870,726.092
D 108 31 39 108.53 98.57 0.800 0.920 0.680 92 9 25 92.157 23.98 23.97 23.70 -3.57 -0.191 227,215.958 98,870,727.256
D 102 44 51 102.75 92.79 1.100 1.280 0.920 90 50 50 90.847 36.00 35.99 35.95 -1.75 -0.122 227,228.209 98,870,729.075
D 102 52 23 102.87 92.91 0.800 0.985 0.615 90 5 41 90.095 37.00 37.00 36.95 -1.88 0.649 227,229.211 98,870,728.945
D' 179 23 30 179.39 169.43 1.400 1.785 1.015 90 13 8 90.219 77.00 77.00 14.12 -75.69 -0.184 227,206.379 98,870,655.134
D' 175 35 29 175.59 165.63 1.500 1.890 1.110 90 14 9 90.236 78.00 78.00 19.35 -75.56 -0.311 227,211.613 98,870,655.267
1+300 175 11 8 175.19 165.23 1.400 1.795 1.005 90 31 24 90.523 79.00 78.99 20.14 -76.38 -0.611 227,212.402 98,870,654.445
D 173 2 28 173.04 163.08 1.500 1.900 1.100 90 28 55 90.482 80.00 79.99 23.28 -76.53 -0.663 227,215.537 98,870,654.294
D 170 32 0 170.53 160.57 1.400 1.800 1.000 90 26 39 90.444 80.00 80.00 26.60 -75.44 -0.510 227,218.863 98,870,655.385
ODOLITE

: 16 FEBRUARI 2022

ELEVASI
Z Nomor Patok

17.000 0+ 227023.00 98871131.00 17.00 0


14.952 D 227041.38 98871051.10 14.95 D
14.908 D 15.308 227024.88 98871047.04 14.91 D
14.903 D 227004.80 98871040.83 14.90 D
14.436 AL4 227031.07 98870994.26 14.44 AL4

14.436 AL4
14.671 D 227064.04 98871009.67 14.67 D
14.464 D 227045.93 98871005.77 14.46 D
14.382 0+600 227031.35 98871003.45 14.38 0+600
14.420 D' 227026.46 98871003.35 14.42 D'
14.524 D' 227013.02 98871002.86 14.52 D'
14.521 D' 227001.71 98871000.41 14.52 D'
14.180 D 227033.90 98870954.36 14.18 D
14.115 D 227026.32 98870956.56 14.12 D
14.240 D 227025.90 98870979.11 14.24 D
13.920 0+650 227018.78 98870960.42 13.92 0+650
14.025 D' 227014.68 98870961.09 14.03 D'
14.150 D' 227013.76 98870960.43 14.15 D'
14.102 D' 227001.84 98870960.31 14.10 D'
13.854 AL5 227027.30 98870898.33 13.85 AL5

13.854 AL5

13.533 AL6 227081.74 98870885.19 13.53 AL6

13.533 AL6
13.200 D 227112.54 98870871.03 13.20 D
13.119 D 227111.44 98870871.03 13.12 D
13.048 0+800 227111.05 98870866.06 13.05 0+800
13.215 D' 227111.54 98870865.10 13.22 D'
13.342 AL7 227126.69 98870861.11 13.34 AL7
13.342 AL7
13.575 AL8 227148.66 98870860.03 13.58 AL8

13.575 AL8

12.949 AL9 227172.72 98870842.12 12.95 AL9

12.949 AL9
12.762 D' 227203.41 98870839.67 12.76 D'
12.632 0+900 227202.13 98870848.98 12.63 0+900
12.908 D 227202.14 98870849.77 12.91 D
12.771 D' 227199.60 98870857.51 12.77 D'
12.463 D 227243.46 98870874.93 12.46 D
12.442 D' 227260.62 98870838.04 12.44 D'
12.370 0+950
12.372
12.394 D'
12.280 AL10

12.280 AL10
12.005 D 227284.83 98870900.20 12.01 D

12.122 D' 227333.43 98870917.47 12.12 D'


12.203 D' 227315.43 98870907.56 12.20 D'
11.926 1+050 227315.07 98870907.99 11.93 1+050
11.744 D 227326.22 98870925.53 11.74 D
11.990 D 227315.03 98870938.24 11.99 D
11.755 D
12.179 D
11.980 D'
11.767 1+100
11.567
11.555
11.584
12.308
11.697 AL11

11.697 AL11
11.785 D 227427.19 98870938.06 11.78 D
11.677 1+150 227425.08 98870955.30 11.68 1+150
11.310 D 227425.40 98870956.15 11.31 D
11.129 D 227429.34 98870967.32 11.13 D
11.898 227430.74 98870964.58 11.90
11.473 227465.77 98870921.09 11.47
11.417 227466.79 98870926.14 11.42
11.298 227467.24 98870927.23 11.30
11.255 227469.88 98870938.50 11.26
11.517 227461.12 98870946.81 11.52
12.115 227473.37 98870948.67 12.12
12.641 AL12

12.641 AL12
12.666 D' 227189.50 98870725.06 12.67 D'
12.570 D' 227195.38 98870725.71 12.57 D'
12.237 1+250 227196.10 98870726.23 12.24 1+250
12.340 D 227204.77 98870726.09 12.34 D
12.450 D 227215.96 98870727.26 12.45 D
12.519 D 227228.21 98870729.08 12.52 D
13.290 D
12.457
12.330
12.030
11.979
12.131
1 227023.000 98871131.000 17.000 0
2 227041.383 98871051.101 14.952 D
3 227024.876 98871047.035 14.908 D
4 227004.804 98871040.831 14.903 D
5 Err:509 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509 Err:509
7 Err:509 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509 Err:509
9 Err:509 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509 Err:509
12 Err:509 Err:509 Err:509 Err:509
13 Err:509 Err:509 Err:509 Err:509
14 Err:509 Err:509 Err:509 Err:509
15 Err:509 Err:509 Err:509 Err:509
16 Err:509 Err:509 Err:509 Err:509
17 Err:509 Err:509 Err:509 Err:509
18 Err:509 Err:509 Err:509 Err:509
19 Err:509 Err:509 Err:509 Err:509
20 Err:509 Err:509 Err:509 Err:509
21 227031.067 98870994.256 14.436 AL4
22 227031.067 98870994.256 14.436 AL4
23 227064.037 98871009.670 14.671 D
24 227045.927 98871005.767 14.464 D
25 227031.352 98871003.450 14.382 0+600
26 227026.458 98871003.355 14.420 D'
27 227013.015 98871002.862 14.524 D'
28 227001.707 98871000.406 14.521 D'
29 227033.905 98870954.361 14.180 D
30 227026.325 98870956.556 14.115 D
31 227025.903 98870979.113 14.240 D
32 227018.781 98870960.421 13.920 0+650
33 227014.679 98870961.087 14.025 D'
34 227013.764 98870960.427 14.150 D'
35 227001.838 98870960.308 14.102 D'
36 Err:509 Err:509 Err:509 Err:509
37 227027.304 98870898.334 13.854 AL5
38 Err:509 Err:509 Err:509 Err:509
39 Err:509 Err:509 Err:509 Err:509
40 Err:509 Err:509 Err:509 Err:509
41 Err:509 Err:509 Err:509 Err:509
42 Err:509 Err:509 Err:509 Err:509
43 Err:509 Err:509 Err:509 Err:509
44 227027.304 98870898.334 13.854 AL5
45 Err:509 Err:509 Err:509 Err:509
46 Err:509 Err:509 Err:509 Err:509
47 Err:509 Err:509 Err:509 Err:509
48 Err:509 Err:509 Err:509 Err:509
49 Err:509 Err:509 Err:509 Err:509
50 Err:509 Err:509 Err:509 Err:509
51 Err:509 Err:509 Err:509 Err:509
52 Err:509 Err:509 Err:509 Err:509
53 Err:509 Err:509 Err:509 Err:509
54 Err:509 Err:509 Err:509 Err:509
55 Err:509 Err:509 Err:509 Err:509
56 Err:509 Err:509 Err:509 Err:509
57 Err:509 Err:509 Err:509 Err:509
58 Err:509 Err:509 Err:509 Err:509
59 Err:509 Err:509 Err:509 Err:509
60 Err:509 Err:509 Err:509 Err:509
61 Err:509 Err:509 Err:509 Err:509
62 Err:509 Err:509 Err:509 Err:509
63 Err:509 Err:509 Err:509 Err:509
64 Err:509 Err:509 Err:509 Err:509
65 Err:509 Err:509 Err:509 Err:509
66 Err:509 Err:509 Err:509 Err:509
67 Err:509 Err:509 Err:509 Err:509
68 227081.737 98870885.187 13.533 AL6
69 227081.737 98870885.187 13.533 AL6
70 227112.543 98870871.034 13.200 D
71 227111.444 98870871.031 13.119 D
72 227111.045 98870866.059 13.048 0+800
73 227111.544 98870865.101 13.215 D'
74 Err:509 Err:509 Err:509 Err:509
75 Err:509 Err:509 Err:509 Err:509
76 Err:509 Err:509 Err:509 Err:509
77 Err:509 Err:509 Err:509 Err:509
78 Err:509 Err:509 Err:509 Err:509
79 Err:509 Err:509 Err:509 Err:509
80 Err:509 Err:509 Err:509 Err:509
81 Err:509 Err:509 Err:509 Err:509
82 Err:509 Err:509 Err:509 Err:509
83 Err:509 Err:509 Err:509 Err:509
84 Err:509 Err:509 Err:509 Err:509
85 227126.689 98870861.110 13.342 AL7
86 227126.689 98870861.110 13.342 AL7
87 Err:509 Err:509 Err:509 Err:509
88 Err:509 Err:509 Err:509 Err:509
89 Err:509 Err:509 Err:509 Err:509
90 Err:509 Err:509 Err:509 Err:509
91 Err:509 Err:509 Err:509 Err:509
92 Err:509 Err:509 Err:509 Err:509
93 Err:509 Err:509 Err:509 Err:509
94 Err:509 Err:509 Err:509 Err:509
95 Err:509 Err:509 Err:509 Err:509
96 Err:509 Err:509 Err:509 Err:509
97 Err:509 Err:509 Err:509 Err:509
98 Err:509 Err:509 Err:509 Err:509
99 Err:509 Err:509 Err:509 Err:509
100 Err:509 Err:509 Err:509 Err:509
101 Err:509 Err:509 Err:509 Err:509
102 Err:509 Err:509 Err:509 Err:509
103 Err:509 Err:509 Err:509 Err:509
104 Err:509 Err:509 Err:509 Err:509
105 Err:509 Err:509 Err:509 Err:509
106 Err:509 Err:509 Err:509 Err:509
107 Err:509 Err:509 Err:509 Err:509
108 Err:509 Err:509 Err:509 Err:509
109 Err:509 Err:509 Err:509 Err:509
110 Err:509 Err:509 Err:509 Err:509
111 227148.662 98870860.025 13.575 AL8
112 227148.662 98870860.025 13.575 AL8
113 Err:509 Err:509 Err:509 Err:509
114 Err:509 Err:509 Err:509 Err:509
115 Err:509 Err:509 Err:509 Err:509
116 Err:509 Err:509 Err:509 Err:509
117 Err:509 Err:509 Err:509 Err:509
118 Err:509 Err:509 Err:509 Err:509
119 227172.719 98870842.118 12.949 AL9
120 Err:509 Err:509 Err:509 Err:509

Vous aimerez peut-être aussi