Resource unit: is each unit in a resources pool Unit loads: total amount of time the resources works to process each flow unit 6
Industrial Engineering-ITS
Computing
Table 5.1 and 5.2
Industrial Engineering-ITS
Theoretical capacity
Theoretical capacity of a resources unit is its maximum sustainable flow rate if it were fully utilized (without interruptions, downtime, time wasted etc) Theoretical capacity of a resources pool is the sum of the theoretical capacities of all the resource unit in pool
Industrial Engineering-ITS
Computing
Table 5.3
Industrial Engineering-ITS
10
Others factors
Load batching resources can process several flow units simultaneously
Scheduled availability : the amount of time that a resource is scheduled for operation
Industrial Engineering-ITS
11
Computing
table 5.4
Industrial Engineering-ITS
13
Capacity utilization : the degree to which resources are effectively utilized by a process
Industrial Engineering-ITS
14
Computing
table 5.5
Industrial Engineering-ITS
16
learning
Effect of product mix on theoretical capacity and profitability of a process