PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

ar Khw ton Dar

00 10

1000

Rano

lia

ar Khw

1200

an Kh

ra go Min

N
P O W E R H O U SE THAK O T H P P
0 12 0 1000
800

THAKOT
2800 MW

R E S E R V O IR W . L . 6 1 0 m .a .s .l

T H A K O T D A M A XB S S H A M IE 1200
1000 800 760
600

800

r 1000 wa Kh

d Roa

R ES E R VO IR W . L . 8 2 5 m .a .s .l

har Ba nk

Dube
1200 1000 800

r r Khwa

AR HW NK KHA 72 MW
610

wa Kh

R E S E R V O IR W . L . 1 2 1 8 m .a.s .l

800

600

INDUS

T A IL R A C E W . L . 5 7 0 m .a .s.l
1000

1200 1000

THAK OT R E S ER V O IR

D U B ER B AZ A R

r wa Kh an Kh
600 80 0 100 0 1200

W . L. 6 10 m .a.s .l
800
1000 1200

800 100 12000

1200 1000 800

R D UBE MW

130

10 1200

00

IN DU SR am IV arak ur ER K

Hig hw

ay

RIVER

600

TA IL R A C E W . L . 6 1 0 m .a .s .l

2800 MW

PATAN

T A IL R A C E W . L . 6 7 7 m .a.s .l

PA TA N TO W N
KEYA
122 MW

1200 1000 800 600 Karaku ram

T A IL R A C E W . L . 4 7 2 m .a .s.l

POW ERHO USE PATAN H P P

K yal Ke

ar hw

R E SE R V O IR W . L . 1 4 2 2 .5 m .a .s .l

600
00 12 00 10 800

Hi gh

TA IL R A C E W . L . 6 9 3 m .a .s.l
800 1000 00 12

TA IL R A C E W . L . 6 8 6 m .a .s .l

80 1000 0

800

R IV E R NULLA
A LLA I K H W AR 1 21 M W
T A ILR A C E W . L . 5 5 2 m . a.s .l

621A S V MW ALLE

R E S E R V O IR TOW N D A M A X IS

R IVE INDUS R
R o a d T o B a tg ran d M a n s e h ra A m

R E S E R V O IR W . L . 1 4 5 0 m .a .s .l

PAL

800
1200

Way

PA T A N H PP R E S E R V O IR
IND US R IVER
Kar ak ura

1200 1000

1000 800 600

W . L. 7 60 m .a .s .l

l Ana ar Khw

T H A K O B R ID G E T
1200
00 10 800 0 60
800 100 0

R E S E R V O IR W . L . 7 6 0 m .a .s .l

P A T A N D A M A X I S m Hig

hw

ay

12 1000 00
800

1200

LE G E N D

600

12 00

1000

600

600

Y LE AL SV LA PA

800

PATAN HYDROPOWER PROJECT

HYDRO PLANNING ORGANIZATION WAPDA, SUNNY VIEW, LAHORE


P-1

1000

C ON CEPTUAL LAYOUT
P A T A N A N D TH A K O T H Y D R O P O W E R P R O JE C TS

2800 MW

FEBRURY, 2011

PATAN HYDROPOWER PROJECT


1.0 General

The Pakistan Water and Power Development Authority (WAPDA) launched a 25 years comprehensive integrated programme in 2001 Water Resources and Hydropower Development Vision 2025. Programme which aims at the development of water storage projects as well as harnessing the hydropower potential in the country. Thakot Hydropower Project, being a run off river hydropower project, is also included in that programme. 2.0 Location Patan Hydropower Project is located on Indus River in District Kohistan of NWFP. The dam site is located on Indus River about 4 Km upstream of village Patan on Karakorum Highway (KKH). The proposed underground powerhouse site is located on the left bank about 8 km upstream of Besham Town and is accessible via KKH. Powerhouse and dam sites are 349 km and 383 km respectively from Islamabad. 3.0 Background WAPDA in 1975 requested the assistance of Canadian Government through CIDA in making ranking study of hydroelectric power sites with a view to meet the long-term power demand of Pakistan. Accordingly CIDA provided a grant to assist WAPDA in cost effective hydropower sites and to focus on the best-ranked project for development / implementation. CIDA appointed Montreal Engineering Company Limited (MONENCO) to undertake hydroelectric inventory ranking and feasibility studies in Pakistan. The contract between CIDA and Consultant (MECO) was signed on August 5, 1981. Patan Hydropower Project was identified as part of Inventory and Ranking Study of Hydropower potential on main rivers of Pakistan, carried out in 1981-84. For main-stem Indus River Projects, Patan Project was ranked fifth after Basha, Dasu, Bunji and Thakot hydropower projects. Monenco studies revealed at identification level that Patan Hydropower Project would utilize the steep river gradient available on Indus river. The concept of development was to construct a 104 m high dam on Indus river. The project

P-2

would provide some 1172 MW (Index Capacity) in an underground powerhouse with gross head of 150 m and design discharge of 1070 m3/s. The Index capacity at Identification study by Monenco was reviewed and revised as 2800 MW with design discharge of 2600 m3/s and mean annual energy of 15,230 GWh by Hydro Planning Organization with updated flow data and design discharge.

4.0 Salient Features (Review of MONENCO Study by HPO, WAPDA)


- Design Capacity - Design Discharge - Plant Factor - Full supply level - Normal Tailwater Level at damsite - Gross Head - Net Head - Mean Annual Energy - Mean Annual Flow - Dam height - Length of Power Tunnel - Tentative Project Cost Scope fpr Feasibility Study The study will cover data collection, field investigations, technical analysis to select the appropriate project lay out to develop the hydro power potential required to fully establish the feasibility of the selected project layout, design of structure and equipments, cost estimates, economic and financial analysis for the Patan Hydropower project. The works for a feasibility study are indicated below : Field surveys and investigations Collecting of all relevant data Finalization of project layout after considering different alternatives. Design of Structures and equipments, : : : : : : : : : : : ; 2800 MW 2600 m3/s. 62.2 % 760 m.a.s.l 680 m.a.s.l 610 m.a.s.l 150 m 129 m 15230 GWh 2180 m3/s. 104 m 18 Km 6.0 Billion US $

- Normal Powerhouse Tailrace Level :

P-3

Study of KKH and other access Roads. Cost Estimates. Optimization of project capacity and structures. Preparation of basic project design at feasibility level. Economic analysis Financial analysis

Field investigations will include: topographic, other surveys like Bathymetric Survey shall be carried out at Project site in order to produce site maps at scales adequate for structure planning, flow measurements, seismic refraction, surface geological mapping, sub surface drilling, test pits sampling and testing of materials in potential borrow areas, test trenches, sediment study of Indus River and its tributaries and Hydraulic Model Studies of the project are needed for Feasibility study.
5.0

Cost Estimate for Feasibility Study

The Cost covers the planning, investigations and preparation of feasibility study report of Patan Hydropower Project with in estimated amount of Rs. 731.233 Million Details of Cost estimates are given in table 1. Year wise phasing of the estimated costs is as below:

YEAR 1st Year 2 Year Total 6.0


nd

AMOUNT (Million Rs.) Local Foreign Total

191.497 182.234
373.731

210.637 146.865
357.502

402.134 329.099
731.233

Manner of Implementation and Time Period

The feasibility study of Patan Hydropower Project will be conducted by team of Consultants preferably joint venture of Local and Foreign Consultancy Firms. Hydro Planning Organization (HPO)- WAPDA will be the main agency for execution of study. Consultants will be responsible for quality and timely completion of the work. WAPDA professionals will participate actively in the subject study and will work in collaboration with Consultants. WAPDA will help Consultants in timely completion of survey and other field & subsoil investigations. All reports submitted by Consultants will be reviewed by independent Panel of Experts (POE) appointed by WAPDA.

P-4

7.0

Present Status

CDWP has approved PC-II for an amount of Rs.731.233 Million in a meeting held on 17.09.2009.

MoW&P has accorded administrative approval to undertake the work vide No. P.II.15(17)/2009 dated 27.10.2009.

Feasibility study will be completed in twenty four months after engagement of Consultants.

P-5