Daily Log: Pascual, John Casimir T.

January 20, 2011 On the first day on the site we are introduced to the staff., we were required to attend a safety orientation on the safety department. Sir Floyd, the safety officer oriented us about the safety rules and procedures. We were required to have our own personal protection equipment. After the orientation, we were turned over to Engr. Cid Dimagiba, the project superintendent of tower C. January 21, 2011 This day we were assigned and taught on stirrup estimate and basic excel programming January 24, 2011 This is the very first time we went outside of the office to go to the field. Engr. Cid showed us a briefing about the whole site January 25, 2011 This day we were taught how to compute for the elevation of the basement. We went to tower B where we observe that is being done in the that tower January 26, 2011 During this day we computed for the elevation but on the 2 nd floor of the building. This is the first time I learned of the word soffit. January 28, 2011 During this day this is the first time we computed for the volume of the concrete for the concrete pouring that will occur on the evening. January 31, 2011 We inspected the dried concrete that was poured yesterday evening. We took pictures for the files. I observe that concrete pouring can last a whole night and more February 01, 2011 We were introduced by one of the PS Sir Pat and to Engr. Frank the concrete engineer in the Jazz Residence. He explained to us a brief discussion about concrete pouring from the types of concrete strength to the concrete being self compacting

February 04, 2011 We gathered some important files for our fortnightly report. We interviewed various engineers on the site for information to be included in our report. February 07, 2011 We met Engr. Denise, the QS/QA in the project site. He explained to us how the inspection process works for the rebar per floor. February 08, 2011 During this meeting we took some photos for the report and gather some files. Then we interview Engr. Floyd about the safety precaution made by the site February 11, 2011 During this meeting Engr. Pat taught us about how to create a cutting list for the rebar in the column and how to compute the number of rebar to be use. He also explain splicing of the rebar, why is it right to splice in this part of the column and also how to use the cutting list. February 14, 2011 During this time we went outside to visit the excavated portion of the site. We also visited the foundation of Tower B and its progress February 15, 2011 Engr. Russel showed us the different foundation used in the site as well us contribute some information about the site as well as his experience as being an engineer February 08, 2011 Engr. Mark told us to go up to his tower to see the MAC(formwork use in the shear wall to move fast in the construction) system of formworks. He show and explain how to jack up a tower crane on the building. He shows us the mac system and how it works. February 21, 2011 During this day we gather some data and interview the consultant of the company(PMCI). Were head personally explain to us about the cash flow and s-curve of the project.

February 22, 2011 During this day we were assigned to estimate the volume of concrete to be poured on the site tonight. We were asked to go and measure the columns, beams, slab and shear walls. Then we compute their volumes. February 25, 2011 During this day Engr. Cid instructed us to go to the concrete pouring that was still in process due to some technical problem with the supplier. We interviewed Engr. Frank about the equipments use in the site. They have a leveling device for the concrete. February 28, 2011 During this day we were taught of the importance of proper utilization of materials. Proper delivery and utilizing of the material will cause a positive effect in the construction and avoid delay of the project. March 01, 2011 I interviewed the QS/QA engineer about my report about Variation order and Time extension and Quality Control March 04, 2011 This was the last day of my practicum; We gathered documents for the completion of our 4th fortnightly report. Before we leave the site, I notify Engr. Cid for a certificate of completion who gave us the certificate at a later date (March 12, 2011).

Vous aimerez peut-être aussi