Vous êtes sur la page 1sur 4

List of Post Graduate Thesis

No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Thesis Title Application of Expert System on Disputes of Competitive Contracts of Construction Projects. Deriving an Approximate Method of Cost Estimation. Management of Constructability Enhancement of the Construction Industry. Management Information System (MIS) for Planning And Schedule Control of Construction In the Iraqi Oil Sector. Integrated Construction Management System for Site Cost Problems And Management Evaluation with Expert System Implementation. Developing an Integrated Management System for Selecting Method and Equipment of Excavation Irrigation Projects with Expert System Implementation. Deriving an Equation for Calculating the Productivity of Equipments for Road Projects. Using a Computer Interactive Model for Evaluating and Improving projects Expert System Application on Selection of Compaction Method and Equipment. Improving the Cost Components in the Reconstruction Projects that have been Executed Through The Period (1991-1994). Management and Control of on-Site Construction Material. Deriving an Equation to Calculate The Productivity of Excavation. Evaluation System for Work Progress by Standard Weights of Construction Items. Optimal Management Solution of Estimation Cost of Highway Project in Iraq. The Development of A management System for Controlling and following-up Subcontractor Work. Developing A management Systems for Plant Management with Expert System implementation. Developing an Interactive Computer Program for Evaluating the Performance of Construction Management at The Execution Stage. graduation M.SC. M.SC. M.SC. Ph.D. Ph.D. M.SC. M.SC. M.SC. M.SC. M.SC. Ph.D. M.SC. Ph.D. Ph.D. Ph.D. M. Sc. M. Sc. Year of research 1996 1996 1996 1996 1996 1997 1997 1997 1998 1998 1999 1999 1999 1999 1999 1999 1999

No. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36.

Thesis Title Using Value. Engineering for Studying the Possible Alternatives for Execution The Earth Water Tanks A comparison Between The Reconstruction Mission of Service Building Projects. Developing A management Information System (MIS) for Controlling the Execution Cost of Irrigation Projects. Using Value-Engineering for Building A management System for Evaluating the Security-Projects. Integrated Management System For Site Quality Control. Developing a knowledge Based Expert System for Building Management System for Decision Making Delays in Construction Projects. Electing A Management System for Controlling the on-Site labour. Developing a Planning Relationship Between CPM and Line of Balance (L.O.B) Method. Project Management And Its Effect On The Quality Control in The Construction Sector. Design an Integrated Management System for Quality Control By Using (ISO-9000) Guide. Developing Management System For Selecting The Constructing Method and Execution Approach Of Construction Projects By Using Expert System Technique. Design A management System For Controlling The on-Site Material Usage. Election of A management System For Identifying The Execution Weight Of Fortified Building. Developing A Management System For Planning The OneSite Material Usage. Using Value-Engineering For Designing A management System For Evaluation Of Execution Irrigation Projects. Cost Evaluation Standards for Industrial Buildings. Quality Cost and Their Considerations in Managing The Factories Of Pre-Casting Concrete Units. Appling The Value-Engineering Approach For Controlling The On-Site Cost Of Building Projects. Developing A management System For Controlling The Project Cost in The Construction Sector.

graduation M.SC. M.SC. M.SC. M.SC. M.SC. M.SC. M.SC. M.SC. M.SC. Ph.D. M.SC. M.SC. M.SC. M.SC. M.SC. Ph.D. M.C.S Ph.D. M.SC.

Year of research 2000 2000 2000 2000 2000 2000 2000 2001 2001 2001 2001 2001 2001 2001 2001 2002 2002 2002 2002

No. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51 52

Thesis Title

Year of Graduation Researc h M.SC. Ph.D. M.SC. M.SC. M.SC. M.SC. M.SC M.SC M.SC M.SC M.SC M.SC M.SC M.SC M.SC M.SC 2002 2002 2002 2003 2003 2003 2005 2005 2005 2005 2005 2005 2005 2005 2006 2006

Using Standards For Evaluating The Performance Of Project Management in Preventing The Time Delay. Developing of Value Engineering Management System For Construction Projects in Iraq. Using Value Engineering Concept For Evaluating and Improving The Maintenance Management of University Buildings . Building an Engineering System For Quality Management on The Design Stage ( Radio Station as case study). Developing an Interactive System for Controlling Construction Plant Cost. Implementing Total Quality Management in The Productive Factories of the Construction Section (Al- Taje factories as Case study). Design a Developed Management System For Site Usage of Construction Materials. Implementation of CPM for Avoiding and Controlling Time Delays in Construction Projects Evaluation of Libyan Contract Conditions And Its Application On Engineering Projects Expert Systems Applications for Selection a Type of Contracts and Project Delivery Method for Construction Project. Application of Intranet As an Engineering Management Information System For Service Management (SMIS) of Drugs Distributions. Implementation of Value Management In Designing The Construction Works In Respect to Cost. Establishing a Management System to Select A Type of Contract And Execution Approach For Construction projects By Implementation Expert System Technique. Applying of Engineering Management Aspects for Evaluation of The Availability of Implementing New Technologies in Constructing Road Projects Expert System Application For Evaluation of The Engineering Projects With Earned Value System Implementation Developing A Resource Management System for A successful Project Management

No. 53

Thesis Title

Year of Graduation Researc h 2006

54 55 56 57 58 59 60 61 62 63

Implementing The Engineering Project Concepts For Building An Engineering Management System For Material M.SC Stocking ( Steel Complex in Musrata / Libya as a Case Study) Application of Engineering Management Aspects With Simulation Techniques For Developing A Power Load M.SC Distribution System Implementation of Computer Programs For Site Management M.SC of Engineering Projects) Developing An Integrated Labor Site Cost Management M.SC System (ISCMS) For Construction Projects Value Engineering Aspects For Improving The Projects' M.SC Performance at the Implementation Phase Of Oil Projects Implementation of TQM Fundamentals in Constructing the M.Sc. Marine Projects in the States of Kuwait Implementation of Value Engineering in Managing M.Sc. Governmental Buildings in Kuwait State Changing Orders and Its Impacts on the Projects Time and M.Sc. Cost Implementation of T.Q.M Planning and Control Techniques in Constructing the Marine Projects in the M.Sc. State of Kuwait Implementations Of T.Q.M Control Techniques In Power M.Sc. Station In State Of Kuwait Developing a Qualification Based Selection Standard Model for Contractor Selection of Construction Projects in The State of Kuwait M.Sc.

2006 2006 2006 2006 2009 2009 2009 2009 2009 2009

Vous aimerez peut-être aussi