Vous êtes sur la page 1sur 71

Inventory of Major Alberta Projects

June 2011
Alberta Finance and Enterprise 4th Floor, Commerce Place Edmonton, Alberta T5J 4L6

Inventory of Major Alberta Projects


Introduction
The Inventory of Major Alberta Projects is produced by Alberta Finance and Enterprise to assist firms in identifying potential supply opportunities. The Inventory lists construction projects in Alberta valued at $5.0 million or greater that are planned, underway, or have recently been completed. This edition also identifies projects that have been put on hold or deferred due to the economic downturn. Project data is obtained from public and private information sources. Where possible, this data has been verified with the project proponent/developer. However, users of the Inventory may wish to confirm project data with the proponent/developer. While efforts have been made to obtain the most recent information, it should be noted that projects are constantly being re-evaluated by industry. Although the Inventory attempts to be as comprehensive as possible, some information may not be available at the time of printing, or not published due to reasons of confidentiality. The Inventory can be accessed on the Internet at www.albertacanada.com/about-alberta/inventory-ofmajor-projects.html. New projects and (where possible) updated information on current projects is added to the Internet database on a monthly basis. The print edition of the report is produced quarterly. Projects added to the Inventory between April 1 and June 30, 2011 are noted in upper case in the Project Description column. If you have questions or require additional information about the Inventory, contact Alberta Finance and Enterprise by phone at (780) 427-6787, or by fax at (780) 422-0061.

Inventory of Major Alberta Projects Summary


Project Sector Agriculture & Related Biofuels Chemicals & Petrochemicals Commercial/Retail Commercial/Retail and Residential Forestry & Related Infrastructure Institutional Manufacturing Mining Oil & Gas Oil Sands Other Industrial Pipelines Power Residential Telecommunications Tourism/Recreation Total # of Projects 10 12 4 69 7 7 320 127 4 4 9 63 7 31 40 89 2 99 904 Value of All Projects # of On Hold ($ Millions) Projects $296.4 $1,436.6 $118.5 $8,793.0 $1,567.8 $266.5 $18,897.0 $8,558.9 $641.0 $445.0 $1,742.5 $112,503.6 $1,510.5 $7,583.4 $13,844.2 $4,813.1 $656.0 $4,525.9 $188,199.9 Value of On Hold Projects ($ Millions) 0 1 0 3 4 0 6 6 0 0 0 8 0 1 0 20 0 6 55 $210.0 $146.0 $1,227.8 $106.7 $310.5

$15,330.0 $2,000.0 $1,708.0 $181.4 $21,220.4

1. This Inventory lists projects in Alberta, valued at $5 million or greater, that have recently been completed, are currently under construction, or are proposed to start construction within two years. Not all projects over this threshold are listed due to reasons of confidentiality and/or due to information not being available at the time of printing. 2. Project data is obtained from public information sources. Although, where possible, this data has been verified with the project proponent/developer, users of the Inventory may wish to confirm project data with the proponent/developer. 3. The Inventory does not breakdown project expenditures by any given year. The cost of a project is the value of expenditures expected over all phases of project construction, which may span over two or more years. 4. The cost of projects listed in the Inventory are estimated values only.

Inventory of Major Alberta Projects


Project Sector/ Company Name Agriculture & Related
Agropur Cheese Plant Expansion County of Lethbridge (near Diamond City) Clearwater County across Alberta Calmar Lacombe MD of Smoky River (W of MCLennan) High River Mountain View County (jct Hwy 2/Hwy 27) Ponoka $23.0 2011 Under construction. Stuart Olson Dominion Construction. Proposed 2010-2011 Under construction. Proposed. Planned completion by 2012. Proposed for 2012 - 2013. 2011Announced. FWS Group (Phase 1). Phase 1 to be completed in 2011, phase 2 (grain terminal) to be added at later date. Announced Proposed. Plan includes hotel, convention centre, racino (racetrack and casino). 2010-2011 Completed. Stretch Construction. Facility will include the Canadian Professional Rodeo Hall of Fame. Completed

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Alberta Infrastructure Alberta Sustainable Resource Development BioNeutra Biosphere Technologies Inc. Cargill Inc.

RAVEN BROOD TROUT STATION RENOVATIONS / UPGRADES Grazing Reserve Maintenance and Infrastructure Upgrades Substitute Sugar Plant and Starch Plant Biorefinery (previously described as Biorefining Demonstration Facility) Grain Elevator and Crop Protection Seed Shed Plant Modernization / Expansion GATEWAY CENTRE FACILITY

$13.7 $9.2 $100.0 $30.0 $13.0

Cargill Meat Solutions Olds Agricultural Society

$42.0 $50.0

2011-2012

Ponoka Ag - Event Centre Society (PAECS) Western Irrigation District

Ag - Event Centre

$8.5

Canal Upgrades

Wheatland Cty (between Chestermere Lk and Strathmore)

$7.0

2010-2011

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name Biofuels


Alberta Ethanol and Biodiesel GP All Peace Industries Ltd.

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Integrated Biodiesel and Ethanol Refinery Phase 1 Biodiesel Fuel Plant

Red Deer County (near Innisfail) four locations under consideration Lethbridge County (near Chin) Minburn County (near Vegreville) County of Two Hills (Hairy Hill) Bruderheim Edmonton Edmonton

$190.0 $50.0

Proposed Proposed. Locations under consideration include High Prairie, Fort Saskatchewan, Smoky Lake and Waskatenau. 2011-2012 Announced.

Bfuel Canada Corp.

Biodiesel Plant

$22.0

BioStreet Canada BioWaste to Energy for Canada Integration Initiative Corp. (BECii) Blue Horizon Energy Inc. City of Edmonton City of Edmonton / Alberta Energy Research Institute / GreenField Ethanol / Enerkem Greenfield Alberta Biofuels CR Fuels Inc.

Biodiesel Plant BECii Clean Energy Centre at Grow - Gen Biogas Plant 'Blue Horizon' Biodiesel Facility Biofuel Feedstock Plant Biofuel Facility Producing Ethanol from Municipal Solid Waste

$210.0 $11.6

On hold. Trimark Engineering. Proposed

$160.0 $38.0 $70.0

2011-2013

Under construction. Proposed for 2011

2010-2011

Under construction

Alternative Energy (Ethanol, Biodiesel and Biogas Digester) Complex Biofuel Complex (Biofuel Village)

MD of Taber (E of Purple Springs) Wheatland County (N of Strathmore) Lethbridge County County of Two Hills (near Hairy Hill)

$325.0

Proposed for 2011 - 2013.

CR Fuels Inc.

$235.0

2011-2012

Announced. Biodiesel, ethanol and electrical generation. Planned construction start July 2011. Proposed for 2011.

ECB Enviro North America Inc. Growing Power Hairy Hill / ATCO Midstream

Biogas and Co-gen Plant (3.2MW) Bio - Energy Facility (Integrated Biorefinery)

$25.0 $100.0 2010-2012

Under construction (biogas facility). FWS Construction. Biorefinery proposed for 2011 - 2012.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

Chemicals & Petrochemicals


Alberta Sulphur Terminals (a division of Hazco Environmental Services) Dow Chemical Canada Inc. NovaGreen Inc. NovaGreen Inc. Sulphur Forming and Shipping Facility POLYETHYLENE PLANT EXPANSION Commercial Facility Demonstration Facility Lamont County (E of Bruderheim) Lacombe County (Prentiss) Killam Killam $35.0 2011 Announced. NRCB approved July 2009.

$41.0 $35.0 $7.5

2011-2012

Under construction. New rail lines and additional equipment. Proposed for late 2012 or early 2013.

2011

Announced

Commercial/Retail
Alberta Development Partners Inc. Alberta Infrastructure Aspen Properties Ltd. ATCO Electric ATCO Electric Burnet Duckworth & Palmer Cadillac Fairview Corp. 'Stampede Trail' Retail Development, Calgary Stampede Grounds North Petroleum Plaza Tenant Improvements 'Palliser Square' East and West Towers REGIONAL SERVICE CENTRE Office / Warehouse Interior Alterations 'Calgary City Centre' Development Phase 1 (Office Tower), Eau Claire District 'Century Crossing' Commercial Development REFRIGERATED WAREHOUSE ADDITION Canadian Tire / Marks Work Wearhouse Store, Gateway Calgary $150.0 Proposed for 2011 - 2013. Part of Stampede Park $400M expansion. 2010-2011 Completed. Graham Construction. Proposed 2011-2013 2011 Under construction. Clark Builders. Under construction. Clark Builders. Proposed Proposed for 2012 - 2014. Phase 2 onwards on hold, pending improved market conditions. 2010-2013 Under construction. Phased development. Proposed 2011 Nearing completion

Edmonton Calgary Grande Prairie Lloydminster Calgary Calgary

$8.2 $220.0 $73.0 $6.0 $12.0 $60.0

Camgill Enterprises Canada Safeway Canadian Tire Real Estate Ltd.

Spruce Grove Calgary Canmore

$75.0 $20.0 $7.0

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


CAPP Investments Ltd. City of Calgary City of Edmonton Dialog Edmonton Air Cargo Development Group Encana Federated Co - op Genco Development Corp. Gregg Distributors Ltd. GWL Realty Advisors

Project Description
'Skyway Professional Centre' Medical Office Building WHITEHORN MULTI SERVICES BUILDING RENOVATIONS OXFORD STAGE 17 GRADING AND SITE SERVICING Warehouse AVIATION COMPLEX, EDMONTON INTERNATIONAL AIRPORT OFFICE RENOVATIONS Warehouse Expansion '634 Genco Court' Office Building Distribution Centre WESTMOUNT CORPORATE CAMPUS BUILDING 4 (OFFICE BUILDING) Warehouse Building 3, Prospect Business Park 'Currents of Windermere' Retail Development New Office Building Plant Phase 2 New Store, Sunridge Lowe's of South Edmonton OFFICE ALTERATIONS

Project Location
Red Deer Calgary Edmonton Calgary Leduc County Calgary Calgary Calgary Edmonton Calgary

Cost in $ Millions
$6.4 $5.1 $12.9 $16.0 $16.0 $6.8 $6.1 $21.0 $38.0 $24.9

Construction Schedule
2011-2012 2011 2011-2012

Remarks
Under construction. Timcon Construction. Under construction. Stuart Olson Dominion Construction. Under construction. Rulam Contracting. Proposed

2011-2012

Announced. PCL Construction Management. Proposed

2010-2011

Nearing completion On hold. Originally proposed for 2010 - 2011

2011-2012

Under construction. Dawson Wallace Construction. Proposed. Stuart Olson Dominion Construction.

GWL Realty Advisors Ltd. / Remington Development Corp. Harvard Developments / Cameron Development Corp. Husky Energy Inland Pipe Lowe's Companies Canada Lowe's Companies Canada Macleod Dixon
July 04, 2011

Edmonton

$14.2

Proposed

Edmonton

$500.0

2008-2011

Under construction. Willl include Cineplex theatre complex. Home Depot, Wal-Mart, Canadian Tire, London Drugs completed. Nearing completion. CANA Construction. Proposed

Lloydminster Calgary Calgary Edmonton Calgary

$24.4 $8.3 $15.0 $17.0 $5.5

2010-2011

2010-2011 2010-2011 2011

Nearing completion. Gioffre Companies Inc. Completed. Wright Construction Western Inc. Under construction. Prime Projects. 4

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Matco Investments Ltd. / Alberta Investment Management / SITQ Matthews Southwest Developments McCall Electric Wholesaler MD of Foothills / Town of High River Monarch Oxford Properties

Project Description
'Eighth Avenue Place' Office Building East Tower 'The Bow' Office Tower Warehouse / Office Building Charles Clark Medical Centre LIGHT INDUSTRIAL BUILDING Oxford Airport Business Park

Project Location
Calgary

Cost in $ Millions
$600.0

Construction Schedule
2007-2011

Remarks
Completed. EllisDon Construction.

Calgary Calgary High River Calgary Calgary

$1,500.0 $5.5 $5.2 $6.2 $500.0

2007-2012

Under construction. Ledcor Construction. Proposed

2010-2011

Under construction. Chandos Construction. Proposed Proposed. Multi - phased project will take eight years to complete. Planned construction first building in 2011 - 2012.

PCL Group Pembina Pipelines Precision Drilling Corp. PRISM Developments ProCura Developments Qualico Developments

HEADQUARTERS EXPANSION (BUILDING 5) OFFICE ALTERATIONS OFFICE RENOVATIONS 'Prism Place' Office Building Associated Engineering Building Renovations / Upgrades Conversion of Golden West Golf Course to Light Industrial / Business Park EPCOR Office Tower Westwinds Business Park Phase 3 'Quarry Park' Mixed-Use Development phases 1 and 2

Edmonton Calgary Calgary Calgary Edmonton Edmonton

$24.0 $8.6 $5.1 $36.7 $10.0 $500.0

2011-2012 2011

Under construction Under construction. Lignum Interiors. Proposed

2011-2012 2011

Announced Under construction Proposed

Qualico Developments Remington Development Corp. Remington Development Corp.

Edmonton Calgary Calgary

$250.0 $13.0 $1,000.0

2008-2012

Under construction. Ledcor Construction. Stage 1 of Station Lands development. Proposed for 2011 - 2012

2006-2015

Under construction. Phase 1 completed. Office buildings A and B under construction.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


RioCan RIET / Trinity Development Group / Canada Pension Plan Investment Board Ronmor Developers Inc. Royop Corporation SmartCentres SmartCentres

Project Description
'Jacksonport' Retail Development

Project Location
Calgary

Cost in $ Millions
$230.0

Construction Schedule

Remarks
Proposed

'The Market at Silverado' SHOPPING CENTRE 'Gates of Walden' Shopping Centre Sylvan Lake Power Centre Phase 2 (Eight Buildings) Sylvan Lake Power Centre (Ten Buildings) Car Dealership Commercial Development EQUIPMENT DEALERSHIP

Calgary Calgary Sylvan Lake Sylvan Lake

$12.0 $10.5 $20.0 $50.0 2007-2011 2010-2011

Proposed. Possible construction start summer 2011. Nearing completion. Dawson Wallace. Proposed Under construction. Wal-Mart anchor tenant. Dollarama nearing completion, Canadian Tire completed Under construction. Barjac Construction Management. On hold. Domtar site remediation underway. 2011 Under construction

Southgate Chevrolet Buick GMC Springwood Development Strongco Corp.

Calgary Cochrane Parkland County (Acheson Ind Park) Calgary Calgary

$6.5 $75.0 $9.5

2010-2011

Sun Life Financial Target Corporation

Interior Alterations CONVERSION OF SIX ZELLER'S STORES TO TARGET STORES CONVERSION OF THREE ZELLER'S STORES TO TARGET STORES CONVERSION OF ZELLER'S STORE TO TARGET STORE CONVERSION OF ZELLER'S STORE TO TARGET STORE CONVERSION OF ZELLER'S STORE TO TARGET STORE

$7.3 $60.0

2011

Completed. Stuart Olson Dominion Construction. Proposed for 2012 - 2013. Chinook Centre, Forest Lawn, Market Mall, Shoppes at Shawnessy, Signal Hill, Sunridge Mall. Proposed for 2012 - 2013. Bonnie Doone, Kingsway Garden Mall, Mill Woods Town Centre. Proposed for 2012 - 2013. Prairie Mall. Proposed for 2012 - 2013. Bower Place. Proposed for 2012 - 2013. St. Albert Centre.

Target Corporation

Edmonton

$30.0

Target Corporation Target Corporation Target Corporation

Grande Prairie Red Deer St. Albert

$10.0 $10.0 $10.0

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Target Corporation

Project Description
CONVERSION OF ZELLER'S STORE TO TARGET STORE BUILDING AND GROUNDS UPGRADES, TELUS TOWER 'Ironwood Tower' Office Building New Store, Stony Plain Road Medical Centre WELLNESS CENTRE (MEDICAL CENTRE) 'Millennium Ridge' Retail Development NEW BUILDING Interior Alterations WESTBROOK MALL STORE REDEVELOPMENT AND RENOVATION (STORE 3009) New Store Northwest (#1122) 'Stonegate Landing' Retail, Office and Industrial Development 'Hanson Square' Retail / Office Building

Project Location
Strathcona County (Sherwood Park) Edmonton Edmonton Edmonton St. Paul St. Paul Strathcona County (Sherwood Park) Calgary Calgary Calgary

Cost in $ Millions
$10.0

Construction Schedule

Remarks
Proposed for 2012 - 2013. Sherwood Park Mall.

Telus The Ironwood Group Totem Building Supplies Town of St. Paul Town of St. Paul / County of St. Paul Trans America Developments Village Honda Wal - Mart Canada Corp. Wal - Mart Canada Corp.

$20.0 $50.0 $6.0 $6.0 $6.3 $14.0 2011-2012 2010-2011 2010-2011

Proposed On hold. Dominion Construction. Nearing completion. Dawson Wallace. Proposed Announced. Dawson Wallace Construction. Planned construction start fall 2011. Under construction.

$7.2 $7.5 $10.7 2011

Proposed Proposed for 2011 Nearing completion. Bird Construction.

Wal - Mart Canada Corp. WAM Development Group / AIMCo Western Securities

Edmonton Calgary Calgary

$14.0 $2,250.0 $17.4

2011-2012

Under construction. Wright Construction Western Inc. Proposed. Stoney Industrial Centre warehouse 4 under construction.

2010-2012

Under construction. Stuart Olson Dominion.

Commercial/Retail and Residential


Anderson Builders Group (1989) Inc. Baralot International Mixed Use Building 'Sky Plaza' Development (Office Space and Condo Units) Red Deer Calgary $8.0 $66.0 2010-2011 Completed On hold pending improved market conditions. Originally proposed for 2010 - 2011.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


FRAM Building Group / Slokker Canada Corp. / Tricon Capital Group Harvard Developments Jade Developments River City Developments WAM Development / Opus Building Corp.

Project Description
Highrise and Medium Rise Buildings, East Village Eau Claire Market Redevelopment 'Copperstone Village' Residential / Commercial Building 'Elements at Rivers Edge' Mixed Use Buildings 'Stampede Station' Retail / Office Space, Hotel and Residential Buildings

Project Location
Calgary

Cost in $ Millions
$300.0

Construction Schedule

Remarks
Proposed. Possible construction start sometime in 2012. On hold On hold

Calgary Airdrie Red Deer Calgary

$750.0 $11.8 $32.0 $400.0 2010-2011 2004-2011

Under construction On hold. Phase 2 (office towers).

Forestry & Related


Alberta - Pacific Forest Industries Ltd. (Al - Pac) Diashowa - Marubeni Peace River Pulp Division Millar Western Forest Products Ltd. Sundre Forest Products West Fraser Mills Ltd. West Fraser Mills Ltd. West Fraser Mills Ltd. Plant Upgrades County of Athabasca (Boyle) Peace River Fox Creek Sundre Hinton Hinton Woodlands County (near Whitecourt) $62.9 Proposed for 2011 - 2012.

Construction / Installation of 25MW Generator Sawmill 2011 Capital Improvements Recovery Boiler and Pulp Machine Upgrades Sawmill Equipment Upgrades Facility Upgrades, Blue Ridge Lumber

$40.0 $45.8 $13.0 $37.8 $39.0 $28.0

2010-2011 2010-2011 2011

Completed Nearing completion Announced Proposed

2010-2012

Under construction. Proposed

Infrastructure
Alberta Infrastructure Alberta Infrastructure
July 04, 2011

Medical Examiner Building Addition / Renovation Federal Building Redevelopment

Edmonton Edmonton

$20.0 $165.0 2008-2012

Proposed for 2011 - 2012. Tender for general contractor anticipated late 2011. Under construction. Clark Builders. 8

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Alberta Infrastructure Alberta Infrastructure Alberta Social Housing Corp. Alberta Transportation Alberta Transportation Alberta Transportation

Project Description
Federal Building Parkade and Centennial Plaza Legislature Dome Renovations / Repairs PARSONS CREEK ROAD CONSTRUCTION STAGE 1 Highway Twinning Project (North South Trade Corridor) INTERCHANGE HIGHWAY 55 / SH813 and BRIDGE Highway 201 Grade, Base and Pave, Bridge (Stoney Tr / Crowchild Tr Interchange) Southeast Section Calgary Ring Road (Stoney Trail) from 17 Ave SE to Highway 2A Highway 22, Highway 11 and SH 766 Pave

Project Location
Edmonton Edmonton RM of Wood Buffalo (Ft McMurray) across Alberta Athabasca Calgary

Cost in $ Millions
$110.0 $6.1 $10.0

Construction Schedule
2009-2012 2011-2012

Remarks
Under construction. Clark Builders. Announced. Planned construction start late 2011. Proposed.

$1,900.0 $15.0 $41.6

1998-2012

Under construction. 500km across Alberta Proposed for 2011 - 2013.

2009-2011

Under construction. South Rock Ltd.

Alberta Transportation

Calgary

$769.0

2010-2013

Under construction. Chinook Roads Partnership.

Alberta Transportation

Clearwater and Lacombe Counties Cold Lake County of Camrose County of Camrose (Hwy 56 to SH854) County of Forty Mile

$20.0

2010-2011

Completed. Riverside Contracting (Montana). Highway 22 from Hwy 11 to Hwy 53; Hwy 11 E of Condor to SH766; SH766 from N of Eckville to Hwy 12. Under construction Under construction. Sandstar Construction. Hwy 56 from S of SH609 to Hwy 13; SH609 from Edberg to Hwy 56; SH833 from Camrose to SH617. Under construction. M Pidherney's Trucking Ltd.

Alberta Transportation Alberta Transportation

Twinning Highway 28 from 57 Ave to 10 St Highway 56 / SH 609 / SH 833 Pave

$26.4 $8.2

2009-2011 2011

Alberta Transportation

HIGHWAY 13 GRADE, BASE AND PAVE Highway 61 Grade, Base and Pave

$16.6

2011-2012

Alberta Transportation

$7.9

2011

Under construction. South Rock Ltd.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Alberta Transportation

Project Description
Highway 16 and SH 831 Pave

Project Location
County of Minburn (near Vegreville) County of Newell (SH873 to W of SH884) County of Newell (W of Bassano to SH 550) County of Two Hills / County of St. Paul County of Vermilion River Cty of Thorhild (SH 661 to N of jct SH 661) Cypress Cty to Special Area 3 Drayton Valley

Cost in $ Millions
$14.4

Construction Schedule
2011

Remarks
Under construction. E Construction / Ruel Bros.

Alberta Transportation

Highway 1 Pave

$15.4

2011

Under construction. South RockLtd.

Alberta Transportation

Highway 1 Pave

$16.1

2010-2011

Completed. Border Paving.

Alberta Transportation

HIGHWAY 36 and HIGHWAY 29 GRADE, BASE AND PAVE HIGHWAY 16 BASE AND PAVE SH827 GRADE, BASE AND PAVE

$10.9

2011

Under construction. Sureway Construction Management. Under construction. Ledcor Alberta Ltd. Proposed.

Alberta Transportation Alberta Transportation

$13.2 $7.0

2011-2012

Alberta Transportation Alberta Transportation

HIGHWAY 41 CRACK REPAIR AND PAVE Highway 22 Grade, Base and Pave plus Bridge over N Saskatchewan River Anthony Henday Dr / Stony Plain Rd Interchange Callingwood Rd and Lessard Rd Interchanges, Anthony Henday Drive Anthony Henday / Cameron Heights Drive Interchange Anthony Henday Dr (Hwy 216) / Rabbit Hill Rd Interchange and Bridge

$12.4 $60.0

2011-2012 2011-2014

Under construction. Lahrmann Engineering. Section from N of SH545 to E of SH895. Announced. Phase 1 (eastern approach work) under construction. Under construction. KMC / PCL A Joint Venture. Under construction. Alberco Construction. Under construction. Graham Construction. Under construction. PCL Construction Management.

Alberta Transportation Alberta Transportation Alberta Transportation Alberta Transportation

Edmonton Edmonton Edmonton Edmonton

$168.6 $45.0 $25.0 $14.0

2009-2011 2009-2011 2010-2011 2010-2011

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

10

Project Sector/ Company Name


Alberta Transportation

Project Description
Anthony Henday Drive NW

Project Location
Edmonton area

Cost in $ Millions
$1,420.0

Construction Schedule
2008-2011

Remarks
Under construction. NORTHWESTCONNECT General Partnership. Yellowhead Tr to Manning Freeway. Completed. E Construction / Ruel Brothers.

Alberta Transportation

Highway 16 and SH 627 Grade, Base and Pave and Intersection Improvements Highway 13 / Highway 36 / SH 602 ROBB ROAD PAVE (FROM MOUNTAIN ST TO S OF K - LYNN SITE) Highway 63 Clearing and Grading HIGHWAY 22 GRADE WIDENING, BASE AND PAVE Highway 12 Road Improvements (Re - alignment) SH 625 Grade, Base and Pave, Bridge Culvert, Lighting Roadwork plus Two Bridges Highway 58 Grade, Base and Pave

Edmonton area

$15.1

2010-2011

Alberta Transportation Alberta Transportation

Flagstaff County Hinton

$15.5 $6.0

2010-2011

Under construction. Border Paving. Proposed for 2012.

Alberta Transportation Alberta Transportation

Lac la Biche County Lac Ste. Anne Cty (SH647 to N of Hwy 43) Lacombe County (Hwy 20 to SH 792) Leduc County (Nisku) Mackenzie County Mackenzie County (S of Negus Ck to High Level) Mackenzie County (Tall Creek IR to Bear R) MD of Big Lakes (SH749 to SH750)

$0.0 $7.5

2011-2012 2011

Under construction. Thompson Bros (Const) Ltd. $20.8 million. Part of Highway 63 twinning project. Under construction. E Construction / Ruel Brothers

Alberta Transportation

$14.0

Proposed

Alberta Transportation Alberta Transportation Alberta Transportation

$14.5 $17.9 $26.7

2010-2011 2010-2011 2011-2012

Under construction. Border Paving. Nearing completion. Prairie North Construction. Under construction. Knelsen Sand & Gravel.

Alberta Transportation

Highway 88 Base and Pave

$18.2

2010-2011

Completed. Ledcor Alberta.

Alberta Transportation

SH 679 BASE AND PAVE

$8.2

2011

Under construction. Knelsen Sand and Gravel.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

11

Project Sector/ Company Name


Alberta Transportation

Project Description
SH 540 BASE AND PAVE

Project Location
MD of Foothills (E of Hwy 22 to Hwy 2) MD of Foothills (N of Nanton to S of Cayley) MD of Greenview MD of Greenview (Berland R to S of Muskeg Cabins) MD of Greenview (Crooked Ck to Valleyview) MD of Opportunity (N of SH686 to Willow Creek) MD of Peace (Hwy 2 to Grimshaw) MD of Pincher Creek MD of Rocky View (E of Hwy 22 to W of SH 766) MD of Spirit River (E of Rycroft to E of SH733) Medicine Hat

Cost in $ Millions
$5.4

Construction Schedule
2011

Remarks
Under construction. Central City Asphalt.

Alberta Transportation

Highway 2 Grade, Base and Pave plus Bridge Removal Highway 43 Grade, Base and Pave Highway 40 Grade, Base and Pave

$12.0

2011-2012

Under construction. Mesken Contracting.

Alberta Transportation Alberta Transportation

$25.7 $11.5

2010-2011 2011-2012

Under construction. Richardson Bros (Olds) Ltd. From E of Crook Creek to W of Sturgeon Lk IR. Under construction. Wapiti Gravel Suppliers.

Alberta Transportation

Twinning Highway 43 near Sturgeon Lake Cree Nation Highway 88 Base and Pave

$26.0

2010-2012

Announced

Alberta Transportation

$11.7

2010-2011

Under construction. Carmacks Enterprises.

Alberta Transportation

Highway 2A Grade, Base and Pave

$7.2

2011

Under construction. Ledcor Alberta.

Alberta Transportation Alberta Transportation

HIGHWAY 6, SH510 AND SH785 PAVE Highway 1A Grade, Base and Pave

$7.7 $9.5

2011 2010-2011

Announced. South Rock Ltd. Tender includes grading on Hwy 36 near Vauxhall. Nearing completion. South Rock.

Alberta Transportation

HIGHWAY 49 PAVE AND CRACK REPAIR HIGHWAY 1 BRIDGE (WESTBOUND LANES) OVER SOUTH SASKATCHEWAN RIVER

$11.0

Proposed for 2011

Alberta Transportation

$20.0

Proposed for 2011 - 2012.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

12

Project Sector/ Company Name


Alberta Transportation Alberta Transportation Alberta Transportation

Project Description
HIGHWAY 2 BRIDGE OVER PEACE RIVER SH 791 Extension from SH 590 to Highway 42 Interchange Reconfiguration jct Highways 2 / 11 (Grade, Base and Pave) Highway 21, Highway 56, SH 601 and SH 590 Base and Pave North - Bound Bridge across Athabasca River Highway 63 Grading HIGHWAY 63 GRADE, BASE AND PAVE (MORRISON ST TO ATHABASCA R), GRADE SEPARATION CARRYING HWY 63 OVER FRANKLIN AVE AND BRIDGE REPLACEMENT (HWY 63 SOUTH - BOUND LANES) OVER ATHABASCA RIVER Highway 63 / Thickwood Blvd and Highway 63 / Confederation Way Interchanges Highway 63 Grade, Base and Pave

Project Location
Peace River Red Deer County Red Deer County (N of Red Deer) Red Deer, Kneehill and Stettler Counties RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (Ft McMurray)

Cost in $ Millions
$19.0 $14.6 $23.7

Construction Schedule

Remarks
Proposed. Aecom Technology Corp. $US. Proposed. Part of Alberta Transportations threeyear construction program 2012-2014.

2010-2011

Under construction. Border Paving.

Alberta Transportation

$12.6

2010-2011

Completed. Border Paving. Hwy 21 from N of SH587 to S of Hwy 42; Hwy 56 from S of SH 589 to S of Hwy 12; SH601 from Hwy 12 to Hwy 21. Under construction. Flatiron Construction. Under construction. Prairie Roadbuilders. S of May Tower to S of House River. Proposed

Alberta Transportation Alberta Transportation Alberta Transportation

$127.0 $17.6 $60.0

2008-2011 2010-2011

Alberta Transportation

RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) to jct Hwy 55 (near Grassland)

$300.0

2009-2012

Under construction. South Rock Ltd.

Alberta Transportation

$43.7

2010-2012

Under construction. Graham Bros. Construction Group. N of Athabasca R to S of Thickwood Blvd. Under construction.. Section N of Wandering River in 2010 - 2011

Alberta Transportation

Twinning Highway 63

$940.0

2007-2015

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

13

Project Sector/ Company Name


Alberta Transportation

Project Description
Highway 63 Pave

Project Location
RM of Wood Buffalo (S of SH881 to S of Hwy 69) Rocky View County / Mountain View Cty Saddle Hills County (Hwy 49 to SH680) Saddle Hills Cty (Hwy 49 to S of SH680) Special Area 3 (SH884 to SH886) Sturgeon County Vermilion Vulcan County

Cost in $ Millions
$7.1

Construction Schedule
2010-2011

Remarks
Completed. Knelsen Sand and Gravel.

Alberta Transportation

HIGHWAY 2 BASE AND PAVE (N of jct Hwy 2A / Hwy 72 to S of SH 581)

$10.0

2011

Proposed

Alberta Transportation

SH 727 Pave

$6.7

2011

Under construction. Knelsen Sand and Gravel.

Alberta Transportation

SH 727 Grade and Bridges over Howard Creek and Kitsuan River SH570 PAVE

$37.9

2009-2011

Nearing completion. Sureway Construction.

Alberta Transportation

$8.0

Proposed

Alberta Transportation Alberta Transportation Alberta Transportation

Highway 28 Grade, Base and Pave HIGHWAY 16 PAVE CARSELAND - BOW RIVER HEADWORKS SYSTEM REHABILITATION TRAVERS RESERVOIR STRUCTURES PHASE 2 MAIN EMBANKMENT REHABILITATION Carseland - Bow / Travers Reservoir Concrete Structures Highway 24 Crack Repair and Pave

$12.0 $14.0 $8.0

2010-2011

Completed. E Construction / Ruel Brothers. Proposed. Proposed

Alberta Transportation Alberta Transportation

Vulcan County Vulcan County (Hwy 23 to Bow R) Wetaskiwin County (SH792 to E of Hwy 2A)

$11.8 $7.7

2010-2011 2010-2011

Nearing completion. Graham Infrastructure. Completed. Border Paving. Project includes SH817 sideslope repair from SH901 to S of Strathmore. Proposed for 2011 - 2012.

Alberta Transportation

SH 604 GRADE, BASE AND PAVE

$15.0

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

14

Project Sector/ Company Name


Alberta Transportation Alberta Transportation

Project Description
Highway 9 Widen, Base and Pave Highway 40 Grade, Base and Pave

Project Location
Wheatland County Yellowhead County (N of Hwy 16 to S of Pinto Ck) Barrhead Drayton Valley Calgary Calgary Calgary Calgary Calgary Calgary Edmonton northeastern Alberta Strathcona County Rocky View County (Conrich) Rocky View County (Springbank)

Cost in $ Millions
$20.4 $6.0

Construction Schedule
2010-2011

Remarks
Under construction. South Rock Ltd. Proposed.

Barrhead Regional Water Commission Brazeau County Calgary Airport Authority Calgary Airport Authority Calgary Airport Authority / City of Calgary Calgary Convention Centre Authority Calgary Municipal Land Corp. (CMLC) Calgary Police Services Canadian National Railway Canadian National Railway Canadian National Railway Canadian National Railway (CN) Central Aviation / Springbank Aero Properties

Water Treatment Plant Expansion Municipal Administration Building and Public Works Facility North - South Parallel Runway International Transborder Concourse Road Improvements to 36 St NE between 48 Ave and Airport Rd Convention and Trade Show Facility Infrastructure Upgrades, The Rivers (including East Village) Office Alterations NEW RAILWAY TRACK (11,400 FT) LAC LA BICHE SUBDIVISION IMPROVEMENTS NEW RAILWAY TRACK (3.5 MILES) 'Calgary Logistics Park' Intermodal Terminal Springbank Airport Development (Office and Hangar Expansion) plus Two New Hangars

$13.0 $19.8 $620.0 $1,400.0 $10.5 $300.0 $200.0 $25.0 $12.0 $10.0 $12.0 $200.0 $6.0 2007-2012 2009-2011 2011 2011 2011 2011-2012 2009-2011 2011-2014 2011-2015 2010-2011

Proposed Under construction. Under construction. PCL Parsons Dufferin (JV). Under construction. EllisDon Construction. Under construction Proposed. Planned completion in late 2013. Under construction Nearing completion Announced Announced Announced Announced.Planned construction start summer 2011. Proposed. Scott Builders.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

15

Project Sector/ Company Name


City of Airdrie

Project Description
'Chinook Winds' Regional Waste Management Facility, Park and Operations Centre Emergency Services Facility, Chinook Winds West Side Emergency Services Station RCMP Detachment 2011 ROAD PROJECTS Fire / Ambulance Station, Bridlewood Road Widening Peigan Tr from Barlow Tr to 52 St SE Widen 14 St W from 90 Ave S to Anderson Rd Interchange Trans Canada Highway and Bowfort Rd NW Interchange at 14 St and 90 Ave SW 37 St / Glenmore Tr SW Interchange Rehabilitation of Westbound Bow Trail Bridge over CPR MAJOR ROADS RECONSTRUCTION ELBOW DRIVE SW FROM 50 AVENUE TO GLENMORE TRAIL Fire Station, Seton Westbrook LRT Station / Tower West Pine Creek Sanitary Trunk Part 1 and MacLeod Trail Feedermain Phase 2

Project Location
Airdrie

Cost in $ Millions
$11.4

Construction Schedule
2010-

Remarks
Announced.

City of Airdrie City of Airdrie City of Airdrie City of Airdrie City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Airdrie Airdrie Airdrie Airdrie Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary

$9.0 $13.0 $10.5 $8.0 $15.8 $9.0 $14.5 $47.0 $12.9 $40.0 $8.0 $8.0

2010-2011 2010-2011 2010-2012 2011

Under construction. Bird Construction. Under construction. Bird Construction. Under construction Announced Proposed for 2012. On hold. On hold. On hold. On hold. Originally scheduled for 2008 - 2010. Proposed. Detour bridge completed Sept 2010. Proposed Proposed

City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary

$15.0 $37.1 $20.0

Proposed for 2011 - 2012. Proposed for 2011 - 2012 Proposed for 2011 - 2012

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

16

Project Sector/ Company Name


City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Project Description
Fire Station, Royal Oak West LRT 69 St Station AIRPORT TRAIL TUNNEL UNDER NEW RUNWAY PHASE 1 210 Ave Trunk Utilities Contract 3B St. Patrick's Island Bridge 52 St SE Widening Phase 3 (Supporting Road Network) Fire Station, Marda Loop Glenmore Water Treatment Plant Upgrades / Expansion Cranston Bow River Crossing Water Pipeline 'Harvey Passage' Weir Reconstruction, Bow River Emergency Operations Control Centre LRT Extension Northeast, Westwinds to Saddle Ridge LRT Extension NW to Rocky Ridge, Tuscany Mahogany Storm Trunk Metis Trail NE from 64 Ave to 96 Ave

Project Location
Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary

Cost in $ Millions
$15.0 $9.9 $280.0 $6.0 $15.0 $10.0 $15.0 $218.7 $12.6 $16.6 $54.0 $124.0

Construction Schedule

Remarks
Proposed for 2011 - 2012. Pending funding approval. Proposed Proposed for completion by 2014. Tunnel and extension of Airport Tr to 36 St NE. Proposed Proposed. Proposed Proposed

2004-2011 2008-2011 2008-2011 2009-2012 2009-2012

Completed. PCL Construction. Nearing completion. Phased construction. Nearing completion. Degraaf Excavating Ltd. Under construction. Under construction. Standard General (grading, utilities, noise barrier, park and ride). Whitehorn Station PCL Construction. Under construction. LRT overpass over Stoney Tr. Graham Construction Group. LRT track, station construction start 2012. Completed. Whissell Contractors. Under construction (phase 2). Standard General. Phase 1 64 Ave LRT tunnel. Phase 2 link from 80 to 96 Ave.

City of Calgary

Calgary

$115.0

2009-2014

City of Calgary City of Calgary

Calgary Calgary

$6.4 $18.6

2010-2011 2010-2011

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

17

Project Sector/ Company Name


City of Calgary

Project Description
Wastewater Sanitary Trunk / Lift Station Projects 2010 - 2011 Lakeview Storm System Improvements Sunalta West LRT 'Peace Bridge' Pedestrian Bridge over Bow R near Prince's Island West LRT Parkade Downtown Accommodation Plan (Three Buildings) 96 Ave N Extension from Deerfoot Tr to Airport Trail and Deerfoot Tr / Airport Tr Interchange West LRT Line from Downtown to Westside Rec Centre 210 AVE TRUNK UTILITIES CONTRACT 3B (WEST SIDE UTILITIES) 13 Avenue Greenway Phase 1 (1 St SE to 4 St SW) Saddle Ridge Relief Trunk East Calgary Landfill Collection Services Depot 52 ST SE BRIDGE OVER CPR / WH CANAL Shepard Landfill Stormwater Collection and Treatment Expansion Fire Station, Douglas Glen

Project Location
Calgary

Cost in $ Millions
$62.0

Construction Schedule
2010-2011

Remarks
Under construction. Nose Creek trunk, Saddle Ridge relief trunk. Nose Creek Phase A contract 3 Whissell Contractors. Completed. Caliber Systems. Under construction Under construction. Graham Infrastructure. Under construction Announced Under construction. Aecon Construction.

City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary Calgary Calgary Calgary

$17.4 $9.4 $24.5 $28.0 $7.0 $28.7

2010-2011 2010-2011 2010-2011 2010-2011 2010-2012 2010-2012

City of Calgary City of Calgary

Calgary Calgary

$1,000.0 $6.0

2010-2012 2011

Under construction. SNC Lavelin Construction (Pacific). Under construction. Volker Stein Contracting.

City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary

Calgary Calgary Calgary Calgary Calgary Calgary

$8.5 $5.0 $13.0 $36.1 $10.0 $6.7

2011 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012

Under construction. Volker Stein Contracting. Announced Announced Under construction. Graham Construction and Engineering. Announced Under construction. Devitt and Forand Contractors.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

18

Project Sector/ Company Name


City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary City of Calgary / Calgary Municipal Land Corporation City of Camrose City of Camrose City of Edmonton City of Edmonton

Project Description
Spyhill Landfill Scale House and Entrance Replacement Storm Water Quality Retrofits Nose Creek Sanitary Trunk Phase B Crestmont Pump Station Lakeview Storm System Upgrades Phase 2 Spyhill Landfill Gas Collection System and Treatment Fire Station, Symons Valley Currie Pump Station East Calgary Landfill Scalehouse and Entrance Replacement Fire Station, South Calgary (Replacement for Station 5) East McKenzie Feedermain Shepard Landfill Collection Services Depot II Four Lane Underpass connecting East Village and Victoria Park / Stampede Grounds (4 St SE) Wastewater Treatment Facility NEW CITY HALL Kennedale Traffic Operations Building Fire Station, Heritage Valley

Project Location
Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary

Cost in $ Millions
$13.0 $17.0 $32.0 $10.0 $8.0 $10.0 $6.0 $15.0 $14.0 $7.2 $20.0 $8.0 $70.0

Construction Schedule
2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2011-2012 2010-2011

Remarks
Announced Announced. Planned construction of three ponds. Announced. Tender for phase B contract 1 cancelled. Announced Announced Announced Under construction. Lear Construciton Management. Announced Announced Announced. Graham Construction and Engineering. Announced Announced Under construction. Graham Construction.

Camrose Camrose Edmonton Edmonton

$55.0 $16.0 $16.5 $7.6

Proposed Proposed to start construction in 2011. Proposed Proposed

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

19

Project Sector/ Company Name


City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton City of Edmonton

Project Description
ECO STATION (RECYCLING STATION), NORTHEAST WESTWOOD TRANSIT GARAGE EXPANSION / RENOVATION Heavy Repair and Equipment Facility, Ellerslie Kennedale Waste Management Facility Expansion Quesnell Bridge Widening and Rehabilitation Fire Station 27, Ellerslie Police Station, Southwest Fulton Place and Capilano Neighbourhood Rehabilitation 2011 South Residential and Industrial Overlay NORTH SNOW STORAGE SITE DEVELOPMENT 99 ST RENOVATION FROM 81 AVE TO SASKATCHEWAN DR 118 AVE STREETSCAPING BETWEEN 78 ST AND 83 ST Gateway Blvd / 23 Ave Interchange Contract 2 (Road Upgrading / Realignment) 2011 SOUTH WEST RESIDENTIAL OVERLAY (CONTRACT 1108) 2011 Neighbourhood Renewal Projects

Project Location
Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton

Cost in $ Millions
$15.0 $50.0 $56.0 $9.0 $161.0 $10.1 $20.8 $11.5 $8.8

Construction Schedule

Remarks
Proposed Proposed Proposed. Proposed for 2011 - 2012.

2009-2011 2010-2011 2010-2012 2010-2012 2011

Under construction. Concreate USL Ltd. Nearing completion. Stuart Olson Dominion Construction. Under construction. Clark Builders. Under construction. Carmacks Enterprises. Under construction. Lafarge Canada Ltd / Wells Construction. Greenview residential, McIntyre Industrial, Weir Industrial. Under construction. Sureway Construction Management. Announced Announced Under construction. Park Paving.

City of Edmonton City of Edmonton City of Edmonton City of Edmonton

Edmonton Edmonton Edmonton Edmonton

$9.7 $6.0 $7.6 $11.2

2011 2011 2011 2011

City of Edmonton City of Edmonton

Edmonton Edmonton

$6.7 $140.0

2011 2011

Under construction. North West Paving. Announced

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

20

Project Sector/ Company Name


City of Edmonton City of Edmonton City of Edmonton City of Edmonton

Project Description
ROAD WORK ON FORT ROAD BETWEEN 131 AND 137 AVENUES 2011 SOUTHEAST RESIDENTIAL OVERLAY PROGRAM Engineering Services Office and Lab Facility 108 STREET CAPITAL BOULEVARD STREETSCAPE BETWEEN 99 AVE AND 104 AVE Whitemud Drive / 17 St Interchange Scona Road Reconstruction 17 ST FROM 23 AVE TO SILVERBERRY RD (CONTRACT 1118) RABBIT HILL ROAD WIDENING LRT Extension from Downtown to NAIT Replacement for Walterdale Bridge Police Building Expansion 100 Ave Downtown Improvements Program Civic Office Building (City Hall) / Library Fire Station #3, Centre West Industrial Park 116 St Upgrades between 68 Ave and 97 Ave

Project Location
Edmonton Edmonton Edmonton Edmonton

Cost in $ Millions
$5.9 $6.3 $16.5 $10.7

Construction Schedule
2011 2011 2011-2012 2011-2012

Remarks
Under construction. Lafarge Canada / Wells Construction. Under construction. Lafarge Canada / Wells Construction Ltd. Under construction. Chandos Construction. Under construction. Standard General Inc.

City of Edmonton City of Edmonton City of Edmonton

Edmonton Edmonton Edmonton

$19.0 $12.0 $11.1

2011-2012 2011-2012 2011-2012

Under construction. Graham Construction. Under construction. Lafarge Canada Inc. Announced. Sureway Construction.

City of Edmonton City of Edmonton

Edmonton Edmonton

$8.8 $725.0

2011-2012 2011-2013

Under construction. Earthwise Contracting Ltd. Under construction. Graham Construction and Engineering. EPCOR Tower tunnel nearing completion. Announced Proposed for 2012.

City of Edmonton City of Fort Saskatchewan City of Fort Saskatchewan City of Fort Saskatchewan City of Grande Prairie City of Grande Prairie

Edmonton Fort Saskatchewan Fort Saskatchewan Fort Saskatchewan Grande Prairie Grande Prairie

$132.0 $5.6 $10.0 $13.3 $6.3 $6.7

2013-2014

2010-2012 2011-2013 2010-2012 2011

Under construction. Three - year project. Under construction. Marshall - Lee Construction. Under construction. Clark Builders. Under construction. Wapiti Gravel Suppliers.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

21

Project Sector/ Company Name


City of Grande Prairie / Aquatera City of Leduc City of Lethbridge City of Lethbridge City of Lethbridge City of Lethbridge City of Lethbridge City of Lloydminster City of Lloydminster City of Lloydminster City of Medicine Hat

Project Description
Wastewater Treatment Plant Upgrades Phase 2 Public Services Buildings GARRY DRIVE WEST ROAD EXTENSION Transit Administration Centre Expansion Police Headquarters Expansion Upgrades to 28 St N Fleet Services Building plus Other Work Sewage Treatment Plant Expansion COLONIAL PARK EAST PHASE 1 RESIDENTIAL INFRASTRUCTURE RCMP Detachment Building South Ridge Drive Upgrade to Four Lanes from Highway 1 (TCH) to Strachan Road Fire Station, South Ridge INFRASTRUCTURE UPGRADES / REPLACEMENT, CONNAUGHT SUBDIVISION POLICE STATION EXPANSION Water Treatment Plant Discharge Treatment Facility Alterations to Existing Building (future location of Environmental Utilities Dept) Gaetz Avenue Revitalization Project

Project Location
Grande Prairie Leduc Lethbridge Lethbridge Lethbridge Lethbridge Lethbridge Lloydminster Lloydminster Lloydminster Medicine Hat

Cost in $ Millions
$45.0 $10.7 $10.0 $16.0 $26.7 $10.0 $17.3 $7.8 $5.7 $13.9 $11.7

Construction Schedule

Remarks
Proposed for 2012 - 2014. Tender call for general contractor anticipated early 2012.

2010-2011

Completed. PCL Construction. Four buildings. Proposed Proposed for 2011 - 2013. Proposed for 2013 - 2015. Proposed.

2010-2011 2010-2011 2011 2011-2012

On hold. Western Construction and Combustion Services. Announced Under construction. Rusway Construction. Under construction. Dowland Contracting. Proposed

City of Medicine Hat City of Medicine Hat

Medicine Hat Medicine Hat

$7.5 $11.0

Proposed. Planned completion by / in 2014. Proposed

City of Medicine Hat City of Medicine Hat City of Medicine Hat

Medicine Hat Medicine Hat Medicine Hat

$17.0 $30.0 $6.0

Proposed. Tender call expected fall 2011. Proposed. Planned completion in 2014. Proposed for 2011 - 2012.

City of Red Deer


July 04, 2011

Red Deer

$8.6

Proposed. Gaetz Avenue between 46 St. and 53 St. 22

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


City of Red Deer City of Red Deer City of Red Deer

Project Description
RIVERSIDE DRIVE SANITARY TRUNK EXTENSION PHASE 3 Sanitary Sewer and Storm Water Sewer Improvements Intersection Improvements on Spruce Drive, Springfield Ave and 40 Ave Intersection Upgrades 32 St between Spruce Drive and 40 Avenue Wastewater Treatment Plant Upgrade phases 1 to 3 2011 Paving Projects North Side Highway Connector Project phase 1A RAY GIBBON DRIVE PHASE 3 (GIROUX ROAD TO SH 633) Western Boundary Road Phase 3 (Ray Gibbon Drive) LANDFILL REMEDIATION RIEL PARK PHASES 3 AND 4 Arterial Road Connections to Anthony Henday Drive 2011 Local Roadwork Inland Multi - Modal Logistics Park (Integrated Rail / Truck Container Depot) Phase 1 2011 Road Construction Projects

Project Location
Red Deer Red Deer Red Deer

Cost in $ Millions
$10.0 $36.0 $8.5

Construction Schedule

Remarks
Proposed Proposed Proposed for 2011 and / or 2012.

City of Red Deer

Red Deer

$8.0

Proposed for 2013.

City of Red Deer City of Red Deer City of Red Deer City of St. Albert City of St. Albert City of St. Albert

Red Deer Red Deer Red Deer St. Albert St. Albert St. Albert

$70.2 $5.5 $15.5 $17.2 $47.0 $9.0

2007-2011 2011 2011-2012

Nearing completion. Graham Industrial Services. Announced Under construction. Northside Construction Partnership (grading Gaetz Ave to 78 St). Proposed Proposed. Giroux Rd to Villeneuve Rd. Proposed to start in 2012. Includes remove surface, install clay cap and restore the soccer, rugby and cricket facilities. Proposed

City of St. Albert Clearwater County County of Grande Prairie

St. Albert Clearwater County County of Grande Prairie County of Grande Prairie

$11.2 $5.7 $28.0 2011

Completed. Sandstar Construction. Proposed

County of Grande Prairie

$17.3

2011

Announced

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

23

Project Sector/ Company Name


County of Lethbridge County of Newell County of Thorhild

Project Description
PARK LAKE ROAD GRADE, BASE AND PAVE County Office Building HIGHWAY 28 / 63 REGIONAL WATER SYSTEM PHASE 2 CONTRACT 2 ACE Regional Water System Phase 1 Watermain Contracts 1 and 2 ACE Regional Water System Phase 1 Water Transfer Station Eagle Butte Road Grade, Base and Pave Infrastructure Upgrades, CFB Cold Lake Fire Station, CFB Suffield Training Accommodation Building, CFB Edmonton Community Centre, CFB Wainwright Edmonton International Airport Expansion

Project Location
County of Lethbridge County of Newell Smoky Lake County (Waskatenau to Smoky Lake) County of Vermilion River Vegreville Cypress County Cold Lake Cypress County (Ralston) Edmonton Wainwright Leduc County

Cost in $ Millions
$6.0 $13.0 $5.1

Construction Schedule

Remarks
Proposed

2010-2012 2011

Under construction. Ledcor Construction. Under construction. Peace River Heating.

County of Vermilion River County of Vermilion River Cypress County Defence Construction Canada Defence Construction Canada Defence Construction Canada Defence Construction Canada Edmonton Regional Airport Authority

$14.3 $6.0 $6.0 $120.0 $6.2 $11.6 $5.1 $1,800.0

2011 2011

Under construction. Nu Edge Construction. Under construction. Graham Construction and Engineering. Proposed for 2011.

2006-2015 2011-2012 2011-2012

Under construction Under construction. Wahl Construction. Under construction. Pentagon Structures. Proposed for 2012 - 2013. Anticipated call for general contractor spring 2012.

2009-2012

Under construction. Central utilities plant 2010 2011 Stuart Olson. Apron expansion Dufferin Construction. Control tower and office building 2010 - 2012 EllisDon. Main terminal expansion 2009-2012 PCL Construction. Proposed

EPCOR EPCOR Fort McMurray Airport Authority

North LRT Extension -- Distribution and Transmission Power Facilities 2011 Water Main Renewals AIRPORT EXPANSION / REDEVELOPMENT SITE WORKS

Edmonton Edmonton RM of Wood Buffalo (Ft McMurray)

$17.0 $30.6 $49.0 2011 2011-2014

Announced Under construction. E Construction / Ruel Brothers.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

24

Project Sector/ Company Name


Fort McMurray Regional Airport Authority Hangar Development / Edmonton Airports Lac la Biche County Lac la Biche County

Project Description
Fort McMurray Airport Upgrade / Expansion Combined Hangar / Office Building, Edmonton International Airport Wastewater Treatment Facility, Lift Station and Forcemain Wastewater Biological Nutrient Removal Facility PRENTISS RD PAVE, HAYNES RD AND C & E TRAIL BASE AND PAVE 2011 Road Construction and Paving Programs HIGHWAY 2 FREEWAY CONVERSION (GRADE, BASE AND PAVE) 54 Ave Reconstruction WOLF LAKE ROAD BASE AND PAVE 2011 ROAD CONSTRUCTION / MAINTENANCE PROGRAM MUNICIPAL OFFICE ADDITION / RENOVATION SH 543 (Tongue Creek Rd) Extension Forestry Trunk Road Upgrading Project Phase 3 2011 Local Road Surfacing South Shore Wastewater Project

Project Location
RM of Wood Buffalo (Ft McMurray) Leduc County Lac la Biche County Lac la Biche County (Lac la Biche) Lacombe County Lacombe County Lacombe County

Cost in $ Millions
$198.0

Construction Schedule

Remarks
Proposed for 2011 - 2013. Terminal and expanded parking. Tender for the air terminal building closes July 14.

$20.0 $22.0 $5.0

2010-2011

Under construction. Clarke Builders. Proposed for 2011 - 2012. Maple Reinders. Proposed for 2011. Maple Reinders.

Lacombe County Lacombe County Lacombe County

$5.1 $18.2 $5.6

2011 2011 2011

Completed. Border Paving. Under construction Under construction. Central City Asphalt. Milton West Exchange from Spruceville Rd to Rge Rd 263A. Proposed Proposed

MD of Bonnyville MD of Bonnyville MD of Bonnyville MD of Bonnyville MD of Foothills / Town of High River MD of Greenview MD of Greenview MD of Lesser Slave River

Bonnyville MD of Bonnyville MD of Bonnyville MD of Bonnyville MD of Foothills / High River MD of Greenview MD of Greenview MD of Lesser Slave River

$5.6 $7.2 $23.0 $5.0 $17.4 $10.0 $5.8 $10.0 2011 2009-2011 2011 2011-2012 2010-2011

Announced Under construction. GenMec ACL. Under construction. Graham Infrastructure. Proposed. Under construction. Wapiti Gravel Suppliers. Under construction. Phase 4 Urban Underground Solutions. 25

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


MD of Wainwright Mountain View County Municipality of Crowsnest Pass Northern Sunrise County / Woodland Cree First Nation / Village of Nampa Parks Canada Parks Canada

Project Description
Ribstone Road, Truck Pit Road Base and Pave Road Restoration Upgrades to Frank Sewer Plant 'New Water' Regional Water Project Phase 2A PAVING HIGHWAY 1 KM 47 - 72 Twinning Highway 1

Project Location
MD of Wainwright Mountain View County Crowsnest Pass Northern Sunrise County Banff National Park Banff National Park (Castle Jct to BC border) Banff National Park (near Lake Louise to BC) High Level

Cost in $ Millions
$5.9 $12.0 $30.0 $10.8

Construction Schedule
2011

Remarks
Completed. Border Paving. Proposed. Multi - year project. Proposed for 2011 - 2019. To be completed in stages over eight and a half years.

2010-2011

Completed. Good Brothers Construction (water pipeline Cadotte Lake to Little Buffalo). Under construction. Okanagan Aggregates. Under construction. Dawson Construction. Phase 3B completed. Under construction. Aecon Group.

$7.5 $30.3

2011-2012 2009-2012

Parks Canada

Twinning Trans - Canada Highway and Associated Bridges Km 76 to 82 RCMP Detachment Building

$46.7

2010-2011

Public Works and Government Services Canada Red Deer Regional Airport Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo
July 04, 2011

$7.8

Proposed

Airport Alteration and Runway Extension Regional Landfill Cells 2, 3 and Stockpile Pad Replacement Bridge for Fort MacKay River Bridge Highway 69 Improvements Contract 1 Saline Creek Outfall Sewer, Water Supply 2011 Solid Waste Projects

Red Deer County RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo

$6.0 $8.0 $10.0 $8.0 $11.4 $23.0 2010-2011 2011

On hold pending funding. Originally proposed for 2010 - 2011. Proposed Proposed Proposed. Planned construction start March. Nearing completion. Tri - City Contracting. Announced

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

26

Project Sector/ Company Name


Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo

Project Description
2011 Road Rehabilitation and Infrastructure Projects 2011 Water Services Projects 2011 Transportation Projects Parsons Creek Water Reservoir and Pump Station Gregoire East Sanitary Outfall Contract 2 (HDD Siphon) Water Supply Line Upgrade Contract 1 Franklin Ave / Highway 63 Interchange 2011 URBAN INFRASTRUCTURE REHABILITATION PROGRAM CONTRACT 4 (THICKWOOD HEIGHTS) SALINE CREEK WATER SUPPLY LINE PHASE 4, KING STREET PARSONS DEVELOPMENT AREA WATER TRANSMISSION MAIN PHASE 2 Lower Townsite West Loop Road Contract 1 (Roadwork, Sanitary Sewer, Watermain) Parsons Creek Site Grading Stage 2

Project Location
RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (Conklin) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray)

Cost in $ Millions
$153.0 $148.0 $144.0 $12.4 $14.6 $12.7 $10.0

Construction Schedule
2011 2011 2011 2011-2012 2011-2012 2010-2011

Remarks
Announced Announced Announced Under construction. Bird Construction Company. Under construction. Direct Horizontal Drilling. Under construction. Alpha Construction. Proposed

$10.2

Proposed. H Wilson Industries Ltd.

Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo

$7.0

Proposed

$15.0

Proposed

$6.0

Proposed for 2011.

$16.9

2010-2011

Nearing completion. Sureway Construction Management.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

27

Project Sector/ Company Name


Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo

Project Description
Fire Station #5 (South Station)

Project Location
RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray)

Cost in $ Millions
$19.4

Construction Schedule
2010-2011

Remarks
Under construction. Marshall-Lee Construction.

Parsons Development Area Water Transmission Main Phase 1 Athabasca Water Treatment Plant Upgrades PARSONS CREEK ROAD CONSTRUCTION STAGE 1 LOWER TOWNSITE WEST LOOP ROAD CONTRACT 2 (PRAIRIE LOOP BLVD) 2011 URBAN INFRASTRUCTURE REHABILITATION PROGRAM CONTRACT 2 (THICKWOOD HEIGHTS) Holding Cell Facility

$12.4

2010-2011

Nearing completion. Tri - City Contracting.

$161.5

2010-2012

Under construction. Bird Construction.

$9.3

2011

Under construction. H Wilson Industries Ltd.

$6.5

2011

Under construction. E Construction.

$7.5

2011-2012

Under construction. E Construction.

Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo

$20.0

2011-2012

Announced. Planned construction start summer 2011. Under construction. Nason Contracting Group.

Lower Townsite Reservoir and Pump Station PARSONS DEVELOPMENT AREA SEWER OUTFALL 2011 INFRASTRUCTURE REHABILITATION PROGRAM CONTRACT 1 (ABASAND HEIGHTS)

$12.2

2011-2012

$17.7

2011-2012

Under construction. Sureway Construciton Management. Under construction. Sprague Rosser Contracting.

$24.0

2011-2013

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

28

Project Sector/ Company Name


Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Rocky View County Rocky View County

Project Description
Lower Townsite Redevelopment (Water Lines, Sewer Lines, Storm Lines, Surface Work) WASTEWATER TREATMENT PLANT ADMINISTRATION SERVICES BUILDING SALINE CREEK CONTRACT 2 WATER SUPPLY AND DISTRIBUTION MAIN Two Fire Stations, East Balzac and Elbow Valley Wastewater Pipeline

Project Location
RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft. McMurray RM of Wood Buffalo (Ft. McMurray) Rocky View County Rocky View County (Dalroy to Langdon) Saddle Hills County Saddle Lake Cree Nation Edmonton

Cost in $ Millions
$60.0

Construction Schedule
2011-2013

Remarks
Announced.

$8.0

Proposed

$13.8

2011-2012

Under construction. Site Energy Services.

$10.0 $18.0

2010-2011

Under construction (Elbow). Balzac Devitt & Forand. Proposed

Saddle Hills County Saddle Lake Cree Nation Santas Anonymous / Christmas Bureau of Edmonton South Red Deer Regional Wastewater Commission

TOWNSHIP ROAD 801 AND RANGE ROAD 131 PAVE Water Treatment Plant Upgrades Contract 5 Jerry Forbes Centre for Community Spirit Regional Wastewater Pipeline

$5.0 $7.0 $21.0

2011

Under construction. Wapiti Gravel Suppliers. Proposed Proposed for 2011 - 2012. Synergy Projects.

Olds to Red Deer

$96.0

2009-2014

Under construction. Three phases: Innisfail Penhold; Penhold - Red Deer; Olds - Innisfail. Olds - Innisfail section to start construction late summer 2011. Penhold - Red Deer to be built after the other two phases. Proposed for 2011 - 2012.

South Red Deer Regional Wastewater Commission (SRDRWC) / City of Red Deer Strathcona County Strathcona County

Wastewater Treatment Plant Upgrade Phase 4

Red Deer

$80.0

17 St Water Reservoir / Pumphouse Upgrades 2011 Rural Road Overlay Program

Strathcona County Strathcona County

$19.0 $5.1

2009-2011 2011

Nearing completion. Sure - Form Construction. Under construction

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

29

Project Sector/ Company Name


Strathcona County

Project Description
Ardrossan Wastewater Line

Project Location
Strathcona County (Ardrossan) Strathcona County (N from Hwy 15) Strathcona County (Sherwood Park) Strathcona County (Sherwood Park) Sturgeon County Beaumont Beaumont Beaumont Blackfalds Bonnyville Rocky View County / Bragg Creek Chestermere Chestermere Cochrane Devon

Cost in $ Millions
$30.0

Construction Schedule

Remarks
Proposed. To be considered in 2011 budget.

Strathcona County

Rge Rd 220 Pave and Intersection Upgrade (Rge Rd 220 / Hwy 15) 'Sparta' TRANSIT TERMINAL, BETHAL DRIVE Firefighter Training Centre / Fire Station 6 195 Ave E and 82 St Grade, Base and Pave 50 STREET CORRIDOR UPGRADES ZONE 4 St. Vital Park Reservoir and Pumphouse 50 St Widening from SH625 to 41 Ave in Edmonton RCMP Detachment Building and Fire Station RCMP Detachment Building Water and Wastewater Treatment Facility Lift Station 13 (Sanitary Lift Station) Sanitary Forcemain Centre Avenue Redevelopment Water Treatment Plant

$12.6

2011-2012

Under construction. Carmacks Enterprises.

Strathcona County

$20.4

Proposed for 2011 - 2013.

Strathcona County

$17.5

Proposed

Sturgeon County Town of Beaumont Town of Beaumont Town of Beaumont / City of Edmonton Town of Blackfalds Town of Bonnyville Town of Bragg Creek / Rocky View County / Province of Alberta Town of Chestermere Town of Chestermere Town of Cochrane Town of Devon

$7.1 $11.0 $6.2 $40.0 $5.3 $5.5 $26.0

2010-2011

Under construction. Carmacks Enterprises. Proposed for 2011 - 2012

2009-2011 20112010-2011 2010-2011 2010-2012

Completed. Gabriel Construction. Announced. Phase 1 expected to begin construction summer 2011. Completed. Shunda Consulting and Construction Management. Under construction. GenMec ACL Inc. Under construction (phase 1 -- water treatment plant). Proposed for 2012 or 2013. Proposed for 2012 or 2013. Proposed for 2012

$9.0 $13.8 $9.0 $5.6 2010-2011

Under construction. Nason Contracting Group.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

30

Project Sector/ Company Name


Town of Didsbury Town of Drayton Valley Town of Drayton Valley Town of Fort MacLeod Town of High River / MD of Foothills Town of Lacombe Town of Mundare Town of Okotoks Town of Peace River

Project Description
North Industrial Area Roadwork and Stormwater Management New Water Treatment Plant Wastewater Treatment Facility Expansion WATER / SEWER SERVICES TO POLICE COLLEGE SITE Bridge over Highwood River Highway 2A Grade, Base and Pave Main Street Revitalization Southridge Emergency Services Building Shaftesbury Water Treatment Plant Upgrades (part of regional water system with MD of Northern Lights) Treated Water Reservoir and UV Disinfection East Side Servicing Project Town Administration Building CENTENNIAL PARK REDEVELOPMENT Regional Water Treatment Plant and Pipework 50 Ave (Main St) Makeover (Water / Sewer Lines and Streetscape) phases 1 and 2

Project Location
Didsbury Drayton Valley Drayton Valley Fort MacLeod High River Lacombe Mundare Okotoks Peace River

Cost in $ Millions
$6.4 $19.0 $7.7 $7.0 $18.0 $19.3 $6.3 $11.0 $20.0

Construction Schedule

Remarks
Proposed Proposed for 2011 - 2012. Proposed Proposed

2011 2011-2012 2010-2011 2011-2012

Under construction Under construction. Border Paving. Under construction Under construction. Chandos Construction. RCMP, municipal enforcement and fire station. Proposed for 2011 - 2012. Regional system includes line to Dixonville, reservoir on West Hill.

Town of Slave Lake Town of Sundre Town of Sylvan Lake Town of Sylvan Lake Town of Vauxhall / MD of Taber Town of Wetaskiwin

Slave Lake Sundre Sylvan Lake Sylvan Lake MD of Taber

$8.1 $19.0 $6.4 $5.2 $19.3

2010-2011

Completed. Alpha Construction. Proposed Proposed for 2011 - 2012.

2011 2011-2012

Announced. Pidherney's Trucking. Under construction. Vauxhall to Enchant and Vauxhall to Hays. Pipeline LW Dennis Contracting. Water treatment plant Maple Reinders. Announced. Phase 1 (48 St to 50 St) in 2011, phase 2 (50 St to 53 St) in 2012. The remainder of downtown (47 St to 48 St and 53 St to 56 St) to be completed at a later date.

Wetaskiwin

$11.0

2011-2012

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

31

Project Sector/ Company Name


Village of Longview Village of Thorsby Vulcan County Wheatland County

Project Description
Water Treatment Plant Upgrades and Wastewater Lagoon Water Treatment Plant Water Treatment Plant ROCKYFORD ROAD (Rge Rd 233 / 232) BASE AND PAVE

Project Location
MD of Foothills (Longview) Leduc County (Thorsby) Vulcan County (near Vulcan) Wheatland County (SH564 to Hwy 9)

Cost in $ Millions
$5.8 $6.3 $6.7 $6.7

Construction Schedule

Remarks
Proposed for 2011

2010-2011

Under construction. Nason Contracting Group. Proposed for 2011 - 2012.

2011

Under construction. Central City Asphalt.

Institutional
Acadia Foundation AgeCare Health Services Ltd. AgeCare Health Services Ltd. Alberta Advanced Education and Technology / University of Alberta Alberta Education*

*Procurement activities under direction of associated School Board


New Seniors Lodge 'Walden' Supportive Living Facility Seniors Supportive Housing Units, Sagewood Lodge (Phase 1) Edmonton Clinic North Building Hanna Calgary Strathmore Edmonton $15.0 $19.8 $12.2 $425.0 2009-2011 2008-2012 2010-2011 Completed. Kellar Construction. Proposed for 2011 - 2012 Under construction Under construction. PCL Construction Management.

Four High Schools

across Alberta

$96.8

2010-2012

Under construction. Clark Builders. Edmonton (Mother Margaret Mary Grades 10-12), Calgary (Northwest Grades 10-12), Spruce Grove (St. Peter the Apostle Grades 9-12) and Sherwood Park (Archbishop Jordan Grades 9-12). Nearing completion. West Calgary High School. Stuart Olson Constructors. Nearing completion. Western Canada HS. Clark Builders. Completed. Lord Shaughnessy HS. Westcor Construction. Under construction. St. Anthony's. CANA Construction. 32

Alberta Education* Alberta Education* Alberta Education* Alberta Education*

Replacement School for Ernest Manning HS Modernization Career and Technology Centre Modernization New School (K to Grade 12)

Calgary Calgary Calgary Drumheller

$33.6 $35.0 $6.2 $13.5

2009-2011 2009-2011 2011 2008-2012

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Alberta Education* Alberta Education* Alberta Education* Alberta Education*

Project Description
Replacement Facility Renovations Modernization Addition / Modernization

Project Location
Edmonton Edmonton Edmonton Fort Saskatchewan Millet Picture Butte Ponoka

Cost in $ Millions
$60.0 $7.8 $6.0 $13.2

Construction Schedule
2008-2011 2010-2011 2010-2011 2009-2011

Remarks
Nearing completion. Victoria School of Performing and Visual Arts. Aman Building Corp. Under construction. Eastglen High School. Jen Col Construction. Under construction. Prince Charles and Forest Heights Schools. Synergy Projects. Nearing completion. Fort Saskatchewan Elementary School / Christian School. Chandos Construction. Under construction. Griffiths - Scott Middle School. Pentagon Structures. Completed. Picture Butte Jr / Sr High School. Western Construction and Combustion Services. Proposed for completion by 2013. Ponoka Composite.

Alberta Education* Alberta Education* Alberta Education*

Replacement School (Grades 5 to 9) Modernization MODERNIZATION PHASE 3 (FINE ARTS AREA, THEATRE, GYM AND CAREER / TECHNOLOGY STUDIES AREA) Modernization (Phases 1 and 2) High School (Grades 7 to 12), Timberlea New Junior High School (Grades 7 to 9) Modernization Modernization Foothills Medical Centre Upgrade

$7.4 $13.4 $6.0

2011-2012 2010-2011

Alberta Education* Alberta Education*

Ponoka RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) Vauxhall Vauxhall Calgary

$11.0 $53.0

2010-2012 2009-2011

Under construction. Ponoka Composite HS. Graham Construction. Completed. Holy Trinity, including performing arts centre. Aman Building Corp. Nearing completion. Ecole McTavish Jr HS. Dowland Contracting. Under construction. Vauxhall HS. UFA Construction. Under construction. Vauxhall Elementary. UFA Construction. Under construction. EllisDon Construction. Main tower complete. Hospital department renovations underway.

Alberta Education*

$40.8

2010-2011

Alberta Education* Alberta Education* Alberta Health and Wellness

$15.5 $6.1 $560.0

2010-2011 2010-2011 2006-2014

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

33

Project Sector/ Company Name


Alberta Health and Wellness / Good Samaritan Society Alberta Infrastructure

Project Description
'Linden View' Designated Assisted Living (DAL) Facility Bow Island Health Centre Redevelopment (Emergency Dept Addition / Renovation) PETER LOUGHEED CENTRE, WOMEN'S HEALTH AND VASCULAR SURGERY FACILITY Provincial Cancer Strategy Calgary Phase 1 South Health Campus, Calgary Provincial Cancer Strategy Edmonton Phase 1 STOLLERY CHILDREN'S HOSPITAL SURGICAL SUITE REDEVELOPEMENT University of Alberta Endoscopy Relocation Stollery Children's Hospital Pediatric Intensive Care Unit Expansion Edmonton Clinic South Building / Alberta Urology Centre New Remand Facility Stollery Children's Hospital Emergency Dept Expansion Alberta Hospital Edmonton Food Services Depot Edson Healthcare Centre

Project Location
Taber

Cost in $ Millions
$13.0

Construction Schedule
2008-2011

Remarks
Completed. FWS Construction.

Bow Island

$5.3

2011-2012

Announced. Planned construction start July.

Alberta Infrastructure

Calgary

$36.3

Proposed

Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure

Calgary Calgary Edmonton Edmonton

$141.0 $1,310.0 $67.0 $33.6 2007-2012

Proposed Under construction. EllisDon Construction. Kasian Architecture / HDR Inc. Proposed Proposed

Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure

Edmonton Edmonton Edmonton Edmonton Edmonton Edmonton Edson

$14.5 $8.7 $484.0 $568.6 $24.2 $7.0 $108.0 2008-2012 2008-2012 2010-2012 2011-2012 2011-2014

Proposed Proposed Under construction. PCL Construction. Under construction. Stuart Olson Constructors. Under construction. PCL Construction. Under construction. Johnston Builders. Announced. Planned construction start fall 2011.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

34

Project Sector/ Company Name


Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure Alberta Infrastructure

Project Description
Fort Saskatchewan Community Hospital Grande Prairie Queen Elizabeth II Hospital Renovations Grande Prairie Regional Healthcare Centre NEW ROOF STRUCTURE, PEACE WAPITI ACADEMY High Prairie Health Complex Chinook Regional Hospital Parkade Lethbridge - Chinook Regional Hospital Redevelopment Lloydminster Continuing Care Project Medicine Hat Regional Hospital Redevelopment Central Alberta Cancer Centre (CACC) Fort McMurray Continuing Care Centre NORTHERN LIGHTS REGIONAL HEALTH CENTRE EMERGENCY AND ICU RENOVATIONS Strathcona Hospital Phase 1

Project Location
Fort Saskatchewan Grande Prairie Grande Prairie Grande Prairie High Prairie Lethbridge Lethbridge Lloydminster Medicine Hat Red Deer RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) Strathcona County (Sherwood Park) Strathmore

Cost in $ Millions
$87.0 $9.5 $520.0 $5.0 $89.8 $17.5 $112.7 $34.2 $199.8 $46.0 $50.0

Construction Schedule
2008-2012 2010-2011 2011-2014 2012 2011-2013 2010-2011 2012-2015 2011-2012 2011-2015 2010-2013

Remarks
Under construction. EllisDon Construction. Nearing completion. Delnor Construction. Announced. Planned construction start September 2011. Includes cancer treatment centre. Announced. Planned construction start summer 2012. Announced. Planned construction start late summer 2011. Under construction. Graham Construction. Announced. Phase 1 from 2012 - 2015. Under construction. Trumbley & Hampton Inc. Announced. Site work in 2011. Under construction. Stuart Olson Dominion Construction. Proposed for 2011 - 2012.

Alberta Infrastructure

$12.5

Proposed.

Alberta Infrastructure

$84.2

2010-2012

Under construction. EllisDon Construction. CASA House completed. Proposed

Alberta Infrastructure

Strathmore Continuing Care (previously described as 'Community of Care' Personal Care Facility)

$17.5

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

35

Project Sector/ Company Name


Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health and Wellness Alberta Infrastructure / Alberta Health Services / Good Samaritan Society Alberta Infrastructure* / B2L Partnership

Project Description
Barrhead Healthcare Centre Redevelopment Norwood - Glenrose Long Term Care Facility Strathcona Hospital Phase 2

Project Location
Barrhead

Cost in $ Millions
$17.3

Construction Schedule

Remarks
Proposed. Deferred pending results of Alberta Health Services review. On hold. Jen - Col Construction. Originally scheduled for 2008 - 2010. Proposed

Edmonton

$68.0

Strathcona County (Sherwood Park) Stony Plain

$59.1

Good Samaritan Care Centre Replacement Facility Ten Schools (P3 Project)

$24.0

2010-2011

Nearing completion. Chandos Construction.

across Alberta

$253.0

2010-2012

Under construction. Edmonton (three K to Grade 9), Calgary(four Grade 5 to 9, one K to Grade 9), Okotoks (K to Grade 9) and Langdon (Sarah Thompson School, K to Grade 4). Proposed for 2011 - 2012.

Alberta Seniors and Community Support Alberta Solicitor General and Public Security All Saints Parish All Seniors Care Living Centres Bethany Care Society Bethany Group Bishop O'Byrne Housing for Seniors Association Bow Valley College

Didsbury Long Term Care Centre (Affordable Supportive Living Spaces) Provincial Police and Peace Officer Training Centre New Catholic Church 'Laurel' Retirement Residence Affordable Housing Complex, Riverview Village 'Peace Hills Lodge' Seniors Facility 'Columbus Village' AFFORDABLE SENIORS HOUSING FACILITY Campus Redevelopment and Expansion

Didsbury

$26.5

Fort MacLeod Lethbridge Edmonton Calgary Wetaskiwin Calgary Calgary

$122.4 $21.0 $20.0 $11.0 $8.5 $11.6 $170.0

2012-2014

Announced. Planned construction start summer 2012. Proposed for 2013 - 2015. Consolidation of St. Basil's, Assumption and St. Patrick's parishes.

2010-2012 2011-2013 2009-2011

Under construction. Man - Shield Construction. Announced. Planned construction start spring 2011. Completed. Replacement for current Peace Hills Lodge. Proposed

2006-2012

Under construction. Stuart Olson Constructors.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

36

Project Sector/ Company Name


Bow Valley Regional Housing Brenda Stafford Foundation Calgary Academy / Tanbridge Academy Calgary Board of Education Carrington Communities Choices in Community Living Inc. Christenson Communities Ltd. / Good Samaritans Society City of Edmonton City of Edmonton City of Edmonton City of Red Deer City of Red Deer Continuum Health Care / Eldercare Communities Covenant Health Extendicare

Project Description
BOW RIVER LODGE REDEVELOPMENT (RENOVATIONS AND ADDITION) 'Tudor Manor' Affordable Assisted Living Facility 'The Academies' Shared Campus (K to Grade 12 Educational Space and Recreation Centre) Education Centre Including Dr. Carl Safran Centre Seniors Complex Rebuild after Fire 'Copper Sky Lodge' Assisted Living Facility Royal Oak Village Seniors Housing Phases 2 and 3 (Phase 2 Life Lease, Phase 3 Designated Assisted Living) New Library Branch, Mill Woods Library Renovations / Expansion, Highlands Jasper Place Library Renewal / Expansion Native Friendship Centre Civic Centre (City Hall) Renovations / Expansion Phase 1 Supportive Living Complex New Designated Assisted Living Facility Seniors Facility, Eaux Claires

Project Location
Canmore

Cost in $ Millions
$19.3

Construction Schedule

Remarks
Proposed

Okotoks Calgary

$15.3 $65.0

2010-2012

Under construction. Medican Construction. Proposed for 2011 - 2012. Possible construction start June / July 2011.

Calgary Edmonton Spruce Grove Lacombe

$80.5 $10.0 $28.0 $16.8

2008-2011

Under construction. EllisDon Construction. Proposed. Planned completion by spring 2012.

2010-2012 2011-2012

Under construction. Krawford Construction. Announced. Phase 2 (life lease) to follow phase 3.

Edmonton Edmonton Edmonton Red Deer Red Deer High River Red Deer Edmonton

$30.0 $9.5 $14.0 $5.0 $58.5 $6.0 $25.0 $25.2 2009-2011 2011-2012

Proposed. Planned completion in 2014. Proposed Announced. Proposed. Estimated cost range $5M to $8M. On hold. Project has been deferred to 2015 in 2010 budget. Proposed Proposed for 2011 - 2012. In design stage. Under construction

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

37

Project Sector/ Company Name


Fort McMurray Family Crisis Society Fort Saskatchewan Foundation Glenmore Christian Academy Grande Prairie and District Society for Christian Education High Prairie School Division Keyano College

Project Description
New Women's Shelter

Project Location
RM of Wood Buffalo (Ft McMurray) Fort Saskatchewan Calgary Grande Prairie

Cost in $ Millions
$50.0

Construction Schedule

Remarks
Proposed

New Seniors Lodge (Replacement for Turner Lodge) ADDITION School Expansion (Phases 1 to 3)

$18.0 $5.0 $9.0 2010-

Proposed for 2012 Proposed Nearing completion (phase 1).

Support Services Building POWER ENGINEERING / PROCESS OPERATOR POWER LAB Kopernik Seniors Complex and Community Centre LDS Calgary Temple NEW SCHOOL (K to GRADE 7) 'South Country Village' SENIORS COMPLEX EXPANSION, HERITAGE HEIGHTS 'The Bella Concert Hall' Conservatory of Music / Performance Hall Library Roderick Mah Centre for Continuous Learning Expansion and Technology Wing Expansion

High Prairie RM of Wood Buffalo (Ft McMurray) Edmonton

$10.0 $20.0

Proposed. Pending funding approval. Proposed

Kopernik Polish Heritage Society / Good Samaritan Society LDS Church Lloydminster Regional Catholic School District 89 Medican Developments / Haven of Rest Society Mount Royal University

$55.0

On hold

Calgary Lloydminster Medicine Hat

$24.5 $22.0 $8.5

2010-2011

Announced Proposed. Ecole St Thomas. Planned construction start June 2011.

2010-2011

Nearing completion. Medican Construction.

Calgary

$73.0

Proposed. Planned completion in 2013.

Mount Royal University Mount Royal University

Calgary Calgary

$41.0 $35.5 2009-2011

Proposed. Pending funding. Completed. PCL Construction.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

38

Project Sector/ Company Name


Peace Country Health / Chantelle Management Ltd. Penner Development Group Penner Development Group / Oi Kwan Foundation Points West Living Cold Lake / Alberta Health Services Points West Living Inc. Points West Living Inc. Points West Living Ltd. Public Works and Government Services Canada Public Works and Government Services Canada Public Works and Government Services Canada Public Works and Government Services Canada Red Deer College

Project Description
Grande Prairie Campus of Care

Project Location
Grande Prairie

Cost in $ Millions
$20.0

Construction Schedule
2010-2011

Remarks
Under construction. Nahanni Construction.

'Amica at Aspen Woods' RETIREMENT RESIDENCE PHASE 1 Oi Kwan Place Addition / Renovations Supportive Living Facility

Calgary

$25.0

Proposed for 2011 - 2012. Planned construction start summer 2011. 2010-2012 Under construction. Graham Construction.

Calgary

$22.1

Cold Lake

$17.0

2011-2012

Announced. Maclean Young Construction.

Supportive Living Units, Westgate Seniors Assisted Living Facility Continuing Care Facility (Affordable Supportive Living Spaces) Bowden Institute Expansion (Medium Security Housing Unit) Drumheller Institute Expansion (Medium Security Housing Unit) Edmonton Institute for Women Addition / Renovations Edmonton Maximum Security Institution Expansion Sports and Wellness Centre and Health Education Centre (Building Communities Through Learning Phase 2)

Grande Prairie Grande Prairie Stettler Bowden

$11.0 $35.0 $8.8 $8.8 2009-2011 2011-2012 2011

Proposed for 2011. Completed Announced Announced. UPA Construction Group.

Drumheller

$25.0

Proposed

Edmonton

$8.0

Proposed.

Edmonton

$22.7

Proposed

Red Deer

$100.0

On hold.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

39

Project Sector/ Company Name


Rocky Senior Housing Council Rocky View Foundation Santos Property Inc. Shalem Society for Senior Citizens Care Slim Thorpe Recovery Centre Southern Alberta Institute of Technology (SAIT) Stoney Tribal Administration Strathcona Shelter Society

Project Description
Westview Lodge Replacement Facility New Seniors Residence (Supportive Living Units) 'The Gardens at Highway 2' Assisted Living Facility Phase 1 Care Centre (Senior Citizens Home) New Detox and Treatment Facility

Project Location
Rocky Mountain House Crossfield Red Deer Calgary County of Vermilion River (W of Blackfoot) Calgary Stoney IR 142,143,144 (Morley) Strathcona County (Sherwood Park) Calgary Calgary Calgary Calgary Innisfail

Cost in $ Millions
$10.0 $9.2 $23.0 $5.8 $16.2

Construction Schedule
2010-2012 2010-2012

Remarks
Under construction. Chandos Construction. Two phases. Under construction. Keller Construction. On hold. Previously proposed for 2011 - 2012. Proposed

2009-2011

Nearing completion

Trades and Technology Complex Elementary School

$445.0 $12.0

2010-2012 2010-2011

Under construction. PCL Construction. Nearing completion. Trumbley and Hampton.

New Women's Shelter (Replacement Building for 'A Safe Place') Experiential Learning Centre (ELC) Interior Alterations, Clara Christie Centre for Mouse Genomics Science Building 'A' Renovations / Remediation Wastewater Treatment Plant Innisfail Gathering Place (New Library, Seniors Centre and Meeting Rooms) 'Glenway' Seniors Housing Facility

$6.8

Proposed

The University of Calgary The University of Calgary The University of Calgary The University of Calgary Town of Innisfail

$300.0 $6.0 $8.0 $16.0 $9.0

2008-2011 2010-2011 2011-2013 2011-2013 2010-2011

Completed (phase 1 Energy, Environmental, Experiential Learning Centre). EllisDon. Completed. PCL Construction. Announced Announced. Graham Construction. Completed. Pentagon Structures.

Trinity Place Foundation

Calgary

$6.0

2010-2011

Under construciton. Graham Construction.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

40

Project Sector/ Company Name


University of Alberta

Project Description
SOUTH CAMPUS (BALMORAL FACILITY RENOVATION / REPURPOSE) Stem Cell Research Facility Student Physical Activity and Wellness Centre CPOC Building Devonian Botanic Garden Ecological Learning Centre Performing Arts Centre, Augustana Campus 'Aperture Residential Park' Student Residences Phase 3 (Apartments) Performing Arts Centre Pembina Lodge Expansion 'Elk Island View - Bison Place' Assisted Living Facility

Project Location
Edmonton

Cost in $ Millions
$21.0

Construction Schedule

Remarks
Proposed. RFP design/build closes August 10.

University of Alberta University of Alberta University of Alberta University of Alberta University of Alberta / City of Camrose / Camrose County University of Lethbridge Webber Academy Westlock Foundation Wimco Properties Ltd.

Edmonton Edmonton Edmonton Parkland County Camrose

$26.5 $57.0 $35.0 $30.0 $11.5 2009-2011

Proposed. Planned completion in 2 1/2 years (mid 2013). Proposed. Four - year project. Under construction. Chandos Construction. Proposed Proposed to start construction in 2011. Fundraising underway. 2011-2013 2010-2011 2011-2012 Under construction. Stuart Olson Dominion. Nearing completion. Stuart Olson Dominion. Under construction On hold pending improved market conditions.

Lethbridge Calgary Westlock Lamont

$15.0 $9.9 $14.4 $6.0

Manufacturing
Fiberex Glass Corp. Hi Tech Canada Development Inc. Lafarge Canada Leading Manufacturing Group Ltd. Manufacturing Plant Manufacturing Plant Phase 3 Plant Modernization (Upgrades and Development) Oil Tank Manufacturing Facility Leduc Ponoka MD of Bighorn (Exshaw) Vermilion $30.0 $6.0 $600.0 $5.0 2010-2011 Proposed. Pending funding. Proposed for 2011. Pre - built building to be assembled on site. Proposed Completed

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

41

Project Sector/ Company Name Mining


Coalspur Mines Ltd.

Project Description

Project Location

Cost in $ Millions

Construction Schedule

Remarks

'Vista' Thermal Coal Mine

Yellowhead County (near Hinton) Grande Cache Grande Cache RM of Wood Buffalo (N of Ft McMurray)

$185.0

Proposed for 2013 - 2014.

Grande Cache Coal Corporation MAXIM Power Corp. Parsons Creek Aggregates

Development of #8 Surface Mine and #12 South B2 Underground Mine Development of #14 Coal Mine Parsons Creek Aggregates Limestone Quarry

$180.0 $50.0 $30.0

2009-2012

Under construction. ERCB approval for #8 mine November 2009. Proposed. ERCB approval October 2009. Proposed for 2011 - 2012, pending approvals.

Oil & Gas


AltaGas Income Trust Harmattan Co - Stream Project Mountain View County (Harmattan complex) Saddle Hills County (Gordondale area) northwestern Alberta MD of Big Lakes Yellowhead County (near Edson) across Alberta MD of Pincher Creek MD of Opportunity $100.0 2011-2012 Announced. Cost range $100M to $120M. ERCB approval December 2010.

AltaGas Ltd.

NATURAL GAS PROCESSING PLANT

$235.0

2011-2012

Announced

Birchcliff Energy Ltd. Free Energy International Inc. Inclusive Energy Ltd.

'Pouce Coupe South' GAS PLANT EXPANSION PHASE 3 Geothermal Plant Facility (1000kW) Liquids Storage Facility

$66.0 $5.5 $40.0

2011-2012

Announced Proposed Proposed

Pembina Pipeline Corp. Shell Canada Sunshine Oilsands

Midstream Capital Projects 20112013 WATERTON NATURAL GAS PROCESSING PLANT 'Muskwa' Heavy Oil Project Phase 1

$225.0 $40.0 $31.0

2011-2013 2011-2012

Announced Announced. Planned construction start summer 2011. Proposed. Five phases in total.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

42

Project Sector/ Company Name


Swan Hills Synfuels LP

Project Description
Coal Gasification Plant

Project Location
MD of Big Lakes (Swan Hills area)

Cost in $ Millions
$1,000.0

Construction Schedule

Remarks
Proposed for 2011 - 2014. PCL Industrial Management (syngas processing facility).

Oil Sands
Alberta Oilsands Inc. 'Clearwater West' SAGD Production RM of Wood Buffalo (S of Ft McMurray) RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo Sturgeon County (near Redwater) RM of Wood Buffalo (N of Ft McMurray) RM of Wood Buffalo (SE of Conklin) Lac la Biche County RM of Wood Buffalo (E of Conklin) RM of Wood Buffalo (S of Ft McMurray) $415.0 Proposed. Application filed January 2010.

BP Canada / Value Creation Inc. Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) Canadian Natural Resources Ltd. (CNRL) / North West Upgrading Inc. Cenovus Energy

'Terre de Grace' SAGD Oil Sands Project 'Horizon' OIL SANDS PROJECT PHASES 3 AND 4 'Project Horizon' Mining and Drilling Project phase 2 / 3 'Kirby South' In - Situ Oil Sands Project Phase 1 Bitumen Upgrader Phase 1

$3,500.0 $200.0 $1,080.0 $1,250.0 $4,000.0 2010-2013 2012-2014

On hold pending financing. Proposed for 2012 - 2013. EPC Technip. Proposed for 2012 - 2013. Approved Jan 2004. EPC Technip. Under construction. Application approved Q3 - 2010. Announced. EPC SNC-Lavalin, PCL Industrial Management. Site preparation complete. On hold. Owner expects construction start 2014.

'Borealis' SAGD Project Phase 1

$1,000.0

Cenovus Energy Inc.

Christina Lake Thermal Expansion Project Phases 1E, 1F and 1G 'Foster Creek' Oil Sands Project Phases F, G and H 'Narrows Lake' In Situ Oil Sands Project using Solvents 'Great Divide' SAGD Expansion Phase 1

$2,700.0

2011-2016

Announced. Application approved April 2011. Estimated construction Phase 1E 2011- 2014; Phase 1F 2012 - 2015; Phase 1G 2014 - 2016. Announced. ERCB approval September 2010. Site preparation underway. Proposed. Application filed early February.

Cenovus Energy / ConocoPhillips Cenovus Energy Inc. / ConocoPhillips Connacher Oil & Gas Ltd.

$2,000.0 $1,600.0

2011-2017

$600.0

Proposed for 2012 - 2013

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

43

Project Sector/ Company Name


ConocoPhillips Canada / Total Canada Devon Canada Corp.

Project Description
'Surmont Phase 2' Oil Sands Development 'Jackfish' Oil Sands Project Phase 3

Project Location
RM of Wood Buffalo RM of Wood Buffalo (SE of Conklin) RM of Wood Buffalo Strathcona County RM of Wood Buffalo RM of Wood Buffalo (Ft McKay) RM of Wood Buffalo RM of Wood Buffalo (SW of Ft McMurray) RM of Wood Buffalo (SE of Conklin) northern Alberta RM of Wood Buffalo (near Ft McMurray) RM of Wood Buffalo (N of Ft McMurray)

Cost in $ Millions
$2,000.0 $1,000.0

Construction Schedule
2010-2014

Remarks
Under construction Proposed for 2012 - 2014. Application filed Q3 2010. Proposed for 2013 - 2015. Application filed February 2011. Five phases in total. Proposed for 2011 - 2012, pending regulatory approval. Proposed for 2011 - 2013. Planned construction start late 2011, pending regulatory approvals.

Dover Operating Corp. (Dover OPCO) Enbridge Inc. E-T Energy Ltd. Finning (Canada) Ltd.

'Dover' Commercial Oil Sands Project Phase 1 Terminal Tankage (Storage Capacity) Expansion Phases 1 and 2 'Poplar Creek' Bitumen Extraction Project SERVICE FACILITY

$2,500.0 $260.0 $103.0 $110.0 2011-2012

Under construction.

Fort Hills Energy Corp. (Suncor Energy Inc. / Total SA / Teck Cominco) Grizzly Oil Sands ULC

'Fort Hills' Oil Sands Mine

$9,600.0

Proposed. Corporate approval for construction expected by end of 2012. Planned to come onstream in 2016. Proposed for 2012 - 2013. SNC - Lavelin.

'Algar Lake' SAGD Oil Sands Project

$500.0

Harvest Operations Corp. (formerly listed as Korea National Oil Company (KNOC)) Horizon North Logistics Inc. Horizon North Logistics Ltd. Husky Energy Inc. / BP PLC

'BlackGold' In Situ Oil Sands Project Phase 1

$300.0

2011-2012

Announced. GS Engineering and Construction Corp.

Oil Sands Work Camp Oil Sands Accommodation Camp

$25.0 $20.0 2011

Proposed Announced

'Sunrise Thermal Project' SAGD Oil Sands Project Phase 1

$2,500.0

2012-2013

Announced. SaipamSpA. Application approved. Corporate approval Nov 2010. WorleyParsons Canada EPC field facilities.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

44

Project Sector/ Company Name


Husky Energy Inc. / BP Plc. Imperial Oil Ltd. Imperial Oil Resources / ExxonMobil Canada

Project Description
'Sunrise Thermal Project' Phase 2 'Nabiye' Oil Sands Project 'Kearl Lake' Oil Sands Mine Phase 1 of 2

Project Location
RM of Wood Buffalo MD of Bonnyville (Cold Lake area) RM of Wood Buffalo

Cost in $ Millions
$1,900.0 $1,300.0 $10,900.0

Construction Schedule

Remarks
On hold pending review of costs and project optimization Proposed. Planned on - stream by 2015. Corporate decision by end of 2011.

2009-2012

Under construction. Three production trains / phases in total. Application approved (both phases). AMEC (EPC). Fluor Corp infrastructure and facilities. Proposed for 2012 - 2013. Application filed November 2010. Proposed for 2011 - 2014. Application filed. Approval expected Q3 2011 Proposed for 2013 - 2015, pending approvals.

Ivanhoe Energy

'Tamarack' Bitumen Project Phase 1

RM of Wood Buffalo (near Ft McMurray) RM of Wood Buffalo (SW of Ft McMurray) RM of Wood Buffalo (SE of Conklin) MD of Opportunity

$1,250.0

Japan Canada Oil Sands Limited (JACOS) / Nexen Inc. Korea National Oil Corporation (KNOC) Laricina Energy Ltd.

Hangingstone SAGD Commercial Production Project 'BlackGold' Oil Sands Project Phase 2 'Germain' Commercial Demonstration Project (Solvent Cyclic SAGD) In Situ Oil Sands Project Phase 2B

$1,200.0

$540.0

$250.0

Proposed for 2011 - 2012, pending approvals. Smaller scale pilot plant approved by ERCB completed. 2011-2013 Announced. Planned construction start in 2011. Corporate approval December 2010. Proposed On hold due to uncertain financial markets and escalating capital cost. Cost estimates are preliminary. Corporate approval deferred til late 2011. 2008-2011 Under construction. Proposed for 2011 - 2018. Application filed January 2010.

MEG Energy Corp.

RM of Wood Buffalo (Christina Lake) RM of Wood Buffalo RM of Wood Buffalo

$1,400.0

N-Solv Corp. OPTI Canada / Nexen Inc.

Pilot Plant 'Long Lake South' SAGD Project Phase 2 (Kinosis)

$50.0 $2,790.0

OPTI Canada Inc / Nexen Inc. Osum Oil Sands Corp.

Ash Processing Pit (part of Long Lake project) 'Taiga' Oil Sands Project

RM of Wood Buffalo MD of Bonnyville (N of Cold Lake)

$175.0 $1,570.0

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

45

Project Sector/ Company Name


Pengrowth Energy Trust Penn West Energy Trust / China Investment Corp. Petrobank Energy and Resources PTI Group

Project Description
SAGD Pilot Project, Lindbergh Development of Seal Lake Operations 'May River' Commercial Bitumen Project Phase 1 Wapasu Creek Lodge Expansion

Project Location
RM of Wood Buffalo MD of Big Lakes (N of High Prairie) RM of Wood Buffalo RM of Wood Buffalo (N of Ft McMurray) MD of Bonnyville (Hilda Lake) RM of Wood Buffalo / Strathcona County near Ft Saskatchewan to Thorhild Cty Northern Sunrise County (NE of Peace River) RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (N of Ft McMurray) RM of Wood Buffalo (NW of Ft McMurray)

Cost in $ Millions
$50.0 $150.0 $250.0 $460.0

Construction Schedule
2011 2010-2011

Remarks
Announced Announced Proposed for 2012 - 2013. Application filed December 2008. FEED underway.

2009-2011

Completed

Royal Dutch Shell

'Orion' Heavy Oil SAGD Facility (Phases 1 and 2) Athabasca Oil Sands Project Debottleneck Phase 1

$340.0

2005-2010

On hold. Phase 1 completed, phase 2 on hold pending review. Approved Oct 2004. Phased development, building to 20,000 bpd. Proposed. Muskeg River Mine, Jackpine Mine and Scotford. Corporate decision in 2011.

Shell Canada

$2,000.0

Shell Canada / Chevron / Marathon Oil Shell Canada Ltd.

'Quest' Carbon Capture and Storage Project 'Carmon Creek' Bitumen Project

$900.0

Proposed for 2012 - 2015. Pending corporate approval. Application filed November 2010. Proposed for 2011 - 2016. Two central processing facilities and three co-generation units. Proposed. Application to be filed early 2011. Approval expected in 2014. Proposed. Application to be filed with Frontier in early 2011. 2011-2012 Under construction. Application filed May 2009. Approval October 2010. Proposed

$3,450.0

SilverBirch Energy SilverBirch Energy Southern Pacific Resource Corp. Southern Pacific Resource Corp.

'Frontier' Oil Sands Mine Phase 1 'Equinox' Oil Sands Mine (Lease 14) 'McKay' SAGD Oil Sands Project Phase 1 'McKay' SAGD PROJECT PHASE 2

$6,000.0 $2,500.0 $408.0

$100.0

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

46

Project Sector/ Company Name


Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc. Suncor Energy Inc.

Project Description
'Voyageur South' Oil Sands Mining Operation North Steepbank Mine Extension 'Firebag' Oil Sands Project Stage 3 'Firebag' Oil Sands Project Phase 4 MacKay River SAGD Expansion

Project Location
RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (NW of Ft McMurray) RM of Wood Buffalo RM of Wood Buffalo (N of Ft McMurray) MD of Opportunity RM of Awood Buffalo (N of Ft McMurray) RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Mildred Lake)

Cost in $ Millions
$4,400.0 $400.0 $900.0 $1,700.0 $1,000.0

Construction Schedule

Remarks
On hold pending market conditions. Application filed July 2007. Corporate approval January 2008. On hold, but planned in-operation late 2012. Application approved November 2006.

2010-2011 2011-2013

Completed. Cord WorleyParsons. Under construction. ERCB approval March 2010. On hold pending review of project costs. Application filed Dec 2005.

Suncor Energy Inc. / Total SA Suncor Energy Services

'Voyageur' Oil Sands Third Upgrader (U3) 'Firebag' Administration Complex and Village Camp Core 'West Ells' Oil Sands Project TWO NEW MINE TRAINS, MILDRED LAKE MINE SITE COMPOSITE TAILINGS PLANT, AURORA NORTH MINE SITE South West Sand Storage Conversion Phase 4: Upgrader Expansion Phase 2 / Aurora South Mine Trains 1 and 2 Sulphur Emission Reduction Program (SERP)

$11,600.0 $177.0

2011-2016

Announced. Project does not include bitumen feed to upgrader. Completed. Bird Construction.

Sunshine Oilsands Syncrude Canada

$385.0 $3,600.0

Proposed for 2011 - 2012. Proposed for 2011 - 2014

Syncrude Canada Syncrude Canada Ltd. Syncrude Canada Ltd.

$800.0 $34.6 $2,300.0

2012-2014

Announced Proposed. Application filed. Proposed. Pre-engineering study underway (AMEC). Expansion SNC-Lavalin, Fluor Daniel. Train 3 AMEC.

Syncrude Canada Ltd.

$1,600.0

2005-2011

Under construction

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

47

Project Sector/ Company Name


Total E&P Canada Ltd. / Suncor Energy Inc.

Project Description
Joslyn North Mine

Project Location
RM of Wood Buffalo

Cost in $ Millions
$6,000.0

Construction Schedule

Remarks
Proposed for 2013 - 2016. Application filed early 2006. ERCB conditional approval January 2011. Corporate approval to proceed expected by end of 2012. FEED underway. Proposed

Value Creation Inc. (previously listed as TriStar) Williams Canada

'TriStar' SAGD Pilot Project

RM of Wood Buffalo (S of Ft McMurray) RM of Wood Buffalo and Redwater

$100.0

Off- Gas Extraction Plant Modifications and Construction of De - Ethanizer

$311.0

2011-2013

Announced

Other Industrial
Defence Construction Canada Defence Construction Canada Defence Construction Canada Defence Construction Canada Defence Construction Canada Public Works and Government Services Canada TransAlta Corp. / TransCanada Pipelines Ltd. Range Control Facility, CFB Suffield Land Force Western Area Headquarters, CFB Edmonton BUILDING 700 OFFICE BUILDING, CFB EDMONTON Kitting Facility, Canadian Manoeuvre Training Centre, CFB Wainwright Maintenance Facility, CFB Wainwright Lethbridge Research Centre Building 102 Exterior Envelope Replacement 'Project Pioneer' Carbon Capture and Storage (CCS) Project at Keephills Cypress County Edmonton Edmonton Wainwright Wainwright Lethbridge $5.1 $17.0 $30.0 $19.5 $30.0 $8.9 2011-2013 2011-2012 Under construction. Wahl Construction. Proposed for 2011 - 2013. Proposed. Tender closes July 5. Proposed for 2011. Cost estimate includes demolition of existing facility. Pending approval. Proposed for 2011 - 2013. Announced. Chandos Construction.

Parkland County

$1,400.0

Proposed for 2012 - 2014. FEED underway.

Pipelines
Athabasca County Enbridge Inc. Athabasca Regional Water Pipeline 'Athabasca' Pipeline Capacity Expansion 2 County of Athabasca between Cold Lake and Hardisty $28.0 $200.0 Proposed for 2011 - 2012. From Boyle to Grassland / Wandering River. Proposed. To be completed by early 2014.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

48

Project Sector/ Company Name


Enbridge Inc. Enbridge Inc. Enbridge Inc. Enbridge Inc. Enbridge Inc.

Project Description
'Waupisoo' Pipeline Expansion Pipelines and Terminal Facilities, Christina Lake Heavy Oil Project 'Wood Buffalo' Crude Oil Pipeline 'Norealis' Bitumen Pipeline, Husky Sunrise to Cheecham Terminal 'Athabasca' Oil Pipeline Expansion 1

Project Location
Edmonton to Ft McMurray RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo RM of Wood Buffalo to Hardisty RM of Wood Buffalo to near Edmonton RM of Wood Buffalo (Kearl to Cheecham Terminal) RM of Wood Buffalo to Alberta / BC border near Edmonton to Camrose and Lacombe Counties Cty of Forty Mile / MD of Taber Cold Lake area Edmonton area to Kearl Lake oilsands project

Cost in $ Millions
$400.0 $250.0 $370.0 $475.0 $185.0

Construction Schedule
2011-2013

Remarks
Announced. Planned construction start Nov 2011. Proposed Proposed Proposed for 2011 - 2012. Proposed for 2012 - 2013. Application filed.

Enbridge Inc.

'Fort Hills' Bitumen / Diluent Pipelines and Terminal Facilities 'Woodland' Bitumen Pipeline

$2,000.0

On hold til markets improve. Originally proposed for 2010 - 2012. Pending approvals. Proposed for 2011 - 2012

Enbridge Pipelines

$100.0

Enbridge Pipelines Inc.

'Northern Gateway' Bitumen and Condensate Pipelines (Alberta portion) CO2 Pipeline (Alberta Carbon Trunk Line)

$1,500.0

Proposed for 2014 - 2015. Application filed May 2010. Hearings start January 12, 2012. Construction cost entire pipeline (Alberta and BC) $5.5 billion. 2012-2014 Announced. Revised application submitted to ERCB November 2010.

Enhance Energy Inc.

$600.0

Highway 3 Water Committee Inter Pipeline Fund Inter Pipeline Fund

Regional Water System Bow Island / Grassy Lake / Burdett Pipeline System Connection Upgrades and Expansions 'Polaris Pipeline' Expansion / Extension of Existing Diluent Pipeline

$8.5 $14.0 $135.0 2011 2010-2012

Proposed Completed Under construction

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

49

Project Sector/ Company Name


Keyera Corp. Keyera Corp. Keyera Corp.

Project Description
'Carlos' Natural Gas Pipeline Pipeline and Connections Two 4KM Pipelines Connecting new ADT Facility to Fort Saskatchewan Pipeline System SUNNYSLOPE WSA WATER DISTRIBUTION SYSTEM Water Line Twinning

Project Location
central Alberta Edmonton / Fort Saskatchewan Edmonton / Strathcona County Kneehill County Innisfail to Olds

Cost in $ Millions
$30.0 $58.0 $18.0

Construction Schedule
2010-2011

Remarks
Completed Proposed

2011

Completed.

Kneehill County Mountain View Regional Water Services Commission Northern Sunrise County

$8.7 $34.0

2011-2012 2010-

Under construction. Chinook Pipeline. Under construction (Phase 1 completed).

REGIONAL WATER SYSTEM PHASE 2A (WATERLINES AND FILL STATIONS) NORTHWEST MAINLINE EXPANSION Willesden Green Pipeline Expansion, Trunk Line Improvements and Debottlenecking Drayton Valley Trunk Line Extension Pipeline Debottleneck and Construction of Truck Terminals Oil Pipeline Capacity Expansion Pipeline Reactivation / Recertification

Northern Sunrise County (St. Isadore and Nampa) Mackenzie Cty (SW of Rainbow Lake) across Alberta

$10.0

Proposed

Nova Gas Transmission Ltd. Pembina Pipeline Corp.

$60.0

Proposed. Public hearing November 2011. Kyklo Creek, Timberwolf and Cranberry pipeline sections. 2011-2012 Announced

$40.0

Pembina Pipeline Corp. Pembina Pipeline Corp. Pembina Pipeline Corp. Pembina Pipeline Corp.

central Alberta central Alberta central Alberta Yellowhead County (Edson area) Slave Lake and Whitecourt areas to Edmonton

$6.0 $11.0 $23.0 $15.0 2010-2011 2011

Proposed Proposed Nearing completion. Pipeline runs from Willseden Green to Buck Creek. Nearing completion

Pembina Pipelines Income Fund

'Nipisi' Heavy Oil and 'Mitsue' Condensate Pipelines

$440.0

2010-2011

Nearing completion

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

50

Project Sector/ Company Name


Plains Midstream Canada (Plains)

Project Description
'Rainbow Pipeline II' Butane and Condensate Pipeline

Project Location
Northern Sunrise County to Strathcona County Swan Hills to Whitecourt Counties of Vermilion River, Minburn and Two Hills Fort McMurray to Redwater

Cost in $ Millions
$200.0

Construction Schedule

Remarks
Proposed for 2011 - 2012.

Swan Hills Synfuels Vermilion River Regional Water System (VRRWS)

Synthetic Gas Pipeline Regional Water System Phase 1

$50.0 $31.2

Proposed Proposed

Williams Energy

'Boreal' Natural Gas Liquids (NGL) Pipeline

$283.0

2010-2012

Under construction. Willbros Canada. $US.

Power
Alberta Electric System Operator (AESO) Alberta Electric System Operator (AESO) Alberta Electric System Operator (AESO) Alberta Electric Systems Operator (AESO) Alberta Electric Systems Operator (AESO) Alberta Electric Systems Operator (AESO) Alberta Wind Energy Corp. Rebuild of Electricity Infrastructure Drayton Valley, Wabamun, Edson, Hinton east central Alberta Wetaskiwin to Didsbury central Alberta $30.0 2010-2013 Under construction. Hinton nearing completion.

Transmission Reinforcement, Hanna Region Transmission Line Rebuild (138kV) Transmission System Upgrade

$1,000.0 $60.0 $206.0

Proposed. Stage 1 to be in service by 2012, stage 2 in service by 2017. Proposed. Project includes new substation near Didsbury and upgrades to Ponoka substation Proposed. New substations near Didsbury, Ponoka and Innisfail, substation upgrades Benalto and west Lacombe. Proposed over five to seven years (completion between 2015 and 2017). Proposed over five to seven years (completion between 2015 and 2017). Line from hamlet of Little Smoky to Grande Prairie. Proposed. Pending completion of transmission line Pincher Creek to Lethbridge.

Transmission Line, Poplar Hills to Grande Prairie Transmission Line

County of Grande Prairie MD of Greenview / Cty of Grande Prairie MD of Pincher Creek (NE of Pincher Creek)

$20.0 $150.0

'Oldman River' Wind Farm (50MW)

$47.0

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

51

Project Sector/ Company Name


Alberta Wind Energy Corp. / Mainstream Renewable Power Alberta Wind Energy Corporation / Mainstream Canada AltaLink AltaLink AltaLink

Project Description
Two Wind Generation Projects (350MW total) 'Oldman 2' Wind Farm (46MW)

Project Location
southern Alberta

Cost in $ Millions
$840.0

Construction Schedule

Remarks
Proposed. Windy Point (62MW, planned construction start 2012) and Waterton Colony.

MD of Pincher Creek (NE of Pincher Creek) Edmonton to Calgary Fort Macleod to High River MD of Pincher Creek (Pincher Creek to Lundbreck) southeastern Alberta Strathcona County (Rge Rd 224 / Twp Rd 542) County of Newell (W of Brooks) MD of Pincher Creek Edmonton to Calgary Paintearth County (near Halkirk) Medicine Hat Calgary

$120.0

2012

Announced. Planned construction start spring 2012.

Western Alberta Transmission Line (500kV) South Foothills Transmission Project (240kV) Transmission Line (240kV) and 'Chapel Rock' Substation

$1,100.0 $345.0 $300.0

Proposed for 2012 - 2014. Application filed March 2011. Proposed to start construction summer 2012, pending approvals. Proposed. Application to be filed in 2012.

AltaLink AltaLink

Transmission Line (240kV), Cassils to Bowmanton ELECTRICAL SUBSTATION

$407.0 $16.0

2011-2014

Announced. Route to go north of Lake Newell. Proposed

AltaLink Management Ltd. AltaLink Management Ltd. ATCO Power Capital Power Corp.

Transmission Line 666L Russell 632S Substation Eastern Alberta Transmission Line (500kV) 'Halkirk' Wind Farm phases 1 and 2 (150MW each) Concentrating Solar Thermal Energy Demonstration Project 'Bonnybrook Energy Centre' Power Plant (165MW)

$8.0 $17.2 $1,650.0 $350.0 2011-2013

Proposed. AUC approval January 2011. Proposed. AUC approval January 2011. Proposed for 2012 - 2014. Announced

City of Medicine Hat ENMAX Energy Corp.

$9.0 $200.0

Proposed for 2011 - 2012 Proposed. Pending approvals. Planned in - service early 2013. 52

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


ENMAX Energy Corp.

Project Description
'Shepard Energy Centre' Natural Gas Fired Generating Plant (800MW) 'Heartland' Transmission Line (500kV)

Project Location
Calgary

Cost in $ Millions
$1,000.0

Construction Schedule
2011-2015

Remarks
Announced. Kiewit Energy Canada Corp. / Black & Veatch Canada Corp. AUC conditional approval October 2010. Proposed. Application filed with Alberta Utilities Commission (AUC) September 2010.

EPCOR Distribution and Transmission / AltaLink Management Greengate Power Corp.

Wabamun to Ind Heartland NE of Fort Saskatchewan Red Deer County (between Red Deer and Pine Lake) Vulcan County (near Carmangay) Warner County (Stirling) Lamont County (NE of Bruderheim) MD of Greenview (near Grande Cache) Lethbridge to Great Falls near Lethbridge County of Warner Cypress County Cypress County (S of Irvine)

$387.0

'Radar Hill' Wind Farm (100MW)

$200.0

Proposed

Greengate Power Corp.

'Blackspring Ridge' Wind Power Project (300MW) Phase 1 'Stirling' Wind Farm (100MW) Gas Fired Electric Plant (190MW)

$700.0

2012-2013

Announced

Greengate Power Corp. MAXIM Power Corp.

$250.0 $140.0

Proposed for 2011. Pending AUC approval. Proposed. To be built next to existing Deerland substation. Pending improved market comditions. Proposed. Pending approvals.

MAXIM Power Corp.

'Milner Expansion' Coal - Fired Generating Plant (500MW) Montana - Alberta Transmission Line (230MW) Electrical Substation 'Prairie Home' Wind Farm Phase 2 (89 MW) East Palliser Transmission Line 'Wild Rose' Wind Farm (200MW) Phase 1

$1,400.0

Montana Alberta Tie Ltd. (MATL) Montana Alberta Tie Ltd. (MATL) Naturener Energy Canada Naturener Energy Canada Naturener Energy Canada

$213.0 $6.0 $100.0 $100.0 $400.0

2009-2011 2010-2011

Under construction. Rocky Mountain Contractors (EPC). Under construction. SNC-Lavelin. Proposed for 2011 - 2012 Proposed Proposed. AUC approval October 2010. Dependent on approval of East Palliser Transmission Line.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

53

Project Sector/ Company Name


Naturener Energy Canada

Project Description
'Wild Rose' Wind Farm Phase 2 (162MW) 'Hand Hills' Wind Farm (80MW) Waste to Energy Gasification Plant (25MW) Plasma Gasification Plant (waste to - energy conversion) 'Wintering Hills' Wind Farm (88MW)

Project Location
Cypress County (S of Medicine Hat) Starland County (E of Delia) Brazeau County (near Drayton Valley) Red Deer County (Horn Hill Waste Transfer Site) Wheatland County (near Drumheller) Whitecourt MD of Foothills (near High River) Kananaskis Country (Peter Lougheed Prov Park)

Cost in $ Millions
$410.0

Construction Schedule

Remarks
Proposed. Planned to be in - service in 2012.

Nexen / Joss Power Otoka Energy Corp.

$200.0 $100.0

Proposed for 2011 - 2012 Proposed construction start phase 1 in 2011. Three phases. Pending approvals. Proposed for 2011 - 2012. Pending federal funding.

Plasco Energy Group / Central Waste Management Commission Suncor Energy / Teck Resources Ltd. Swan Hills Synfuels Trans Canada Corp. TransAlta

$93.0

$350.0

2010-2011

Under construction. AUC approval June 2010.

Power Generation Plant (300MW) 'Saddlebrook' Natural Gas Fired Power Plant (350MW) POCATERRA HYDRO FACILITY UPGRADES (PENSTOCK REPLACEMENT)

$500.0 $400.0 $20.0

Proposed. Planned construction start 2012. Proposed Proposed for 2011 - 2012

Residential
Alberta Ronald Macdonald House Amacon Ronald McDonald House 'St. Albert Village' Condo Towers and Urban Village on Grandin Park Plaza Site 'Waterfront' Condominiums (Three Towers and Five Podiums) plus Townhouses 'Union Square' Condominium Apartment Building Phase 2 Red Deer St. Albert $10.0 $450.0 2010-2011 Nearing completion. Timcon Construction. On hold. Approved by city council May 2008.

Anthem Riverfront Land Holdings Apex Lifestyle Communities

Calgary

$750.0

On indefinite hold (site 3). EllisDon Construction.

Calgary

$25.0

On hold. EllisDon Construction.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

54

Project Sector/ Company Name


Arcus Developments Asset Builders Corp. Assured Developments Avalon Central Alberta Bethany Group Bond Street Properties

Project Description
'Astoria on 10th' Condominium Tower Row Housing Complex 'Akoya at the Bridges' Apartment Building Phase 2 'Verde in Clearview Ridge' Townhouse Development 'Brookside' Seniors Condominiums 'The Bond Centre' Condominium Towers 1 and 2 Residential / Retail Complex (Three Towers), East Village 'Mosaic Cranston' Townhouses

Project Location
Calgary Sylvan Lake Calgary Red Deer Camrose RM of Wood Buffalo (Ft McMurray) Calgary Calgary

Cost in $ Millions
$60.0 $6.2 $40.1 $35.0 $18.0 $160.0

Construction Schedule

Remarks
On hold. Ledcor Construction. Original schedule 2007 - 2010

2011-

Under construction On hold.

2011-2013 2010-2011

Under construction Nearing completion. WCMI Construction Services. Proposed. Pending financing.

Bosa Development / Embassy Development Brookfield Homes (formerly Hawthorne Homes) Brookfield Homes / Urban Landmarks Master Builder Bucci Developments CAIRN Corporation Calgary Homeless Foundation Cardel Homes Cardel Lifestyles Cardel Lifestyles

$300.0 $20.0 2010-2012

Proposed. Construction over five to seven years. Under construction

'Aurora' Phase 1: Mira Condominium Tower plus Townhouses 'Next' APARTMENT CONDOMINIUMS 'Cairn on the Boulevard' Affordable Housing Project Home Construction Project 'Lighthouse Landing' Townhouses Building A5 'Village at Prestwick' Building B (Apartment Building) Prestwick Place' Apartment Buildings

Edmonton Calgary Grande Prairie Calgary Calgary Calgary Calgary

$325.0 $18.6 $14.0 $24.0 $9.2 $6.6 $20.0

2007-2011

Under construction Proposed

2011-2013

Announced. Planned construction start summer 2011. Proposed

2010-2011

Nearing completion Proposed

2010-2011

Under construction

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

55

Project Sector/ Company Name


Carlisle Group (formerly Pointe of View Development) Century Group Lands Corp. Christenson Developments / Western Asset Management Group (WAM) Cidex Developments Cidex Developments Cidex Developments City of Calgary

Project Description
'Glenbow Place' Condo Apartment Complex (Three Buildings) 'Liberty Junction' Apartments and Town House Complex 'Centre in the Park' Housing / Retail / Commercial Development

Project Location
Cochrane

Cost in $ Millions
$25.0

Construction Schedule

Remarks
Proposed. Planned construction start summer 2011.

Red Deer County Strathcona County (Sherwood Park) Calgary Calgary Calgary Calgary

$41.5 $230.0 2006-2011

On hold until spring 2012 (Phase 1). Under construction. Can-Der Construction.

'Treo Beacon Heights' Apartment Building 4 'Treo Beacon Heights' Apartment Buildings 2 and 3 'Treo Beacon Heights' Apartment Building 1 The Bridges Phase 2 Site 15 Affordable Housing Project (Mcpherson Place) Wild Rose Arena Site Affordable Housing Project RESIDENTIAL COMPLEX Apartment Complex Row Housing Development Condominium Apartment Building and Townhouses, Eau Claire 'Monarch at Mackenzie Towne' CONDO APARTMENTS PHASE 3 'Nuera 2' Apartment Building

$6.3 $6.4 $7.2 $18.5 2011

Proposed Proposed Under construction. Proposed

City of Camrose / Bethany Group Clay Cup Developments Cold Lake Affordable Housing Society (CLAHS) Concept Homes Concord Pacific Inc. Cove Properties Ltd. Cove Properties Ltd.

Camrose Innisfail Cold Lake Edmonton Calgary Calgary Calgary

$9.0 $8.0 $5.5 $11.0 $30.0 $9.0 $31.0

2010-2011

Under construction. WCMI Construction Services. Proposed for 2011 - 2012. Planned construction start fall 2011. On hold. Proposed On hold pending a shift in the economy. Proposed for 2011 - 2012 Proposed for 2012 - 2013

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

56

Project Sector/ Company Name


Cove Properties Ltd. Cove Properties Ltd. Devonian Properties

Project Description
'Monarch at Mackenzie' Building 1 Phase 2 'Monarch at Mackenzie Towne' Condominium Apartment Building 'Longboat Landing' Townhouses and Apartments 'Longboat Landing' Earthworks and Deep Services 'Sky Tower' Apartment Building Boyle Renaissance Phase 1 -'Welcome Village' Affordable Housing and Community Centre 'Origins at Cranston' Apartment Condominium Building 'Valour Park' Townhouse Complex Rosslyn Place Apartment Building Addition (New Building) 'Drake' Apartment Building Townhouses Kai Mortenson Towers (Two Residential Towers) Townhouses Affordable Housing Condominium Building

Project Location
Calgary Calgary RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) Calgary Edmonton

Cost in $ Millions
$7.4 $25.0 $560.0

Construction Schedule

Remarks
Proposed for 2011 - 2012 Proposed Proposed (phase 2 and phase 4 onwards). Earthworks and deep services anticipated to be completed by early 2013.

Devonian Properties

$90.0

2010-2012

Under construction

Diamond Trust Development Edmonton YMCA

$47.8 $42.2 2010-2012

On hold. ITC Construction Group. Under construction. Clark Builders.

Evolution by Greenboro Evolution by Greenboro Greater Edmonton Foundation Grosvenor Canada Ltd. Habitat for Humanity / Trico Homes Homburg - Centron Teamworks Homes by Avi Horizon Housing Society IMC Construction

Calgary Calgary Edmonton Calgary Calgary Calgary

$5.6 $5.0 $10.0 $12.0 $13.5 $130.0 2010-2012 2010-2011

Proposed Proposed Completed. Delnor Construction. Proposed for 2011 - 2013 Proposed Under construction (tower 1 Oslo parkade). Centron Construction. Construction of tower expected to start spring 2011. Proposed Proposed 2010-2011 Announced. Planned construction start spring 2010.

Calgary Calgary Sylvan Lake

$7.0 $9.0 $5.2

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

57

Project Sector/ Company Name


Jarvis Bay Developments Jayman MasterBUILT

Project Description
'The Savanna' Condominium Complex 'Chesapeake in Auburn Bay' TOWNHOUSE COMPLEX BUILDINGS 1 - 5 AND 10 Lumino Building C Condo Apartment Building 'Lumino West' Affordable Housing (Apartment Building) Lumino Building B Apartment Building 'Centuria on the Park' Condo Apartments 'Cornerstone Village' Residential Development (Apartment Building and Villa Bungalows) Condominium Apartment Building 'Vida' Condominium Apartment Building 'Sierras of Michener Hill' Condominium Complex Phase 1 'Axxess' and 'Reflections' Condo Complexes, Beacon Hill Affordable Housing Tower (Apartment Building) Affordable Housing Project 'Highbury Tower Residences' Condominiums Phase 3 'Highbury Tower Residences' Condominiums Phase 2

Project Location
Sylvan Lake Calgary

Cost in $ Millions
$20.0 $8.8

Construction Schedule

Remarks
Proposed. Scope of work revised. Proposed

Kanas Corporation Kanas Corporation Kanas Corporation Lake Placid Developments Leaside Development Corp. Luxe Developments Luxe Developments Medican Developments Monarch Group Mustard Seed Ministry North Peace Housing Foundation Perera Shawnee Ltd. Perera Shawnee Ltd.

Calgary Calgary Calgary Calgary Olds

$9.0 $11.1 $14.8 $27.0 $50.0 2008-2011 2010-2011 2011-2012

Proposed for 2011 - 2012. Completed Under construction Proposed to bring building to grade by March 2011. Under construction (phase 2). Four phases. Phases 3 and 4 apartment condominiums. On hold 2010-2011 2009-2011 2008-2011 2011-2012 Under construction Completed Under construction. Announced. Clark Builders. Planned construction start September. Proposed On hold. Originally proposed for 2011 - 2013 On hold. Perera Development Group.

Calgary Calgary Red Deer Sylvan Lake Calgary Peace River Calgary Calgary

$32.0 $6.3 $8.5 $8.1 $60.0 $7.0 $32.0 $40.5

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

58

Project Sector/ Company Name


Pointe of View Condominiums ProCura Real Estate ProCura Real Estate Services ProCura Real Estate Services Qualex - Landmark Group Remington Development Schizophrenia Society of Alberta Slave Lake Equities Source Development Corp. Statesman Group of Companies Statesman Group of Companies Statesman Group of Companies Stonecroft Streetside Development Streetside Development Corp. Streetside Developments

Project Description
'Indigo Sky' CONDO APARTMENT BUILDING 'Mayfair Village' Highrise Apartment Complex phase 1 (South Tower) 'Azure on the Park' Condo Complex Phase 1 'Mayfair Village' North (Second) Tower 'Luna' Condominium Apartment Building 'Quarry Park' APARTMENT BUILDING 'Iris Court' Affordable Supportive Living Facility APARTMENT BUILDING AFFORDABLE HOUSING PROJECT 'Manchester Station' Condo Apartments 'Riverside Quays' Condominium Apartments Phase 5 'Riverside Quays' Condo Apartments and Townhouses Phase 4 'Landings at Cougar Ridge' Townhouse Development COPPERFIELD BUILDING 4 Townhouses and Condo Apartments 'Pefect Fit' Condominium Apartment Building 'Ginger Park' Townhouse Complex (Buildings S,T,V,X,Y)

Project Location
Calgary Edmonton Edmonton Edmonton Calgary Calgary Edmonton Slave Lake Calgary Calgary Calgary Calgary Calgary Calgary Calgary Calgary

Cost in $ Millions
$36.0 $56.5 $6.5 $100.0 $50.0 $18.6 $5.1 $10.0 $25.0 $28.0 $18.0 $30.0 $5.0 $28.0 $12.5 $6.8

Construction Schedule

Remarks
Proposed

2010-2011

Nearing completion. Clark Builders. Proposed. Proposed. Clark Builders.

2010-2011

Under construction. Intertech Construction Group. Proposed On hold.

2011-2012

Announced. Nova Builders Inc. On hold. On hold On hold

2011-2012

Announced. Planned construction start summer 2011. Proposed

2011-2013

Under construction Proposed. In redesign Proposed

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

59

Project Sector/ Company Name


Swerve Living Town of Lloydminster / Libbie Young Centre Urban Landmarks Valour Place Society

Project Description
'Swerve Living' Condominium Building Supportive Living Units and Community Centre 'The Britnell' Apartments (Two Buildings) 'Valour Place' Apartment Housing for Military during Rehabilitation / Treatment 'London at Heritage Station' Condominium Towers 'Valmont' RESIDENTIAL COMPLEX 'Elk Island View - Heron Place' Condominium Apartment Building 'Elk Island View - Swan Place' Condominium Apartment Building 'Stony Mountain Plaza' Affordable Housing Project 'Fusion Plaza' Apartments Phase 1

Project Location
Red Deer Lloydminster Edmonton Edmonton

Cost in $ Millions
$9.5 $5.0 $20.5 $10.0

Construction Schedule

Remarks
Proposed. Pending funding.

2011-2012

Under construction. Fillmore Construction Management. On hold. Urban Landmarks.

2011

Announced

Westcorp Inc. WestCreek Developments Wimco Properties Ltd.

Calgary Calgary Lamont

$200.0 $8.2 $6.0

2006-

Under construction. Towers 1 and 2 completed. To be built in five stages. Proposed On hold. Wimco Construction Ltd. Project expected to start after Motel 6, pending improved market conditions. On hold pending improved market conditions.

Wimco Properties Ltd. Wood Buffalo Housing and Development Corporation (WBHDC) Woodfine Developments

Lamont RM of Wood Buffalo (Ft McMurray) Grande Prairie

$6.0 $32.0 2010-2011

Completed

$45.0

On hold indefinitely.

Telecommunications
City of Grande Prairie TELUS Outdoor Wireless Network Initiative 2011 Network Expansion / Enhancement Grande Prairie across Alberta $6.0 $650.0 2011 Proposed Announced. Fibreoptic lines and cellphone towers.

Tourism/Recreation
Argyll Velodrome Association BCP Construction Indoor Velodrome and Multi-Use Sports Facility Hotel Edmonton Blackfalds $32.0 $7.5 Proposed for location by Peter Hemingway Pool On hold

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

60

Project Sector/ Company Name


Bearspaw - Glendale Community Association Calgary Exhibition and Stampede Calgary Science Centre Calgary Winter Club Calgary Zoo Cantos Music Foundation

Project Description
Sports Facility

Project Location
Rocky View County (Bearspaw) Calgary Calgary Calgary Calgary Calgary

Cost in $ Millions
$6.0

Construction Schedule

Remarks
Proposed for 2011 - 2012. Phased development.

'Western Event Centre' Agriculture Arena and Exhibit Hall New 'Telus World of Science Calgary' Science Centre Phase 1 - Addition 'Antarctic Landing' Penguin Exhibit King Edward Hotel Redevelopment and Cantos at the King Eddy National Music Centre Radisson Calgary Airport East Hotel and Conference Centre, near Calgary Airport Best Western Hotel Museum and Cultural Heritage Centre Genesis Place Phase 3 (Twin Ice Arena, Meeting and Multi-Use Space) Brighton Athletic Park (four multi purpose fields) Devonian Gardens Renovation Phase 2 Development of Lynnview Ridge as Parkland, Golf Course 'Fields for Life' Artificial Turf Soccer Fields

$65.0 $160.0 $14.0 $24.5 $110.5 2009-2011 2011-2012 2010-2011

Proposed for 2012 - 2014. Part of Stampede Park $400M expansion. Under construction. Cana Construction. Location near Calgary Zoo. Under construction. Chandos Construction. Completed. Ledcor Construction. Proposed to start construciton late 2011 or early 2012. Museum, recording studio and music centre. 2011-2012 Announced. Anticipated construction start spring 2011. Completed Proposed Proposed

Carlson Hotels

Calgary

$19.0

Chateau Inn Ltd. Chinatown and Little Italy Business Association City of Airdrie

Sylvan Lake Edmonton Airdrie

$10.0 $6.0 $18.0

2010-2011

City of Calgary City of Calgary City of Calgary City of Calgary / Calgary Soccer Federation

Calgary Calgary Calgary Calgary

$8.0 $14.5 $22.0 $13.0

Proposed for 2011 - 2014. Proposed. Project will be completed as a continuation of Phase 1. Proposed Proposed. Fundraising underway.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

61

Project Sector/ Company Name


City of Calgary / Nose Creek Sports and Recreation Asoociation City of Calgary / Seton Sport Recreation Culture and Wellness Society City of Calgary / South Fish Creek Recreation Association City of Calgary / YMCA / Martindale Community Association / United Way / Genesis Land Development Corp. City of Cold Lake City of Cold Lake

Project Description
'Cardel Place' RECREATION FACILITY EXPANSION Recreation Centre, Seton

Project Location
Calgary

Cost in $ Millions
$50.0

Construction Schedule

Remarks
Proposed

Calgary

$70.0

Proposed

South Fish Creek Recreation Centre Expansion (Two Ice Surfaces) Genesis Centre of Community Wellness

Calgary

$21.0

2010-2011

Under construction. Chandos Construction.

Calgary

$66.0

2009-2011

Under construction. Stuart Olson Constructors.

Cold Lake Energy Centre Phase 2 (Community Event Centre) Community Event Centre Phase 1 at the Energy Centre

Cold Lake Cold Lake

$20.0 $15.3

2010-2012 2010-2012

Under construction. Scott Builders. Under construction. Scott Builders. Stage 1 is the hockey rink. Stages 2 / 3 second hockey rink and additional facilities. Estimated cost phases 1 and 2 range $20M to $25M. Proposed for 2011 - 2013. Proposed for completion in 2013. Proposed for 2012 - 2014.

City of Edmonton City of Edmonton City of Edmonton

Recreation Centre / Library, Meadows EDUCATION CENTRE, VALLEY ZOO RIVERSIDE, RUNDLE AND VICTORIA GOLF COURSE REDEVELOPMENT SEAT REPLACEMENT, COMMONWEALTH STADIUM NEW ABBOTTSFIELD RECREATION CENTRE Multi - Purpose Facility, Clareview

Edmonton Edmonton Edmonton

$80.0 $10.0 $30.0

City of Edmonton City of Edmonton City of Edmonton

Edmonton Edmonton Edmonton

$12.0 $5.5 $90.0

Proposed for 2011 - 2013. Proposed Proposed. Renovation / expansion of Clareview Twin Arenas, plus new library, Catholic high school.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

62

Project Sector/ Company Name


City of Edmonton

Project Description
Outdoor Pool, Kinsmen Park (Replacement for Queen Elizabeth Pool) North Centre Community Recreation Centre, Commonwealth Stadium 'Polar Extremes Arctic Shores' Sea Mammals (Pinniped) Exhibit, Valley Zoo Valley Zoo Entrance and Wander Path Project NEW PARK PAVILIONS FOR MILL WOODS SPORTS PARK, JOHN FRY SPORTS PARK, VICTORIA PARK, CASTLE DOWNS DISTRICT PARK and BORDEN PARK ENTERTAINMENT AND SPORTS VENUE (DOWNTOWN HOCKEY ARENA) Jubilee Recreation Centre Renovations Aquatics and Wellness Multiplex Prairie Art Gallery Restoration North Lethbridge Regional Park ENMAX Centre Renovations / Expansion Community Arts Centre Two Sheet Ice Arena, West Lethbridge Regional Event Centre, Box Springs Business Park

Project Location
Edmonton

Cost in $ Millions
$5.5

Construction Schedule
2009-2011

Remarks
Completed. Jen - Col Construction.

City of Edmonton City of Edmonton

Edmonton Edmonton

$95.0 $15.0

2009-2012 2010-2011

Under construction. Clark Builders. Field house completed. Nearing completion. PCL Construction.

City of Edmonton City of Edmonton

Edmonton Edmonton

$35.0 $13.2

2011-2012 2011-2013

Announced. Planned construction start August 2011. Announced

City of Edmonton / The Katz Group of Companies City of Fort Saskatchewan City of Grande Prairie City of Grande Prairie City of Lethbridge City of Lethbridge City of Lethbridge City of Lethbridge City of Medicine Hat

Edmonton

$450.0

Proposed

Fort Saskatchewan Grande Prairie Grande Prairie Lethbridge Lethbridge Lethbridge Lethbridge Medicine Hat

$7.0 $98.2 $10.0 $15.0 $33.7 $13.2 $26.3 $89.8 2009-2012 2011-2012 2011-2012 2009-2011 2010-2011

Proposed. To be undertaken after Sportsplex renovations. Under construction. Wright Construction Western Inc. Part of the Community Knowledge Campus. Under construction. Chandos Construction. Proposed for completion by 2017. Estimated cost range $15M to $20M. Under construction. Ward Bros Construction. Under construction. Dawson Wallace Construction. On hold pending finalization of grant funding. On hold.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

63

Project Sector/ Company Name


City of Red Deer

Project Description
Rotary Recreation Park Phase 2

Project Location
Red Deer

Cost in $ Millions
$23.0

Construction Schedule

Remarks
Proposed for 2011 - 2012. Conversion of current museum to accommodate the Golden Circle Seniors Centre. On hold

City of St. Albert City of St. Albert City of Wetaskiwin / County of Wetaskiwin Clearwater County

Redevelopment Red Willow Park West Riel Park Reclamation Phase 2 Aquatic Facility Multi - Use Trail

St. Albert St. Albert Wetaskiwin Clearwater County (Rocky Mtn House to Nordegg) County of Grande Prairie (Clairmont) Calgary Edmonton Edmonton

$11.0 $8.5 $18.6 $6.8 2010-2011

Completed Proposed Proposed

County of Grande Prairie

Regional Sportsplex (Twin Ice Arena and Soccer Pitch) 'Edworthy Club' Health Club Redevelopment of Alberta Hotel Multicultural Centre, Ellerslie

$26.0

2011-2012

Announced. Kaldon Construction.

Dolemo Developments Dub Architects Ltd. Edmonton Korean Community Centre Foundation Edmonton Minor Soccer Association Edmonton Volleyball Centre / Edmonton Grads Basketball Centre / Ortona Gymnastics Club Fort Edmonton Foundation Fort Edmonton Historical Foundation

$1,000.0 $15.0 $8.4 2009-2011

Proposed. Spa, squash courts, hockey rinks, movie theatre and condo hotel. Completed Proposed

Soccer Facility (27 to 29 Playing Fields) GO Community Centre Court Sports Complex

Parkland County Edmonton

$6.0 $36.0 2010-2011

Proposed to start construction 2012. Phased project over several years. Nearing completion. Clark Builders.

'Spirit of the First Nations' Aboriginal Village, Fort Edmonton Park Fort Edmonton Park Renovations / Revitalization (Capitol Theatre)

Edmonton Edmonton

$15.0 $13.9 2010-2011

Proposed. Nearing completion. PCL Construction.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

64

Project Sector/ Company Name


Innoka Point Resort Corp. Louis Bull Tribe Marmot Basin

Project Description
Innoka Resort Casino New High Speed Ski Lift (Paradise Express) and Relocation of Paradise Triple Chair Hotel and Convention Centre Indoor Arena next to Heritage Heights School Infrastructure Upgrades

Project Location
Canmore Wetaskiwin County Jasper National Park Medicine Hat MD of Foothills Banff National Park

Cost in $ Millions
$15.0 $12.0 $7.0

Construction Schedule
2010-2012

Remarks
Under construction. Phased development (five buildings). Proposed. Pending approvals.

2011

Announced

Mayfield Hospitality MD of Foothills / Dunbow Recreation Board Parks Canada

$25.0 $5.8 $9.7

Proposed. Contingent on Regional Event Centre. Proposed Proposed. Projects include Cave and Basin parking lot, roadwork in Banff, washrooms at C&B and Johnston Canyon, improvements to Banff Museum exterior, Sulphur Mtn boardwalk repairs. Proposed 2009-2011 20102011-2012 Under construction Under construction. Multi-year project. Announced. Expected construction start August.

Parks Canada Parks Canada Parks Foundation Calgary Pipestone Creek Dinosaur Bed Project Committee Pomeroy Inn & Suites / Olds College Prestige Capital (previously listed as Hilton Hotels) Province of Alberta

Cave and Basin National Historic Site Renovations Waterton Lakes National Park Upgrades and Repairs Perimeter Pathway System (Calgary Greenway) Philip J. Currie Dinosaur Museum (previously listed as the 'River of Death and Discovery' Dinosaur Centre) Hotel at Olds College (Part of Canadian Institute for Rural Entrepreneurship) Homewood Suites Extended Stay Hotel NEW ROYAL ALBERTA MUSEUM, DOWNTOWN

Banff National Park (Banff) Waterton Lakes National Park Calgary Wembley

$13.8 $9.4 $50.0 $26.4

Olds

$12.0

Proposed for 2011 - 2012.

Calgary

$36.3

2011-2013

On hold. Part of Calgary Airport Village

Edmonton

$340.0

Proposed. Planned completion by 2015.

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

65

Project Sector/ Company Name


Pumphouse Theatre Red Deer Curling Club Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo Regional Municipality of Wood Buffalo River Valley Alliance Royal Canadian Legion, Kingsway Branch #175 Strathcona County

Project Description
Theatre Expansion Phase 1 Building Renovation 2011 Parks Projects Anzac Leisure Facility Performing Arts Centre, MacDonald Island Park Athletic Field, Timberlea High School Site North Saskatchewan River Valley Trail Phase 1 New Legion Building Millennium Place Expansion

Project Location
Calgary Red Deer RM of Wood Buffalo RM of Wood Buffalo (Anzac) RM of Wood Buffalo (Ft McMurray) RM of Wood Buffalo (Ft McMurray) Devon to Fort Saskatchewan Edmonton Strathcona County (Sherwood Park) Strathcona County (Sherwood Park) Red Deer Medicine Hat Rocky View County (Balzac) Sundre Beaumont

Cost in $ Millions
$10.5 $5.6 $22.0 $24.0 $10.0

Construction Schedule

Remarks
On hold

2011 2011

Under construction Announced Proposed Proposed. Feasibility study to be done.

$15.0

2011-2012

Under construction. Wilco Contractors NW.

$110.0 $8.7 $8.4 2010-2011 2010-2011

Proposed Completed. PCL Construction. Nearing completion. Delnor Construction.

Strathcona County

Broadmoor Golf Club Addition / Modernization Refurbishment of Capri Centre as Sheraton Hotel Medalta Site Restoration, Historic Clay District 'The Titan Project' Entertainment Venue BEST WESTERN HOTEL Centre Communautaire Beaumont Community Centre (CCBCC)

$5.1

2010-2011

Nearing completion. Atkinson Construction.

Temple REIT The Friends of Medalta Society The Titan Entertainment Group Inc. Totem Golf Ltd. Town of Beaumont

$8.0 $7.5 $40.0 $8.0 $6.2

2011 2009-2011

Nearing completion Under construction Proposed construction start August 2011. Proposed Proposed. Project has been placed in the Town's 10-year capital plan. 66

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

Project Sector/ Company Name


Town of Beaverlodge Town of Blackfalds Town of Canmore

Project Description
New Indoor Pool / Community Centre Fieldhouse (Recreation Facility) Multiplex

Project Location
Beaverlodge Blackfalds Canmore

Cost in $ Millions
$11.6 $8.0 $31.4

Construction Schedule
2010-2012

Remarks
Under construction. Proposed. Pending funding.

2011-2012

Under construction. Graham Construction and Engineering. Will include library, daycare, aquatics facility, climbing wall, retail space, administration space and community space. Proposed. Feasibility study completed.

Town of Cochrane Town of Drumheller Town of Edson Town of Grimshaw Town of High River Town of Mayerthorpe Town of Morinville Town of Slave Lake Town of Westlock / Westlock County Trestle Creek Golf Resort

New Aquatic Facility at Spray Lake Sawmills Family Sports Centre Badlands Community (Multi - Use) Facility Phase 1 FIELDHOUSE Community Multiplex New Recreation Facility Hockey Arena (Exhibition Centre) Community Cultural Centre Arctic Ice Centre Upgrades and Fieldhouse Westlock 'Spirit Centre' Sports Complex RV Resort, Recreation Centre, Equine Centre, Sports Park and 27 Hole Golf Course Horse Racing Complex Phase 1

Cochrane Drumheller Edson Grimshaw High River Mayerthorpe Morinville Slave Lake Westlock Parkland County

$26.0 $14.0 $14.0 $16.0 $20.0 $5.2 $11.0 $11.9 $15.5 $30.0 2010-2011 2010-2011 2010-2011 2010-2012 2010-2014 2010-2011 2010-2011

Nearing completion. Dawson Wallace Construction. Proposed. Addition to existing Leisure Centre Completed. Cormode & Dickson Construction. Arena, fitness centre, walking track and field house. Proposed. No construction expected in 2011. Completed. Chandos Construction. Completed. PCL Construction. Under construction. Jen-Col Construction. Under construction. Brenex Construction. Under construction. Construction schedule is for golf course. First nine hole to be completed for play in summer 2011. Proposed for 2011 - 2012.

United Horsemen of Alberta Winsport Canada Winsport Canada

Rocky View County (near Balzac) Calgary Calgary

$35.0

Canada Olympic Park Facility Expansion and Upgrade Olympic Oval Roof Restoration

$322.0 $8.0

2007-2011 2011

Under construction. Cana Construction. Freestyle ski area completed. Athletic and ice complex. Nearing completion

July 04, 2011

Alberta Finance and Enterprise New projects are shown in upper case in the Project Description column

67

Alberta Finance and Enterprise 4th Floor Commerce Place 10155-102 Street Edmonton, AB T5J 4L6 Canada Telephone: 780.427.6787 Fax: 780.422.0061 Website:www.albertacanada.com 2011 Government of Alberta ISSN: 1702-2851 ISSN: 1718-1399 (pdf) Printed in Canada

You can access the Inventory of Major Alberta Projects and the following related department publications on the Internet at: http://albertacanada.com/about-alberta/statistics-and-publications.html :

Alberta Oil Sands Industry Quarterly Update Monthly Economic Review Highlights of the Alberta Economy Facts on Alberta Place-to-Place Price Comparison Survey

Vous aimerez peut-être aussi