Purpose
Finalize the prioritized list of potential infrastructure improvements that might be funded by the $1 million deposit into the Davis Garden TIF District Increment Fund.
Background
City staff previously developed a list of potential infrastructure improvement throughout the District that could be funded by the $1 million deposit
Kings Demonstration Plaza Kings Permanent Plaza Kings Parking Rosemont Plaza Rosemont Safe Route Davis Corridor Bicycle Facility 7th Street Bicycle Facility Matching Funds for the Kessler Theaters Infrastructure
Office of Economic Development WWW.DALLAS-ECODEV.ORG 3
Background
The following infrastructure improvements were approved for funding as part of the September 23rd Davis Garden TIF Board Meeting:
Project Matching funds for the Kessler Theater's NCTCOG Grant Rosemont Plaza Rosemont Safe Route Davis Corridor Bicycle Facility City of Dallas Design Studio Concept for reconfiguration of W. Davis Street from Montclair to Zang Boulevard Total Est. Cost $60,000 $201,512 $36,272 $159,000 $35,880 $492,664 Source 100% OED; leverages approx. $180K in outside funds 100% OED 100% OED 100% OED 100% OED
Background
Jason Roberts and Andrew Howard are here to explain the Kings Demonstration Plaza, Permanent Plaza and Parking concepts Staff is also asking the Board to reconsider the segments that comprise the Davis Street Corridor Bicycle improvements
Davis Street
7th Street
Tyler Street
Staff recommends the following changes to the segments that comprise the Davis Corridor Bicycle Facility
Exclude the Mary Cliff Road to Zang Boulevard segment (approximately $21,000) Add the 7th Street Bicycle Facility as a segment (approximately $85,844)
Project Est. Cost $60,000 $201,512 $36,272 $223,844
Project Matching funds for the Kessler Theater's NCTCOG Grant Rosemont Plaza Rosemont Safe Route Davis Corridor Bicycle Facility City of Dallas Design Studio Concept for reconfiguration of W. Davis Street from Montclair to Zang Boulevard Total
Source 100% OED; leverages approx. $180K in outside funds 100% OED 100% OED 100% OED 100% OED
Matching funds for the Kessler Theater's NCTCOG Grant Rosemont Plaza Rosemont Safe Route Davis Corridor Bicycle Facility (Mary Cliff Rd to Zang Blvd segment replaced by the 7th Street Bicycle Facility) City of Dallas Design Studio Concept for reconfiguration of W. Davis Street from Montclair to Zang Boulevard Total
Source 100% OED; leverages approx. $180K in outside funds 100% OED 100% OED 100% OED
$35,880 $557,508
100% OED
10