Bhushan Power & Steel Limited, a fully integrated 2.

3 Million TPA Steel making Company with turnover of INR 5020 Crores (USD 1123 Million) and 7 World Class ISO 9000 Certified State of the Art Plants at Chandigarh, Derabassi, Kolkata and Orissa in India. A leading manufacturer of flat, rounds and long products including value added products with total steel value chain right from Coal Mining, Billets, HR Coils, Pig Iron, CR Coils, GP/GC, Precision Tubes, Black Pipe/GI Pipe, Cable Tapes, Tor Steel, Wire Rod Bright Bars and Special Alloy Steel. Successfully commissioned 2.3 Million TPA Greenfield Steel and Power Plant in Orissa with HR Coil making facility First in Private Sector in the State of Orissa. For the Orissa plant, technology and equipments are procured from world-renowned companies like Lurgi from Germany, ABB Ltd., SMS Siemag etc. Bhushan is selling its Value added range of products in Secondary Steel through a large distribution network in India (comprising more than 50 sales offices) and Abroad. A rock-solid foundation combined with continuous upgradation and innovation has ensured that we have constantly surpassed our goals. Our end-to-end portfolio offers a wide spectrum of products with consistently superior quality. In addition to our export thrust, we supply to fast-growing sectors like automotive, white goods, construction, furniture, fasteners, telecommunication, etc.

Growing from strength to strength 1970 - Started with very small initial outlay for manufacturing Door Hinges & later on, Rail Track Fasteners. 1973 - Manufacturing facilities set up for Tor Steel and Wire Rod in Chandigarh. 1981 - Rolling Mill Project commissioned at Chandigarh for Round and Narrow Strips. 1985 - Backward Integration Project for Steel Melting facilities. 1986 - Upgrading of Mini Steel Plant with continuous casting and ladle furnace facilities.

1997 - Commissioning of Narrow Width Cold Rolling Project at Chandigarh. 1998 - Commissioning of Precision Pipe Project at Chandigarh. 2001 - Commissioning of Cold Rolling & Galvanizing Complex at Kolkata. 2002 - Addition of narrow width Cold Rolling facilities at Kolkata. 2003 - Expansion of wide width Cold Rolling facilities, ERW Water Pipes & Tubes down stream facilities at Kolkata. 2004 - Further expansion of Cold Rolling facilities at Kolkata. 2005 - Commissioning of Orissa Project Phase-I consisting of 4 DRI Kilns, Steel Making Facilities, Coal Washery and 100 MW Power Plant. 2007 - Commissioning of further expansion of Orissa Project Phase-II consisting of HR Coil Mill, Steel making, Blast Furnance, Sinter plant, Coke oven plant, Oxygen plant and Lime & Calcining Plant. 2009 - Commissioning of 3.5 million tpa Coal Washery, 146 MW Power Plant and 0.3 million tpa Sponge Iron under Phase III of Orissa Project. 2010 - Commissioning of 130 MW Power Plant and Electric Arc Furnace under Phase III of Orissa Project and further expansion of Orissa Project under Phase IV consisting of 6 DRI Kilns, 130 MW Power Plant, Steel Making Facilities,2nd CSP Caster & 6th strand along with Tunnel Furnace, Oxygen Plant, Lime Calcining with downstream facilities - Cold Rolling, Galvanizing, Galvalume, Colour Coating, Precision Tube & Black Pipe/GI Pipe. 2011 - Commissioning of two DRI Kilns, Electric Arc Furnace, 2nd CSP Caster & 6th Strand along with Tunnel Furnace, Cold Rolling Mill Complex and Galvanising under Phase-IV of Orissa Project.

Vous aimerez peut-être aussi