Step 1

Project Details Construction and Demolition Waste Estimation Operational Waste Estimation Salvage/Reycling Capture Rates Credit Point Summary Construction and Demolition Waste Summary Operational Waste Summary

Background

Step 2

Step 3

Design teams are required to proceed through the worksheets Steps 1 to 4 in order. All Input Cells must be completed in order to display results correctly within the Summary worksheets. The results are presented in the Summary worksheets, but please do not proceed to next step if there are any warning messages in any of the Steps. Instructions: * Design teams are required to enter information in all light blue input cells not greyed out to display the results in the Results worksheet. Please do not proceed if there are any warning messages in any of the Steps. * For construction rating submissions, select "Construction" as the Pearl Rating Stage and override default values with actual data from construction and, if applicable, demolition Note: This tool is for use with the Pearl Rating System only and to demonstrate compliance with the Pearl Rating requirements. It is not a design tool.

Step 4

Summary 1

Summary 2

Summary 3

Key to cell formats in the waste calculator Input Cells that may be changed by design teams Last Revised: 1st November 2010
Next

Step 1 - Project Details


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

Project Details
Community/Project Name Location Total building GFA, m2 Warning: Please fill all fields above.

Client Details
Client Name Client Contact Client Address Warning: Please fill all fields above.

Rating System Details


Project ID Pearl Rating System Pearl Rating Stage Warning: Please fill all fields above. Community

Design Team Details


Architect Developer

Pearl QP Details
Pearl QP Name Pearl QP Number Warning: Please fill all fields above.

Mechanical Engineer Electrical Engineer Structural Engineer Ecologist Landscape Architect Other

Waste Calculator
Person Responsible Company Date of Issue Warning: Please fill all fields above.

Other Other Other Other

Previous

Home

Next

Step 2 - Construction and Demolition Waste Estimation


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

Details of existing buildings and infrastructure to be demolished


Are there any existing building(s) within the community? Is there any existing public realm infrastructure within the community? No No

Note: Only include public realm infrastructure or buildings that will be demolished in preparation of public realm/infrastructure work. Do not include buildings that will be part of individual plots and that will be considered by the Building or Villa rating systems
Override default demolition waste values? No 50.0

Existing building(s) Attribute Total gross floor area Unit sqm Value

Demolition waste generated in m3 per 100 m2 of building: Please write the source reference of this figure:

Existing public realm infrastructure Attribute Total area Unit sqm Value Demolition waste generated in tonnes per 100 m2 of public realm infrastructure: Please write the source reference of this figure:

Proposed Community Details


Note: Please fill in all areas of public realm/common elements of the community with their respective construction waste rates as no default benchmarks are provided.
Proposed public realm/common elements in the community Attribute Street/Roads/Highways Unit m2 Value Construction waste generated in tonnes per 100 m2 of Street/Roads/Highways Please insert the source reference for the value used: Infrastructure buildings, e.g. district cooling centres m2 Construction waste generated in tonnes per 100 m2 of Infrastructure buildings, e.g. district cooling centres Please insert the source reference for the value used: Utility corridors m2 Construction waste generated in tonnes per 100 m2 of Utility corridors Please insert the source reference for the value used: Parks / landscape with vegetation m2 Construction waste generated in tonnes per 100 m2 of Parks / landscape with vegetation Please insert the source reference for the value used: Waterfront features m2 Construction waste generated in tonnes per 100 m2 of Waterfront features Please insert the source reference for the value used: Other m2 Construction waste generated in tonnes per 100 m2 of Other Please insert the source reference for the value used: Other m2 Construction waste generated in tonnes per 100 m2 of Other Please insert the source reference for the value used: Please fill areas of public realm/common elements of the community. Proposed buildings within the community Attribute Total Gross Floor Area (GFA) GFA of Offices in the community GFA of Retail in the community GFA of School in the community GFA of Residential in the community GFA of Other building - Hotel in the community GFA of Other bldg: Name: GFA of Other bldg: Name: Unit m2 m2 m2 m2 m2 m2 m2 m2 Value 0

Note: Earthworks are not included in the construction waste calculations. Nonetheless, balancing filling and excavation volumes within the community site is best practice.

Previous

Home

Next

Step 3 - Operational Waste Estimation


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

Proposed Community Details


Office Attribute Office Gross Floor Area Office Net Floor Area Office Unit sqm sqm No Value 0 Non-default waste composition and generation for Offices Paper/Cardboard 59.0% Quantity Metal 1.0% 80.0 Glass 2.0% kg/m2/year Plastic 9.0% Organic 19.0% Other non-haz. 10.0%

Override default operational waste values for offices?

Please insert the source reference for the value used:

Retail Attribute Retail Gross Floor Area Retail Net Floor Area Override default waste values for retail?

Retail Unit sqm sqm No Value 0

Non-default waste composition and generation for Retail Paper/Cardboard 62.0% Quantity Metal 1.5% 40.0 Glass 0.0% kg/m2/year Plastic 28.0% Organic 3.5% Other non-haz. 5.0%

Please insert the source reference for the value used:

School Attribute School Gross Floor Area Number of students

School Unit sqm students No Value 0

Non-default waste composition and generation for School Paper/Cardboard 55.0% Quantity Metal 2.0% 70.0 Glass 4.0% kg/student/year Plastic 17.0% Organic 18.0% Other non-haz. 4.0%

Override default waste values for schools?

Please insert the source reference for the value used:

Residential Attribute Residential Gross Floor Area Total number of residents

Residential Unit sqm person No Value 0

Non-default waste composition and generation for Residential Paper/Cardboard 15.0% Quantity Metal 5.0% 532.9 Glass 5.0% kg/person/year Plastic 15.0% Organic 50.0% Other non-haz. 10.0%

Override default operational waste values for Residential?

Please insert the source reference for the value used:

Other building types: Attribute Hotel Gross Floor Area Number of rooms Override default waste values for hotels?

Hotel Unit sqm rooms No Value 0

Non-default waste composition and generation for Other - Hotel Paper/Cardboard 37.2% Quantity Metal 7.5% 900.0 Glass 0.9% kg/room/year Plastic 11.4% Organic 35.3% Other non-haz. 7.7%

Please insert the source reference for the value used:

Other building types: Attribute Gross Floor Area Net Floor Area Unit sqm sqm Value 0

Non-default waste composition and generation for Other Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

Quantity

kg/m2/year

Please insert the source reference for the value used:

Other building types: Attribute Gross Floor Area Net Floor Area Unit sqm sqm Value 0

Non-default waste composition and generation for Other Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

Quantity

kg/m2/year

Please insert the source reference for the value used:

Landscape Attribute Landscape Area Unit sqm Value 0

Landscape waste generation Quantity kg/m2/year Landscape architect report for masterplan in July 2010

Please insert the source reference for the value used:

Previous

Home

Next

Step 4 - Salvage/Reycling Capture Rates


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

Construction and Demolition waste recycling and salvage rates


Salvage and recycling of Construction and Demolition waste Non-technical factors Will a construction and demolition waste management plan be written? (Required SM-R2) Will waste education be provided to construction contractors? Will waste education be provided to demolition contractors? Will waste be adequately segregated and temporarily stored on-site during construction? Will waste be adequately segregated and temporarily stored on-site during demolition? Will there be a person responsible of C&D waste management? No No No No No No Salvage rate Technical factors What percentage of material from existing community elements/buildings will be reused in the new one? List of items reused: Will construction waste be segregated in a recycling plant? Which plant(s)? Will demolition waste be segregated in a recycling plant? Which plant(s)? No No 0% Non-technical capture rate Technical capture rate Overal capture rate Construction 0% 0% 0% Demolition 0% 0% 0% 0% NOTE: Capture rates represent the expected salvage/recycling rates of the project for construction and demolition waste at the design stage or those achieved during the construction stage. They are not the final salvage/recycling rates that will be achieved in the projects. These which are shown in the Summary 2 worksheet. Capture rates are always <100% because they represent are a combination of non-technical factors such as education and management as well as technical factors, e.g. only aggregates can be reprocessed.

Override automatic values and enter customised capture rates?

No

Construction 0%

Demolition 0%

Please insert the source reference for these figures:

Operational waste diversion from landfill rates


General Will an operational waste management plan be written? (Required SM-R3) Will adequate access be provided for refuse collection vehicles? (Required SM-R3) Will landscape waste be collected? Will landscape waste be treated in a suitable facility, e.g. composting? Will at least one collection point will be provided to collect hazardous waste from the community? Will adequately sized collection and storage waste facilities be provided? (Required SM-R3) If appropriate, will adequately sized treatment waste treatment facilities be provided? (Required SM-R3) No No No No No No No NOTE: Capture rates represent the percentage of each waste stream expected to be diverted from landfill, either by reusing it, recycling, composting, or treating it in a biological or thermal treatment plant not including incineration. The rates can be estimated during the desing stages or be based in actual data gathered during construction. They are not the final diversion from landfill rates that will be achieved in the building which are shown in the Summary 3 worksheet. Capture rates are always <100% as they represent residents and tenant's attitudes towards recycling as well as the technical feasiliby of diverting each waste stream from landfill through the alternatives mentioned.

Non-residential Non-technical factors Will waste education be provided to staff, guests, students, etc., e.g. leaflets? Will non-residential non-organic waste be stored and collected as separate streams? Will organic waste from all non-residential building uses be stored and collected separately? Will there be a facilities manager responsible for waste in the building? No No No No NOTE: If organic waste is collected from some building uses but not from others please enter customised capture rates below Non-residential Technical factors Will non-organic recyclable waste be segregated manually on-site or mechanically in a recycling plant? Will organic waste be composted, and if so will it be done on-site or off-site? No No Non-technical capture rate Technical capture rate Overal capture rate Non-organic 0% 0% 0% Organic 0% 0% 0% Landscape Capture rate Organic 0%

Residential Non-technical factors Will waste education be provided to residents, e.g. leaflets? Will non-organic residential waste be stored and collected as separate streams? Will organic residential waste be stored and collected separately? No No No Residential Non-technical capture rate Technical capture rate Overal capture rate Technical factors Will non-organic recyclable waste be segregated manually on-site or mechanically in a recycling plant? Will organic waste be composted, and if so will it be done on-site or off-site? No No Non-organic 0% 0% 0% Organic 0% 0% 0%

Override automatic values and enter customised capture rates

Capture rates for Office for Office? No Paper/Cardboard 0% Metal 0% Glass 0% Plastic 0% Organic 0% Other non-haz. 0% Please insert the source reference for the value used:

Capture rates for Retail for Retail? No Paper/Cardboard 0% Metal 0% Glass 0% Plastic 0% Organic 0% Other non-haz. 0% Please insert the source reference for the value used:

Capture rates for School for School? No Paper/Cardboard 0% Metal 0% Glass 0% Plastic 0% Organic 0% Other non-haz. 0% Please insert the source reference for the value used:

Capture rates for Residential for Residential? No Paper/Cardboard 0% Metal 0% Glass 0% Plastic 0% Organic 0% Other non-haz. 0% Please insert the source reference for the value used:

Capture rates for Hotel for Other - Hotel? No Paper/Cardboard 0% Metal 0% Glass 0% Plastic 0% Organic 0% Other non-haz. 0% Please insert the source reference for the value used:

Capture rates for for Other - ? No Paper/Cardboard 56% Metal 56% Glass 56% Plastic 56% Organic 0% Other non-haz. 56% Please insert the source reference for the value used:

Capture rates for for Other - ? No Paper/Cardboard 0% Metal 0% Glass 0% Plastic 0% Organic 0% Other non-haz. 0% Please insert the source reference for the value used:

Capture rates for landscape for landscape? No Organic 0% Please insert the source reference for the value used:

Previous

Home

Next

Summary 1 - Credit Point Summary


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

0 Building Construction and Demolition Waste Estimated demolition waste generated in tonnes Estimated construction waste generated in tonnes Estimated total C&D waste generated in tonnes Quantity landfilled in tonnes Estimated construction and demolition waste salvaged/recycled in % 0 0 0 0 0.0%

SM-R2: Basic construction waste management


Pre-requisite Achieved?

No

SM-R3: Basic operational waste management strategy


Pre-requisite Achieved?

No

Building Operational Waste Estimated operational waste generated in tonnes per annum Estimated operational waste landfilled in tonnes per annum Estimated operational waste diverted in tonnes per annum Estimated operational waste diverted in % 0 0 0 0.0%

SM-5: Improved construction waste management


Credit Points Awarded

SM-6: Improved operational waste management


Credit Points Awarded

SM-7: Organic waste management


Credit Points Awarded

SM-8: Hazardous waste management


Credit Points Awarded

0
Next

Previous

Home

Summary 2 - Construction and Demolition Waste Summary


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

Estimated Construction and Demolition waste

Generated Tonnes

Landfilled Tonnes 0 0 0

Salvaged/ Recycled Tonnes 0 0 0

Salvaged/ Recycled % 0.0% 0.0%

Demolition waste Construction waste Total waste Percentage of Construction and Demolition waste recycled/salvaged

0 0 0

0.0%

Construction and Demolition Waste: 0 tonnes


Construction and Demolition Waste: 0 tonnes
Construction and Demolition Waste: 0 tonnes

1 1 1 1 1

Tonnes
Landfilled Salvaged/ Recycled

0 0 0 0 0 0 Demolition waste
Salvaged/ Recycled Landfilled

Construction waste

Previous

Home

Next

Summary 3 - Operational Waste Summary


Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

Estimated Operational waste

Generated

Landfilled

Recycled/ Composted/ Treated tpa 0 0 0 0 0 0 0

Recycled/ Treated % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

tpa Paper/Cardboard Metal Glass Plastic Organic Other non-hazardous Total operational waste generated in tonnes per annum Percentage of operational waste recycled/composted/treated NOTE: tpa: tonnes per annum 0 0 0 0 0 0 0

tpa 0 0 0 0 0 0 0

0.0%

Operational Waste: 0 Tonnes per annum


1 1 1 1
Reference http://www.beeah-uae.com/en/whatyoucando/industry/did-you-know-industry

Operational Waste: Tonnes per per Operational Waste: 0 0Tonnes annumannum

Tonnes per annum


Landfilled Recycled/ Composted/ Treated

1 0 0 0 0 0 0 Paper/Cardboard Metal
Home

Recycled/ Composted/ Glass Treated

Landfilled

Plastic

Organic

Other non-hazardous

Previous

Vous aimerez peut-être aussi