REF. NO. CONTRACTOR PROJECT NAME DESIGN/M-01/II/2008 PT. KINDEN DAIRI ZINC/LEAD PORT FACILITY PROJECT
SUBMITTED BY
SIGNATURE
REMARKS As a notice :
1 Storage water tank with capacity 300 m3 was design base on assumption of Rain water catchement area 60m x 34 m ( 2040 m2) which can be serviced by 2 nos pipe gutter with dia. 200 mm. Details of calculation is enclosed in another sheet. 2 For catchment area 120 m x 34 m ( 4080 m2) Drainage system must be serve by 4 nos pipe gutter with dia. 200 mm each. Equivalent Water volumetric for rain water 50 mm/h with rain duration 4 hours (maximum), 816 M3 Rainwater volume exceeding the water tank which has capacity 300 m3 The excessive water supply must be drained to near pit
COMMENTS
APPROVED
NON APPROVED
SIGNATURE
SHEET No:
CASE I
Rainfall Intensity Q (m3/h) Q (m3/s) Drain pipe run out Pipe dia Selection Flow required Q (d) = = = = = = 30 mm/h 61.2 0.02 2 Nos 200 mm 0.008 m3/s 0.03 m/h
Coefficient of surface roughness n= 0.009 Slope of Pipe S = 1 Vertically 200 Horizontal. Grade Selected = 1 : 200 ( See Grade regulation Australia Std ) Diameter of Pipe D (mm) PIPE FULL Manning Formula Q = 0.312/ n* (D)^8/3*S^1/2 Manning Formula V = 0.397/ n* (D)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 75% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 50% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = V = 1.07 m/s 0.0167 m3/s 197.0 % V = 1.21 m/s 0.0306 m3/s 359.6 % V = 1.07 m/s 0.0335 m3/s 394.5 % Flow Depth = H.Area = Rh=0.603*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 0.75 D ) Flow Depth = H.Area = Rh=0.5*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 0.5 D ) (MIN 0.8 , MAX 3 M/S) Qf>Qd = 200 0.20 m
0.5
Q(f)=
Q(f)=
Q(f)=
SHEET No:
Coefficient of surface roughness n= 0.009 Slope of Pipe S = 1 Vertically 200 Horizontal. Grade Selected = 1 : 200 ( See Grade regulation Australia Std ) Diameter of Pipe D (mm) PIPE FULL Manning Formula Q = 0.312/ n* (D)^8/3*S^1/2 Manning Formula V = 0.397/ n* (D)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 75% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 50% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = V = 1.07 m/s 0.0167 m3/s 118.2 % V = 1.21 m/s 0.0306 m3/s 215.8 % V = 1.07 m/s 0.0335 m3/s 236.7 % Flow Depth = H.Area = Rh=0.603*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 0.75 D ) Flow Depth = H.Area = Rh=0.5*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 075 D ) (MIN 0.8 , MAX 3 M/S) Qf>Qd = 200 0.20 m
0.5
Q(f)=
Q(f)=
Q(f)=
SHEET No:
Coefficient of surface roughness n= 0.009 Slope of Pipe S = 1 Vertically 200 Horizontal. Grade Selected = 1 : 200 ( See Grade regulation Australia Std ) Diameter of Pipe D (mm) PIPE FULL Manning Formula Q = 0.312/ n* (D)^8/3*S^1/2 Manning Formula V = 0.397/ n* (D)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 75% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 50% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = V = 1.07 m/s 0.0167 m3/s 59.1 % V = 1.21 m/s 0.0306 m3/s 107.9 % critical V = 1.07 m/s 0.0335 m3/s 118.4 % Flow Depth = H.Area = Rh=0.603*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 0.75 D ) Flow Depth = H.Area = Rh=0.5*r (MIN 0.8 , MAX 3 M/S) Qf<Qd (MIN 0.8 , MAX 3 M/S) Qf>Qd = 200 0.20 m
0.5
Q(f)=
Q(f)=
Q(f)=
( insufficient)
SHEET No:
4080 m2
0.05 m/h
Coefficient of surface roughness n= 0.009 Slope of Pipe S = 1 Vertically 200 Horizontal. Grade Selected = 1 : 200 ( See Grade regulation Australia Std ) Diameter of Pipe D (mm) PIPE FULL Manning Formula Q = 0.312/ n* (D)^8/3*S^1/2 Manning Formula V = 0.397/ n* (D)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 75% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = PIPE 50% Manning Formula Q = V * Hydraulic Area Manning Formula V = 1/ n* (Rh)^2/3*S^1/2 Velocity Discharge Relation Qf/Qd = V = 1.07 m/s 0.0167 m3/s 118.2 % V = 1.21 m/s 0.0306 m3/s 215.8 % V = 1.07 m/s 0.0335 m3/s 236.7 % Flow Depth = H.Area = Rh=0.603*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 0.75 D ) Flow Depth = H.Area = Rh=0.5*r (MIN 0.8 , MAX 3 M/S) Qf>Qd (Peak Flow 0.5 D ) (MIN 0.8 , MAX 3 M/S) Qf>Qd = 200 0.20 m
0.5
Q(f)=
Q(f)=
Q(f)=
SHEET No:
OK OK OK OK
OK OK OK OK
OK OK
x
OK
Case I to III Base on assumption :Rain water catchment area is 2040 m2 Case IV base assumption rainwater catchement area 4080 m2 with 4 nos drain pipe with dia. 200 mm each
CONCLUSION
1 2 Nos Gutter/Pipe drain with dia. 200 mm each are sufficient and have good performing for condition above with the maximum rain intensity 50 mm/hr. at condition of rainfall instensity 100 mm/hr with the depth/ weted radius 50 % flow ability is insufficient but this case is rarely happen For catchment area 120 m x 34 m ( 4080 m2) Drainage system must be serve by 4 nos pipe gutter with dia. 200 mm each. Equivalent Water volumetric for rain water 50 mm/h with rain duration 4 hours (maximum), 816 M3 Rainwater volume exceeding the water tank which has capacity 300 m3 Excessive rain water must be drained to near pit
31-Jan-12 Herawan
m m2 m
m m2 m
31-Jan-12 Herawan
m m2 m
m m2 m
31-Jan-12 Herawan
m m2 m
m m2 m
( insufficient)
31-Jan-12 Herawan
m m2 m
m m2 m
31-Jan-12 Herawan
as capacity 300 m3
A.
Volume of Rainfall for the Area of roof (Precipitation) CASE1 30mm/hour Q=0.03m/h2,040m2=61m3/h CASE2 50mm/hour Q=0.05m/h2,040m2=102m3/h CASE3 100mm/hour Q=0.10m/h2,040m2=204m3/h Gutter pipe flow ability (using D200 2pipes) Water occupied area for pipe CASE1 Pipe 50% Q=(0.2^23.14/450%)1.07m/S3,600S2pipes=121m3/h CASE2 Pipe 75% Q=(0.2^23.14/475%)1.21m/S3,600S2pipes=205m3/h CASE3 Pipe 100% Q=(0.2^23.14/4100%)1.07m/S3,600S2pipes=242m3/hPrecipitation 100mm/h Precipitation per pour is generally 10~30mm/hour It is rare rainfalling 100mm/hour
Base on assumtion of Rainfall water 50 mm/hr (0.05 m/hr) Debit of rain water within 4 running hours : 400 m3
Q 2= over Flow
Q3 = 0 in Full Sto
over flow 200 mm dia LAYOUT STORM WATER DRAINAGE SYSTEM NO SCALE
Q 2= over Flow