Components of a Mine
Access Roads Mill or Processing Plant
Tailings Impoundment
Process Ponds & Water Supply Waste Rock Dumps Reclamation Soil Stockpiles
Challenges
Tailings dams are now largest dams in the world
Conceptual Pre-Feasibility
Feasibility
Project Timelines
Exploration -30 t = 0 yr 2 3 Pre-Feasibility 4 Feasibility
Engineering Studies
3+ mths
Conceptual Engineering
6+ mths Pre-Feasibility
Environmental Studies
Baseline Studies
EIA