Vous êtes sur la page 1sur 2

Job N o : Project: Owner: Item:

Royal Garden

Rev. No. Date: Designed by: L Ngc Hin Checked by: Nguyn Vn Don

1 5/1/2012

BORE PILE DESIGN


A. GENERAL DATA Bottom level of pilecap: Diameter of pile: Pile length: Pile length from ground level: Rebar diameter: Rebar number: B. SOIL DATA Underground water Position ABOVE PILECAP layer 1 2 2 3 5 3 4 5 7 8 9 10 11 5 Hw = type clay clay clay sand clay sand sand clay sand sand sand sand sand clay 10 hi (m) 0.6 5.40 18.0 8.5 8.5 m g tn (T/m3) 1.800 2.000 2.000 1.960 2.040 g dn (T/m3) 1.800 1.680 1.680 1.640 1.710 C (T/m2) 2.00 2.00 0.50 3.70 f SPT

Df = d= Lp = f= n=

6 1.5 35.0 41.0 22 20

m m m mm cm

10.60 10.60 20.00 13.08

11 11 13 35

BELOW PILECAP

END PILE

2.040

1.710

3.700

13.083

35.000

C. PILE BEARING CAPACITY Ptk = MIN(1,2,3) Ptk Chn = 1. Refer to material Material data : - Concrete grade: - Steel grade: Pile capacity Qvl= 1329 = 1072 1000 T T

C35 A-III T

Rn = Ra = (1)

60.00 3600

Kg/cm2 Kg/cm2

2. According to soil data (appendix B -TCXD 205-1998) Qa = Allowable pile capacity 1072 Qa = QS / FSs + Qp/FSp Ultimate pile capacity Qu = uSfsili + qpAp With: fsi: qp: u: Ap: FSs: FSp: skin friction end bearing pile diameter pile cross section safety factor for skin friction safety factor for end bearing FSs = FSp = u= Ap = 1 2 4.712 1.767 Qu = 1338

T T

(2)

m m

+ fs = Ca + s'h tgja Ca = ja = s'v = Sgihi + qp = cNc + s'vNq + gdNg Nc ,Nq ,Ng sub to j layer 1 2 2 3 5 type clay clay clay sand clay h m 0.6 5.4 18 8.5 8.5 gi (T/m) 1.8 1.68 1.68 1.64 1.71 Ci (T/m) 2 2 0.5 3.7 ji deg. 10.6 10.6 20 13.0833 s'v (T/m) 10.15 25.27 6.97 32.54 4.88 1.73 8.05 87.8 14.7 68.5 fs (T/m) fs*li (T/m) C 3j/4

s'h = kss'v = (1-sinj)s'v

END PILE j= 13.08 deg.

1.71

3.7 0.228347244 Nq 3.66 301.22

13.0833

68.87 sum 171.0

Nc 11.5 qp =

Ng 2.50 T/m2

3. Pile bearing capacity according to standard penetration test (TCXD 195-1997) Allow Bearing Capacity: With: NTB Ns Nc Ls Lc Area of pile: Parameter of pile: layer 1 2 2 3 5 3 4 5 7 8 9 10 11 END PILE SUM h (m) 0.6 5.4 18 8.5 8.5 NTB SPT index at bottom pile SPT index in clay soil layer SPT index in sand soil layer Length of pile in clay soil layer Length of pile in sand soil layer Ap = W= Nc 1.77 4.71 Lc (m) m2 m Ns 11 11 13 8.5 35 8.5 Ls (m) 0.6 5.4 18 NcLc NsLs Wp (T) Qa = 1124 Ton (3)

Qa = 1.5NTBAp + (0.15NcLc + 0.43NsLs)W - W p

198 110.5 297.5

26.083 12.918 11.866

35 110.5 495.5 50.867

Vous aimerez peut-être aussi