Most MRP systems are software-based, while it is possible to conduct MRP by hand as well. An MRP system is intended to simultaneously meet three objectives:
y y y
Ensure materials are available for production and products are available for delivery to customers. Maintain the lowest possible material and product levels in store Plan manufacturing activities, delivery schedules and purchasing activities.
History
Prior to MRP, and before computers dominated industry, reorder-point/reorder-quantity (ROP/ROQ) type methods like EOQ had been used in manufacturing and inventory management. In the 1964, Joseph Orlicky as a respond to the TOYOTA Manufacturing Program and developed Material Requirements Planning (MRP). First company to use MRP was Black & Decker in 1964. With Dick Alban as project leader. In 1978 Oliver Wight and George Plossl then developed MRP into manufacturing resource planning (MRP II).[1] Orlicky's book is entitled The New Way of Life in Production and Inventory Management (1975). By 1975, MRP was implemented in 150 companies. This number had grown to about 8,000 by 1981. In the 1980s, Joe Orlicky's MRP evolved into Oliver Wight's manufacturing resource planning (MRP II) which brings master scheduling, rough-cut capacity planning, capacity requirements planning, S&OP in 1983 and other concepts to classical MRP. By 1989, about one third of the software industry was MRP II software sold to American industry ($1.2 billion worth of software).[2]
If a company purchases insufficient quantities of an item used in manufacturing (or the wrong item) it may be unable to meet contract obligations to supply products on time.
y y
If a company purchases excessive quantities of an item, money is wasted - the excess quantity ties up cash while it remains as stock and may never even be used at all. Beginning production of an order at the wrong time can cause customer deadlines to be missed.
MRP is a tool to deal with these problems. It provides answers for several questions:
y y y
What items are required? How many are required? When are they required?
MRP can be applied both to items that are purchased from outside suppliers and to subassemblies, produced internally, that are components of more complex items. The data that must be considered include:
y y y y y y y
The end item (or items) being created. This is sometimes called Independent Demand, or Level "0" on BOM (Bill of materials). How much is required at a time. When the quantities are required to meet demand. Shelf life of stored materials. Inventory status records. Records of net materials available for use already in stock (on hand) and materials on order from suppliers. Bills of materials. Details of the materials, components and sub-assemblies required to make each product. Planning Data. This includes all the restraints and directions to produce the end items. This includes such items as: Routings, Labor and Machine Standards, Quality and Testing Standards, Pull/Work Cell and Push commands, Lot sizing techniques (i.e. Fixed Lot Size, Lot-For-Lot, Economic Order Quantity), Scrap Percentages, and other inputs.
Output 1 is the "Recommended Production Schedule" which lays out a detailed schedule of the required minimum start and completion dates, with quantities, for each step of the Routing and Bill Of Material required to satisfy the demand from the Master Production Schedule (MPS). Output 2 is the "Recommended Purchasing Schedule". This lays out both the dates that the purchased items should be received into the facility AND the dates that the Purchase orders, or Blanket Order Release should occur to match the production schedules.
Purchase orders. An order to a supplier to provide materials. Reschedule notices. These recommend cancelling, increasing, delaying or speeding up existing orders.
more general feature of MRP2 is its extension to purchasing, to marketing and to finance (integration of all the function of the company), ERP has been the next step
The final step is 'offsetting'. This determines when manufacturing should start so that the finished items are available when required. To do so a 'lead time' has to be assumed for the operation. This is the anticipated time for manufacturing. The whole process is repeated for the next level in the BOM and so on until the bottom is reached. These will give the requirements and timings to outside suppliers. There are three major assumptions made when constructing an MRP schedule:
y y y
The first, and possibly the most important, is that there is sufficient capacity available. For this reason MRP is sometimes called infinite capacity scheduling. The second is that the lead times are known, or can be estimated, in advance. The third is that the date the order is required can be used as the starting date from which to develop the schedule.