You, or the third party grant applicant must have a freehold interesting the property or if you are taking a lease we will not accept one with a break clause. You must have a leasehold interest with an unexpired term of at least ten years. If the interest is less than this, the superior lessor or freeholder must be joined in the application and bound by the contractual conditions attaching to the grant.
Priority will be given to the schemes that offer the greatest improvement to the overall environment, that are of the highest quality and which respect any existing historic fabric.
HOW TO APPLY
Applications should be submitted to the City of Edinburgh Council (CEC) using the application form. Applicants will also be responsible for obtaining planning permission and/or listed building consent. Advertisement consent may be required in certain circumstances. A building warrant application may also be required. The costs incurred in obtaining these consents are eligible costs.
The applicant contacts the planning department to discuss the principle of the proposed shopfront application details. At this stage an architect need not be appointed. The planning department will confirm that the property is within the Leith THI area and will make a site visit to look at the property.
The applicant may also prepare a sketch design and discuss general proposals with the planning department. At this stage the application will be assessed against the assessment criteria sheet and it will be agreed by CEC whether the works are eligible for grant funding. Stage 2 Preparation of Design Drawings and obtaining Costs and Statutory Approvals
At this stage the applicant should appoint an architect to design the scheme. The applicant /architect will then be asked to provide the following information:
A completed application form. Sketch design drawings showing elevations, a section and details of the materials to be used, all agreed by the client and the Council. A 1:50 scale drawing of the whole building including the shopfront; A 1:25 scale elevations of the shopfront; Full or half size details of mouldings and features; and A floor plan of the premises. Four copies each of 35mm photographic transparencies (slides) or digital images showing:-
o Three views of the condition of the property before improvement works o Key stages throughout the development o Three identical views to the above showing the property after the completion of the works. These slides or digital images shall be provided free of charge for unrestricted use by CEC.
A cost plan detailing fees and all anticipated costs. The applicant must obtain at least three tenders for Eligible Works and submit to CEC a summary of the tenders received and your reasoning (if relevant) for not wishing to submit the lowest tender. Should you not wish to proceed with the lowest tenderer and for reasons given by you prefer to go ahead with another tenderer then you must meet the difference in the cost..
After gaining agreement of the design the architect will complete or finalise the scheme and obtain the relevant planning and building warrant consents, etc. He will also prepare contract documents and obtain quotations. After approval of the final design as agreed by CEC an NHMF and receiving details of the costs, CEC will make a firm grant offer. The level of assistance is discretionary but for most shops it will cover 75% of the eligible costs of the work and the fees. VAT is not normally covered since the applicant can recover it. CEC may only agree to award a financial contribution of less than 75% to expensive shopfront improvement schemes that would take up a disproportionately large part of the overall budget for the Initiative or schemes which do not offer comprehensive improvements. Stage 3 - Works
After the applicant's agreement of the grant offer (within 14 days of receipt) and its associated terms, the actual work to the shopfront may start and CEC is informed when the scheme will be proceeding. Please note, applicants must sign the contract before works start.
PAYMENT
Payment for the work will be made on completion of the work to the satisfaction of the Council and on receipt of a final certificate or final invoice and evidence that all financial obligations have been met. CEC will have the discretion to be flexible about stage payments but in general would expect to only pay the main contribution at the end of the contract and not normally in stages. 10% of the total payment will be retained until the final completion certificate has been issued.