Considering:
In view of:
a.
b.
c.
1.
2.
3.
Regulation of the Minister of Manpower No. Per 02/Men/1983 regarding it Installation of automatic Fire
Alarms;
4.
Regulation of the Minister of Manpower No. Per04/Men/1988 regarding the Validity of National Standard SNI
225 Regulation of Indonesian Electricity Installation at
workplace;
5.
6.
7.
MM11-1997.PDF
INSTRUCTED
TO:
1.
2.
3.
4.
Carry out this instruction with full responsibilities in accordance with the
prevailing stipulations and technical guidelines attached. Report the
implementation to the Minister.
Promulgated in Jakarta
On 21 October 1991
On behalf on the Minister of Manpower
Director General of Industrial relationship
Building and Supervision
MOHD. SYAUFII SYAMSUDIN
NIP. 160008975
Minister of Manpower
2.
3.
4.
MM11-1997.PDF
Appendix
No.
: INS. 11 /M/BW/1997
Date
: 21 October 1997
___________________________________________________________________________
GUIDELINES FOR TECHNICAL SUPERVISIONS OF FIRE PROTECTION
SYSTEM
I.
GENERAL GUIDELINES
Work safety conditions related to fire protection have clearly been outlined in Law
No. 1 of 1970, among others:
-
2.
Actions to reduce the seriousness level of financial loss and number of victims
can be done by localizing and compartment so fire, smoke, and gas do not
spread to other parts.
3.
4.
The availability of roads for escaping that are safe, fast and sufficient in
accordance with the number of people and building construction shape.
5.
Construction and supervision tasks for work safety for fire prevention area as the
explanation above must be carried out professionally by supervising officials and by
cooperating closely and harmoniously with related institutions/services.
MM11-1997.PDF
II.
1.
Every plan for a workplace must consider conditions and stipulations for fire
protection effort, both active and passive protections.
-
2.
3.
4.
Planning file system is made in triplicate and after being examined and
authorized by the supervisor is then sent to the Director of PNKK to be
published for its legalization/approval for the planning blueprint mentioned.
III.
1.
2.
3.
After the installation work is completed, local inspection and testing must be
carried which is attended by all parties involved, among others:
-
Contractor
Planner (consultant)
Owner (employer)
MM11-1997.PDF
4.
After the entire inspection and testing are completely carried out, evaluation is
done together. Manpower supervisor provides comments and conditions
considered necessary based on the findings when inspection and testing were
carried out.
5.
As built drawing must be made completely together with the Official Report
regarding the result of inspection and testing, sent to the Director of PNLL to be
issued for legalization.
6.
IV.
1.
Dwelling classification
Dwelling type classification will determine the technical conditions for fire
protection system that must be applied.
2.
Ignition Sources
Notice any potency that can become a trigger source of fire and notice whether
the safety device required is suitable, when the latest inspection is, and whether
the conditions given have been implemented.
3.
Flammable/explosive materials
Notice the types of materials being processed, finished, or stored. Recognize
their physical and chemical properties, whether they contain flammable or
explosive potencies. Notice whether there is a work safety procedure or it is
carried out properly.
4.
Compartment
Notice the conditions of workplace environment concerning the spreads of fire,
heat, and smoke and whether or not there are efforts to control them.
5.
Emergency exits
Notice the evacuation lanes, emergency exits stairs, whether or not there are
barriers that can obstruct, whether there are directional signals, emergency
lights, and the distance to the exits is not more than 36 m for low risk, 30 m for
medium risk, and 24 m for high risk.
MM11-1997.PDF
6.
7.
8.
Alarm installation
a.
b.
c.
d.
Carry out testing on equipment function on the panel, whether or not all
equipment and indicators work properly, and zone alarm signaling has
been installed;
e.
f.
Conduct test on open circuit by opening the resistor in the last detector
circuit.
g.
b)
c)
d)
Check the pump room and record technical data of the pump, activator,
and the available equipment, control panel, and so on;
e)
Check the water supply system whether it can guarantee the water
requirement for extinguishing operation in time in accordance with
certain standard time;
f)
Carry out test on pump operation by opening test shell provided in the
pump room and watch closely t6he pump pressure;
MM11-1997.PDF
g)
1)
2)
3)
Close the test-shell and record the pump pressure at spur stop
position;
4)
Reopen the test-shell until the main pump operates and record its
pressure;
5)
Monitor for a certain time the operation pressure of the main pump
and record it.
6)
Closer again the test-shell and let the main pump run. Record the
pressure and monitor whether the safety valve work or not;
7)
Test the spare pump. Record its start and operational pressure as the
steps taken in testing the main pump.
Pump Evaluation
Hydrant pump must have a minimum pressure of 4.5 kg/Cm2 and a
minimum flow of 500 US GPM. Match the pump specification based on
the catalogue with the result of try-out.
Check the pump control circuit, among others:
h)
1)
The electric capacity supply must be pulled from the supply side in
the main panel by using its own switch;
2)
3)
4)
5)
Between the motor and the control circuit, it is not allowed to install
safety device for extra load.
Open the closest hydrants point to the pump. Measure to the right
of the spraying opening with pivot pipe and record the pressure on
the manometer in the pump room;
2)
Open the second hydrant point, that is the furthest one and the first
testing point leave open. Measure the pressure at the spraying
opening and manometer pressure in the pump room;
MM11-1997.PDF
3)
i)
Open the third hydrant point, that is the middle one and let the first
and second points open. Measure the pressures at the spraying
openings and on the manometer in the pump room.
9.
Special Installation
Certain objects sometimes require special fire protection system with certain
media that are adjusted to the concerned object characteristics. The evaluation
criteria for special installation must refer to the prevailing standard and
technical specification of the equipment from the manufacturer.
Promulgated in: J A K A R T A
On : 21 October 1999
On
behalf
of
MANPOWER
the
MINISTER
OF
Director General of
THE ESTABLISHMENT OF INDUSTRIAL
RELATIONSHIP AND MANPOWER
DIVISION
Signed
MOHD. SYAUFII SYAMSUDDIN
NIP. 160008975
MM11-1997.PDF
REGIONAL/LOCAL OFFICE
SUPERVISING OFFICIAL
INSTALLATION BY CONTRACTOR
SUBMISSION OF USE PERMIT ( 65-K FORM)
CONTRACTOR
DESIGNER/ CONSULTANT
OWNER/ EMPLOYER
MANAGER
SUPERVISING OFFICIAL
EVALUATION/ REPORT ( 66-K FORM)
NO
COMPLY WITH CONDITIONS?
REGIONAL OFFICE
LEGALIZATION FOR
TEMPORARY USE ( 67-K FORM)
CENTRAL OFFICE/ DIRECTOR OF PNKK
MM11-1997.PDF
63 K FORM
APPLICATION FOR LEGALIZATION/CERTIFICATION
FIRE PROTECTION INSTALLATION
No. .
Based on Law No. 1 of 1970 and Instruction of the Minister of Manpower No. Inst.
11/M/BW/1997, we herewith submit a legalization/certification application for the
installation of fire protection.
Applicant
Name
Position
Institution/company
Address
:
:
:
:
General Data
Building name
:
Type of business/activity :
Address
:
Owner
Manager
Organizers name
Types of installations :
:
:
:
Consultant
Address
:
:
Contractor
Address
:
:
Implementation schedule :
Explanation
:
.
.
.
.
Phone Fax
.
.
.
.
.
.
.
( ) Alarm installation
( ) Hydrant installation
( ) Sprinkler installation
( ) Special installation *) Please specify
...
.
.
Phone Fax .
.
.
Phone . Fax
.
Details of design criteria, plan drawing, and technical
specification is attached.
To:
The Director of PNKK
Directorate General of the Binawas
Jl. Jend. Gatot Subroto Kav 51
Jakarta
.,
Applicant,
Revenue stamps
Rp.2000
MM11-1997.PDF
10
10
64-K FORM
DEPARTMENT OF MANPOWER OF THE REPUBLIC OF INDONESIA
DIRECTORATE GENERAL OF THE ESTABLISHMENT OF INDUSTRIAL
RELATIONSHIP AND SUPERVISION OF MANPOWER
LEGALIZATION OF PLAN DRAWING OF
FIRE PROTECTION INSTALLATION
No. .
Considering:
1.
To Legalize
Explanation
MM11-1997.PDF
11
64-K FORM
Other requirements that: - The execution of fire protection installation must meet
the approved drawing.
- After installation the owner must report to Manpower
Dept Officer to be conducted an examination and
testing.
On Behalf Of The Directorate General Of
The Establishment of Industrial Relationship and
Supervision of Work Safety and Health Norms
_____________________________________
NIP.
MM11-1997.PDF
12
65-K FORM
Drawing Legalization
: No. :
Date:
Consultant
: .
Address
: .
Phone Fax
Contractor
: .
Address
: .
Phone . Fax
Implementation schedule : .
Explanation
: Enclosed
- As built drawing
- Official Report on the result of internal
inspection/testing
..,
To:
The Applicant,
Director of PNKK Dir.Gen. of the Binawas
Jl. Jend. Gatot Subroto Kav 51
Jakarta
MM11-1997.PDF
13
65-K FORM
Official Report Form Sample
No:
Date:
PROJECT
OFFICIAL REPORT OF
INSPECTION/TESTING OF FIRE
Sheet quantity:
Sheet No.:
LOCATION
CONTRACTOR
On ...................... date.................................. , I;
Name:
...............................................................................................
Position:
...............................................................................................
Institution: ...............................................................................................
Witnessed by parties signing this official report, it has been
carried out:
....................................................................................................................
....................................................................................................................
....................................................................................................................
..................................................................................................
Results:
....................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................
..................................................................................................
Note:
....................................................................................................................
....................................................................................................................
....................................................................................................................
..................................................................................................
Thus this official report is properly made
Name
Position/Occupation
Signature
MM11-1997.PDF
14
66-K FORM
REPORT ON THE INSPECTION AND
TESTING OF FIRE PROTECTION
No.:
Date:
I.
II.
GENERAL DATA
1.
Building name
2.
Type of activity/business
3.
Address
:
:
:
4.
5.
6.
:
:
:
Owner
Manager
Name of organizer
No. of KLUI:
..................................................... .
..................................................... .
..................................................................
..................................................................
..............................................................
..................................................................
..................................................................
..................................................................
BUILDING DATA
1.
Land area
:
................. m2
2.
Building area
:
................. meter
3.
Building Construction
:
..................................................................
- Main structure
:
..................................................................
- Floor structure
:
..................................................................
- Outside wall
:
..................................................................
- Inside wall (isolation)
:
..................................................................
- Ceiling frame
:
..................................................................
- Ceiling cover
:
..................................................................
- Roof frame
:
..................................................................
- Roof cover
:
..................................................................
4.
Building height
:
.. meter
5.
Number of stories
:
..................................................................
6.
Floor area
:
.. m2
7.
Build in (year)
:
..................................................................
8.
Fire protection equipment
8.1. ( ) Light fire extinguisher
8.2. ( ) Automatic fire alarm installation
8.3. ( ) Hydrant installation
8.4. ( ) Sprinkler installation
8.5. ( ) Specific installation*) ..........................................................
8.6. ( ) Evacuation infrastructure
9.
No.
Work unit
Location
MM11-1997.PDF
15
Equipment
1.
Control panel
2.
Enunciator
3.
Heat detector
4.
Smoke detector
5.
Flame detector
6.
Gas detector
7.
Manual knob
8.
Bell alarm
9.
Trade-Mark/Model
Quantity
66-K(A) Form
Unit
Condition
Note:
MM11-1997.PDF
16
Zone No.
(1)
(2)
Detector
ROR
(3)
Fixed
(4)
Sample
(5)
TPM
Fl. Sw.
(6)
(7)
Alarm
Bell
(8)
Lamp.
(9)
STATUS*)
(10)
MM11-1997.PDF
17
Inspection /Testing
1.
2.
Alarm Test
3.
Foult Test
4.
General Alarm;
Result
Conditions
AC Interconnection, LIFT,
PRESS FAN, etc.
Position
Signature
MM11-1997.PDF
18
Extinguishing Media
No.
Protected Room
Room
Volume
Media Type
Quantity
66-K(IS) Form
Application System
Single
Detection /
Cross Zone
Total Flooding
Extinguisher/
Local Protection
Position
Signature
MM11-1997.PDF
19
No.
Concerning
Specification
1.
2.
Ground reservoir
3.
Gravitation Tank
4.
Siamese connection
5.
Spur pump
Q: ..............US GPM
H: ..............Meter
Start Auto./Man :
..................Kg/Cm2
Stop Auto./Man :
..................Kg/Cm2
6.
Main pump
Q: ..............US GPM
H: ..............Meter
Start Auto./Man :
..................Kg/Cm2
Stop Auto./Man :
..................Kg/Cm2
7.
Spare pump
Q: ..............US GPM
H: ..............Meter
Start Auto./Man :
..................Kg/Cm2
Stop Auto./Man :
..................Kg/Cm2
8.
Priming tank
9.
Wind vessel
10.
11.
Test valve
12.
13.
Sucking pipe
14.
15.
Upright pipe
16.
Yard hydrant
17.
Building hydrant
18.
Hose reel
Status
66-K(IS) Form
Explanation
Capacity:.............. Litter
: ............. Kg/Cm2
: ............. Kg/Cm2
Note:
MM11-1997.PDF
20
In door
Location
2.5
1.5
Status
Out door
Landing valve
1
HP
HM
SC
Note:
MM11-1997.PDF
21
Pump
1.
Spur pump
2.
Main pump
3.
Spare pump
4.
Diesel pump
Start
Stop
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Explanation
Experiment
1.
Stand by
2.
1 point of hydrant
3.
2 point of hydrant
4.
3 point of hydrant
Pressure
Status
Explanation
Position
Signature
MM11-1997.PDF
22
No.
Concerning
Specification
1.
2.
Ground reservoir
3.
Gravitation tank
4.
Siamese connection
5.
Q: ............. US GPM
H: ............. Meter
Start Auto./Man :
.................. Kg/Cm2
Stop Auto./Man :
.................. Kg/Cm2
6.
Main pump
Q: ............. US GPM
H: ............. Meter
Start Auto./Man :
.................. Kg/Cm2
Stop Auto./Man :
.................. Kg/Cm2
7.
Spare pump
Q: ............. US GPM
H: ............. Meter
Start Auto./Man :
.................. Kg/Cm2
Stop Auto./Man :
.................. Kg/Cm2
8.
Priming tank
Capacity:
9.
Wind vessel
Q : ......................... Litter
:.............. Kg/Cm2
:.............. Kg/Cm2
10.
11.
Test valve
12.
13.
Gong Alarm
14.
Sucking pipe
15.
Main pipeline
16.
Upright pipe
17.
Divider
18.
Service pipe
19.
Head
66-K(SP) Form
Explanation
Litter
Note:
MM11-1997.PDF
23
Location
2)
3)
4)
Note
Pump
Spur pump
Start
Stop
Automatic/Manual
Automatic/Manual
.......
2.
3.
4.
Main pump
Spare pump
Diesel pump
Explanation
....... Kg/Cm2
Kg/Cm2
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Automatic/Manual
Automatic/Manual
....... Kg/Cm2
....... Kg/Cm2
Position
Signature
MM11-1997.PDF
24
Concerning/Location
Condition/Finding
Suggestions
Thus the results of inspection and recommendation for perfecting means of fire protection
have been discussed with those signing this report for further consideration.
Compiled in .................... on ..............................................
Name
Position
Signature
MM11-1997.PDF
25
67-K FORM
DEPARTMENT OF MANPOWER OF THE REPUBLIC OF INDONESIA
REGIONAL OFFICE IN PROVINCE: ..
TEMPORARY LEGALIZATION
INSTALLATION OF FIRE PROTECTION
No. ...........................................
The Head of Regional office of the Department of Manpower in Province ...
Reading
Considering
In View of
To Stipulate
MM11-1997.PDF
26
67-K FORM
With stipulations :
......................... , ................................................
Department Of Manpower
Regional Office of Province .
Head,
___________________________
NIP.
MM11-1997.PDF
27