worse!
The Value of RCM in
Business Today Stan Nowlan and Howard Heap1 studied aircraft
failures looking for correlations between those
failures and the maintenance that was being
Summary performed. They recognized that maintenance
Reliability-Centered Maintenance (RCM) is the was a contributing factor to many of the failures
world’s dominant proactive method for but in some other cases maintenance was able to
determining maintenance requirements for improve the situation. They looked for patterns
physical assets. It is a thorough methodology and found them. There were actually six patterns
that produces well documented and fully of Conditional Probability of Failure2.
justified decisions on asset management
strategies. It has been highly successful at
improving reliability and safety while reducing A 4%
overall maintenance costs and increasing
capacity for increased revenue generation. RCM