ITEM SPL-1

Project
Location
Duration
Subject

: REHAB. OF ILOILO EAST COAST CAPIZ ROAD


: BAROTAC VIEJO, ILOILO
: 90 C.D.
: PERT-CPM

90 CD
ITEM A.1.1
86.25 CD

A.1.1

ITEM 105
18.75 CD

Start: August
29,2011

3.75 CD

ITEM 201
18.75 CD

3
2

43

ITEM 302
7.5 CD

43
5

ITEM 310
7.5 CD

63
4
5

ITEM 302
7.5 CD

ITEM 310
7.5 CD

73
4
5

ITEM 612
15 CD

43
8
5

201

10

3.75 CD

ITEM SPL-3
90 CD
ITEM SPL-2
3.75 CD

ITEM SPL-2
3.75 CD

1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88

ITEM

A. 1. 1

DESCRIPTION

Office & Laboratory for the Engineers

QUANTITY

UNIT COST CONTRACT AMOUNT

1.00 l.s.

% Wt

127,421.82

3.70%

105

Subgrade Preparation

867.00 sq.m.

8,817.39

0.26%

201

Aggregate Base Course

81.00 cu.m.

117,431.37

3.41%

302

Bituminous Tack Coat

129,652.96

3.76%

310

Bituminous Concrete Surface Course,( Hot Laid 0.05m thk)

1,451.80 sq.m.

2,569,424.68

74.60%

612

Thermoplastic Pavement Markings

75.15 sq.m.

105,303.94

3.06%

1.23 tonnes

1st Week

2nd Week

3rd Week

4th Week

5th Week

6th Week

7th Week

8th Week

9th Week

10th Week

11th Week

12th Week

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ##

S-CURVE
## ## ## ## ## ## ## ## ## ##

## ##
## ## ## ##

## ## ## ##
## ## ## ##

## ## ## ##
## ## ## ## ## ## ## ##

SPL - 1

Provision for Safety & Health

1.00 l.s.

107,747.00

3.13%

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

SPL - 2

Mobilization and Demobilization

1.00 l.s.

240,801.79

6.99%

## ##

SPL - 3

Project Sign Board

2.00 l.s.

37,690.90

1.09%

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

3,444,291.85

FINANCIAL ACCOMPLISMENT

Prepared by:

100%

Quarterly
Commulative
Quarterly
Commulative

PHYSICAL ACCOMPLISHMENT

## ##

5.73%
5.73%
197,433.22
197,433.22

Checked by:

5.76%
11.49%
198,487.65
395,920.86

Recommended for Approval:

60.75%
72.25%
2,092,523.16
2,488,444.02

27.75%
100.00%
955,847.83
3,444,291.85

Approved by:

SHAK CONSTRUCTION

JOSE M. ORBISTA

DENE B. BALDONADO JR.

AGRIFINO B. ANDONG JR.

GEORGE O. SUY

Contractor

Project Engineer

Engineer III

OIC, Asst. District Engineer

OIC, District Engineer

End: November
26,2011

3.75 CD
10

100

75

50

25