PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12
f'c
20.7
Mpa
db fy
= = =
16 314 40
mm Mpa mm
(Gr. 40)
LS WS wS tS Wb LB AB WT
= = = = = = = =
VMAX
6.5664
kN
MU
5.25312 kN-m
MU f'c fy J F1 b h d
= = = = = = = =
mm mm mm = 0.022174
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 w = 1.672741 w = 0.022174 3.2.2 Computation of VREQ VMIN = 1.4 / fy VREQ = w * f'c / f y VMIN VREQ = = = 0.004459 0.001462 0.02345 USE
VMAX = J*[0.85 * F1 * f'c / f y] [600 / (600+fy)] VMAX 3.2.2 Computation No. of Steel Bars AREQ = V * b * d As = T * d2 / 4 n = AREQ / As AREQ As n
= = =
224.7134 mm 2 201.0619 mm 2 2
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 3.4 Check for Shear Design Constants Maximum Shear Conc. Comp. Strength Rebar Yield Strength Reduction factor Allowable VC Width Height Effective depth Stirrups
VMAX f'c fy J
= = = = = = = = = =
6.5664 20.7 314 0.85 0.78 200 300 252.0 10.0 78.5398163
b h d Av
3.4.1 Computation of VU VU = VMAX - (W T * d) 3.4.2 Computation of Actual V Actual VC = VU / (.85 * b * d) 3.4.2 Computation for Stirrups s = Av * fy / ((VC - V) * b) s = 378.9042 Actual VC = 0.129136 Mpa VU = 5.532192 KN
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12
f'c
20.7
Mpa
db fy
= = =
16 314 40
mm Mpa mm
(Gr. 40)
LS WS wS tS Wb LB AB WT
= = = = = = = =
VMAX
64.176
kN
MU
56.154
kN-m
MU f'c fy J F1 b h d
= = = = = = = =
mm mm mm = 0.280279
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 w = 1.414636 w = 0.280279 3.3.2 Computation of VREQ VMIN = 1.4 / fy VREQ = w * f'c / f y VMIN VREQ = = = 0.004459 0.018477 0.02345 USE
VMAX = J*[0.85 * F1 * f'c / f y] [600 / (600+fy)] VMAX 3.3.4 Computation No. of Steel Bars AREQ = V * b * d As = T * d2 / 4 n = AREQ / As AREQ As n
= = =
931.2416 mm 2 201.0619 mm 2 5
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 3.4 Check for Shear Design Constants Maximum Shear Conc. Comp. Strength Rebar Yield Strength Reduction factor Allowable VC Width Height Effective depth Stirrups
VMAX f'c fy J
= = = = = = = = = =
64.176 20.7 314 0.85 0.78 200 300 252.0 10.0 78.5398163
b h d Av
3.4.1 Computation of VU VU = VMAX - (W T * d) 3.4.2 Computation of Actual V Actual VC = VU / (.85 * b * d) 3.4.2 Computation for Stirrups s = Av * fy / ((VC - V) * b) s = -490.9505 Actual VC = 1.282322 Mpa VU = 54.93466 KN
Prepared By:
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12
= =
24 1.6
kN/m 3 Kpa
3.2
Kpa
f'c
20.7
Mpa
db fy
= = =
16 314 40
mm Mpa mm
(Gr. 40)
= =
0.2 0.3
m m
2.1 Axial Loads at 2nd Floor 2.1.1 Weight of slab Thickness of slab WS tS = = 25.4016 kN 0.100 m
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 Wb = 2.1.2 Weight of beam 7.392 kN Total Length of Beams Area of beam 2.1.3 Weight of Super-Imposed Dead Load 2.1.4 Weight of Live Load 2.1.5 Weight of Column Height 2.1.6 Total Weight Carried by 2nd floor Column W T = 7 of weights(2nd flr) 2.2 Axial Loads at Attic 2.2.1 Weight of slab Thickness of slab 2.2.2 Weight of beam Total Length of Beams Area of beam 2.2.3 Weight of Super-Imposed Dead Load 2.2.4 Weight of Live Load 2.2.5 Weight of Column Height 2.2.6 Total Weight Carried by 2nd floor Column W T = 7 of weights(attic) 2.3 Ultimate Axial Load PU = PU1 + PU2 3.0 Analysis Design Constants Conc. Comp. Strength Rebar Yield Strength Reduction factor No. of Steel Bars WS tS Wb LB AB SDL LL WC Ht PU2 = = = = = = = = = = 8.792 0.100 2.2176 4.4 0.015 kN m kN m m
2
LB AB SDL LL WC Ht PU1
= = = = = = =
5.5 0.04
m m2
101.5392 kN
PU
175.8512 kN
f'c fy J n
= = = =
3.1 Considering Axial Load PU = 0.80 * J * AG [.85 * f'c * (1/ VG) + (VGfy)] 3.1.1 Computation of VG VG = A S / A G PU = 791.4338 kN > 175.8512 kN
PU VG
= =
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 3.2 Design of Lateral Ties Using 10mm Lateral Ties, spacing "s" must be the least value of the 3 conditions set 3.2.1 16 * Longitudinal Bar 3.2.2 48 * Lateral Tie Bar 3.2.3 Least Column Size = = = 256 480 200 mm mm mm
Prepared By:
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12
f'c
20.7
Mpa
db fy
= = =
16 314 75
mm Mpa mm
(Gr. 40)
2.1 Axial Loads at 2nd Floor 2.1.1 Weight of slab Thickness of slab WS tS = = 25.4016 kN 0.100 m
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 Wb = 2.1.2 Weight of beam 7.392 kN Total Length of Beams Area of beam 2.1.3 Weight of Super-Imposed Dead Load 2.1.4 Weight of Live Load 2.1.5 Weight of Column Height 2.2 Axial Loads at Attic 2.2.1 Weight of slab Thickness of slab 2.2.2 Weight of beam Total Length of Beams Area of beam 2.2.3 Weight of Super-Imposed Dead Load 2.2.4 Weight of Live Load 2.2.5 Weight of Column Height 2.3 Total Axial Dead Load PDL = 7 of Dead Loads (2nd Flr and Attic) / 1.4 2.4 Total Axial Live Load PLL = 7 of Live Loads (2nd Flr and Attic) / 1.7 2.5 Total Axial Load PT = PDL + PLL WS tS Wb LB AB SDL LL WC Ht PDL = = = = = = = = = = 8.792 0.100 2.2176 4.4 0.015 kN m kN m m2 LB AB SDL LL WC Ht = = = = = = 5.5 0.04 m m2
PLL
48.384
kN
PT
110.344 kN
3.0 Analysis Design Constants Conc. Comp. Strength Rebar Yield Strength Reduction factor
= = = = = = =
85.00 kN/m2 300.00 mm 10% of PT B = 1.194982 m Adopt 1.20m x 1.20m Square Ftg.
3.1 Computation for the size of Square Footing A=B*B 3.1.1 Computation of Rquired Area A = (PT + Wt. of Footing) / SBC 3.2 Design of Steel Reinforcement 3.2.1 Computation of Actual Ultimate Soil Pressure qU = PU / (B * B) 3.2.3 Computation of Ultimate Moment MU = qU * B * [ (B-a) / 2 ] * [ (B-a) / 4 ] 3.2.3 Computation of d d1 = a - c - (1.5 * db) d2 = a - c - (0.5 * db) 3.2.4 Computation of w MU = Jbd2f'cw(1-0.59w) w - 0.59w2 = 0.066447 w = 1.625636 w = 0.069279 3.2.5 Computation of VREQ VMIN = 1.4 / fy VREQ = w * f'c / f y
2
1.427981 m2
qU
123.1467 kN/m2
MU
66.68395 kN-m
d1 d2 w
= = =
mm mm
USE
VMIN VREQ
= =
0.004459 0.004567
PROJECT: A & C APARTMENT LOCATION: KANLAON ST, ALABANG COUNTRY HOMES, BRGY. PUTATAN, MUNTINLUPA CITY DESIGNED BY: ENGR. ANTONIO M. AGANON, JR. DATE: 10-Jan-12 VMAX = J*[0.85 * F1 * f'c / f y] [600 / (600+fy)] VMAX = 0.02345
Assumed d = 201 mm is safe for flexure 3.2.5 Computation for No. of Steel Bars AREQ =VREQ * B * d n = AREQ / AS Use 8 -16 mm Both Ways AREQ n = = 1432.068 8
Prepared By: