CK570CCK240
125m14.9m26.9m
39.5m41.5m2m63m13H
41.5m
5m
19.8m(CEDM)
1.25
CK570C
1.
2.
3.
4.
bowin520@trts.dorts.gov.tw
hkc5191@mail.sinotech.com.tw
pfyang@mail.sinotech.com.tw
geolin@mail.sinotech.com.tw
38
Case Study of the Dewatering Methods for the Deep Excavation of Turnout
Structure of CK570C of the Taipei MRT
Bo-Win Yu 1 Kan-Chung Huang 2 Pong-Fey Yang 3 Lin-Kun Lin 4
Abstract
The site of the Xinzhuang MRT line turnout structure is located on the northern side of Taipei
Bridge and underneath both the inner and outer sides of the Danshui River dike. The turn-out
structure also lies beneath the elevated Huanhe Expressway in Sanchong and will be used as a track
switch for the Xinzhuang-Luzhou line. The turn-out structure is the shape of a trumpet with its west
section more wide and its east section more narrow, of which its length is 125 m and width is 14.9
m~26.9 m. The excavation depth of the turn-out structure is 39.5 m~41.5 m. In order to support the
sides of the excavation, a 2 m-thick, 63 m-deep diaphragm wall was constructed around the site
perimeter and a 13-layer temporary H-shaped steel strut was used as a retaining structure. Due to the
lack of an impermeable soil layer lying beneath the foundation excavation face, the safety factor of
the nal excavation face did not satisfy Civil Engineering Design Manual (CEDM) specications.
So plugged grout and dewatering through the application of a Jingmei Gravel Layer was applied
as an auxiliary method to stabilize the structure foundation excavation to avoid leakage problems
on the final excavation face. The auxiliary method not only avoided leakage problems but also
decreased the need for water to be pumped out of the Jingmei Gravel Layer, it also assisted with the
problem of up-lift of the nal excavation face.
This article introduces the design and construction procedure of plugged grout and dewatering
in the Jingmei Gravel Layer in the turnout structure of section contract CK570C of the Taipei MRT.
Keywords: CK570C Lot, Jingmei Gravel Layer, Plugged Grout, Dewater
38972
39
12m
2025m
CP261CP262
CT201F
CK570CCK24039.5m41.5m
16.5m18.5m
51.5m
CEDM1.25
2000m2
CK570CO8
O53.2km
(O5O6O7)()
1
125m14.9m26.9m39.5m
41.5m2/31/2
2
58.5m
40
1 CK570C
21m
38972
41
7m
()
58.5 m
7m
28.5mCEDM1.25
39.5m41.5m2
1
51.5m18.5m33m
63m
5m3
51.5m31.7m19.8mCEDM1.25
(1996)CP261CP262CT201FTheis
(1996)T=0.15m2/
secS=0.0025(1996)
Jacob
Q=5.46T/log(2.25Tt/r2S)
Q=11146m3/hr11146cmh
Qw360cmh
11146/36031
()
1.
53
42
3
64A~DE~F
Double Packer Sleeve Grouting Method
Sleeve Pipe
0.33m
8~15 liter/min.
60 min.
38972
43
1
10-5cm/sec
Epvcmf!Qbdlfs!
!
Tmffwf!Qjqf
Dbtjoh!
DCTM !
6
2.
()
120
O8
3396m(30m)
100HPQw
360cmh
44
800mm
Bailer
700mm
71m
6m
1 1/2PVC(65~70m)3
23m
360cmh
20055
17360cmh
EL+76.7mEL+103.5m4.9m1.1
85
Jacob
1710
21000Kva
ATS
ADEF
1
200511820061120
38972
45
(EL)(m)
92.4(4.1*)
3
2
11
12
12
13
87.6(8.9*)
13
14
82.7(13.8*)
14
B5
77.5(19.0*)
10
B5
B5
85.9(10.6*)
B5
B4
88.4(8.1*)
B4
B4
89.7(6.8*)
B4
B3
90.7(5.8*)
B3
B3
92.9(3.6*)
B3
B3+B2
95.0(1.5*)
11
12
92.4(4.1*)
12
13
87.6(8.9*)
B-D
13
14
82.7(13.8*)
14
B5F
77.5(19.0*)
10
B5F
B5
85.9(10.6*)
10
11
95.0(1.5*)
11
12
91.6(4.9*)
12
13
87.5(9*)
13
14
82.7(13.8*)
14
B5F
76.8(19.7*)
B5F
B5F
87.88.7*
10
11
95.0(1.5*)
11
12
91.6(4.9*)
12
13
87.5(9*)
13
14
82.7(13.8*)
14
B5F
76.8(19.7*)
B5F
B5F
86.9(9.6*)
46
()
2005118200611207
1625
()
1.
70%
131
O8
BD
8
BDB5
A
2.
3.
)3*
P8
FM/)n*
FM/)n*
P8
P8
P8
FM/)n*
FM/)n*
38972
47
0.7 km9
EL. 87.8
m13 m(2)6.1 km9
()
()
0.7 km~6.3 km13 m~10 m
()
1.//2006CK240
2.//2007CK570C
3.(1996)
(1996)