Summary Have 30 years experience since qualifying in very varied industries and positions from ConceptFEED through Detail

Design, Construction & Commissioning, both at home and overseas, onshore and offshore. The highlight being the head of dept for the successful Specification, Design, Construction and Upgrade of the instrumentation and new DCS control room for Warri Refinery and Power plant. Participates in the execution of project maintenance management programs and identification and procurement of equipment and spares for start up, planned maintenance and shut down maintenance. Training of technicians in their craft discipline and technology & engineering know-how transfer to local nationals has been a major factor throughout my international assignments. Work Experience EMPLOYMENT HISTORY:- July 2010 TO PRESENT Employer:- Swift Worldwide Resources. Client:- Angola LNG. Project:- Angola LNG.. Position:- Instrument Team Lead. Leading the instrument team for construction and subsequent commissioning, maintenance management and training on instrumentation systems on an LNG plant in Angola. Working to ISO 9000 for QA and QC traceability. Overseeing and approving instrument equipment and design with our main contractor Bechtel. Attending factory acceptance tests at our vendors sites worldwide. Specify and approve equipment and spares for start up and maintenance. Write maintenance procedures. Specify test equipment and set up maintenance department. Interview and hire Instrument personnel. Assist maintenance supervisors in the management of their personnel and work activities, while adhering to safe working practises. Facility systems consist of: Honeywell Experion DCS with Foundation Fieldbus. ICS Triplex ESD. Bently Nevada system one machine monitoring systems. Siemens SGT600 gas turbine generators Power plant, and GE Pignone frame 6 and 7 gas turbine driven compressors with electric helper motor/generators, with Speedtronics MK6. CCC antisurge control systems. Atlas Copco air compressors. General monitors fire and gas systems. Khrone fiscal metering sytems. SVT loading arms and hydraulics. KTI fired heaters and hot oil system. SAAB tank gauging system. ABB gas chromatographs. 2010 TO 2010. Employer:- Worldwide Worker. Client:- OMV Yemen. Project:- OMV pipeline. Position:- Senior Instrument Engineer. Leading the instrument team for construction of Instrumentation sytems on a 160Km crude oil pipline and oil well gathering sytem, to and from a new Central Processing Facility, in the Republic of Yemen. Overseeing and approving instrument equipment and design with our main contractor, GPS KENTZ. Review any design work and to participate and lead HAZOP, HAZID,

IPF safety and technical audits. Participate in the preparation of PEF,s / P & ID,s, ESD Safeguarding systems, Cause and Effects and Logic drawings. Emerson Delta V, ICSS with Emerson (Daniels) metering skids, block valve and pumping stations. 2008 TO 2010. Employer:- Compania Operadora de LNG del Peru sac. Client:- Peru LNG. Project:- Peru LNG. Position:- Instrument Team Lead. Leading the instrument team for construction and subsequent commissioning, maintenance management and training on instrumentation systems on an LNG plant in Peru. Working to ISO 9000 for QA and QC traceability. Overseeing and approving instrument equipment and design with our main contractor (CB & I) at their offices in London. Attending factory acceptance tests at our vendors sites worldwide. Specify and approve equipment and spares for start up and maintenance. Write maintenance procedures. Specify test equipment and set up maintenance workshop. Interview and hire Instrument personnel. Assist maintenance supervisors in the management of their personnel and work activities, while adhering to safe working practises. Facility systems consist of: Emerson Delta V ICSS with Foundation Fieldbus. Emerson transmitters. Bently Nevada system one machine monitoring systems. GE LM 2500 gas turbine generators Power plant, and GE Pignone frame 7 gas turbine driven compressors with electric helper motor/generators, with Speedtronics MK6. CCC antisurge control systems. Atlas Copco air compressors. General monitors fire and gas systems. Khrone fiscal metering sytems. FMC loading arms and hydraulics. Boustead fired heaters and hot oil system. Enraf tank gauging system. ABB gas chromatographs. 2007 TO 2008. Employer:- Aspin International Ltd. Client:- SPDC, Nigeria. Project:- Various oil and gas projects. Position:- Senior Instrument Design Engineer. Leading the instrument team in an engineering design office in Nigeria. Preparing manhour estimates, detailed planning and scheduling for drafting work to be carried out. Preparing sketches/proposals for the designers and draftpersons to develop into detailed design drawings. Review any design work and to participate lead HAZOP, HAZID, IPF safety and technical audits. Participate in the preparation of PEF,s / P & ID,s, ESD Safeguarding systems, Cause and Effects and Logic drawings. Carrying out checks on drawings produced by the instrument department. Supervision of the training and development of new trainee engineers. Actively develop local staff to fulfill engineers role. Supervise the quality control requirements and general management of a multi discipline engineering office. Equipment sizing calculation and selection. Prepare instruments and instrumentation equipment datasheets. 2007 TO 2007.

Employer:- Baker Energy. Client:- Conoco Phillips, Algeria. Project: - MLN block 405A. Position:- Controls and Instrument Engineer. Leading the instrument team in project maintenance management of a 55000 bopd crude oil and gas processing facility in the Algerian Sahara desert. Also commissioning of a Frame 5 GT gas compression and reinjection expansion project. Providing sustainable production uptime, troubleshooting and fault finding issues on installed equipment and planning safe interventions, whilst minimising downtime. Ensuring all maintenance activities are safely conducted using the correct maintenance techniques and procedures. Planned and carried out Shutdown maintenance. Train and assist technicians in their discipline and work activities. Specify, approve and procure spare parts. Facility systems consist of: Honeywell Plantscape DCS, with C200 process controllers and Honeywell FSC, ESD/F&G. Centrax/Rolls Royce 501-KB7 GT Power Plant, Oil storage tanks, export pump system, oil pipeline. Compression facilities Thermodyne and NP compressors (controlled by Allen Bradley PLC). Gas transfer, gas lift and injection pipelines. Condensate stabilisation and column. TEG dehydration system. HP and MP separators. Daniel crude oil Fiscal metering systems. Speedtronics MK6. 2006 TO 2007. Employer:- Acumen. Client:- Foster Wheeler. Project:- Woodside LNG,Train 5. Position:- Lead Instrument Planned Maintenance Engineer. Lead planned maintenance engineer in charge of the team for writing routine maintenance protocols and procedures for all systems and units on train 5 LNG plant and GE gas turbine power plant, (being built on site in Australia). Generating and developing maintenance templates, including SIL classification, maintenance procedures and spare parts required for planned maintenance and shut down. Hazops and cause and effects and downloading into SAP PM. Developing work schedules and coordination of maintenance procedures with other disciplines. 2006 TO 2006. Employer:- Parsons Fluor Daniel. Client:- Tengiz Chevroil, Kazakhstan. Project:- SGI/SGP. Position:- Controls and Instrument Engineer. Project management role for overseeing the EPC contractors in construction and commissioning of the Tengiz sour gas injection and second generation phase crude stabilisation and Sulphur plants in Kazakhstan. Specify and approve procurement of equipment and spare parts. NACE requirements. SIL classification, Hazops and Cause and effects. Participate in meetings and

inspections with the client and construction contractors to ensure correct specifications and procedures are being met and maintained while adhering to safe working practises. PID red lining and Punch list corrections. Facility systems consist of: Honeywell DCS. Allen Bradley and Hima plc,s. ICS Triplex ESD. Fenwal gas monitoring system with Draeger and Detronics gas detectors for toxic and flammable gasses. GE frame 9 gas turbines power plant and also Nuovo Pignone compressors, using speedtronics mark 5. Bently Nevada 3500 machine monitoring systems. Atlas Copco air compressors. 2005 TO 2006. Employer:- KBR. Client:- Shell Expro, North Sea. Project:- Fulmar Alpha, offshore oil and gas platform. Position:- Maintenance Supervisor. Leading the maintenance management team on the platform. Participate in the maintenance programs, especially SIL checks and requirements, Hazops and Cause and effects. Planned and carried out Shutdown maintenance. Specify and procure equipment and spares required for maintenance. Identify and solve problems related to maintenance of project equipment. Train and assist technicians in their discipline and work activities in safe manner. Facility systems consist of: Honeywell plantscape DCS, ABB and Fisher Rosemount smart transmitters. Allen Bradley plc,s. Bently Nevada machine monitoring systems. Wormald fire and gas monitoring system with Detronics and MSA gas detectors. GEC/Rolls Royce RB211 gas turbines with Digigov control, driving 24 MW generators and Dresser Clarke gas compressors. Nuovo Pignone and Sulzer compressors. Sulzer pumps and GEC Alstom electric motors. Erskine UPS. Kent Jordan oil and gas fiscal metering systems. Daniels gas chromatographs and Solartron densitometers. 2004 TO 2005. Employer:- Baker OTS Ltd. Client:- NLNG, Nigeria. Project:- NLNG, Plus project. Position:- Instrument Commissioning/Maintenance Engineer. Leading the instrument team for construction and subsequent commissioning, project maintenance management and training on instrumentation systems on the LNG trains 4 and 5 for NLNG Bonny Island Nigeria. Working to Shell DEP,S and ISO 9000 for QA and QC traceability. Specify and approve equipment and spares for start up and maintenance. Assist maintenance supervisors in the management of their personnel and work activities, while adhering to safe working practises. Facility systems consist of: Foxboro IA DCS. Triconex ESD system. B&K Compass and Bently Nevada machine monitoring systems. GE Pignone frame 6, 32MW gas turbine generators power plant, and frame 7 gas turbine driven compressors with electric helper motor/generators (13MW) and waste heat exchangers, with Speedtronics MK5 & 6. CCC antisurge control systems. Geveke 2.7MW emergency diesel generators. Control valves with smart positioners. Stahl and General monitors fire and gas sytems. Imtech systems fiscal metering using Coriolis meters.

2000 TO 2004. Employer:- Baker OTS Ltd. Client:- NNPC/MPN, Nigeria. Project:- OSO/NGL and Offshore. Position:- Senior Instrument Advisor. Head of instrument dept, for maintenance management and on the job training of instrumentation systems on an NGL Plant at Bonny Island and oilfield maintenance offshore Eket, Nigeria. Identify and solve problems related to maintenance of project equipment (instrumentation, electrical or mechanical) especially SIL specifications and cause and effect requirements. Specify, order and procure spares and equipment. Planned and carried out Shutdown maintenance. Write maintenance procedures. Approve detailed engineering instrument hook up drawings. Train technicians in their craft discipline and assist maintenance supervisors in the management of their personnel and work activities and maintain safety at all times. Participate in the execution of the maintenance programs. Working to Exxonmobil ISO 9000 QA/QC for traceability. Facility systems consist of: Fisher Rosemount Delta V and Provox DCS and smart transmitters. ICS triplex ESD systems. ABB Vista gas chromatographs, Allen Bradley and GE Fanuc PLCs. Masoneilan, Fisher, and KTM control valves and Rotork actuators. Bently Nevada 3300 machine monitoring systems. Anderson Greenwood in tank valves. Solar Taurus 60 Gas Turbine generators. GE frame 5 gas turbine generator with speedtronics MK5. LM 2500 Gas Turbine driven compressors. Praxair N2 membrane systems. Detronics and General monitors fire and gas systems. Ebara compressors and pumps. CCC antisurge control sytems. FMC loading arms. Smith systems fiscal meter provers. 1998 TO 2000. Employer:- AES Ltd. Client:- AES, Wales. Project:- Barry Power Station. Position:- Plant Engineer. Operation and Maintenance management of a 250MW combined cycle power station. Specify. order and procure spares and equipment. Participate in the improvement of the maintenance programs and assist with identification and ordering of materials and spares. Planned and carried out Shutdown maintenance. Ensure all SIL checks and cause and effect requirements are met. Facility systems consist of: Siemens V94.2 gas turbines with 150 MW Generators. Mitsubishi 75MW steam turbine. Nooter Eriksen HRSG. Bellis and Morcom gas compressors. Ingersoll Rand air compressors and dryers. Brush 11KV and Ansaldo 15kv generators. GEC Alsthom 6.6kv/11kv/15kv to 132kv transformers with Hawker Siddeley tap changers. Saft and Seira UPS systems. ABB 415v air circuit breakers. GEC Alsthom 6.6KV vacuum circuit breakers and SF6 132KV breakers. Bailey Infini 90 DCS system. GE Fanuc 90.30 series and Allen Bradley SLC 500 PLC,s. 1997 TO 1998.

Employer:- Baker OTS Ltd. Client:- NNPC/MPN, Nigeria. Project:- OSO/NGL. Position:- Senior Instrument Advisor. Project management role as clients head of dept advisor, for inspection of instrumentation systems on an NGL Plant during construction, commissioning and maintenance on Bonny Island Nigeria. Specify and approve hook up drawings and equipment. Ensure all SIL checks and requirements are met. Working to Mobil specifications ISO 9000 for QA/QC traceability. Participate in inspections and meetings with contractors to ensure specifications and procedures are met and maintained at all times, while adhering to safe working practises. Facility systems consist of: Fisher Rosemount Provox DCS and smart transmitters. ICS triplex ESD systems. ABB Vista gas chromatagraphs, Allen Bradley and GE Fanuc PLCs. Bently Nevada 3300 machine monitoring systems. Anderson Greenwood in tank valves. Solar Taurus 60 Gas Turbines power plant. Praxair N2 membrane systems. Detronics and General monitors fire and gas systems. Ebara compressors and pumps. CCC antisurge control systems. Smith systems fiscal meter provers. 1988 TO 1997. Employer:- Babcock King Wilkinson Ltd. Client:- NNPC, Nigeria. Project:- Warri and Kaduna refinery, petrochemical plants and Power station. Position:- Instrument Superintendent. Head of instrument dept for leading the team in construction and subsequent commissioning, maintenance management, TAM Turnaround maintenance and upgrade of instrumentation systems on Refineries, Power Plant and Petro-Chemical Complex for NNPC (Warri WRPC and Kaduna KRPC) in Nigeria. Participate in inspections and meetings with contractors to ensure specifications and procedures are met and maintained safely. Specify, order and procure spare parts and equipment. Develop detailed engineering hook up drawings. Train technicians and assist maintenance supervisors in their work activities. Facility systems consist of: Yokogawa Centum XL and Honeywell TDC 3000 DCS systems. Allen Bradley PLC,s. Bently Nevada machine monitoring systems. Ohmart nucleonic level and density systems. Whessoe tank level gauges. Ingersall Rand air compressors and Roots blowers. GE frame 5 Gas turbines with speedtronics MK4 and ABB steam generators power plant,. Nuovo Pignone steam turbines, blowers and compressors. 1985 TO 1987. Employer:- Parsons and Whittemore Lyddon. Client:- NNMC, Nigeria. Project:- Calabar newsprint mill and Power station. Position:- Instrument Engineer.

Leading the team in construction and subsequent commissioning and maintenance management of instrument systems on a Power Station, Pulp and Paper Mill for NNMC near Calabar Nigeria. Specify, order and procure spare parts and equipment. Develop detailed engineering drawings. Interview and hire local technicians. Identify and solve problems related to maintenance and participate in the training of technicians and assist maintenance supervisors in their work activities. Facility systems consist of: Bently Nevada machine monitoring systems. GEC 30 MW steam turbine generators. GM diesel generators. Black Clawson paper machines. Babcock Wilcox Stork oil fired boilers.

1985 TO 1985. Employer:- Aughton Automation. Client:- DPC, Dubai. Project:- Fateh waterflood instrument upgrade Offshore. Position:- Instrument Supervisor. Supervision of instrument and electrical personnel for upgrade construction and commissioning of instrument systems on Fateh oil platform offshore Dubai, UAE. 1984 TO 1984. Employer:- Sterford Ltd. Client:- MLNG, Malaysia. Project:- MLNG phase one. Position:- Instrument Job Instructor. Supervision and on the job training of instrumentation maintenance on an LNG plant, Sarawak, E Malaysia. While adhering to safe working practises, SIL classification, Hazops and cause and effects. Working to Shell DEP,s. 1983 TO 1983. Employer:- Ipedex Production. Client:- ADMA OPCO, Abu Dhabi. Project:- Zakum Central Super Complex platform. Position:- Instrument Supervisor. Commissioning and maintenance of instrumentation on Zakum Central Super Complex oil platform, offshore Abu Dhabi, UAE. Working to BP specifications for QA./QC. . 1983 TO 1983. Employer:- Chemical and Power Plant Operations Ltd. Client:- APV, UK. Project:- St Ivel dairy.

Position:- Commissioning Engineer. Overseeing construction contractors and subsequent commissioning of instrument, electrical, mechanical and process systems on a new St Ivel dairy, Wiltshire UK. Built by APV Ltd. 1982 TO 1983. Employer:- Chemical and Power Plant Operations Ltd. Client:- SOM, Iraq. Project:- Alkaim fertilizer complex and Power station. Position:- Instrument Supervisor. Commissioning and Maintenance of instrumentation on a Power Plant and Fertilizer Complex, including Sulphur, Sulphuric acid, Ammonia and Rock phosphate, phosphoric acid plants in Iraq. 1980 TO 1981. Employer:- Coppas International Ltd. Client:- NOC, Libya. Project:- Marsa el Brega petrochemical complex and Power station. Position:- Instrument Supervisor. Maintenance of instrumentation systems on a Desalination Unit, Power Plant and PetroChemical Complex in Libya. 1979 TO 1980. Employer:- C and P Engineering Services Ltd. Client:- Monsanto and CEGB, Wales. Project:- Contract. Position:- Lead Instrumentation. Construction of instrument systems on new projects at Monsanto Chemicals and Aberthaw Power Station. 1976 TO 1979. Employer:- National Smokeless Fuels Ltd. Client:- National Smokeless Fuels Ltd, Wales. Project:- Cwm Coal Mine, Coking works and Power station. Position:- Lead Instrumentation. Installation and Maintenance of instrumentation on a modern Coal mine and Coking Works and associated by-products Plants