Vous êtes sur la page 1sur 11

SETTING-UP CONTROL STAND

SINGLE LOCO OPERATION NON-WORKING CONTROL STAND Auto Brake Handle FS Direct Brake Handle REL Lead/Trail Switch TRAIL WORKING CONTROL STAND Auto Brake Handle RUN Direct Brake Handle FULL when stopped & REL for moving the Locomotive Lead/Trail Switch LEAD

Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

SETTING-UP CONTROL STAND ctd


SETTING L/T SWICHES FOR MULITIPLE LOCO OPERATION LEADING LOCO NON-WORKING CONTROL STAND Auto Brake Handle FS Direct Brake Handle REL Lead/Trail Switch TRAIL WORKING CONTROL STAND Auto Brake Handle RUN Direct Brake Handle FULL when stopped & REL for moving the Locomotive Lead/Trail Switch LEAD TRAILING LOCO ON BOTH CONTROL STAND (Both are Non-Working) Auto Brake Handle FS Direct Brake Handle REL Lead/Trail Switch TRAIL
Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

SETTING-UP CONTROL STAND ctd


BANKER OPERATION NON-WORKING CONTROL STAND Auto Brake Handle FS Direct Brake Handle REL Lead/Trail Switch TRAIL WORKING CONTROL STAND Auto Brake Handle FS Direct Brake Handle FULL when stopped & REL for moving the Locomotive Lead/Trail Switch HLPR NOTE : With the above settings in Banker Loco, attach BP hoses between Leading & Banker Loco, open BP angle COCs to charge BP. BP in the Banker Loco may drop immediately once angle COC is opened and PCS will knock-out (no message on LCC screen). Once, BP is charged from Leading Loco, PCS in the Banker Loco will reset automatically and Loco is ready for operation. CAUTION: DO NOT CHANGE ANY SETTINGS ON BANKER LOCO CONTROL STANDS EXCEPT RELEASING DIRECT BRAKES i.e, BRINGING DIRECT BRAKE HANDLE TO RELEASE POSITION FOR MOVEMENT If the AUTO BRAKE HANDLE in the Banker Loco is left in RUN and while moving the loco, PCS will knockout when the speed reaches 3 kmph (No development of BC Pressure). But, message on EM2000 - "NO LOADPCS OPEN, RECOVER THE AIR BRAKE SYSTEM TO RESET PCS will appear. Stop moving Locos, Bring Throttle Handle to IDLE, EM2000 message will change as : "AIR BRAKE PENALTY-PLACE HANDLE IN FULL SERVICE FOR 10 SECONDS Place Auto Handle in FS for 10 seconds, PCS resets and the EM2000 message changes as : "TO RESTORE NORMAL AIR BRAKE OPERATION-PLACE AUTOMATIC HANDLE IN RUNNING" Bring the AUTO handle to RUN once & immediately move the Auto handle to FS which is strictly legitimate handle position for Banker Operation.
Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

TO RESET PENALTY BRAKES


IF THE PENALTY IS FOR EMERGENCY and after SELF TEST etc (AS PER LCC MESSAGE) First Bring Throttle Handle to IDLE & the Reverser to NEUTRAL FROM WORKING CONTROL STAND Keep AUTO BRAKE HANDLE in EMER for 60 sec After completion of 60 sec, a message will display on LCC screen to keep AUTO BRAKE HANDLE in RUN Keep AUTO BRAKE HANDLE in RUN and BP starts charging IF THE PENALTY IS FOR FS and after ALERTER operation etc (AS PER LCC MESSAGE) First Bring Throttle Handle to IDLE & the Reverser to NEUTRAL FROM WORKING CONTROL STAND Keep AUTO BRAKE HANDLE in FS for 10 sec After completion of 10 sec, a message will display on LCC screen to keep AUTO BRAKE HANDLE in RUN Bring and Keep AUTO BRAKE HANDLE in RUN and BP starts charging
Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

TO ATTACH THE LOCOMOTIVE ON FORMATION


First attach the Locomotive to Formation and ensure CBC is properly Locked From WORKING CONTROL STAND Auto Brake Handle RUN Direct Brake Handle FULL Lead/Trail Switch Press Down & move from LEAD to TEST Connect Loco & Formation BP hose pipes (Connect FP hose pipe also in case of Twin Pipe Operation) First Open Formation side BP Angle COC Then Open Loco side BP Angle COC Lead/Trail Switch Press Down & move to LEAD Allow to charge BP Open Formation FP Angle COC Open Loco FP Angle COC Allow to charge FP
Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

BP LEAKAGE TESTING ON FORMATION


Whenever BP charging problem is noticed after attaching loco to formation First charge BP to the extent possible, then From WORKING CONTROL STAND Auto Brake Handle RUN Direct Brake Handle FULL Lead/Trail Switch Press Down & move from LEAD to TEST & note the time Observe BP Leakage rate as per Railway Guide lines NOTE : During this test BP charging is CUT-OFF to find out the Leakage rate and moving Auto Handle in Service zone will not result in application of auto brakes except EMERGENCY Brakes.

Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

CHANGING CONTROL STAND


SINGLE LOCO OPERATION Stop Locomotive Apply Loco Brakes (DIRECT BRAKE HANDLE FULL) Apply Hand Brakes for safety Always first make both control stands as NON-WORKING WORKING CONTROL STAND Auto Brake Handle FS Move Direct Brake Handle to REL Lead/Trail Switch Press down & move from LEAD to TRAIL NON-WORKING CONTROL STAND (NOW TO SELECT AS WORKING) Auto Brake Handle RUN Direct Brake Handle FULL Lead/Trail Switch Press down & move from TRAIL to LEAD Release Hand Brakes
Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

CHANGING LEAD LOCO TO TRAIL FOR MU OPERATION


MULTIPLE LOCO OPERATION WITH TWO EMD LOCOS Stop Locomotive Apply Loco Brakes (DIRECT BRAKE HANDLE FULL) Apply Hand Brakes for safety Always first make both control stands as NON-WORKING WORKING CONTROL STAND OF PRESENTLY WORKING LOCO Auto Brake Handle FS Move Direct Brake Handle to REL (Wait till BC pressure stabilize) Lead/Trail Switch Press down & move from LEAD to TRAIL NON-WORKING CONTROL STAND Auto Brake Handle FS Direct Brake Handle REL Lead/Trail Switch TRAIL Go to Trailing Loco (If That Loco now to be made as LEADING) ON THE CONTROL STAND TO BE MADE AS LEAD Auto Brake Handle REL Direct Brake Handle - FULL Lead/Trail Switch Press down & move from TRAIL to LEAD NON-WORKING CONTROL STAND Auto Brake Handle FS Direct Brake Handle REL Lead/Trail Switch TRAIL
Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

TO ATTACH THE LOCOMOTIVE AS DEAD IN MU

First attach the Working Locomotive to this Loco to be moved as DEAD and ensure CBC is properly Locked Shut down the loco to be moved as DEAD Put OFF all Circuit Breakers Connect MREQ, BCEQ hose pipes of both locos and open COCs Connect both Locos BP hose pipes and open angle COCs Apply Direct Brakes (loco brakes) from Lead Loco and verify application of Brakes on Dead Loco Release Direct Brakes (loco brakes) from Lead Loco and verify releasing of Brakes on Dead Loco Drop BP from Lead Loco and verify application of Brakes on Dead Loco Re-charge BP from Lead Loco and verify releasing of Brakes on Dead Loco NOTE : Loco Brakes on DEAD Locomotive will operate in both Auto & Direct Braking from the LEAD Locomotive

Knorr-Bremse Group

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

TO ATTACH THE LOCOMOTIVE AS DEAD CONNECTING ONLY BP


First attach the Working Locomotive to this Loco to be moved as DEAD and ensure CBC is properly Locked Shut down the loco to be moved as DEAD Put OFF all Circuit Breakers Drain MR1 & MR2 and close MR drain COCs Open DEAD ENGINE COC on Dead Loco (provided on CCB Brake panel) Connect both Locos BP hose pipes Open MREQ & BCEQ COCs at one end on DEAD Loco (This is to avoid pressure trapping) Open Dead Loco BP Angle COC Open Lead Loco BP Angle COC Charge BP from Lead Loco (NOTE: MR2 in Dead loco will slowly charge from Leading Loco BP to 25 psi (2.5kg/cm2) max. Drop BP from Lead Loco and verify application of Loco Brakes on Dead Loco Re-charge BP from Lead Loco and verify releasing of Loco Brakes on Dead Loco NOTE : Loco Brakes on DEAD Locomotive will operate only by operation of A9 or AUTO handle on Lead Locomotive and during parting between Locomotives.
Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011
Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

Knorr-Bremse Group

10

DOS AND DONTS


Never select both Controller Lead/Trail Switches to HLPR at any point or Keep One in LEAD & the Other in HLPR/TEST. Lead/Trail switch on Brake Controller is with PUSH & ROTATE mechanism and always follow this practice to rotate switch keeping the knob pressed. Do not Change Lead/Trail switch on running Locomotive. Do not Re-cycle CCB Circuit Breaker on a running locomotive. Give some time during two self test (at least 4-5 minutes). Ensure Loco is isolated before performing Air Brake self test. Ensure availability of sufficient MR pressure (always more than 7 Kg/cm2) before starting self test. Do Not hold bail off switch for long time. If Auto Brake are applied and if you are moving Direct Brake Handle to REL position, please be careful to not to lift bail ring other-wise it will result into release of Auto Brakes on Locomotive & Locomotive may roll. Before attaching locomotive to formation, please blow the air thru hoses (by charging BP) and also please clean End connection of formation wagon/coaches. At times it is found that small stone or plastic pieces flow back to Emergency Vent Valve Clear fault codes of Controller Failure i.e, 40, 41 & 42 etc before HLPR operation.
Knorr-Bremse Group

11

Strictly confidential Templates deutsch_5. Oktober 2005 30.03.2011


Copyright 2006 Knorr-Bremse AG. All rights reserved, including industrial property rights applications. Knorr-Bremse AG retains any power of disposal, such as for copying and transferring

Vous aimerez peut-être aussi