Vous êtes sur la page 1sur 85

2.

2 MW MACHAI HYDROPOWER PROJECT


REVIEW REPORT
INTEGRATED PLANT OPERATION WITH DOWNSTREAM HPP

DECEMBER 2011

ASSOCIATED TECHNOLOGIES (PVT) LTD

142-D Model Town, Lahore

Tel: +92-42-35847194-7
www.atlpvt.com

Fax: +92-42-35857637

Machai Hydropower Project

Review Report on Integrated Plant Operation

TABLE OF CONTENTS
1.

GENERAL ......................................................................................................................................... 4
1.1.

2.

INTEGRATED POWER & ENERGY PRODUCTION WITH EXISTING HPP DOWNSTREAM ................... 5
2.1.

INTRODUCTION ....................................................................................................................... 5

2.2.

MODE OF PLANT OPERATION ................................................................................................. 6

2.2.1.

Variable Tail Water Levels ................................................................................................... 6

2.2.2.

Constant Tail Water Levels.................................................................................................. 6

2.2.3.

Selected Mode .................................................................................................................... 7

2.3.

CALCULATION OF HEAD ACROSS ............................................................................................ 8

2.3.1.

Gross Head .......................................................................................................................... 8

2.3.2.

Head Losses ......................................................................................................................... 8

2.3.3.

Rated Net Head ................................................................................................................... 8

2.4.

SELECTION OF DESIGN DISCHARGE ........................................................................................ 9

2.4.1.

Available Flows.................................................................................................................... 9

2.4.2.

Design Discharge ............................................................................................................... 11

2.5.

3.

PROPOSED LAYOUT (PRESENT STUDY) ................................................................................... 4

OPTIMIZATION OF INSTALLED CAPACITY .............................................................................. 12

2.5.1.

Optimization Criteria......................................................................................................... 12

2.5.2.

Power and Energy Calculations ......................................................................................... 12

2.5.3.

Selected Installed Capacity ............................................................................................... 12

SUMMARY ..................................................................................................................................... 15

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

LIST OF FIGURES
Figure 2.2 ................................................................................................................................................ 7
Figure 2.3 ................................................................................................................................................ 9
Figure 2.4.1 ........................................................................................................................................... 10
Figure 2.4.2 ........................................................................................................................................... 11
Figure 2.5.1 ........................................................................................................................................... 14
Figure 2.5.2 ........................................................................................................................................... 15

LIST OF TABLES
Table 15
Table 2..13

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

LIST OF ABBREVIATIONS

ATL
B
SHYDO
KPK
CFD
cumecs
cusecs
D/S
El.
E&M
FSL
ft3/sec
GWh
HPP
HWL
km
kW
L-Section
masl
MW
m3/sec
NSL
Q
RD:
Rs.
TWL
U/S
C

Associated Technologies (Pvt) Limited

Associated Technologies (Pvt.) Ltd.


Bed Width of Canal
Sarhad Hydel Development Organization
Khyber Pakhtunkhwa
Computational Fluid Dynamics
cubic meter per second
cubic feet per second
Down Stream
Elevation
Electrical and Mechanical
Full Supply Level
cubic feet per second
Giga Watt Hour
Hydropower Project
Head Water Level
Kilometer
Kilo Watt
Longitudinal Section
meters above sea level
Mega Watt
cubic meter per second
Natural Surface Level
Discharge
Reduced Distance
Pakistani Rupee
Tail Water Level
Up Stream
Degree Centigrade

Machai Hydropower Project

Review Report on Integrated Plant Operation

STUDY OF INTEGRATED OPERATION OF MACHAI HYDROPOWER


PROJECT WITH EXISTING DOWNSTREAM HPP

1.

GENERAL

The Upper Swat Canal off-takes from Amandara headwork and trifurcates at its tail near
Dargai Town. Two canals and one escape off-take from the tail of Upper Swat canal which
are Machai Branch (latest design discharge: 68.67 m/s), Abazai Branch (design discharge:
18.9 m/s) and Dargai Escape. The Machai Branch head regulator was remodeled in 1999
by increasing its designed capacity from 48.71 m/sec to 68.67 m/sec.
The Machai Branch has a number of fall structures. Out of these falls, three falls at RD
47+010, RD 51+272 & RD 51+786 were allocated to Associated Technologies (Pvt) Limited
(ATL) and LOI was issued by SHYDO on 16 January 2009. However, based on directives
issued by the Khyber Pakhtunkhwa Government, it was decided to utilize only two falls i.e.
RD 51+272 & RD 51+786. The canal is perennial and closed during month of January and
first 10 daily of February for annual maintenance purposes. For the proposed hydropower
station, the fall structures of RD 51+272 and RD 51+786 are used.
It is planned to combine these two falls and construct a low head powerhouse on the canal
at some suitable location. At 1st fall, the u/s water level is 446.419 meter a.m.s.l and d/s
water level is 443.700 meter a.m.s.l. Thus 2.719 m of fall is available at this location. At 2nd
fall, the u/s water level is 443.675 meter a.m.s.l and d/s water level is 440.597 meter a.m.s.l.
Thus 3.078 m of fall is available at this location. When combined, this will give a total fall of
5.8 m which can be utilized for power production.

1.1. PROPOSED LAYOUT (PRESENT STUDY)


It is planned that the main canal will continue flowing without obstruction; powerhouse will be
constructed on the right side of the main canal at RD. 51+450. A connecting power canal will
be constructed on the right side of the main canal starting from RD. 51+000 and ending at
RD. 52+000. The powerhouse will be constructed almost in the middle of this connecting
channel while the main canal will remain in operation. Once the powerhouse and the
connecting canal will be completed, the discharges of the main canal will be diverted
towards the powerhouse in canal closure period through the connecting power canal by
means of cross regulator.
Associated Technologies (Pvt) Limited

Machai Hydropower Project

2.

Review Report on Integrated Plant Operation

INTEGRATED POWER & ENERGY PRODUCTION WITH EXISTING


HPP DOWNSTREAM

2.1. INTRODUCTION
An existing hydropower project is situated just 310m downstream of the Machai hydropower
project. Although the flows available for the Machai HPP would remain same but the head
across the Machai HPP would be adversely affected by the operation of existing HPP at d/s.
Under the integrated operation of the two (02) hydropower projects, the basis for selection of
installed capacity for Machai Hydropower Project and corresponding estimated annual
energy production has been explained in detail in this section. The daily discharge data used
for calculations is derived from the remodeled canal Longitudinal-section acquired from the
relevant Irrigation and Power Department. Different design parameters (existing) related to
the related two falls have been tabulated as following Table 3.1:
Table 1

Design Parameters

Fall at RD 51+272

Fall at RD 51+786

Design Discharge

51.00

cumec

51.00

cumec

Full Supply Level (u/s)

446.419

443.675

Bed Level (u/s)

443.066

440.204

Full Supply Depth (u/s)

3.353

3.471

Bottom Width (u/s)

18.233

18.233

Full Supply Level (d/s)

443.700

440.597

Bed Level (d/s)

440.104

437.156

Full Supply Depth (d/s)

3.596

3.441

Bottom Width (d/s)

18.233

18.233

Longitudinal Slope (u/s)

0.00012

Available Fall

2.719

3.078

Cumulative Fall

2.719

5.797

Associated Technologies (Pvt) Limited

0.00016

Machai Hydropower Project

Review Report on Integrated Plant Operation

2.2. MODE OF PLANT OPERATION


The design head across for the proposed powerhouse depends on the difference of Head
Water Level (HWL) and Tail Water Level (TWL). In the detail report on POWER & ENERGY
OPTIMIZATION, it has been described in detail that Head Water Level (HWL) has been
taken at its maximum and constant throughout to get highest energy benefits.
Broadly speaking, the Tail Water Level (TWL) in downstream reach of a powerhouse is not
controlled and tail water rating curve is used to assess the tail water level corresponding to
range of discharges. However, considering the integrated operation of Machai hydropower
project along with the operation of existing hydropower project situated d/s of the Machai
HPP, the tail water levels (TWL) of Machai HPP will be controlled by existing HPP. The
operation of the existing HPP situated at d/s is based on keeping the Head Water Level
(HWL) at maximum most of the times to get highest benefits from the existing HPP. Under
these conditions, two scenarios for HWL have been analyzed and briefly described below.

2.2.1. Variable Tail Water Levels


This scenario is based on the daily fluctuation of TWL based on observed flows; that means
no ponding is considered in the tailrace canal. This scenario represents the case when the
existing HPP situated d/s of Machai HPP would be shutdown and historical / designed
conditions for Machai canal are prevailing. This scenario has been analyzed in detail report
on POWER & ENERGY OPTIMIZATION.

2.2.2. Constant Tail Water Levels


This scenario is based on the constant TWL based on the operation of existing HPP d/s of
the Machai HPP; that means ponding is considered in the tailrace canal. This scenario
represents the case when the existing HPP situated d/s of Machai HPP would be in
operation. The maximum Tail Water Level which could be maintained due to the operation of
the existing d/s HPP would be 440.624 m.a.s.l. This should be kept in mind that by
considering TWL as 440.624 m.a.s.l, it would be the most adverse effect that could come on
the Machai HPP due to the operation of the existing hydropower project situated d/s of
Machai hydropower project.

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

2.2.3. Selected Mode


It is quite obvious that power potential and corresponding annual energy production can be
achieved more by keeping the tail water level variable but due to the presence of the existing
hydropower project d/s of the Machai HPP, it is impossible to control the d/s flow levels. To
judge the worst effect on the energy production of Machai HPP, it has been decided to use
the maximum tail water level of canal at this location for project sizing and energy generation
calculations under integrated study. The net head across variations keeping the TWL
variable is in the range of 5.88 m to 8.13 m to as shown in Figure below. However by
considering the constant TWL, it remains as 5.48 m throughout the year i.e. the worst case
of energy production.

Figure 2.2

Machai Hydropower Project

Head Availability Corresponding to Time


9.00

Head Across (m)

8.00

7.00

6.00

5.00
0

20

40

60
Time (%)

Associated Technologies (Pvt) Limited

80

100

Machai Hydropower Project

2.3.

Review Report on Integrated Plant Operation

CALCULATION OF HEAD ACROSS

The methodology for gross and net head estimation for power generation of Machai
hydropower project under integrated operation of two hydropower projects is described in
the sections below.

2.3.1. Gross Head


In order to generate energy the head available at two falls need to be combined. For the
calculation of daily gross head a constant HWL and TWL are calculated as 446.582 masl
and 440.624 masl. Details of plant / HWL & TWL operation modes have been briefly
described earlier. By considering this scenario, the gross head remains 5.96 m throughout
the time.

2.3.2. Head Losses


The head losses have been estimated for the entire water way upto the turbines. These
include the local losses at ends and transitions in headrace, in trashracks, in gate / stoplog
slots, etc. The friction losses in the headrace channel have been subtracted from the
designed water level at upstream of fall structure at RD: 51+272 using the existing bed slope
of Machai canal.

2.3.3. Rated Net Head


The net head remains 5.48 m throughout the time. An axial / propeller type machine can
easily handle such variation in net head. A rated net head of 5.48 m, available 100% of time,
has been found suitable for determination of installed capacity for Machai Hydropower
Project. The daily fluctuation of available net head is shown in Figure below.

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

Figure 2.3

Machai Hydropower Project

Daily Net Head Across

9.00

Head Across (m)

8.00

7.00

6.00

361

321

281

241

201

161

121

81

41

5.00

Time (Days)
Variable TWL

2.4.

Constant TWL

SELECTION OF DESIGN DISCHARGE


2.4.1. Available Flows

The historical daily flow series of Machai Canal at the proposed powerhouse location is
presented in next figure.

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

Figure 2.4.1

Machai Hydropower Project

Historical Average Daily Flows

Average Daily Flows (cumecs)

50

40

30

20

10

361

321

281

241

201

161

121

81

41

Time (Days)

The flow duration curve of Machai canal at powerhouse location is shown in Figure below:

Associated Technologies (Pvt) Limited

10

Machai Hydropower Project

Review Report on Integrated Plant Operation

Figure 2.4.2

Machai Hydropower Project

Historical Flow Duration Curve


70.0

Discharge (cumecs)

60.0
50.0
40.0
30.0
20.0
10.0
0.0
0

20

40

60

80

100

Percentage Excedence (%)


2.4.2. Design Discharge
The designed discharge has nothing to do with integrated operation of two hydropower
projects so it would remain the same whether Tail Water Level remains variable or constant.
Design discharge of 45.93 cumec has been selected for powerhouse which has been
remained available for 3% of the time from 2001 to 2008. As per historical records a
maximum discharge 65.9 cumec is observed at powerhouse location on September 07 & 08,
2005. However, it is anticipated that the selected design discharge would be available more
% of time of the year because of Malakand-III hydropower project operating upstream since
2009.

Associated Technologies (Pvt) Limited

11

Machai Hydropower Project

2.5.

Review Report on Integrated Plant Operation

OPTIMIZATION OF INSTALLED CAPACITY


2.5.1. Optimization Criteria

While selecting the design discharge, it is decided to tap the full energy potential of Machai
Canal at this site. The power potential and corresponding annual energy production has
been calculated at a range of discharge as described below.

2.5.2. Power and Energy Calculations


The calculations for power potential and annual energy production of Machai HPP under
integrated operation have been performed on average daily data using a spreadsheet
model. The model takes into account the variation in turbine efficiency with daily discharge
availability. A range of turbines from one (01) to three (03) have been considered with
optimized result for the two (02) number of turbines. Turbine, generator and transformer
efficiencies are taken conservative on lower side as 85%, 96% & 98% respectively with the
combined efficiency of the system as 80%.

2.5.3. Selected Installed Capacity


Under the integrated operation, the design discharge and the turbine units have been
optimized corresponding to the enhanced energy output. Five (05) discharges available for
different %age of time from 48.45 cumec to 44.73 cumec have been considered in each
keeping the same no. of turbine units i.e. two (02). Annual energy production and plant factor
have been calculated at each of the five discharges. The design discharge has been
selected considering the annual energy production and percentage (%) availability of that
discharge. Once the design discharge has been selected with constant no. of turbine units
i.e. two (02), the variations in annual energy production is estimated at the selected design
discharge with different no. of turbine units varying from one (01) number and three (03)
numbers. The results of selection of design discharge, corresponding potential and annual
energy production considering the integrated operation are presented in Table below.

Associated Technologies (Pvt) Limited

12

Machai Hydropower Project

Review Report on Integrated Plant Operation

13

Table 2

Selection of Optimized Designed Discharge (Integrated Operation)

Sr.
No.

Q Available
for % of
Time

Flow

Turbine
Discharge

Rated
Head

No. of
Turbine
Units

Total
Power
Potential

Energy
Production

Plant
Factor

cumecs

(cumecs)

(m)

(No.)

MW

GWh

1.00

48.45

24.23

5.48

2.08

13.10

71.78

2.0

46.52

23.26

5.48

2.00

12.94

73.84

3.0

45.97

22.99

5.48

1.98

12.83

74.11

5.0

45.63

22.82

5.48

1.96

12.79

74.38

7.0

44.73

22.37

5.48

1.92

12.60

74.79

The results of optimization of design discharge are presented in graphical form below:

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

14

Figure 2.5.1

Machai Hydropower Project

13.30

75.0

13.10

74.0

12.90

73.0

12.70

72.0

12.50

71.0
44

45

46

47

48

Plant Factor (%)

Annual Energy Production (GWh)

Optimization of Design Discharge (Integrated Operation)

49

Design Discharge (cumec)


Annual Energy Production

Plant Factor

The results of optimization of number of turbine units have also been presented in graphical
form below:

Associated Technologies (Pvt) Limited

Machai Hydropower Project

Review Report on Integrated Plant Operation

Figure 2.5.2

Machai Hydropower Project

13.0

74.5

12.5

72.0

12.0

69.5

11.5

67.0

11.0

64.5
1

No. of Turbine Units


Annual Energy Production

3.

Plant Factor (%)

Annual Energy Production (GWh)

Optimization of No. of Turbine Units (Integrated


Operation)

Plant Factor

SUMMARY

Based on the discussions in this report following conclusions may be derived;

The plant design discharge of 45.93 cumec is calculated with the rated head of
5.48m.

The plant gives maximum energy output with an installed capacity of 1.98 MW.

A project with installed capacity of 1.98 MW (2 x 0.99 MW) is recommended which


will generate about 12.83 GWh annual energy at a plant factor of 74.1%.

Associated Technologies (Pvt) Limited

15

Machai Hydropower Project

Project Layout Review Report

16

ENERGY COMPUTATION AT DESIGNED DISCHARGE Q1 (Integrated Operation)


Designed Discharge, Q1

48.45

cumecs

Designed Q Available for % Time of year

1.00

Total No. of Turbines

Designed Discharge of Each Turbine

24.23

cumecs

Min. Operating Discharge of Each Unit

12.11

cumecs

Rated Net Head Available

5.48

Turbine Efficiency

85%

Generator Efficiency

96%

Transformer Efficiency

98%

Overall Efficiency

79.97%

Installed Power Potential of Each Unit

1.04

MW

Total Installed Power Potential

2.08

MW

Annual Energy Production (Actual)

13.10

GWh

Annual Energy Production (Theoretical)

18.25

GWh

Plant Factor

71.78

Associated Technologies (Pvt) Ltd

50%

Machai Hydropower Project

Project Layout Review Report

Average
Discharge

Average
Net
Head

H net

QA

QB

Total

PA

PB

Total

(cumecs)

(m)

(cumecs)

(cumecs)

(cumecs)

(MW)

(MW)

(MW)

(GWh)

2.66

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.71

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.71

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.63

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.69

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.61

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.71

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.72

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.44

8.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

0.59

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Day of
Year

Associated Technologies (Pvt) Ltd

Turbines Discharges

17

Turbines Power Potential

10

Total
Energy
Production

Machai Hydropower Project

Project Layout Review Report

18

10

14

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

26

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

28

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

19

10

32

1.84

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33

2.63

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34

2.45

7.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

35

2.45

7.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36

2.54

7.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37

3.89

7.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

38

6.60

7.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

39

5.19

7.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40

6.36

7.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

41

5.61

7.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

42

5.45

7.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

43

5.30

7.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

44

5.21

7.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45

3.73

7.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46

3.03

7.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

47

1.61

8.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48

4.26

7.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

49

4.06

7.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

20

10

50

1.79

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

51

1.68

8.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

52

4.08

7.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53

5.95

7.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

54

8.20

7.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55

10.13

7.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56

10.28

7.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57

11.65

7.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

58

12.70

7.28

12.70

0.00

12.70

1.04

0.00

1.04

0.03

59

12.38

7.30

12.38

0.00

12.38

1.04

0.00

1.04

0.03

60

14.28

7.18

14.28

0.00

14.28

1.04

0.00

1.04

0.03

61

12.72

7.28

12.72

0.00

12.72

1.04

0.00

1.04

0.03

62

12.57

7.29

12.57

0.00

12.57

1.04

0.00

1.04

0.03

63

9.72

7.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

64

8.94

7.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

65

10.71

7.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66

11.04

7.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

67

12.03

7.32

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

21

10

68

12.48

7.29

12.48

0.00

12.48

1.04

0.00

1.04

0.03

69

16.40

7.06

16.40

0.00

16.40

1.04

0.00

1.04

0.03

70

16.48

7.05

16.48

0.00

16.48

1.04

0.00

1.04

0.03

71

17.33

7.00

17.33

0.00

17.33

1.04

0.00

1.04

0.03

72

21.51

6.77

21.51

0.00

21.51

1.04

0.00

1.04

0.03

73

23.57

6.66

23.57

0.00

23.57

1.04

0.00

1.04

0.03

74

24.85

6.60

12.11

12.74

24.85

1.04

1.04

2.08

0.05

75

25.68

6.55

12.11

13.56

25.68

1.04

1.04

2.08

0.05

76

26.35

6.52

12.11

14.24

26.35

1.04

1.04

2.08

0.05

77

24.09

6.63

24.09

0.00

24.09

1.04

0.00

1.04

0.03

78

23.93

6.64

23.93

0.00

23.93

1.04

0.00

1.04

0.03

79

23.03

6.69

23.03

0.00

23.03

1.04

0.00

1.04

0.03

80

21.39

6.78

21.39

0.00

21.39

1.04

0.00

1.04

0.03

81

22.39

6.72

22.39

0.00

22.39

1.04

0.00

1.04

0.03

82

22.85

6.70

22.85

0.00

22.85

1.04

0.00

1.04

0.03

83

21.79

6.76

21.79

0.00

21.79

1.04

0.00

1.04

0.03

84

20.53

6.82

20.53

0.00

20.53

1.04

0.00

1.04

0.03

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

22

10

85

24.03

6.64

24.03

0.00

24.03

1.04

0.00

1.04

0.03

86

24.95

6.59

12.11

12.84

24.95

1.04

1.04

2.08

0.05

87

26.89

6.50

12.11

14.78

26.89

1.04

1.04

2.08

0.05

88

30.05

6.35

12.11

17.94

30.05

1.04

1.04

2.08

0.05

89

31.11

6.30

12.11

19.00

31.11

1.04

1.04

2.08

0.05

90

33.51

6.19

12.11

21.40

33.51

1.04

1.04

2.08

0.05

91

30.58

6.32

12.11

18.47

30.58

1.04

1.04

2.08

0.05

92

28.52

6.42

12.11

16.41

28.52

1.04

1.04

2.08

0.05

93

29.11

6.39

12.11

17.00

29.11

1.04

1.04

2.08

0.05

94

28.86

6.40

12.11

16.75

28.86

1.04

1.04

2.08

0.05

95

27.47

6.47

12.11

15.36

27.47

1.04

1.04

2.08

0.05

96

26.52

6.51

12.11

14.40

26.52

1.04

1.04

2.08

0.05

97

26.93

6.49

12.11

14.82

26.93

1.04

1.04

2.08

0.05

98

27.98

6.44

12.11

15.87

27.98

1.04

1.04

2.08

0.05

99

30.90

6.31

12.11

18.79

30.90

1.04

1.04

2.08

0.05

100

31.90

6.26

12.11

19.79

31.90

1.04

1.04

2.08

0.05

101

32.66

6.23

12.11

20.55

32.66

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

23

10

102

33.45

6.20

12.11

21.34

33.45

1.04

1.04

2.08

0.05

103

33.10

6.21

12.11

20.98

33.10

1.04

1.04

2.08

0.05

104

34.67

6.15

12.11

22.56

34.67

1.04

1.04

2.08

0.05

105

34.87

6.14

12.11

22.76

34.87

1.04

1.04

2.08

0.05

106

36.06

6.09

12.11

23.95

36.06

1.04

1.04

2.08

0.05

107

35.71

6.10

12.11

23.59

35.71

1.04

1.04

2.08

0.05

108

36.00

6.09

12.11

23.89

36.00

1.04

1.04

2.08

0.05

109

36.08

6.09

12.11

23.97

36.08

1.04

1.04

2.08

0.05

110

36.13

6.09

12.11

24.02

36.13

1.04

1.04

2.08

0.05

111

36.47

6.07

12.24

24.23

36.47

1.04

1.04

2.08

0.05

112

36.52

6.07

12.30

24.23

36.52

1.04

1.04

2.08

0.05

113

36.57

6.07

12.34

24.23

36.57

1.04

1.04

2.08

0.05

114

37.53

6.03

13.31

24.23

37.53

1.04

1.04

2.08

0.05

115

36.75

6.06

12.53

24.23

36.75

1.04

1.04

2.08

0.05

116

38.17

6.01

13.95

24.23

38.17

1.04

1.04

2.08

0.05

117

37.60

6.03

13.37

24.23

37.60

1.04

1.04

2.08

0.05

118

37.80

6.02

13.57

24.23

37.80

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

24

10

119

37.82

6.02

13.59

24.23

37.82

1.04

1.04

2.08

0.05

120

38.42

6.00

14.19

24.23

38.42

1.04

1.04

2.08

0.05

121

33.40

6.20

12.11

21.29

33.40

1.04

1.04

2.08

0.05

122

34.98

6.13

12.11

22.87

34.98

1.04

1.04

2.08

0.05

123

35.09

6.13

12.11

22.98

35.09

1.04

1.04

2.08

0.05

124

33.56

6.19

12.11

21.45

33.56

1.04

1.04

2.08

0.05

125

33.43

6.20

12.11

21.32

33.43

1.04

1.04

2.08

0.05

126

33.43

6.20

12.11

21.32

33.43

1.04

1.04

2.08

0.05

127

33.34

6.20

12.11

21.22

33.34

1.04

1.04

2.08

0.05

128

33.99

6.17

12.11

21.88

33.99

1.04

1.04

2.08

0.05

129

34.56

6.15

12.11

22.45

34.56

1.04

1.04

2.08

0.05

130

34.78

6.14

12.11

22.66

34.78

1.04

1.04

2.08

0.05

131

34.47

6.15

12.11

22.35

34.47

1.04

1.04

2.08

0.05

132

35.94

6.09

12.11

23.83

35.94

1.04

1.04

2.08

0.05

133

38.06

6.01

13.83

24.23

38.06

1.04

1.04

2.08

0.05

134

38.64

5.99

14.41

24.23

38.64

1.04

1.04

2.08

0.05

135

39.37

5.96

15.15

24.23

39.37

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

25

10

136

39.37

5.96

15.15

24.23

39.37

1.04

1.04

2.08

0.05

137

39.37

5.96

15.15

24.23

39.37

1.04

1.04

2.08

0.05

138

40.02

5.94

15.80

24.23

40.02

1.04

1.04

2.08

0.05

139

40.33

5.93

16.10

24.23

40.33

1.04

1.04

2.08

0.05

140

40.35

5.92

16.13

24.23

40.35

1.04

1.04

2.08

0.05

141

40.27

5.93

16.05

24.23

40.27

1.04

1.04

2.08

0.05

142

40.27

5.93

16.05

24.23

40.27

1.04

1.04

2.08

0.05

143

40.09

5.93

15.86

24.23

40.09

1.04

1.04

2.08

0.05

144

39.21

5.97

14.99

24.23

39.21

1.04

1.04

2.08

0.05

145

40.59

5.92

16.36

24.23

40.59

1.04

1.04

2.08

0.05

146

40.51

5.92

16.28

24.23

40.51

1.04

1.04

2.08

0.05

147

40.53

5.92

16.31

24.23

40.53

1.04

1.04

2.08

0.05

148

40.53

5.92

16.31

24.23

40.53

1.04

1.04

2.08

0.05

149

40.43

5.92

16.21

24.23

40.43

1.04

1.04

2.08

0.05

150

40.63

5.91

16.41

24.23

40.63

1.04

1.04

2.08

0.05

151

40.77

5.91

16.54

24.23

40.77

1.04

1.04

2.08

0.05

152

40.98

5.90

16.75

24.23

40.98

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

26

10

153

41.11

5.90

16.89

24.23

41.11

1.04

1.04

2.08

0.05

154

40.94

5.90

16.71

24.23

40.94

1.04

1.04

2.08

0.05

155

41.01

5.90

16.78

24.23

41.01

1.04

1.04

2.08

0.05

156

41.24

5.89

17.01

24.23

41.24

1.04

1.04

2.08

0.05

157

38.73

5.98

14.51

24.23

38.73

1.04

1.04

2.08

0.05

158

41.01

5.90

16.78

24.23

41.01

1.04

1.04

2.08

0.05

159

41.32

5.89

17.09

24.23

41.32

1.04

1.04

2.08

0.05

160

41.32

5.89

17.09

24.23

41.32

1.04

1.04

2.08

0.05

161

41.31

5.89

17.08

24.23

41.31

1.04

1.04

2.08

0.05

162

41.73

5.88

17.50

24.23

41.73

1.04

1.04

2.08

0.05

163

41.14

5.90

16.92

24.23

41.14

1.04

1.04

2.08

0.05

164

40.52

5.92

16.30

24.23

40.52

1.04

1.04

2.08

0.05

165

40.82

5.91

16.60

24.23

40.82

1.04

1.04

2.08

0.05

166

41.30

5.89

17.07

24.23

41.30

1.04

1.04

2.08

0.05

167

41.63

5.88

17.41

24.23

41.63

1.04

1.04

2.08

0.05

168

39.15

5.97

14.92

24.23

39.15

1.04

1.04

2.08

0.05

169

39.16

5.97

14.93

24.23

39.16

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

27

10

170

39.37

5.96

15.14

24.23

39.37

1.04

1.04

2.08

0.05

171

36.64

6.07

12.42

24.23

36.64

1.04

1.04

2.08

0.05

172

39.69

5.95

15.47

24.23

39.69

1.04

1.04

2.08

0.05

173

39.83

5.94

15.60

24.23

39.83

1.04

1.04

2.08

0.05

174

39.98

5.94

15.76

24.23

39.98

1.04

1.04

2.08

0.05

175

39.77

5.95

15.55

24.23

39.77

1.04

1.04

2.08

0.05

176

38.95

5.98

14.72

24.23

38.95

1.04

1.04

2.08

0.05

177

39.17

5.97

14.95

24.23

39.17

1.04

1.04

2.08

0.05

178

39.83

5.94

15.60

24.23

39.83

1.04

1.04

2.08

0.05

179

40.40

5.92

16.17

24.23

40.40

1.04

1.04

2.08

0.05

180

38.76

5.98

14.53

24.23

38.76

1.04

1.04

2.08

0.05

181

38.63

5.99

14.40

24.23

38.63

1.04

1.04

2.08

0.05

182

38.87

5.98

14.64

24.23

38.87

1.04

1.04

2.08

0.05

183

40.20

5.93

15.98

24.23

40.20

1.04

1.04

2.08

0.05

184

39.82

5.94

15.59

24.23

39.82

1.04

1.04

2.08

0.05

185

40.28

5.93

16.06

24.23

40.28

1.04

1.04

2.08

0.05

186

40.17

5.93

15.95

24.23

40.17

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

28

10

187

39.12

5.97

14.89

24.23

39.12

1.04

1.04

2.08

0.05

188

39.16

5.97

14.94

24.23

39.16

1.04

1.04

2.08

0.05

189

39.63

5.95

15.41

24.23

39.63

1.04

1.04

2.08

0.05

190

40.86

5.91

16.64

24.23

40.86

1.04

1.04

2.08

0.05

191

38.86

5.98

14.63

24.23

38.86

1.04

1.04

2.08

0.05

192

39.77

5.95

15.54

24.23

39.77

1.04

1.04

2.08

0.05

193

40.04

5.94

15.81

24.23

40.04

1.04

1.04

2.08

0.05

194

37.69

6.02

13.46

24.23

37.69

1.04

1.04

2.08

0.05

195

36.96

6.05

12.74

24.23

36.96

1.04

1.04

2.08

0.05

196

36.04

6.09

12.11

23.93

36.04

1.04

1.04

2.08

0.05

197

36.94

6.05

12.71

24.23

36.94

1.04

1.04

2.08

0.05

198

35.01

6.13

12.11

22.90

35.01

1.04

1.04

2.08

0.05

199

34.95

6.13

12.11

22.83

34.95

1.04

1.04

2.08

0.05

200

35.25

6.12

12.11

23.14

35.25

1.04

1.04

2.08

0.05

201

35.12

6.13

12.11

23.01

35.12

1.04

1.04

2.08

0.05

202

34.58

6.15

12.11

22.47

34.58

1.04

1.04

2.08

0.05

203

34.21

6.16

12.11

22.10

34.21

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

29

10

204

35.14

6.13

12.11

23.03

35.14

1.04

1.04

2.08

0.05

205

34.48

6.15

12.11

22.37

34.48

1.04

1.04

2.08

0.05

206

31.85

6.27

12.11

19.74

31.85

1.04

1.04

2.08

0.05

207

31.38

6.29

12.11

19.27

31.38

1.04

1.04

2.08

0.05

208

30.51

6.33

12.11

18.40

30.51

1.04

1.04

2.08

0.05

209

31.06

6.30

12.11

18.95

31.06

1.04

1.04

2.08

0.05

210

29.74

6.36

12.11

17.63

29.74

1.04

1.04

2.08

0.05

211

30.50

6.33

12.11

18.39

30.50

1.04

1.04

2.08

0.05

212

30.90

6.31

12.11

18.79

30.90

1.04

1.04

2.08

0.05

213

28.02

6.44

12.11

15.91

28.02

1.04

1.04

2.08

0.05

214

31.75

6.27

12.11

19.64

31.75

1.04

1.04

2.08

0.05

215

31.25

6.29

12.11

19.14

31.25

1.04

1.04

2.08

0.05

216

29.56

6.37

12.11

17.45

29.56

1.04

1.04

2.08

0.05

217

29.93

6.35

12.11

17.81

29.93

1.04

1.04

2.08

0.05

218

30.16

6.34

12.11

18.05

30.16

1.04

1.04

2.08

0.05

219

30.07

6.35

12.11

17.96

30.07

1.04

1.04

2.08

0.05

220

30.28

6.34

12.11

18.17

30.28

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

30

10

221

28.15

6.43

12.11

16.03

28.15

1.04

1.04

2.08

0.05

222

25.85

6.55

12.11

13.73

25.85

1.04

1.04

2.08

0.05

223

23.76

6.65

23.76

0.00

23.76

1.04

0.00

1.04

0.03

224

25.11

6.58

12.11

12.99

25.11

1.04

1.04

2.08

0.05

225

25.43

6.57

12.11

13.32

25.43

1.04

1.04

2.08

0.05

226

25.74

6.55

12.11

13.63

25.74

1.04

1.04

2.08

0.05

227

27.37

6.47

12.11

15.26

27.37

1.04

1.04

2.08

0.05

228

27.00

6.49

12.11

14.89

27.00

1.04

1.04

2.08

0.05

229

28.26

6.43

12.11

16.15

28.26

1.04

1.04

2.08

0.05

230

27.76

6.45

12.11

15.64

27.76

1.04

1.04

2.08

0.05

231

28.95

6.40

12.11

16.84

28.95

1.04

1.04

2.08

0.05

232

29.43

6.37

12.11

17.32

29.43

1.04

1.04

2.08

0.05

233

30.06

6.35

12.11

17.95

30.06

1.04

1.04

2.08

0.05

234

30.90

6.31

12.11

18.79

30.90

1.04

1.04

2.08

0.05

235

30.43

6.33

12.11

18.32

30.43

1.04

1.04

2.08

0.05

236

27.87

6.45

12.11

15.76

27.87

1.04

1.04

2.08

0.05

237

28.77

6.41

12.11

16.66

28.77

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

31

10

238

29.13

6.39

12.11

17.02

29.13

1.04

1.04

2.08

0.05

239

29.07

6.39

12.11

16.95

29.07

1.04

1.04

2.08

0.05

240

28.42

6.42

12.11

16.31

28.42

1.04

1.04

2.08

0.05

241

29.81

6.36

12.11

17.69

29.81

1.04

1.04

2.08

0.05

242

27.49

6.47

12.11

15.38

27.49

1.04

1.04

2.08

0.05

243

26.35

6.52

12.11

14.24

26.35

1.04

1.04

2.08

0.05

244

32.00

6.26

12.11

19.89

32.00

1.04

1.04

2.08

0.05

245

31.51

6.28

12.11

19.40

31.51

1.04

1.04

2.08

0.05

246

35.46

6.11

12.11

23.34

35.46

1.04

1.04

2.08

0.05

247

33.98

6.17

12.11

21.87

33.98

1.04

1.04

2.08

0.05

248

33.01

6.21

12.11

20.90

33.01

1.04

1.04

2.08

0.05

249

34.62

6.15

12.11

22.50

34.62

1.04

1.04

2.08

0.05

250

34.88

6.14

12.11

22.76

34.88

1.04

1.04

2.08

0.05

251

36.72

6.06

12.50

24.23

36.72

1.04

1.04

2.08

0.05

252

36.85

6.06

12.62

24.23

36.85

1.04

1.04

2.08

0.05

253

38.84

5.98

14.62

24.23

38.84

1.04

1.04

2.08

0.05

254

38.74

5.98

14.52

24.23

38.74

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

32

10

255

35.35

6.12

12.11

23.24

35.35

1.04

1.04

2.08

0.05

256

39.82

5.94

15.59

24.23

39.82

1.04

1.04

2.08

0.05

257

36.86

6.06

12.63

24.23

36.86

1.04

1.04

2.08

0.05

258

36.62

6.07

12.39

24.23

36.62

1.04

1.04

2.08

0.05

259

37.13

6.05

12.90

24.23

37.13

1.04

1.04

2.08

0.05

260

36.41

6.07

12.18

24.23

36.41

1.04

1.04

2.08

0.05

261

37.20

6.04

12.98

24.23

37.20

1.04

1.04

2.08

0.05

262

38.80

5.98

14.58

24.23

38.80

1.04

1.04

2.08

0.05

263

39.57

5.95

15.35

24.23

39.57

1.04

1.04

2.08

0.05

264

35.71

6.10

12.11

23.60

35.71

1.04

1.04

2.08

0.05

265

37.74

6.02

13.51

24.23

37.74

1.04

1.04

2.08

0.05

266

37.25

6.04

13.03

24.23

37.25

1.04

1.04

2.08

0.05

267

35.62

6.11

12.11

23.51

35.62

1.04

1.04

2.08

0.05

268

32.35

6.24

12.11

20.24

32.35

1.04

1.04

2.08

0.05

269

30.65

6.32

12.11

18.54

30.65

1.04

1.04

2.08

0.05

270

32.78

6.22

12.11

20.67

32.78

1.04

1.04

2.08

0.05

271

31.05

6.30

12.11

18.94

31.05

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

33

10

272

31.34

6.29

12.11

19.22

31.34

1.04

1.04

2.08

0.05

273

30.09

6.34

12.11

17.98

30.09

1.04

1.04

2.08

0.05

274

29.56

6.37

12.11

17.45

29.56

1.04

1.04

2.08

0.05

275

28.23

6.43

12.11

16.12

28.23

1.04

1.04

2.08

0.05

276

28.10

6.44

12.11

15.99

28.10

1.04

1.04

2.08

0.05

277

29.75

6.36

12.11

17.64

29.75

1.04

1.04

2.08

0.05

278

30.86

6.31

12.11

18.75

30.86

1.04

1.04

2.08

0.05

279

29.67

6.36

12.11

17.56

29.67

1.04

1.04

2.08

0.05

280

30.74

6.31

12.11

18.63

30.74

1.04

1.04

2.08

0.05

281

31.13

6.30

12.11

19.01

31.13

1.04

1.04

2.08

0.05

282

33.00

6.22

12.11

20.89

33.00

1.04

1.04

2.08

0.05

283

33.37

6.20

12.11

21.25

33.37

1.04

1.04

2.08

0.05

284

31.76

6.27

12.11

19.64

31.76

1.04

1.04

2.08

0.05

285

27.06

6.49

12.11

14.95

27.06

1.04

1.04

2.08

0.05

286

30.04

6.35

12.11

17.93

30.04

1.04

1.04

2.08

0.05

287

27.51

6.47

12.11

15.40

27.51

1.04

1.04

2.08

0.05

288

26.80

6.50

12.11

14.69

26.80

1.04

1.04

2.08

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

34

10

289

25.59

6.56

12.11

13.48

25.59

1.04

1.04

2.08

0.05

290

24.17

6.63

24.17

0.00

24.17

1.04

0.00

1.04

0.03

291

24.01

6.64

24.01

0.00

24.01

1.04

0.00

1.04

0.03

292

28.34

6.43

12.11

16.23

28.34

1.04

1.04

2.08

0.05

293

28.57

6.41

12.11

16.45

28.57

1.04

1.04

2.08

0.05

294

24.89

6.59

12.11

12.78

24.89

1.04

1.04

2.08

0.05

295

24.46

6.62

12.11

12.35

24.46

1.04

1.04

2.08

0.05

296

24.09

6.64

24.09

0.00

24.09

1.04

0.00

1.04

0.03

297

25.86

6.55

12.11

13.75

25.86

1.04

1.04

2.08

0.05

298

27.85

6.45

12.11

15.74

27.85

1.04

1.04

2.08

0.05

299

25.64

6.56

12.11

13.53

25.64

1.04

1.04

2.08

0.05

300

25.69

6.55

12.11

13.58

25.69

1.04

1.04

2.08

0.05

301

25.22

6.58

12.11

13.11

25.22

1.04

1.04

2.08

0.05

302

24.85

6.60

12.11

12.74

24.85

1.04

1.04

2.08

0.05

303

24.10

6.63

24.10

0.00

24.10

1.04

0.00

1.04

0.03

304

23.42

6.67

23.42

0.00

23.42

1.04

0.00

1.04

0.03

305

19.53

6.88

19.53

0.00

19.53

1.04

0.00

1.04

0.03

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

35

10

306

24.06

6.64

24.06

0.00

24.06

1.04

0.00

1.04

0.03

307

20.65

6.82

20.65

0.00

20.65

1.04

0.00

1.04

0.03

308

22.14

6.74

22.14

0.00

22.14

1.04

0.00

1.04

0.03

309

21.97

6.75

21.97

0.00

21.97

1.04

0.00

1.04

0.03

310

16.83

7.03

16.83

0.00

16.83

1.04

0.00

1.04

0.03

311

20.97

6.80

20.97

0.00

20.97

1.04

0.00

1.04

0.03

312

21.77

6.76

21.77

0.00

21.77

1.04

0.00

1.04

0.03

313

24.98

6.59

12.11

12.87

24.98

1.04

1.04

2.08

0.05

314

25.11

6.58

12.11

13.00

25.11

1.04

1.04

2.08

0.05

315

25.42

6.57

12.11

13.31

25.42

1.04

1.04

2.08

0.05

316

24.80

6.60

12.11

12.69

24.80

1.04

1.04

2.08

0.05

317

22.71

6.71

22.71

0.00

22.71

1.04

0.00

1.04

0.03

318

24.80

6.60

12.11

12.69

24.80

1.04

1.04

2.08

0.05

319

22.93

6.69

22.93

0.00

22.93

1.04

0.00

1.04

0.03

320

21.01

6.80

21.01

0.00

21.01

1.04

0.00

1.04

0.03

321

17.54

6.99

17.54

0.00

17.54

1.04

0.00

1.04

0.03

322

16.41

7.06

16.41

0.00

16.41

1.04

0.00

1.04

0.03

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

36

10

323

18.80

6.92

18.80

0.00

18.80

1.04

0.00

1.04

0.03

324

18.18

6.95

18.18

0.00

18.18

1.04

0.00

1.04

0.03

325

19.23

6.89

19.23

0.00

19.23

1.04

0.00

1.04

0.03

326

18.42

6.94

18.42

0.00

18.42

1.04

0.00

1.04

0.03

327

21.08

6.79

21.08

0.00

21.08

1.04

0.00

1.04

0.03

328

21.32

6.78

21.32

0.00

21.32

1.04

0.00

1.04

0.03

329

23.55

6.66

23.55

0.00

23.55

1.04

0.00

1.04

0.03

330

23.52

6.66

23.52

0.00

23.52

1.04

0.00

1.04

0.03

331

21.65

6.76

21.65

0.00

21.65

1.04

0.00

1.04

0.03

332

21.51

6.77

21.51

0.00

21.51

1.04

0.00

1.04

0.03

333

19.89

6.86

19.89

0.00

19.89

1.04

0.00

1.04

0.03

334

23.05

6.69

23.05

0.00

23.05

1.04

0.00

1.04

0.03

335

19.74

6.87

19.74

0.00

19.74

1.04

0.00

1.04

0.03

336

19.02

6.91

19.02

0.00

19.02

1.04

0.00

1.04

0.03

337

16.96

7.02

16.96

0.00

16.96

1.04

0.00

1.04

0.03

338

15.76

7.09

15.76

0.00

15.76

1.04

0.00

1.04

0.03

339

15.52

7.11

15.52

0.00

15.52

1.04

0.00

1.04

0.03

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

37

10

340

15.12

7.13

15.12

0.00

15.12

1.04

0.00

1.04

0.03

341

16.38

7.06

16.38

0.00

16.38

1.04

0.00

1.04

0.03

342

15.17

7.13

15.17

0.00

15.17

1.04

0.00

1.04

0.03

343

17.58

6.99

17.58

0.00

17.58

1.04

0.00

1.04

0.03

344

18.07

6.96

18.07

0.00

18.07

1.04

0.00

1.04

0.03

345

18.63

6.93

18.63

0.00

18.63

1.04

0.00

1.04

0.03

346

19.31

6.89

19.31

0.00

19.31

1.04

0.00

1.04

0.03

347

18.79

6.92

18.79

0.00

18.79

1.04

0.00

1.04

0.03

348

19.03

6.91

19.03

0.00

19.03

1.04

0.00

1.04

0.03

349

16.65

7.04

16.65

0.00

16.65

1.04

0.00

1.04

0.03

350

17.41

7.00

17.41

0.00

17.41

1.04

0.00

1.04

0.03

351

16.34

7.06

16.34

0.00

16.34

1.04

0.00

1.04

0.03

352

16.16

7.07

16.16

0.00

16.16

1.04

0.00

1.04

0.03

353

16.10

7.07

16.10

0.00

16.10

1.04

0.00

1.04

0.03

354

16.02

7.08

16.02

0.00

16.02

1.04

0.00

1.04

0.03

355

17.33

7.00

17.33

0.00

17.33

1.04

0.00

1.04

0.03

356

17.36

7.00

17.36

0.00

17.36

1.04

0.00

1.04

0.03

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

38

10

357

18.66

6.93

18.66

0.00

18.66

1.04

0.00

1.04

0.03

358

18.70

6.92

18.70

0.00

18.70

1.04

0.00

1.04

0.03

359

19.74

6.87

19.74

0.00

19.74

1.04

0.00

1.04

0.03

360

19.75

6.87

19.75

0.00

19.75

1.04

0.00

1.04

0.03

361

22.42

6.72

22.42

0.00

22.42

1.04

0.00

1.04

0.03

362

21.17

6.79

21.17

0.00

21.17

1.04

0.00

1.04

0.03

363

19.46

6.88

19.46

0.00

19.46

1.04

0.00

1.04

0.03

364

19.32

6.89

19.32

0.00

19.32

1.04

0.00

1.04

0.03

365

16.74

7.04

16.74

0.00

16.74

1.04

0.00

1.04

0.03

Annual Energy
Production

13.10

max Q

41.73

0.00

turbines operating at full capacity

0.00

turbines not operating at full


capacity

0.00

turbines closed

Max. Power Potentail


1.04

ENERGY COMPUTATION AT DESIGNED DISCHARGE Q3 (Integrated Operation)


Designed Discharge, Q3

Associated Technologies (Pvt) Ltd

45.97

cumecs

1.04

2.08

Machai Hydropower Project

Project Layout Review Report

39

Designed Q Available for % Time of year

3.00

Total No. of Turbines

Designed Discharge of Each Turbine

22.99

cumecs

Min. Operating Discharge of Each Unit

11.49

cumecs

Rated Net Head Available

5.48

Turbine Efficiency

85%

Generator Efficiency

96%

Transformer Efficiency

98%

Overall Efficiency

79.97%

Installed Power Potential of Each Unit

0.99

MW

Total Installed Power Potential

1.98

MW

Annual Energy Production (Actual)

12.83

GWh

Annual Energy Production (Theoretical)

17.32

GWh

Plant Factor

74.11

Associated Technologies (Pvt) Ltd

50%

10

Machai Hydropower Project

Project Layout Review Report

Average
Discharge

Average
Net
Head

H net

QA

QB

Total

PA

PB

Total

(cumecs)

(m)

(cumecs)

(cumecs)

(cumecs)

(MW)

(MW)

(MW)

(GWh)

2.66

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.71

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.71

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.63

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.69

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.61

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.71

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.72

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.44

8.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

0.59

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Day of
Year

Associated Technologies (Pvt) Ltd

Turbines Discharges

40

Turbines Power Potential

10

Total
Energy
Production

Machai Hydropower Project

Project Layout Review Report

41

10

14

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

26

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

28

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

42

10

32

1.84

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33

2.63

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34

2.45

7.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

35

2.45

7.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36

2.54

7.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37

3.89

7.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

38

6.60

7.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

39

5.19

7.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40

6.36

7.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

41

5.61

7.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

42

5.45

7.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

43

5.30

7.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

44

5.21

7.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45

3.73

7.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46

3.03

7.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

47

1.61

8.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48

4.26

7.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

49

4.06

7.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

43

10

50

1.79

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

51

1.68

8.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

52

4.08

7.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53

5.95

7.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

54

8.20

7.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55

10.13

7.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56

10.28

7.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57

11.65

7.34

11.65

0.00

11.65

0.99

0.00

0.99

0.02

58

12.70

7.28

12.70

0.00

12.70

0.99

0.00

0.99

0.02

59

12.38

7.30

12.38

0.00

12.38

0.99

0.00

0.99

0.02

60

14.28

7.18

14.28

0.00

14.28

0.99

0.00

0.99

0.02

61

12.72

7.28

12.72

0.00

12.72

0.99

0.00

0.99

0.02

62

12.57

7.29

12.57

0.00

12.57

0.99

0.00

0.99

0.02

63

9.72

7.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

64

8.94

7.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

65

10.71

7.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66

11.04

7.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

67

12.03

7.32

12.03

0.00

12.03

0.99

0.00

0.99

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

44

10

68

12.48

7.29

12.48

0.00

12.48

0.99

0.00

0.99

0.02

69

16.40

7.06

16.40

0.00

16.40

0.99

0.00

0.99

0.02

70

16.48

7.05

16.48

0.00

16.48

0.99

0.00

0.99

0.02

71

17.33

7.00

17.33

0.00

17.33

0.99

0.00

0.99

0.02

72

21.51

6.77

21.51

0.00

21.51

0.99

0.00

0.99

0.02

73

23.57

6.66

11.49

12.08

23.57

0.99

0.99

1.98

0.05

74

24.85

6.60

11.49

13.36

24.85

0.99

0.99

1.98

0.05

75

25.68

6.55

11.49

14.18

25.68

0.99

0.99

1.98

0.05

76

26.35

6.52

11.49

14.86

26.35

0.99

0.99

1.98

0.05

77

24.09

6.63

11.49

12.60

24.09

0.99

0.99

1.98

0.05

78

23.93

6.64

11.49

12.44

23.93

0.99

0.99

1.98

0.05

79

23.03

6.69

11.49

11.54

23.03

0.99

0.99

1.98

0.05

80

21.39

6.78

21.39

0.00

21.39

0.99

0.00

0.99

0.02

81

22.39

6.72

22.39

0.00

22.39

0.99

0.00

0.99

0.02

82

22.85

6.70

22.85

0.00

22.85

0.99

0.00

0.99

0.02

83

21.79

6.76

21.79

0.00

21.79

0.99

0.00

0.99

0.02

84

20.53

6.82

20.53

0.00

20.53

0.99

0.00

0.99

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

45

10

85

24.03

6.64

11.49

12.54

24.03

0.99

0.99

1.98

0.05

86

24.95

6.59

11.49

13.46

24.95

0.99

0.99

1.98

0.05

87

26.89

6.50

11.49

15.40

26.89

0.99

0.99

1.98

0.05

88

30.05

6.35

11.49

18.56

30.05

0.99

0.99

1.98

0.05

89

31.11

6.30

11.49

19.62

31.11

0.99

0.99

1.98

0.05

90

33.51

6.19

11.49

22.02

33.51

0.99

0.99

1.98

0.05

91

30.58

6.32

11.49

19.09

30.58

0.99

0.99

1.98

0.05

92

28.52

6.42

11.49

17.03

28.52

0.99

0.99

1.98

0.05

93

29.11

6.39

11.49

17.62

29.11

0.99

0.99

1.98

0.05

94

28.86

6.40

11.49

17.37

28.86

0.99

0.99

1.98

0.05

95

27.47

6.47

11.49

15.98

27.47

0.99

0.99

1.98

0.05

96

26.52

6.51

11.49

15.02

26.52

0.99

0.99

1.98

0.05

97

26.93

6.49

11.49

15.43

26.93

0.99

0.99

1.98

0.05

98

27.98

6.44

11.49

16.49

27.98

0.99

0.99

1.98

0.05

99

30.90

6.31

11.49

19.41

30.90

0.99

0.99

1.98

0.05

100

31.90

6.26

11.49

20.41

31.90

0.99

0.99

1.98

0.05

101

32.66

6.23

11.49

21.17

32.66

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

46

10

102

33.45

6.20

11.49

21.95

33.45

0.99

0.99

1.98

0.05

103

33.10

6.21

11.49

21.60

33.10

0.99

0.99

1.98

0.05

104

34.67

6.15

11.68

22.99

34.67

0.99

0.99

1.98

0.05

105

34.87

6.14

11.89

22.99

34.87

0.99

0.99

1.98

0.05

106

36.06

6.09

13.07

22.99

36.06

0.99

0.99

1.98

0.05

107

35.71

6.10

12.72

22.99

35.71

0.99

0.99

1.98

0.05

108

36.00

6.09

13.01

22.99

36.00

0.99

0.99

1.98

0.05

109

36.08

6.09

13.10

22.99

36.08

0.99

0.99

1.98

0.05

110

36.13

6.09

13.14

22.99

36.13

0.99

0.99

1.98

0.05

111

36.47

6.07

13.48

22.99

36.47

0.99

0.99

1.98

0.05

112

36.52

6.07

13.54

22.99

36.52

0.99

0.99

1.98

0.05

113

36.57

6.07

13.58

22.99

36.57

0.99

0.99

1.98

0.05

114

37.53

6.03

14.54

22.99

37.53

0.99

0.99

1.98

0.05

115

36.75

6.06

13.77

22.99

36.75

0.99

0.99

1.98

0.05

116

38.17

6.01

15.19

22.99

38.17

0.99

0.99

1.98

0.05

117

37.60

6.03

14.61

22.99

37.60

0.99

0.99

1.98

0.05

118

37.80

6.02

14.81

22.99

37.80

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

47

10

119

37.82

6.02

14.83

22.99

37.82

0.99

0.99

1.98

0.05

120

38.42

6.00

15.43

22.99

38.42

0.99

0.99

1.98

0.05

121

33.40

6.20

11.49

21.91

33.40

0.99

0.99

1.98

0.05

122

34.98

6.13

11.99

22.99

34.98

0.99

0.99

1.98

0.05

123

35.09

6.13

12.11

22.99

35.09

0.99

0.99

1.98

0.05

124

33.56

6.19

11.49

22.07

33.56

0.99

0.99

1.98

0.05

125

33.43

6.20

11.49

21.94

33.43

0.99

0.99

1.98

0.05

126

33.43

6.20

11.49

21.94

33.43

0.99

0.99

1.98

0.05

127

33.34

6.20

11.49

21.84

33.34

0.99

0.99

1.98

0.05

128

33.99

6.17

11.49

22.50

33.99

0.99

0.99

1.98

0.05

129

34.56

6.15

11.57

22.99

34.56

0.99

0.99

1.98

0.05

130

34.78

6.14

11.79

22.99

34.78

0.99

0.99

1.98

0.05

131

34.47

6.15

11.49

22.97

34.47

0.99

0.99

1.98

0.05

132

35.94

6.09

12.95

22.99

35.94

0.99

0.99

1.98

0.05

133

38.06

6.01

15.07

22.99

38.06

0.99

0.99

1.98

0.05

134

38.64

5.99

15.65

22.99

38.64

0.99

0.99

1.98

0.05

135

39.37

5.96

16.39

22.99

39.37

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

48

10

136

39.37

5.96

16.39

22.99

39.37

0.99

0.99

1.98

0.05

137

39.37

5.96

16.39

22.99

39.37

0.99

0.99

1.98

0.05

138

40.02

5.94

17.04

22.99

40.02

0.99

0.99

1.98

0.05

139

40.33

5.93

17.34

22.99

40.33

0.99

0.99

1.98

0.05

140

40.35

5.92

17.37

22.99

40.35

0.99

0.99

1.98

0.05

141

40.27

5.93

17.29

22.99

40.27

0.99

0.99

1.98

0.05

142

40.27

5.93

17.29

22.99

40.27

0.99

0.99

1.98

0.05

143

40.09

5.93

17.10

22.99

40.09

0.99

0.99

1.98

0.05

144

39.21

5.97

16.22

22.99

39.21

0.99

0.99

1.98

0.05

145

40.59

5.92

17.60

22.99

40.59

0.99

0.99

1.98

0.05

146

40.51

5.92

17.52

22.99

40.51

0.99

0.99

1.98

0.05

147

40.53

5.92

17.55

22.99

40.53

0.99

0.99

1.98

0.05

148

40.53

5.92

17.55

22.99

40.53

0.99

0.99

1.98

0.05

149

40.43

5.92

17.45

22.99

40.43

0.99

0.99

1.98

0.05

150

40.63

5.91

17.64

22.99

40.63

0.99

0.99

1.98

0.05

151

40.77

5.91

17.78

22.99

40.77

0.99

0.99

1.98

0.05

152

40.98

5.90

17.99

22.99

40.98

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

49

10

153

41.11

5.90

18.12

22.99

41.11

0.99

0.99

1.98

0.05

154

40.94

5.90

17.95

22.99

40.94

0.99

0.99

1.98

0.05

155

41.01

5.90

18.02

22.99

41.01

0.99

0.99

1.98

0.05

156

41.24

5.89

18.25

22.99

41.24

0.99

0.99

1.98

0.05

157

38.73

5.98

15.74

22.99

38.73

0.99

0.99

1.98

0.05

158

41.01

5.90

18.02

22.99

41.01

0.99

0.99

1.98

0.05

159

41.32

5.89

18.33

22.99

41.32

0.99

0.99

1.98

0.05

160

41.32

5.89

18.33

22.99

41.32

0.99

0.99

1.98

0.05

161

41.31

5.89

18.32

22.99

41.31

0.99

0.99

1.98

0.05

162

41.73

5.88

18.74

22.99

41.73

0.99

0.99

1.98

0.05

163

41.14

5.90

18.16

22.99

41.14

0.99

0.99

1.98

0.05

164

40.52

5.92

17.54

22.99

40.52

0.99

0.99

1.98

0.05

165

40.82

5.91

17.83

22.99

40.82

0.99

0.99

1.98

0.05

166

41.30

5.89

18.31

22.99

41.30

0.99

0.99

1.98

0.05

167

41.63

5.88

18.65

22.99

41.63

0.99

0.99

1.98

0.05

168

39.15

5.97

16.16

22.99

39.15

0.99

0.99

1.98

0.05

169

39.16

5.97

16.17

22.99

39.16

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

50

10

170

39.37

5.96

16.38

22.99

39.37

0.99

0.99

1.98

0.05

171

36.64

6.07

13.66

22.99

36.64

0.99

0.99

1.98

0.05

172

39.69

5.95

16.71

22.99

39.69

0.99

0.99

1.98

0.05

173

39.83

5.94

16.84

22.99

39.83

0.99

0.99

1.98

0.05

174

39.98

5.94

17.00

22.99

39.98

0.99

0.99

1.98

0.05

175

39.77

5.95

16.79

22.99

39.77

0.99

0.99

1.98

0.05

176

38.95

5.98

15.96

22.99

38.95

0.99

0.99

1.98

0.05

177

39.17

5.97

16.19

22.99

39.17

0.99

0.99

1.98

0.05

178

39.83

5.94

16.84

22.99

39.83

0.99

0.99

1.98

0.05

179

40.40

5.92

17.41

22.99

40.40

0.99

0.99

1.98

0.05

180

38.76

5.98

15.77

22.99

38.76

0.99

0.99

1.98

0.05

181

38.63

5.99

15.64

22.99

38.63

0.99

0.99

1.98

0.05

182

38.87

5.98

15.88

22.99

38.87

0.99

0.99

1.98

0.05

183

40.20

5.93

17.22

22.99

40.20

0.99

0.99

1.98

0.05

184

39.82

5.94

16.83

22.99

39.82

0.99

0.99

1.98

0.05

185

40.28

5.93

17.30

22.99

40.28

0.99

0.99

1.98

0.05

186

40.17

5.93

17.19

22.99

40.17

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

51

10

187

39.12

5.97

16.13

22.99

39.12

0.99

0.99

1.98

0.05

188

39.16

5.97

16.18

22.99

39.16

0.99

0.99

1.98

0.05

189

39.63

5.95

16.65

22.99

39.63

0.99

0.99

1.98

0.05

190

40.86

5.91

17.88

22.99

40.86

0.99

0.99

1.98

0.05

191

38.86

5.98

15.87

22.99

38.86

0.99

0.99

1.98

0.05

192

39.77

5.95

16.78

22.99

39.77

0.99

0.99

1.98

0.05

193

40.04

5.94

17.05

22.99

40.04

0.99

0.99

1.98

0.05

194

37.69

6.02

14.70

22.99

37.69

0.99

0.99

1.98

0.05

195

36.96

6.05

13.98

22.99

36.96

0.99

0.99

1.98

0.05

196

36.04

6.09

13.06

22.99

36.04

0.99

0.99

1.98

0.05

197

36.94

6.05

13.95

22.99

36.94

0.99

0.99

1.98

0.05

198

35.01

6.13

12.03

22.99

35.01

0.99

0.99

1.98

0.05

199

34.95

6.13

11.96

22.99

34.95

0.99

0.99

1.98

0.05

200

35.25

6.12

12.26

22.99

35.25

0.99

0.99

1.98

0.05

201

35.12

6.13

12.13

22.99

35.12

0.99

0.99

1.98

0.05

202

34.58

6.15

11.60

22.99

34.58

0.99

0.99

1.98

0.05

203

34.21

6.16

11.49

22.72

34.21

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

52

10

204

35.14

6.13

12.15

22.99

35.14

0.99

0.99

1.98

0.05

205

34.48

6.15

11.50

22.99

34.48

0.99

0.99

1.98

0.05

206

31.85

6.27

11.49

20.36

31.85

0.99

0.99

1.98

0.05

207

31.38

6.29

11.49

19.89

31.38

0.99

0.99

1.98

0.05

208

30.51

6.33

11.49

19.02

30.51

0.99

0.99

1.98

0.05

209

31.06

6.30

11.49

19.57

31.06

0.99

0.99

1.98

0.05

210

29.74

6.36

11.49

18.25

29.74

0.99

0.99

1.98

0.05

211

30.50

6.33

11.49

19.01

30.50

0.99

0.99

1.98

0.05

212

30.90

6.31

11.49

19.41

30.90

0.99

0.99

1.98

0.05

213

28.02

6.44

11.49

16.53

28.02

0.99

0.99

1.98

0.05

214

31.75

6.27

11.49

20.26

31.75

0.99

0.99

1.98

0.05

215

31.25

6.29

11.49

19.75

31.25

0.99

0.99

1.98

0.05

216

29.56

6.37

11.49

18.07

29.56

0.99

0.99

1.98

0.05

217

29.93

6.35

11.49

18.43

29.93

0.99

0.99

1.98

0.05

218

30.16

6.34

11.49

18.67

30.16

0.99

0.99

1.98

0.05

219

30.07

6.35

11.49

18.58

30.07

0.99

0.99

1.98

0.05

220

30.28

6.34

11.49

18.79

30.28

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

53

10

221

28.15

6.43

11.49

16.65

28.15

0.99

0.99

1.98

0.05

222

25.85

6.55

11.49

14.35

25.85

0.99

0.99

1.98

0.05

223

23.76

6.65

11.49

12.27

23.76

0.99

0.99

1.98

0.05

224

25.11

6.58

11.49

13.61

25.11

0.99

0.99

1.98

0.05

225

25.43

6.57

11.49

13.94

25.43

0.99

0.99

1.98

0.05

226

25.74

6.55

11.49

14.25

25.74

0.99

0.99

1.98

0.05

227

27.37

6.47

11.49

15.88

27.37

0.99

0.99

1.98

0.05

228

27.00

6.49

11.49

15.51

27.00

0.99

0.99

1.98

0.05

229

28.26

6.43

11.49

16.77

28.26

0.99

0.99

1.98

0.05

230

27.76

6.45

11.49

16.26

27.76

0.99

0.99

1.98

0.05

231

28.95

6.40

11.49

17.46

28.95

0.99

0.99

1.98

0.05

232

29.43

6.37

11.49

17.94

29.43

0.99

0.99

1.98

0.05

233

30.06

6.35

11.49

18.57

30.06

0.99

0.99

1.98

0.05

234

30.90

6.31

11.49

19.41

30.90

0.99

0.99

1.98

0.05

235

30.43

6.33

11.49

18.94

30.43

0.99

0.99

1.98

0.05

236

27.87

6.45

11.49

16.38

27.87

0.99

0.99

1.98

0.05

237

28.77

6.41

11.49

17.28

28.77

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

54

10

238

29.13

6.39

11.49

17.63

29.13

0.99

0.99

1.98

0.05

239

29.07

6.39

11.49

17.57

29.07

0.99

0.99

1.98

0.05

240

28.42

6.42

11.49

16.93

28.42

0.99

0.99

1.98

0.05

241

29.81

6.36

11.49

18.31

29.81

0.99

0.99

1.98

0.05

242

27.49

6.47

11.49

16.00

27.49

0.99

0.99

1.98

0.05

243

26.35

6.52

11.49

14.86

26.35

0.99

0.99

1.98

0.05

244

32.00

6.26

11.49

20.51

32.00

0.99

0.99

1.98

0.05

245

31.51

6.28

11.49

20.02

31.51

0.99

0.99

1.98

0.05

246

35.46

6.11

12.47

22.99

35.46

0.99

0.99

1.98

0.05

247

33.98

6.17

11.49

22.49

33.98

0.99

0.99

1.98

0.05

248

33.01

6.21

11.49

21.52

33.01

0.99

0.99

1.98

0.05

249

34.62

6.15

11.63

22.99

34.62

0.99

0.99

1.98

0.05

250

34.88

6.14

11.89

22.99

34.88

0.99

0.99

1.98

0.05

251

36.72

6.06

13.73

22.99

36.72

0.99

0.99

1.98

0.05

252

36.85

6.06

13.86

22.99

36.85

0.99

0.99

1.98

0.05

253

38.84

5.98

15.85

22.99

38.84

0.99

0.99

1.98

0.05

254

38.74

5.98

15.75

22.99

38.74

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

55

10

255

35.35

6.12

12.36

22.99

35.35

0.99

0.99

1.98

0.05

256

39.82

5.94

16.83

22.99

39.82

0.99

0.99

1.98

0.05

257

36.86

6.06

13.87

22.99

36.86

0.99

0.99

1.98

0.05

258

36.62

6.07

13.63

22.99

36.62

0.99

0.99

1.98

0.05

259

37.13

6.05

14.14

22.99

37.13

0.99

0.99

1.98

0.05

260

36.41

6.07

13.42

22.99

36.41

0.99

0.99

1.98

0.05

261

37.20

6.04

14.22

22.99

37.20

0.99

0.99

1.98

0.05

262

38.80

5.98

15.82

22.99

38.80

0.99

0.99

1.98

0.05

263

39.57

5.95

16.59

22.99

39.57

0.99

0.99

1.98

0.05

264

35.71

6.10

12.73

22.99

35.71

0.99

0.99

1.98

0.05

265

37.74

6.02

14.75

22.99

37.74

0.99

0.99

1.98

0.05

266

37.25

6.04

14.26

22.99

37.25

0.99

0.99

1.98

0.05

267

35.62

6.11

12.64

22.99

35.62

0.99

0.99

1.98

0.05

268

32.35

6.24

11.49

20.85

32.35

0.99

0.99

1.98

0.05

269

30.65

6.32

11.49

19.16

30.65

0.99

0.99

1.98

0.05

270

32.78

6.22

11.49

21.29

32.78

0.99

0.99

1.98

0.05

271

31.05

6.30

11.49

19.55

31.05

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

56

10

272

31.34

6.29

11.49

19.84

31.34

0.99

0.99

1.98

0.05

273

30.09

6.34

11.49

18.60

30.09

0.99

0.99

1.98

0.05

274

29.56

6.37

11.49

18.07

29.56

0.99

0.99

1.98

0.05

275

28.23

6.43

11.49

16.74

28.23

0.99

0.99

1.98

0.05

276

28.10

6.44

11.49

16.61

28.10

0.99

0.99

1.98

0.05

277

29.75

6.36

11.49

18.26

29.75

0.99

0.99

1.98

0.05

278

30.86

6.31

11.49

19.36

30.86

0.99

0.99

1.98

0.05

279

29.67

6.36

11.49

18.18

29.67

0.99

0.99

1.98

0.05

280

30.74

6.31

11.49

19.25

30.74

0.99

0.99

1.98

0.05

281

31.13

6.30

11.49

19.63

31.13

0.99

0.99

1.98

0.05

282

33.00

6.22

11.49

21.50

33.00

0.99

0.99

1.98

0.05

283

33.37

6.20

11.49

21.87

33.37

0.99

0.99

1.98

0.05

284

31.76

6.27

11.49

20.26

31.76

0.99

0.99

1.98

0.05

285

27.06

6.49

11.49

15.57

27.06

0.99

0.99

1.98

0.05

286

30.04

6.35

11.49

18.55

30.04

0.99

0.99

1.98

0.05

287

27.51

6.47

11.49

16.02

27.51

0.99

0.99

1.98

0.05

288

26.80

6.50

11.49

15.31

26.80

0.99

0.99

1.98

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

57

10

289

25.59

6.56

11.49

14.10

25.59

0.99

0.99

1.98

0.05

290

24.17

6.63

11.49

12.68

24.17

0.99

0.99

1.98

0.05

291

24.01

6.64

11.49

12.52

24.01

0.99

0.99

1.98

0.05

292

28.34

6.43

11.49

16.85

28.34

0.99

0.99

1.98

0.05

293

28.57

6.41

11.49

17.07

28.57

0.99

0.99

1.98

0.05

294

24.89

6.59

11.49

13.40

24.89

0.99

0.99

1.98

0.05

295

24.46

6.62

11.49

12.97

24.46

0.99

0.99

1.98

0.05

296

24.09

6.64

11.49

12.59

24.09

0.99

0.99

1.98

0.05

297

25.86

6.55

11.49

14.37

25.86

0.99

0.99

1.98

0.05

298

27.85

6.45

11.49

16.36

27.85

0.99

0.99

1.98

0.05

299

25.64

6.56

11.49

14.15

25.64

0.99

0.99

1.98

0.05

300

25.69

6.55

11.49

14.20

25.69

0.99

0.99

1.98

0.05

301

25.22

6.58

11.49

13.73

25.22

0.99

0.99

1.98

0.05

302

24.85

6.60

11.49

13.36

24.85

0.99

0.99

1.98

0.05

303

24.10

6.63

11.49

12.60

24.10

0.99

0.99

1.98

0.05

304

23.42

6.67

11.49

11.92

23.42

0.99

0.99

1.98

0.05

305

19.53

6.88

19.53

0.00

19.53

0.99

0.00

0.99

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

58

10

306

24.06

6.64

11.49

12.57

24.06

0.99

0.99

1.98

0.05

307

20.65

6.82

20.65

0.00

20.65

0.99

0.00

0.99

0.02

308

22.14

6.74

22.14

0.00

22.14

0.99

0.00

0.99

0.02

309

21.97

6.75

21.97

0.00

21.97

0.99

0.00

0.99

0.02

310

16.83

7.03

16.83

0.00

16.83

0.99

0.00

0.99

0.02

311

20.97

6.80

20.97

0.00

20.97

0.99

0.00

0.99

0.02

312

21.77

6.76

21.77

0.00

21.77

0.99

0.00

0.99

0.02

313

24.98

6.59

11.49

13.49

24.98

0.99

0.99

1.98

0.05

314

25.11

6.58

11.49

13.61

25.11

0.99

0.99

1.98

0.05

315

25.42

6.57

11.49

13.93

25.42

0.99

0.99

1.98

0.05

316

24.80

6.60

11.49

13.31

24.80

0.99

0.99

1.98

0.05

317

22.71

6.71

22.71

0.00

22.71

0.99

0.00

0.99

0.02

318

24.80

6.60

11.49

13.31

24.80

0.99

0.99

1.98

0.05

319

22.93

6.69

22.93

0.00

22.93

0.99

0.00

0.99

0.02

320

21.01

6.80

21.01

0.00

21.01

0.99

0.00

0.99

0.02

321

17.54

6.99

17.54

0.00

17.54

0.99

0.00

0.99

0.02

322

16.41

7.06

16.41

0.00

16.41

0.99

0.00

0.99

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

59

10

323

18.80

6.92

18.80

0.00

18.80

0.99

0.00

0.99

0.02

324

18.18

6.95

18.18

0.00

18.18

0.99

0.00

0.99

0.02

325

19.23

6.89

19.23

0.00

19.23

0.99

0.00

0.99

0.02

326

18.42

6.94

18.42

0.00

18.42

0.99

0.00

0.99

0.02

327

21.08

6.79

21.08

0.00

21.08

0.99

0.00

0.99

0.02

328

21.32

6.78

21.32

0.00

21.32

0.99

0.00

0.99

0.02

329

23.55

6.66

11.49

12.06

23.55

0.99

0.99

1.98

0.05

330

23.52

6.66

11.49

12.02

23.52

0.99

0.99

1.98

0.05

331

21.65

6.76

21.65

0.00

21.65

0.99

0.00

0.99

0.02

332

21.51

6.77

21.51

0.00

21.51

0.99

0.00

0.99

0.02

333

19.89

6.86

19.89

0.00

19.89

0.99

0.00

0.99

0.02

334

23.05

6.69

11.49

11.56

23.05

0.99

0.99

1.98

0.05

335

19.74

6.87

19.74

0.00

19.74

0.99

0.00

0.99

0.02

336

19.02

6.91

19.02

0.00

19.02

0.99

0.00

0.99

0.02

337

16.96

7.02

16.96

0.00

16.96

0.99

0.00

0.99

0.02

338

15.76

7.09

15.76

0.00

15.76

0.99

0.00

0.99

0.02

339

15.52

7.11

15.52

0.00

15.52

0.99

0.00

0.99

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

60

10

340

15.12

7.13

15.12

0.00

15.12

0.99

0.00

0.99

0.02

341

16.38

7.06

16.38

0.00

16.38

0.99

0.00

0.99

0.02

342

15.17

7.13

15.17

0.00

15.17

0.99

0.00

0.99

0.02

343

17.58

6.99

17.58

0.00

17.58

0.99

0.00

0.99

0.02

344

18.07

6.96

18.07

0.00

18.07

0.99

0.00

0.99

0.02

345

18.63

6.93

18.63

0.00

18.63

0.99

0.00

0.99

0.02

346

19.31

6.89

19.31

0.00

19.31

0.99

0.00

0.99

0.02

347

18.79

6.92

18.79

0.00

18.79

0.99

0.00

0.99

0.02

348

19.03

6.91

19.03

0.00

19.03

0.99

0.00

0.99

0.02

349

16.65

7.04

16.65

0.00

16.65

0.99

0.00

0.99

0.02

350

17.41

7.00

17.41

0.00

17.41

0.99

0.00

0.99

0.02

351

16.34

7.06

16.34

0.00

16.34

0.99

0.00

0.99

0.02

352

16.16

7.07

16.16

0.00

16.16

0.99

0.00

0.99

0.02

353

16.10

7.07

16.10

0.00

16.10

0.99

0.00

0.99

0.02

354

16.02

7.08

16.02

0.00

16.02

0.99

0.00

0.99

0.02

355

17.33

7.00

17.33

0.00

17.33

0.99

0.00

0.99

0.02

356

17.36

7.00

17.36

0.00

17.36

0.99

0.00

0.99

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

61

10

357

18.66

6.93

18.66

0.00

18.66

0.99

0.00

0.99

0.02

358

18.70

6.92

18.70

0.00

18.70

0.99

0.00

0.99

0.02

359

19.74

6.87

19.74

0.00

19.74

0.99

0.00

0.99

0.02

360

19.75

6.87

19.75

0.00

19.75

0.99

0.00

0.99

0.02

361

22.42

6.72

22.42

0.00

22.42

0.99

0.00

0.99

0.02

362

21.17

6.79

21.17

0.00

21.17

0.99

0.00

0.99

0.02

363

19.46

6.88

19.46

0.00

19.46

0.99

0.00

0.99

0.02

364

19.32

6.89

19.32

0.00

19.32

0.99

0.00

0.99

0.02

365

16.74

7.04

16.74

0.00

16.74

0.99

0.00

0.99

0.02

Annual Energy
Production

12.83

max Q

41.73

0.00

turbines operating at full capacity

0.00

turbines not operating at full


capacity

0.00

turbines closed

Max. Power Potentail


0.99

ENERGY COMPUTATION AT DESIGNED DISCHARGE Q5 (Integrated Operation)


Designed Discharge, Q5

Associated Technologies (Pvt) Ltd

44.73

cumecs

0.99

1.98

Machai Hydropower Project

Project Layout Review Report

62

Designed Q Available for % Time of year

7.00

Total No. of Turbines

Designed Discharge of Each Turbine

22.37

cumecs

Min. Operating Discharge of Each Unit

11.18

cumecs

Rated Net Head Available

5.48

Turbine Efficiency

85%

Generator Efficiency

96%

Transformer Efficiency

98%

Overall Efficiency

79.97%

Installed Power Potential of Each Unit

0.96

MW

Total Installed Power Potential

1.92

MW

Annual Energy Production (Actual)

12.60

GWh

Annual Energy Production (Theoretical)

16.85

GWh

Plant Factor

74.79

Associated Technologies (Pvt) Ltd

50%

10

Machai Hydropower Project

Project Layout Review Report

Average
Discharge

Average
Net
Head

H net

QA

QB

Total

PA

PB

Total

(cumecs)

(m)

(cumecs)

(cumecs)

(cumecs)

(MW)

(MW)

(MW)

(GWh)

2.66

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.71

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.71

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.63

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.69

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.61

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.71

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.72

8.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.44

8.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

0.59

8.09

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Day of
Year

Associated Technologies (Pvt) Ltd

Turbines Discharges

63

Turbines Power Potential

10

Total
Energy
Production

Machai Hydropower Project

Project Layout Review Report

64

10

14

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

17

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

26

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

28

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31

0.00

8.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

65

10

32

1.84

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

33

2.63

7.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

34

2.45

7.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

35

2.45

7.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36

2.54

7.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

37

3.89

7.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

38

6.60

7.67

0.00

0.00

0.00

0.00

0.00

0.00

0.00

39

5.19

7.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40

6.36

7.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

41

5.61

7.74

0.00

0.00

0.00

0.00

0.00

0.00

0.00

42

5.45

7.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

43

5.30

7.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

44

5.21

7.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45

3.73

7.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46

3.03

7.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

47

1.61

8.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48

4.26

7.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

49

4.06

7.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

66

10

50

1.79

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

51

1.68

8.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

52

4.08

7.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53

5.95

7.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

54

8.20

7.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55

10.13

7.44

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56

10.28

7.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57

11.65

7.34

11.65

0.00

11.65

0.96

0.00

0.96

0.02

58

12.70

7.28

12.70

0.00

12.70

0.96

0.00

0.96

0.02

59

12.38

7.30

12.38

0.00

12.38

0.96

0.00

0.96

0.02

60

14.28

7.18

14.28

0.00

14.28

0.96

0.00

0.96

0.02

61

12.72

7.28

12.72

0.00

12.72

0.96

0.00

0.96

0.02

62

12.57

7.29

12.57

0.00

12.57

0.96

0.00

0.96

0.02

63

9.72

7.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

64

8.94

7.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

65

10.71

7.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66

11.04

7.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

67

12.03

7.32

12.03

0.00

12.03

0.96

0.00

0.96

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

67

10

68

12.48

7.29

12.48

0.00

12.48

0.96

0.00

0.96

0.02

69

16.40

7.06

16.40

0.00

16.40

0.96

0.00

0.96

0.02

70

16.48

7.05

16.48

0.00

16.48

0.96

0.00

0.96

0.02

71

17.33

7.00

17.33

0.00

17.33

0.96

0.00

0.96

0.02

72

21.51

6.77

21.51

0.00

21.51

0.96

0.00

0.96

0.02

73

23.57

6.66

11.18

12.39

23.57

0.96

0.96

1.92

0.05

74

24.85

6.60

11.18

13.67

24.85

0.96

0.96

1.92

0.05

75

25.68

6.55

11.18

14.49

25.68

0.96

0.96

1.92

0.05

76

26.35

6.52

11.18

15.17

26.35

0.96

0.96

1.92

0.05

77

24.09

6.63

11.18

12.91

24.09

0.96

0.96

1.92

0.05

78

23.93

6.64

11.18

12.75

23.93

0.96

0.96

1.92

0.05

79

23.03

6.69

11.18

11.85

23.03

0.96

0.96

1.92

0.05

80

21.39

6.78

21.39

0.00

21.39

0.96

0.00

0.96

0.02

81

22.39

6.72

11.18

11.21

22.39

0.96

0.96

1.92

0.05

82

22.85

6.70

11.18

11.67

22.85

0.96

0.96

1.92

0.05

83

21.79

6.76

21.79

0.00

21.79

0.96

0.00

0.96

0.02

84

20.53

6.82

20.53

0.00

20.53

0.96

0.00

0.96

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

68

10

85

24.03

6.64

11.18

12.85

24.03

0.96

0.96

1.92

0.05

86

24.95

6.59

11.18

13.77

24.95

0.96

0.96

1.92

0.05

87

26.89

6.50

11.18

15.71

26.89

0.96

0.96

1.92

0.05

88

30.05

6.35

11.18

18.87

30.05

0.96

0.96

1.92

0.05

89

31.11

6.30

11.18

19.93

31.11

0.96

0.96

1.92

0.05

90

33.51

6.19

11.18

22.33

33.51

0.96

0.96

1.92

0.05

91

30.58

6.32

11.18

19.40

30.58

0.96

0.96

1.92

0.05

92

28.52

6.42

11.18

17.34

28.52

0.96

0.96

1.92

0.05

93

29.11

6.39

11.18

17.93

29.11

0.96

0.96

1.92

0.05

94

28.86

6.40

11.18

17.68

28.86

0.96

0.96

1.92

0.05

95

27.47

6.47

11.18

16.29

27.47

0.96

0.96

1.92

0.05

96

26.52

6.51

11.18

15.33

26.52

0.96

0.96

1.92

0.05

97

26.93

6.49

11.18

15.74

26.93

0.96

0.96

1.92

0.05

98

27.98

6.44

11.18

16.80

27.98

0.96

0.96

1.92

0.05

99

30.90

6.31

11.18

19.72

30.90

0.96

0.96

1.92

0.05

100

31.90

6.26

11.18

20.72

31.90

0.96

0.96

1.92

0.05

101

32.66

6.23

11.18

21.48

32.66

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

69

10

102

33.45

6.20

11.18

22.26

33.45

0.96

0.96

1.92

0.05

103

33.10

6.21

11.18

21.91

33.10

0.96

0.96

1.92

0.05

104

34.67

6.15

12.30

22.37

34.67

0.96

0.96

1.92

0.05

105

34.87

6.14

12.51

22.37

34.87

0.96

0.96

1.92

0.05

106

36.06

6.09

13.69

22.37

36.06

0.96

0.96

1.92

0.05

107

35.71

6.10

13.34

22.37

35.71

0.96

0.96

1.92

0.05

108

36.00

6.09

13.63

22.37

36.00

0.96

0.96

1.92

0.05

109

36.08

6.09

13.72

22.37

36.08

0.96

0.96

1.92

0.05

110

36.13

6.09

13.76

22.37

36.13

0.96

0.96

1.92

0.05

111

36.47

6.07

14.10

22.37

36.47

0.96

0.96

1.92

0.05

112

36.52

6.07

14.16

22.37

36.52

0.96

0.96

1.92

0.05

113

36.57

6.07

14.20

22.37

36.57

0.96

0.96

1.92

0.05

114

37.53

6.03

15.16

22.37

37.53

0.96

0.96

1.92

0.05

115

36.75

6.06

14.39

22.37

36.75

0.96

0.96

1.92

0.05

116

38.17

6.01

15.81

22.37

38.17

0.96

0.96

1.92

0.05

117

37.60

6.03

15.23

22.37

37.60

0.96

0.96

1.92

0.05

118

37.80

6.02

15.43

22.37

37.80

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

70

10

119

37.82

6.02

15.45

22.37

37.82

0.96

0.96

1.92

0.05

120

38.42

6.00

16.05

22.37

38.42

0.96

0.96

1.92

0.05

121

33.40

6.20

11.18

22.22

33.40

0.96

0.96

1.92

0.05

122

34.98

6.13

12.61

22.37

34.98

0.96

0.96

1.92

0.05

123

35.09

6.13

12.73

22.37

35.09

0.96

0.96

1.92

0.05

124

33.56

6.19

11.19

22.37

33.56

0.96

0.96

1.92

0.05

125

33.43

6.20

11.18

22.25

33.43

0.96

0.96

1.92

0.05

126

33.43

6.20

11.18

22.25

33.43

0.96

0.96

1.92

0.05

127

33.34

6.20

11.18

22.15

33.34

0.96

0.96

1.92

0.05

128

33.99

6.17

11.63

22.37

33.99

0.96

0.96

1.92

0.05

129

34.56

6.15

12.19

22.37

34.56

0.96

0.96

1.92

0.05

130

34.78

6.14

12.41

22.37

34.78

0.96

0.96

1.92

0.05

131

34.47

6.15

12.10

22.37

34.47

0.96

0.96

1.92

0.05

132

35.94

6.09

13.57

22.37

35.94

0.96

0.96

1.92

0.05

133

38.06

6.01

15.69

22.37

38.06

0.96

0.96

1.92

0.05

134

38.64

5.99

16.27

22.37

38.64

0.96

0.96

1.92

0.05

135

39.37

5.96

17.01

22.37

39.37

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

71

10

136

39.37

5.96

17.01

22.37

39.37

0.96

0.96

1.92

0.05

137

39.37

5.96

17.01

22.37

39.37

0.96

0.96

1.92

0.05

138

40.02

5.94

17.66

22.37

40.02

0.96

0.96

1.92

0.05

139

40.33

5.93

17.96

22.37

40.33

0.96

0.96

1.92

0.05

140

40.35

5.92

17.99

22.37

40.35

0.96

0.96

1.92

0.05

141

40.27

5.93

17.91

22.37

40.27

0.96

0.96

1.92

0.05

142

40.27

5.93

17.91

22.37

40.27

0.96

0.96

1.92

0.05

143

40.09

5.93

17.72

22.37

40.09

0.96

0.96

1.92

0.05

144

39.21

5.97

16.84

22.37

39.21

0.96

0.96

1.92

0.05

145

40.59

5.92

18.22

22.37

40.59

0.96

0.96

1.92

0.05

146

40.51

5.92

18.14

22.37

40.51

0.96

0.96

1.92

0.05

147

40.53

5.92

18.17

22.37

40.53

0.96

0.96

1.92

0.05

148

40.53

5.92

18.17

22.37

40.53

0.96

0.96

1.92

0.05

149

40.43

5.92

18.07

22.37

40.43

0.96

0.96

1.92

0.05

150

40.63

5.91

18.26

22.37

40.63

0.96

0.96

1.92

0.05

151

40.77

5.91

18.40

22.37

40.77

0.96

0.96

1.92

0.05

152

40.98

5.90

18.61

22.37

40.98

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

72

10

153

41.11

5.90

18.74

22.37

41.11

0.96

0.96

1.92

0.05

154

40.94

5.90

18.57

22.37

40.94

0.96

0.96

1.92

0.05

155

41.01

5.90

18.64

22.37

41.01

0.96

0.96

1.92

0.05

156

41.24

5.89

18.87

22.37

41.24

0.96

0.96

1.92

0.05

157

38.73

5.98

16.36

22.37

38.73

0.96

0.96

1.92

0.05

158

41.01

5.90

18.64

22.37

41.01

0.96

0.96

1.92

0.05

159

41.32

5.89

18.95

22.37

41.32

0.96

0.96

1.92

0.05

160

41.32

5.89

18.95

22.37

41.32

0.96

0.96

1.92

0.05

161

41.31

5.89

18.94

22.37

41.31

0.96

0.96

1.92

0.05

162

41.73

5.88

19.36

22.37

41.73

0.96

0.96

1.92

0.05

163

41.14

5.90

18.78

22.37

41.14

0.96

0.96

1.92

0.05

164

40.52

5.92

18.16

22.37

40.52

0.96

0.96

1.92

0.05

165

40.82

5.91

18.45

22.37

40.82

0.96

0.96

1.92

0.05

166

41.30

5.89

18.93

22.37

41.30

0.96

0.96

1.92

0.05

167

41.63

5.88

19.27

22.37

41.63

0.96

0.96

1.92

0.05

168

39.15

5.97

16.78

22.37

39.15

0.96

0.96

1.92

0.05

169

39.16

5.97

16.79

22.37

39.16

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

73

10

170

39.37

5.96

17.00

22.37

39.37

0.96

0.96

1.92

0.05

171

36.64

6.07

14.28

22.37

36.64

0.96

0.96

1.92

0.05

172

39.69

5.95

17.33

22.37

39.69

0.96

0.96

1.92

0.05

173

39.83

5.94

17.46

22.37

39.83

0.96

0.96

1.92

0.05

174

39.98

5.94

17.62

22.37

39.98

0.96

0.96

1.92

0.05

175

39.77

5.95

17.40

22.37

39.77

0.96

0.96

1.92

0.05

176

38.95

5.98

16.58

22.37

38.95

0.96

0.96

1.92

0.05

177

39.17

5.97

16.81

22.37

39.17

0.96

0.96

1.92

0.05

178

39.83

5.94

17.46

22.37

39.83

0.96

0.96

1.92

0.05

179

40.40

5.92

18.03

22.37

40.40

0.96

0.96

1.92

0.05

180

38.76

5.98

16.39

22.37

38.76

0.96

0.96

1.92

0.05

181

38.63

5.99

16.26

22.37

38.63

0.96

0.96

1.92

0.05

182

38.87

5.98

16.50

22.37

38.87

0.96

0.96

1.92

0.05

183

40.20

5.93

17.84

22.37

40.20

0.96

0.96

1.92

0.05

184

39.82

5.94

17.45

22.37

39.82

0.96

0.96

1.92

0.05

185

40.28

5.93

17.92

22.37

40.28

0.96

0.96

1.92

0.05

186

40.17

5.93

17.81

22.37

40.17

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

74

10

187

39.12

5.97

16.75

22.37

39.12

0.96

0.96

1.92

0.05

188

39.16

5.97

16.80

22.37

39.16

0.96

0.96

1.92

0.05

189

39.63

5.95

17.27

22.37

39.63

0.96

0.96

1.92

0.05

190

40.86

5.91

18.50

22.37

40.86

0.96

0.96

1.92

0.05

191

38.86

5.98

16.49

22.37

38.86

0.96

0.96

1.92

0.05

192

39.77

5.95

17.40

22.37

39.77

0.96

0.96

1.92

0.05

193

40.04

5.94

17.67

22.37

40.04

0.96

0.96

1.92

0.05

194

37.69

6.02

15.32

22.37

37.69

0.96

0.96

1.92

0.05

195

36.96

6.05

14.59

22.37

36.96

0.96

0.96

1.92

0.05

196

36.04

6.09

13.68

22.37

36.04

0.96

0.96

1.92

0.05

197

36.94

6.05

14.57

22.37

36.94

0.96

0.96

1.92

0.05

198

35.01

6.13

12.64

22.37

35.01

0.96

0.96

1.92

0.05

199

34.95

6.13

12.58

22.37

34.95

0.96

0.96

1.92

0.05

200

35.25

6.12

12.88

22.37

35.25

0.96

0.96

1.92

0.05

201

35.12

6.13

12.75

22.37

35.12

0.96

0.96

1.92

0.05

202

34.58

6.15

12.21

22.37

34.58

0.96

0.96

1.92

0.05

203

34.21

6.16

11.84

22.37

34.21

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

75

10

204

35.14

6.13

12.77

22.37

35.14

0.96

0.96

1.92

0.05

205

34.48

6.15

12.12

22.37

34.48

0.96

0.96

1.92

0.05

206

31.85

6.27

11.18

20.67

31.85

0.96

0.96

1.92

0.05

207

31.38

6.29

11.18

20.20

31.38

0.96

0.96

1.92

0.05

208

30.51

6.33

11.18

19.33

30.51

0.96

0.96

1.92

0.05

209

31.06

6.30

11.18

19.88

31.06

0.96

0.96

1.92

0.05

210

29.74

6.36

11.18

18.56

29.74

0.96

0.96

1.92

0.05

211

30.50

6.33

11.18

19.32

30.50

0.96

0.96

1.92

0.05

212

30.90

6.31

11.18

19.72

30.90

0.96

0.96

1.92

0.05

213

28.02

6.44

11.18

16.84

28.02

0.96

0.96

1.92

0.05

214

31.75

6.27

11.18

20.57

31.75

0.96

0.96

1.92

0.05

215

31.25

6.29

11.18

20.06

31.25

0.96

0.96

1.92

0.05

216

29.56

6.37

11.18

18.38

29.56

0.96

0.96

1.92

0.05

217

29.93

6.35

11.18

18.74

29.93

0.96

0.96

1.92

0.05

218

30.16

6.34

11.18

18.98

30.16

0.96

0.96

1.92

0.05

219

30.07

6.35

11.18

18.89

30.07

0.96

0.96

1.92

0.05

220

30.28

6.34

11.18

19.10

30.28

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

76

10

221

28.15

6.43

11.18

16.96

28.15

0.96

0.96

1.92

0.05

222

25.85

6.55

11.18

14.66

25.85

0.96

0.96

1.92

0.05

223

23.76

6.65

11.18

12.58

23.76

0.96

0.96

1.92

0.05

224

25.11

6.58

11.18

13.92

25.11

0.96

0.96

1.92

0.05

225

25.43

6.57

11.18

14.25

25.43

0.96

0.96

1.92

0.05

226

25.74

6.55

11.18

14.56

25.74

0.96

0.96

1.92

0.05

227

27.37

6.47

11.18

16.19

27.37

0.96

0.96

1.92

0.05

228

27.00

6.49

11.18

15.82

27.00

0.96

0.96

1.92

0.05

229

28.26

6.43

11.18

17.08

28.26

0.96

0.96

1.92

0.05

230

27.76

6.45

11.18

16.57

27.76

0.96

0.96

1.92

0.05

231

28.95

6.40

11.18

17.77

28.95

0.96

0.96

1.92

0.05

232

29.43

6.37

11.18

18.25

29.43

0.96

0.96

1.92

0.05

233

30.06

6.35

11.18

18.88

30.06

0.96

0.96

1.92

0.05

234

30.90

6.31

11.18

19.72

30.90

0.96

0.96

1.92

0.05

235

30.43

6.33

11.18

19.25

30.43

0.96

0.96

1.92

0.05

236

27.87

6.45

11.18

16.69

27.87

0.96

0.96

1.92

0.05

237

28.77

6.41

11.18

17.59

28.77

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

77

10

238

29.13

6.39

11.18

17.94

29.13

0.96

0.96

1.92

0.05

239

29.07

6.39

11.18

17.88

29.07

0.96

0.96

1.92

0.05

240

28.42

6.42

11.18

17.24

28.42

0.96

0.96

1.92

0.05

241

29.81

6.36

11.18

18.62

29.81

0.96

0.96

1.92

0.05

242

27.49

6.47

11.18

16.31

27.49

0.96

0.96

1.92

0.05

243

26.35

6.52

11.18

15.17

26.35

0.96

0.96

1.92

0.05

244

32.00

6.26

11.18

20.82

32.00

0.96

0.96

1.92

0.05

245

31.51

6.28

11.18

20.33

31.51

0.96

0.96

1.92

0.05

246

35.46

6.11

13.09

22.37

35.46

0.96

0.96

1.92

0.05

247

33.98

6.17

11.61

22.37

33.98

0.96

0.96

1.92

0.05

248

33.01

6.21

11.18

21.83

33.01

0.96

0.96

1.92

0.05

249

34.62

6.15

12.25

22.37

34.62

0.96

0.96

1.92

0.05

250

34.88

6.14

12.51

22.37

34.88

0.96

0.96

1.92

0.05

251

36.72

6.06

14.35

22.37

36.72

0.96

0.96

1.92

0.05

252

36.85

6.06

14.48

22.37

36.85

0.96

0.96

1.92

0.05

253

38.84

5.98

16.47

22.37

38.84

0.96

0.96

1.92

0.05

254

38.74

5.98

16.37

22.37

38.74

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

78

10

255

35.35

6.12

12.98

22.37

35.35

0.96

0.96

1.92

0.05

256

39.82

5.94

17.45

22.37

39.82

0.96

0.96

1.92

0.05

257

36.86

6.06

14.49

22.37

36.86

0.96

0.96

1.92

0.05

258

36.62

6.07

14.25

22.37

36.62

0.96

0.96

1.92

0.05

259

37.13

6.05

14.76

22.37

37.13

0.96

0.96

1.92

0.05

260

36.41

6.07

14.04

22.37

36.41

0.96

0.96

1.92

0.05

261

37.20

6.04

14.84

22.37

37.20

0.96

0.96

1.92

0.05

262

38.80

5.98

16.44

22.37

38.80

0.96

0.96

1.92

0.05

263

39.57

5.95

17.21

22.37

39.57

0.96

0.96

1.92

0.05

264

35.71

6.10

13.35

22.37

35.71

0.96

0.96

1.92

0.05

265

37.74

6.02

15.37

22.37

37.74

0.96

0.96

1.92

0.05

266

37.25

6.04

14.88

22.37

37.25

0.96

0.96

1.92

0.05

267

35.62

6.11

13.26

22.37

35.62

0.96

0.96

1.92

0.05

268

32.35

6.24

11.18

21.16

32.35

0.96

0.96

1.92

0.05

269

30.65

6.32

11.18

19.47

30.65

0.96

0.96

1.92

0.05

270

32.78

6.22

11.18

21.60

32.78

0.96

0.96

1.92

0.05

271

31.05

6.30

11.18

19.86

31.05

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

79

10

272

31.34

6.29

11.18

20.15

31.34

0.96

0.96

1.92

0.05

273

30.09

6.34

11.18

18.91

30.09

0.96

0.96

1.92

0.05

274

29.56

6.37

11.18

18.38

29.56

0.96

0.96

1.92

0.05

275

28.23

6.43

11.18

17.05

28.23

0.96

0.96

1.92

0.05

276

28.10

6.44

11.18

16.92

28.10

0.96

0.96

1.92

0.05

277

29.75

6.36

11.18

18.57

29.75

0.96

0.96

1.92

0.05

278

30.86

6.31

11.18

19.67

30.86

0.96

0.96

1.92

0.05

279

29.67

6.36

11.18

18.49

29.67

0.96

0.96

1.92

0.05

280

30.74

6.31

11.18

19.56

30.74

0.96

0.96

1.92

0.05

281

31.13

6.30

11.18

19.94

31.13

0.96

0.96

1.92

0.05

282

33.00

6.22

11.18

21.81

33.00

0.96

0.96

1.92

0.05

283

33.37

6.20

11.18

22.18

33.37

0.96

0.96

1.92

0.05

284

31.76

6.27

11.18

20.57

31.76

0.96

0.96

1.92

0.05

285

27.06

6.49

11.18

15.88

27.06

0.96

0.96

1.92

0.05

286

30.04

6.35

11.18

18.86

30.04

0.96

0.96

1.92

0.05

287

27.51

6.47

11.18

16.33

27.51

0.96

0.96

1.92

0.05

288

26.80

6.50

11.18

15.62

26.80

0.96

0.96

1.92

0.05

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

80

10

289

25.59

6.56

11.18

14.41

25.59

0.96

0.96

1.92

0.05

290

24.17

6.63

11.18

12.99

24.17

0.96

0.96

1.92

0.05

291

24.01

6.64

11.18

12.83

24.01

0.96

0.96

1.92

0.05

292

28.34

6.43

11.18

17.16

28.34

0.96

0.96

1.92

0.05

293

28.57

6.41

11.18

17.38

28.57

0.96

0.96

1.92

0.05

294

24.89

6.59

11.18

13.71

24.89

0.96

0.96

1.92

0.05

295

24.46

6.62

11.18

13.28

24.46

0.96

0.96

1.92

0.05

296

24.09

6.64

11.18

12.90

24.09

0.96

0.96

1.92

0.05

297

25.86

6.55

11.18

14.68

25.86

0.96

0.96

1.92

0.05

298

27.85

6.45

11.18

16.67

27.85

0.96

0.96

1.92

0.05

299

25.64

6.56

11.18

14.46

25.64

0.96

0.96

1.92

0.05

300

25.69

6.55

11.18

14.51

25.69

0.96

0.96

1.92

0.05

301

25.22

6.58

11.18

14.03

25.22

0.96

0.96

1.92

0.05

302

24.85

6.60

11.18

13.67

24.85

0.96

0.96

1.92

0.05

303

24.10

6.63

11.18

12.91

24.10

0.96

0.96

1.92

0.05

304

23.42

6.67

11.18

12.23

23.42

0.96

0.96

1.92

0.05

305

19.53

6.88

19.53

0.00

19.53

0.96

0.00

0.96

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

81

10

306

24.06

6.64

11.18

12.88

24.06

0.96

0.96

1.92

0.05

307

20.65

6.82

20.65

0.00

20.65

0.96

0.00

0.96

0.02

308

22.14

6.74

22.14

0.00

22.14

0.96

0.00

0.96

0.02

309

21.97

6.75

21.97

0.00

21.97

0.96

0.00

0.96

0.02

310

16.83

7.03

16.83

0.00

16.83

0.96

0.00

0.96

0.02

311

20.97

6.80

20.97

0.00

20.97

0.96

0.00

0.96

0.02

312

21.77

6.76

21.77

0.00

21.77

0.96

0.00

0.96

0.02

313

24.98

6.59

11.18

13.79

24.98

0.96

0.96

1.92

0.05

314

25.11

6.58

11.18

13.92

25.11

0.96

0.96

1.92

0.05

315

25.42

6.57

11.18

14.24

25.42

0.96

0.96

1.92

0.05

316

24.80

6.60

11.18

13.62

24.80

0.96

0.96

1.92

0.05

317

22.71

6.71

11.18

11.53

22.71

0.96

0.96

1.92

0.05

318

24.80

6.60

11.18

13.62

24.80

0.96

0.96

1.92

0.05

319

22.93

6.69

11.18

11.75

22.93

0.96

0.96

1.92

0.05

320

21.01

6.80

21.01

0.00

21.01

0.96

0.00

0.96

0.02

321

17.54

6.99

17.54

0.00

17.54

0.96

0.00

0.96

0.02

322

16.41

7.06

16.41

0.00

16.41

0.96

0.00

0.96

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

82

10

323

18.80

6.92

18.80

0.00

18.80

0.96

0.00

0.96

0.02

324

18.18

6.95

18.18

0.00

18.18

0.96

0.00

0.96

0.02

325

19.23

6.89

19.23

0.00

19.23

0.96

0.00

0.96

0.02

326

18.42

6.94

18.42

0.00

18.42

0.96

0.00

0.96

0.02

327

21.08

6.79

21.08

0.00

21.08

0.96

0.00

0.96

0.02

328

21.32

6.78

21.32

0.00

21.32

0.96

0.00

0.96

0.02

329

23.55

6.66

11.18

12.37

23.55

0.96

0.96

1.92

0.05

330

23.52

6.66

11.18

12.33

23.52

0.96

0.96

1.92

0.05

331

21.65

6.76

21.65

0.00

21.65

0.96

0.00

0.96

0.02

332

21.51

6.77

21.51

0.00

21.51

0.96

0.00

0.96

0.02

333

19.89

6.86

19.89

0.00

19.89

0.96

0.00

0.96

0.02

334

23.05

6.69

11.18

11.87

23.05

0.96

0.96

1.92

0.05

335

19.74

6.87

19.74

0.00

19.74

0.96

0.00

0.96

0.02

336

19.02

6.91

19.02

0.00

19.02

0.96

0.00

0.96

0.02

337

16.96

7.02

16.96

0.00

16.96

0.96

0.00

0.96

0.02

338

15.76

7.09

15.76

0.00

15.76

0.96

0.00

0.96

0.02

339

15.52

7.11

15.52

0.00

15.52

0.96

0.00

0.96

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

83

10

340

15.12

7.13

15.12

0.00

15.12

0.96

0.00

0.96

0.02

341

16.38

7.06

16.38

0.00

16.38

0.96

0.00

0.96

0.02

342

15.17

7.13

15.17

0.00

15.17

0.96

0.00

0.96

0.02

343

17.58

6.99

17.58

0.00

17.58

0.96

0.00

0.96

0.02

344

18.07

6.96

18.07

0.00

18.07

0.96

0.00

0.96

0.02

345

18.63

6.93

18.63

0.00

18.63

0.96

0.00

0.96

0.02

346

19.31

6.89

19.31

0.00

19.31

0.96

0.00

0.96

0.02

347

18.79

6.92

18.79

0.00

18.79

0.96

0.00

0.96

0.02

348

19.03

6.91

19.03

0.00

19.03

0.96

0.00

0.96

0.02

349

16.65

7.04

16.65

0.00

16.65

0.96

0.00

0.96

0.02

350

17.41

7.00

17.41

0.00

17.41

0.96

0.00

0.96

0.02

351

16.34

7.06

16.34

0.00

16.34

0.96

0.00

0.96

0.02

352

16.16

7.07

16.16

0.00

16.16

0.96

0.00

0.96

0.02

353

16.10

7.07

16.10

0.00

16.10

0.96

0.00

0.96

0.02

354

16.02

7.08

16.02

0.00

16.02

0.96

0.00

0.96

0.02

355

17.33

7.00

17.33

0.00

17.33

0.96

0.00

0.96

0.02

356

17.36

7.00

17.36

0.00

17.36

0.96

0.00

0.96

0.02

Associated Technologies (Pvt) Ltd

Machai Hydropower Project

Project Layout Review Report

84

10

357

18.66

6.93

18.66

0.00

18.66

0.96

0.00

0.96

0.02

358

18.70

6.92

18.70

0.00

18.70

0.96

0.00

0.96

0.02

359

19.74

6.87

19.74

0.00

19.74

0.96

0.00

0.96

0.02

360

19.75

6.87

19.75

0.00

19.75

0.96

0.00

0.96

0.02

361

22.42

6.72

11.18

11.23

22.42

0.96

0.96

1.92

0.05

362

21.17

6.79

21.17

0.00

21.17

0.96

0.00

0.96

0.02

363

19.46

6.88

19.46

0.00

19.46

0.96

0.00

0.96

0.02

364

19.32

6.89

19.32

0.00

19.32

0.96

0.00

0.96

0.02

365

16.74

7.04

16.74

0.00

16.74

0.96

0.00

0.96

0.02

Annual Energy
Production

12.60

max Q

41.73

Associated Technologies (Pvt) Ltd

0.00

turbines operating at full capacity

0.00

turbines not operating at full


capacity

0.00

turbines closed

Max. Power Potentail


0.96

0.96

1.92