Project Planning www.renewable-green-energy.

org
Investment : Electricity Plant by Gravity Energy Source

Step 2 : Investment Project to Invent the Prototype Impact Gravity Pump


(Previous Project: 2009) Step : 1 To proof Hydrodynamic of Hammer Shock and Closed- Water System. (Impact Gravity Pump for Vertical Dam) The Previous Objective of Step 1: The First Prototype To Prove the Principle Theory of Hydrodynamics and Hammer Shock could turn turbine to produce electricity in closed water system Influence of Gravity Force causes waters hydrodynamics that contains in high tower tank (Potential Energy), gravity pulls the mass of water rush into the pump which inlet air inside. The airs volume inside engine pressed out of cavity, to loose air inside. The inlet-air-valve suddenly closed, while inlet water or waters momentum (Kinetic Energy) still rush into the pump. The mass compress force reaction explode in fixed capacity of engine then factors cause of phenomena called Hammer Shock Hammer Shock is the reaction of water explode and cause the massive force that compressed directly to the volume of water. Compressed water upwards to turn turbine which mount above the Reservoir for generate electricity. All water fall back return to the reservoir, remain as Kinetics Energy in the Closed-Water system (eternal resource) for producing electricity. Conclusion the benefits of Step 1 To assure that the world is now searching for new energy source to solve the world Warming Crisis and Gravity Energy is the answer. Because of 1) The advantage of lowest electric productions cost To compare with the other source use in the present, so the lowest costs or the maximum profit to produce industry products. 2) The advantage security of energy source Gravity energy is available everywhere in the earth, no limit of amount, 24 hrs. eternal energy and friendly to environment (no toxic) 3) The solution for solving world warming crisis Gravity energy is green energy with offsetting carbon emission. No use oxygen in combustion and create carbon dioxide at the end production. 4) The most interesting project for investment This is the lowest electric productions costs that world requirement energy. In addition, World are searching for long time ago. There is really no fight or protest against the electricity plants construction. This typical of electric production would be rapidly spread everywhere around the world, because of the Lowest Production Costs advantages, Project is exactly well known.

(Present Project) Step : 2

Step 2 : Investment Project to Invent the Prototype: Impact Gravity Pump. Investment $ 3.0 M for Priority Project of Electric Plant Estimate Cost Investment (in 2011)

Investment Project to invent the Second Prototype: Impact Gravity Pump Investment $ 3.0 M : Invention of Impact Gravity Pump and high Tower Tank for typically Small Electricity Plant

1. Tower Tank(36 m.) mount with turbine above, including Piping and 4 Impact Gravity Pump for experiment $ 1,350,000 2. Land, Laboratory Factory and Camp(for 24 workers) $ 500,000 3. CNC Lathe 3 D & 5 axle $ 570,000 4. Furnace(2 cu. m), Hoist, forklift, Truck(mount with crane), Pickup truck, Equipments for metal works etc. $ 350,000 5. Materials (such as aluminum alloy, fuel, mold) etc. $ 300,000 6. Management costs, salary(24 workmen during 18 months) $ 720,000 Total = $ 3,790,000 In 2011, the Project should be invest amount $ 4,000,000 (Cements, steels and more items costs rise up more than 15%, Investment in 2009 = $ 3,000,000)

Project Objective 1) To invent Prototype of Impact Gravity Pump 2) To construction Tower Tank: mount which generator and turbine for producing electricity

1) To invent Prototype of Impact Gravity Pump To arrange: Workshop, laboratory for 55-ton compression, stuff house (28 workers, CNC Lathe 3 D & 5 axle, Furnace 2 cu m., Winch, Tools etc) 2) To construction Tower Tank: mount which generator and turbine for producing electricity Tower tank: water level high 30 m., mount with 4 Impact gravity pump, generator and turbine above tank (total high 36 m.), 2 Piping Columns as shown on the picture The priority typical of Small Scale Electricity Plant: To prove that Electricity could be automatic produce 24 hrs and forever. Without exsource energy, Using only gravity and water in reservoir tank as potential energy in the system

Project Stuff: 24 workers


1. 2. 3. 4. 5. 6. 7. 8. 9. Project manager 3 D designer (Chief = 1, Stuff = 4) CNC controller Metal-melting Chief Laboratory testing Chief Co-worker (to help both Metal-melting and Laboratory testing) Purchasing & Accountant Support Service (Cook = 1, cook helper & Roommate = 2) Security guard & Store Keeper

Total 1 1 4 2 1 1 8 1 3 2

06.00 18.00

18.00 06.00

Responding 24 hrs Responding 24 hrs 2 2 1 1 (+8 Co-worker) 1 2 1 1 1

Total =

24

The Project needs time-period 18 month, as shown in the chart

This budget is including the expense for 24 workers during 18 months. This project, Investor could be joint- involved by accountant auditor for clear and transparence project.

Project Stuff Details 1.) Project Manager : problem shooter and responding project, 24 hrs 2.) 3D Parts Designer : CAD & CAM 1 chief of designer: responding project, 24 hrs 4 designer(engineer) are divide to work in day-time and night-time - Day-time group (2 engineers): bounding for design forward Prototype - Night-time group (2 engineer): following the result of testing and adjust CAD & CAM and set G-Code for CNC to create in that night.

3.) CNC controller : G-Code (from 3 D Part Designer) + Stock (Metal-Melt) = Parts (finished) 2 CNC controller are responding for each 12 hrs 4.) Metal-melt : create the Mold following CAD design and melting the Stocks This section has to melting 3 Stocks in every 3 days. The other 2 days is to create parts mold. This section has 8 co-worker is programming to help metal melting section for Stock and work-time usually arranging in day-time. 5.) Laboratory testing Chief : This section has to prepare to test nearly every day. This section also has to joint with 8 co-worker, usually in day time, helping laboratory testing 6.) Co-worker : To help both metal melting and Laboratory testing, depend on works schedule. 7.) Purchasing & Accountant : Need only one person to do both duties. 8.) Support Service : (Cook = 1, Cook helper & Roommate = 2) Two workers could do both Cook helper and Roommate 9.) Security guard & Store Keeper Two workers could do both Security guard & Store Keeper

Work Schedule Planning for achieve project in 18 months 1. Works are run all 24 hrs and whole 28 days Group1: work 06.00 18.00 AM and Group2: 06.00 18.00 PM. Work-time = 8 hrs and Over-time 4 hrs = 12 hrs per day 2. Working period are 28 days, then take a long weekend 7 days During working period are 28 days, all workers may select 1 holiday/ week but all have to stay in the camp for tag team in some situation 3. After working period 28 days All workers get their salary and allow to go back home for a long weekend 7 days. 4. All stuff, as duty, have to conference every 12 hrs or 2 time a day After 12 hrs work group period, interchange work group every 12 hrs, former work group have to conclusion what their doing and what have to do next. All stuff has to step following the Project road map.

Laboratory Testing: Equipments arranging for 55 tons water pressure During construction, all parts and modules have tested for hydraulic mechanism and water compress under 55 tons stress pressure. All materials

such as springs, seals etc. and laboratory testing have to prove step by step systematically. Until at the end of last module are completed, Impact Gravity Pumps mechanism works smoothly through the retreat stroke without loose any water from the process. That is meaning, the priority typically of Small Scale Electricity Plant are construction completely and there are ready work automatic by using only Gravity Energy source, 24 hrs from now on, and shown the next energy source generation is coming. The Aim of Project All most equipments of human being life are setting for using electric. Worlds requirement energy is the lowest electric costs and must be green energy for solving the problem world-warming crisis, The world is searching for this kind of energy many years ago. This project is the answer and really no fight or protesting against construction of electricity plant and This typical of electric plant is exactly rapid grow everywhere around the world because of its advantages energy beyond 2009.

Step : 3 Launching Electricity Plant (Gravity Energy Source) to the World.

Step 3:

Launching Electricity Plant (Gravity Energy Source) to the World. Benefits of this Project from 193 countries around are share with the investor 50%

Benefits of this Project from 193 countries around are share with the investor 50%

The opportunity for Flagship Early-Stage Investment is precisely decision. The Facts that innovation is never being in the world and gravity is never been interest, this project is also difficult to find out Fund. Our Principle is Proof, the precise decision make on reasonable possibility, and then, the great proudly success will receive the worthwhile reward. The assistance fund, for the Second Project, is the Closed Cooperation for the next project Vertical Dam or Electricity Plant Project. Franchise of Impact Gravity Pump and Shareholder in Worldwide Company is Agreement involve Normal standard of benefits sharing, 50% is fair agreement. Evaluated Profits Strategy (Step 3) a) Our Joint venture is arranging Gravity Electric Corp. each 50% holding. b) Gravity Electric Corp. has to construct the first Small Scale Electric Plant to demonstrate the world. c) There are 193 countries around the world, Gravity Electric Corp. choose only one company from each country, so there are 193 companies, to sign agreement as represented. Each country company or Gravity Electric Plant Co. is holding share 70%, responding invest on construction the electric plant. Gravity Electric Corp. is holding share 30%, we are both join this part, responding offer the technology.

d) Gravity Electric Plant and sell electric to their own country. For certainly, Gravity Electric Plant rapidly growth because of their lowest electric costs. e) We are share profits 50%, from share holding company 30% - 193 countries around the world, so there is worth to invest this Project.