HP E5000 MESSAGING SYSTEM FOR MICROSOFT EXCHANGE

The easiest, most complete way to streamline Exchange 2010 upgrades on the industrys first purpose-configured, pre-tested messaging system from the world's messaging leaders.

2011 2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice

Evolving business communication


Richer interactions and more of it.

People spend ~2hrs per day on email1


Everyone

Daily Messages Sent/Received


250

has a laptop and smartphone


200

About
More

10% more messages sent each year2


time spent managing mailbox size

Messages contain more multimedia content


Rich

150

content drives up message size the need for larger mailboxes

100

Increases

Mailbox sizes can exceed 10 GB over 4 yrs3


Compliance
1The

50

complicates everything

0 2008 2010 2012

Radicati Group, Microsoft Exchange Server Market Analysis, 2010 2014 Executive Summary, April 2010 estimate 3HP calculation
2HP

Large, low cost mailboxes

The medium-sized business challenge


Impacts

600 500 400

to business user productivity implementation

300
200 100 0 Read IOPS
E2K3 E2K7

Complex

Availability

and scale

Write IOPS
E2010

Exchange 2010 improvements


Higher Better Lower

business user productivity with the elimination of *.pst files performance with new IO patterns cost storage availability

Database Availability Group (DAG)


Log Shipping

Upgrades require many considerations

Server 1
DB1 DB2

Server 2
DB1 DB2

Upgrade risks and considerations


How do you know youre making the right decisions?
Application Where does cloud fit? How do I size mailboxes? How do I implement clustering?

Whats my archive strategy? Whats required for disaster recovery?


Virtualization

Will it impact performance? Should I virtualize Exchange 2010? How many VMs on the same server?

What is best practice VM configuration? How do DAGs work with vMotion or live migration?

Network

How many ports? 1GbE or 10GbE?


Is a storage area network required? Whats the best way to implement redundancy?

FC, FCoE, or iSCSI? Do I need a storage controller card? Do I need to leave room for expansion? What are best practice solution sizing?

Servers

What processor? How much RAM? How many disk drives?

How many NICs and what type?

Storage

DAS or SAN? How much capacity? Shared or direct attached storage?

What RAID configuration? Do I need replication with DAG? How does thin provisioning work?

SAS or SATA?

How many support contracts will I have to manage? Do they have similar service levels? How can I get all support contracts to co-terminate?

What about migration services? How do I avoid vendor finger pointing?

Start with the leaders


A joint $250 million investment

Delivering converged application solutions; a new category End-to-end Servers, Storage, Networking , TS and BIS solutions

Resulting in a preferred end-to-end application solution by both HP and Microsoft Jointly developed best practices
Purpose-configured hardware for Exchange 2010 Pre-configured for simplicity Self-contained to ensure appropriate service levels

Addressing Exchange 2010 upgrade risks by:

HP E5000 messaging system for Microsoft exchange


Complete Solutions Simplify Planning & Deployment

Turnkey deployment with pre-sized, tested, and optimized configurations Push-button start-up and automated lifecycle management tools

Optimize Operation

Best practices designed in to ensure service levels are met


Management integration from spindle to application

Agility with Scale

Solutions to scale from 100s to 1000s of mailboxes


Single site, Multi-site and Remote Office configurations

A preferred solution for Exchange 2010

87% less planning and design4


Let HP and Microsoft make the tough choices for you with a complete solution Plan and configure in seconds

Single SKU systems, including support 2 simple steps required to size and configure4 Avoid deployment risk with complex, customized solutions Let HP and Microsoft make 90% of the design decisions4 Purpose-configured hardware for Exchange 2010 Unique form factor from the worlds leading server vendor Best practice configuration decisions designed in Self contained to isolate impact to your environment Wizards to accelerate and validate set up

Deploy with confidence


4Exchange

2010 Planning and Deployment Analysis, The Tolly Group, February 2010 www.TBD.com

HP E5000 quick deployment tool


Streamline deployment and validation

Validates permissions and Active Directory schema Simplifies deployment to a few input fields and mouse clicks Customize unique environment settings

25% smaller data center footprint5


Simplify achieving service levels and keep operational costs down
Ensure service levels

Pre-sized and pre-tested configurations Pre-configured for high availability Self-contained and isolated hardware Single support contract for everything 50% less fans, 50% less power supplies5 Use cost effective direct attached storage Less management complexity with iLO 2 and System Center integration

Reduce total cost of ownership


5Exchange

2010 Planning and Deployment Analysis, The Tolly Group, February 2010 www.TBD.com

Scale from 500 to 15,000 mailboxes


Be able to change with the business as mailbox size, availability, and archive will only continue to grow
Increase mailbox size and number with ease

Increase existing mailbox size with optional capacity upgrades Scale from 500 to 15,000 mailboxes with additional units Balance workload automatically Scale dynamically online, no user impact Implement across locations for higher availability Compliance smart with centralized messaging archive and optional cloud services from HP

Improve availability and archive


10

Accelerate remote office upgrades


Standardize deployment

Reduce planning with pre-packaged complete solutions Accelerate deployment with wizard simplicity

HP E5000 Branch Office

Simplify management
Database Availability Group (DAG)

Manage centrally
Remote access with iLO 2 and Systems Insight Manager

HP E5000 Remote Sites

Microsoft System Center ready

11

HP E5000 product offerings


HP E5000 Messaging System for Microsoft Exchange
E5300

500 1GB mailboxes* 12TB raw capacity 1,000 1GB mailboxes* 16TB raw capacity 1,000 2.5GB mailboxes* 32TB raw capacity 3,000 1GB mailboxes* 40TB raw capacity Includes 2 E5000 Expansion Nodes 3,000 2.5GB mailboxes* 80TB raw capacity Includes 2 E5000 Expansion Nodes 12 & 24TB expansion nodes

BV839A BV895A BV840A

E5500

BV896A

E5700

BV841A

Options

* Not limited to this; mailbox count and sizes are configurable

12

Whats in the box?


HP E5000 all-inclusive configurations Two Windows Server 2008 R2 Enterprise Edition licenses

Exchange 2010 Server quick deployment tools

Single solution support contract


3 years support plus 3 year onsite, next business day

Built in best practice configurations from both HP and Microsoft

13

Achieving simple with a complete solution


HP
Plan and Design 2 Steps How many and what size mailboxes Select a SKU

Competition
24 Steps (online wizard reduces this to 15 steps) 44 pages of documentation http://technet.microsoft.com/enus/library/ gg436085(printer).aspx
Item Number 224-8666 330-9977 317-5875 317-4112 317-2374 317-4124 341-4158 330-5575 330-9853 342-0598 420-6320 430-3260 313-8779 313-8574 313-8551 313-8552 330-5280 342-0564 330-5465 905-6667 905-7218 906-0422 906-0462 906-9710 900-9997 330-6598 310-8509 310-8509 313-9094 342-2100 342-2096 Quantity 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 14 4 Item Description XX XXXX with up to 12 Hot Swap HDDs,LED Server Name Shipping 16GB Memory (8x2GB), 1333MHz Single Ranked UDIMMs for 2 Processors, Optimized Intel XeonE5620 2.4Ghz, 12M Cache,Turbo, HT, 1066MHz Max Mem XX XXXX Heatsink For 2 Processors Intel Xeon E5620 2.4Ghz, 12M Cache,Turbo, HT, 1066MHz Max Mem HD Multi-Select XXXX Battery Cable, R510 XXXX X Cable, 12 Hard Drive Configuration XX XXXX Controller,512Cache XX XXXX Battery with XX XXXX Cable, 12HD No Operating System Broadcom 5709 Dual Port 1GbE NIC w/TOE iSCSI, PCIe-4 Remote Management, Enterprise No Internal Optical Drive Bezel Electronic System Documentation DVD Kit Management Console RAID 1, RAID 5 for XX XXXX Controller Card, x12 Chassis Sliding Ready Rails Hardware Limited Warranty Plus On Site Service Initial Year Hardware Limited Warranty Plus On Site Service Extended Year(s) Next Business Day Onsite Service After Problem Diagnosis, 2Year Extended 7x24 HW/SW Tech Support and Assistance , 3 Year Next Business Day Onsite Service After Problem Diagnosis, Initial Year On-Site Installation 750 Watt Redundant Power Supply Power Cord, NEMA 5-15P to C13, 15 amp, wall plug, 10 feet/3 meter Power Cord, NEMA 5-15P to C13, 15 amp, wall plug, 10 feet/3 meter 8X DVD-ROM, USB, EXTERNAL 2TB 7.2K RPM Near-Line SAS 6Gbps 3.5in Hotplug Hard Drive 500GB 7.2K RPM Near-Line SAS 6Gbps 3.5in Hotplug Hard Drive

Configure and Quote

Item Number Quantity BV895A 1

Item Description E5500 1,000 seat Exchange Messaging System

Purpose-configured

An HP and Microsoft Preferred Solution

14

Did you know?

HP has deployed over 19 million Exchange Server seats6


44% of all Exchange implementations run on HP ProLiant Servers6 HP employs more than 22,000 Microsoft-trained service professionals6 HP is Microsofts largest Gold Certified partner6 HP is the only vendor to be named Microsoft Enterprise Partner of the Year 5 times6 Working together for over 25 years of industry leading solutions6

6HP

Exchange Solution Brief: HP document #4AA2-0991ENW

15

HP + Microsoft advantages
Vendor collaboration

An HP and Microsoft preferred solution Purpose-configured Exchange hardware Single solution support contract

Simplified

Single, complete appliance Pre-configured for HA Exchange deployment toolsets

Optimized

Minimal components Smallest DC footprint Most efficient power/cooling

16

Solutions for Microsoft exchange


Choosing the right implementation for your business
Dedicated Shared Hosted

HP E5000 Messaging System


Value Proposition The cost of direct attached Storage in a fully integrated & tested solution The easiest way to deploy Microsoft Exchange Low TCO

HP ProLiant Servers & D2000


Flexible selection of servers and direct attached storage to build a dedicated Microsoft Exchange solution Lowest initial cost

HP BladeSystem & MDS600

HP P2000 HP P4000 SAN HP P6000

Cloud Mail Deployment

Large scale enterprise Modular SAN for Exchange multiple applications deployments Optimized for Scalable, common Microsoft apps and infrastructure virtualization Easy to scale Multisite HA DAG DAS 3Gb SAS 1000+ mailboxes SAN Replication FC or iSCSI 1000+ mailboxes Hardware snapshots Multi-site HA

HP Technical Services

HA Connection Type Deployment Size Key Features

DAG DAS 6Gb SAS 100-15,000 mailboxes Ease of setup & use Footprint/power & cooling

DAG DAS 6Gb SAS 100-15,000 mailboxes

Service

Familiar infrastructure Enterprise scale, BladeSystem SmartArray Infrastructure

Lowest TCO

17

Common storage platform (CSP)


The building block for a modular scalable storage portfolio
Leverages existing HP technology blade server iLO

X86 compute + dense storage array in a single 3U RM chassis

ProLiant server blades with P410 (Cascade) controller

Dense Storage. Models with 16 LFF or 36 SFF Drives. Support for SAS, MDL SAS and SSD.

18

Common storage platform (CSP)


The building block for a modular scalable storage portfolio
Redundant LOM (LAN on Motherboard) 1GbE or 10GbE connectors to match the installed server. Expose redundant SAS ports for scale-up capacity expansion

Enclosure managementhealth monitor, Onboard Admin emulation.

PCIe expansion slot for each server can use standard PCIe card, no special I/O required. 10 Gb SFP+

High Availability. Redundant, hot swap power and cooling.

19

HP E5000 messaging system


Collapsing the stack and reducing complexity
HA Exchange

Customer Benefits

HP E5000

2 X DL380 2 X MSA disk shelf High Availability

Reduce TCO

X86 Compute + Storage High Availability 3U rack space

75% reduction in power supplies 62% less space 50% fewer components

8U rack space
8 X power supplies

Reduce complexity

2 X power supplies

8U

3U

20

Exchange 2010 role deployment

Each blade is configured to support multiple Exchange 2010 roles


Multiple

instances of HUB and CAS server roles can be run for HA and load balancing

All sizing has been done with up to 2.5 GB mailboxes to simplify the customers deployment
Mailbox

size is customizable by the customer and is expandable with disk shelves

HP Sizer to assist with more detailed configurations


Client Access Server (CAS)

Mailbox Server

Hub Transport

Mailbox Server

Hub Transport

Client Access Server (CAS)

21

DAG configuration

Pre-formatted RAID groups combined with 2-copy DAG configuration for self contained high availability Each blade can support the entire workload with acceptable latency DAG configuration tool for 3+ copy DAG configurations (available mid-201 1)
RAID 1 LUN RAID 1 LUN RAID 1 LUN Redo LUN

2 Hot Spares

DB1

DB2

DB3

DB1

DB2

DB3

RAID 1 LUN

RAID 1 LUN

RAID 1 LUN

Redo LUN

Active copy

Passive copy

22

Multi-site E5000 deployment


Extended high availability or disaster recovery
Multi-site synchronous HA

Site 1

WAN Link

Site 2

Two copies of each database locally for high availability Third copy at second site for extended high availability
DB1 DB2 DB3 DB4 DB5 DB6

Multi-site asynchronous DR

Two copies locally for high availability

DB1

DB2

DB3

DB4

DB5

DB6

DB4

DB5

DB6

DB1

DB2

DB3

Third lagged copy for disaster recovery

23

Target customer segments

Single site

Distributed

Remote/Branch office

SMB and mid market customers 250 to 1000 mailboxes Represents 70% of Exchange install base Complexity of Exchange and DAG configuration

Mid market and enterprise customers Sweet spot up to 15,000 mailboxes

Mid market and enterprise customers Up to 1000 mailboxes per location

Customer Problem

Customer Problem

Customer Problem

Need for higher level of HA and/or DR across multiple sites


Need for remote deployment and management

Need for remote deployment and management


Repeatable, building block approach to Exchange deployment

24

HP E5000 hardware specs


E5300 Blade server Processor RAM Per blade Internal storage Blade NICs Mezz NIC Storage Controller Internal CSP storage External storage
Xeon E5502 Dual Core
(3 @ 4GB DIMMS)

E5500
(equivalent to BL460c G6; 2 per E5000)

E5700

Max
2 blades 2 sockets
(12 @ 4GB DIMMS)

E5460sb

Xeon E5520 Quad Core


(6 @ 4GB DIMMS)

2 @ Xeon E5520 Quad Core


(12 @ 4GB DIMMS)

12 GB

24 GB

48GB

2 @ 300GB SFF SAS (boot drives)


(P410 with 256MB cache, no battery)

2 SFF

Embedded NC532i Dual Port Flex-10 Multifunction Adaptor Optional NC382m Dual Port 1GbE BL-c Adaptor SFP+ 10GbE Optional

P1210m 6 Gbps SAS controller+1GB FBWC per blade 12TB 16TB (16 @ 1TB 7.2K LFF MDL SAS) 16 LFF 32TB (16 @ 2TB 7.2K LFF MDL SAS) Optional 2 E5000 Expansion Nodes 12 or 24TB LFF MDL SAS 4 Expansion Nodes

(12 @ 1TB 7.2K LFF MDL SAS)

25

THANK YOU

Vous aimerez peut-être aussi