Vous êtes sur la page 1sur 6

TUBING CONVEYED PERFORATING TECHNICAL UNIT

Unit No. 5294


Index: 442.00
Date: June 1997 Page:1 of 6

Model A Safety Joint And Overshot


Product No. 302-28
Description
The Safety Joint provides for an emergency release between the drill string and packer. This allows for drill string retrieval and a means for fishing a stuck packer. In the event the Safety Joint is released, the Overshot can be run to reconnect the drill pipe with the packer assembly. This will provide for a better means of manipulating the drill pipe to free the packer.

Specification Guide
A Safety Joint Overshot OD 5.00 9.00 max ID 2.25 Length 27.2 31.0 Shoulder Shoulder Shipping 33.8 34.1 Weight 140 lbs 125 lbs Connections 3.50 IF Box x Pin 3.50 IF Box Up Working Pressure 15,000 psi z Max Temperature 350 F z Tensile Strength 350,000 lbs Torque Strength 10,000 ft/lbs Make-Up Torque 4,000 ft/lbs zz Service H2S per NACE MR-01-75 zRefer to the Tech Unit on "Seals and Lubricants for DST Tools" under Index 442.00 for seal system pressure rating, temperature rating, and selection guidelines. zzValue is for stub acme threads only.

Drawing No. 628-699


This document contains Confidential Information of Baker Hughes Incorporated (Baker) and is furnished to the customer for information purposes only. It is requested that this document not be reproduced in any way whatsoever, in part or in whole, or distributed outside the customer organization without first obtaining the express written authorization of Baker. This document is the property of Baker and returnable on request of Baker. July, 1997, Baker Hughes Incorporated.

Unit No. 5294 Index: 442.00

6-97 Page 2 of 6

Model A Safety Joint And Overshot


Model A Safety Joint
1. Place Top Sub (4) in vise. 2. Make-up the Bottom Sub (5) to Top Sub (4). Align shear screw holes. 3. Install the selected Shear Screws (3). 4. The tool is now ready to be tested.

WARNING
Use of Baker equipment contrary to manufacturers specification may result in property damage, serious injury or fatality.

Operation
The Safety Joint is run on the drill pipe directly above the packer. Either a left-hand release or a right-hand release tool may be run, depending on which is desired. The Safety Joint is released by taking an upstrain on the drill pipe and rotating to the left or right, depending on which tool is run. Hold approximately 1,000 to 3,000 lbs tension on the tool. Apply 700 to 750 ft/lbs of torque for each alloy steel shear screw in the proper direction for release. An additional 11 turns of rotation will release the top sub of the safety joint for removal from the well. The Overshot will be the first tool run in the hole when fishing operations commence. To re-engage the tool, run the Overshot. Upon reaching required depth, "feel" for the Safety Joint. Fifteen turns to the right at the tool are required to makeup the threads. The string is now reconnected and pipe manipulation may begin.

Overshot
NOTE: The Overshot Skirt (4) must have its OD machined to match the casing it is to be run into.

1. Place Top Sub (3) in vise. 2. Install O-ring (1) and Back-Up Rings (2). 3. Make-up the Overshot Skirt (4) or (5).

Disassembly
All parts should be visibly inspected for damage as they are disassembled. Particular attention should be paid to seal surfaces, O-ring grooves, and threads. All wrench and tong marks should also be repaired as much as possible.

Model A Safety Joint


1. 2. 3. 4. Place Top Sub (4) in vise Remove Shear Screws (3). Remove the Bottom Sub (5). Remove all Seals and Back-Up Rings (2).

Assembly
Refer to the Tech Unit on "Seals and Lubricants for DST Tools" under Index 442.00 for proper back-up ring and lubricant selection. Make sure all parts are clean and in good condition. Apply a light coat of recommended lubricant on seal surfaces prior to assembly. Scarf cut all OD back-up rings (except on overshot) for seals and install all seals and back-up rings

Overshot
1. Place Top Sub (3) in vise. 2. Remove the Overshot Skirt (4) or (5). 3. Remove all Seals and Back-Up Rings (2).

Model A Safety Joint Assembly And Dimensional Data Drawing No. 628-699

Model A Safety Joint And Overshot

Parts List
Left Hand And Right Hand Release Refer to Drawing No. 628-699.
Item No. 1 2 3 4 5 6 7 8 Description O-ring Back-Up Ring Annld Stl Shr Scw Top Sub Bottom Sub O-ring Thread Protector Left Hand Release Right Hand Release No. Reqd Standard Trim Premium Trim Standard Trim Premium Trim 1 WW-B339-V40 WW-B339-V40 2 06-28427-22 06-29245-22 06-28427-22 06-29245-22 2 5/16-18 x 5/8 5/16-18 x 5/8 1 06-28293-00 06-28291-00 1 06-28292-00 06-28290-00 1 WW-B598-5VE WW-B598-5VE 06-28317-00 06-28317-00 1 06-28316-00 06-28316-00 Unit No. 5294 Index: 442.00 6-97 Page 3 of 6

Safety Joint Overshot Assembly And Dimensional Data Drawing No. 628-822-1, 7" Casing

Unit No. 5294 Index: 442.00 6-97 Page 4 of 6

Model A Safety Joint And Overshot

Assembly And Dimensional Data Drawing No. 628-822, 9-5/8" Casing

Model A Safety Joint And Overshot

Unit No. 5294 Index: 442.00

6-97 Page 5 of 6

Safety Joint Overshot Parts List


Refer to Drawing Nos. 628-822-1, Size 7" and 628-822, Size 9-5/8".
Item No. 1 2 3 4 6 Description O-ring Back-Up Ring Top Sub 7" Casing 9-5/8" Casing Thread Protector 3-1/2 IF Overshot Skirt Standard Trim No. Reqd 7" Casing 9-5/8" Casing 1 WW-B339-V40 WW-B339-V40 2 06-27509-00 06-27509-00 1 06-27594-00 06-27594-00 06-27593-00 1 06-27590-00 1 06-28317-00 06-28317-00

Unit No. 5294 Index: 442.00

6-97 Page 6 of 6

Model A Safety Joint And Overshot


Recommended Field Test Procedure Model A Safety Joint

Commodity No.:__________________

Serial No.: _______________

The following pressure test will be conducted with water. 1. Install test caps (06-28289-00) into the top and bottom of the tool and hookup the test pump. 2. Pressure up tool to 10,000 psi. Hold for 15 minutes. 3. Bleed off pressure and remove the test caps. Blow Dry.

Tested By:______________________

Date: ____________________

Witnessed By:___________________

Date: ____________________