Krohne Oil & Gas Nigeria Ltd

QUARTERLY VALIDATION REPORT


February 4, 2012

COMPANY LOCATION PURPOSE VENDOR PERSONNEL DATE INTRODUCTION:

: SPDC : GBARAN UBIE GAS PLANT : QUARTERLY VALIDATION : Eisa Jimoh, Ime Archibong & OgheneOchuko Ojirevwe : 30 Jan 2012 to 03 Feb 2012

This is a summary of the validation exercise carried out in SPDC Gbaran Ubie Fiscal Metering system by KROHNE Oil & Gas Nigeria Limited, in January 2012. For details, see submitted detailed report. Validation date: January 30, 2012 to February 3, 2012. Test equipment used: Dead weight tester, temperature block calibrator, vacuum gauge, Kelton flocalc, and validation work station. Certificate of test equipment: SPDC stated to submit to NLNG after the exercise.

RESULTS: Instruments were validated on the metering system thus: Stream 1: Pressure transmitters (result passed): 45 PT-101A, and 45 PT-101B Temperature transmitters (result passed): 45 TT-101A, and 45 TT-101B Differential pressure transmitters (result passed): 45 FT-101A, 45 FT-101B, 45 FT-101C, 45 FT-101D Density transducers (result passed): 45 QT-104A and 45 QT-104B Flow computer ISO 5167 (result failed; Flow computer mass flow rate was not updating on the validation template): 45 UR-101A, and 45 UR-101B Flow computer integration check (result failed; Flow computer mass flow rate was not updating on the validation template): 45 UR-101A, and 45 UR-101B Orifice plate check (not done, as directed by client)

Stream 2: Pressure transmitters (result passed): 45 PT-201A, and 45 PT-201B Temperature transmitters (result passed): 45 TT-201A, and 45 TT-201B Differential pressure transmitters (result passed): 45 FT-201A, 45 FT-201B, 45 FT-201C, 45 FT-201D Density transducer (result passed): 45 QT-204A and 45 QT-204B Flow computer ISO 5167 (result failed; Flow computer mass flow rate was not updating on the validation template): 45 UR-201A, and 45 UR-201B Flow computer integration check (result failed; Flow computer mass flow rate was not updating on the validation template): 45 UR-201A, and 45 UR-201B Orifice plate check (not done, as directed by client)

KROHNE Oil & Gas Nigeria Ltd. 43 Oroma Okocha Street, Rumuigbo, Port Harcourt, Nigeria www.krohne-ng.com

(1/2)

Krohne Oil & Gas Nigeria Ltd

Stream 4: Pressure transmitters (result passed): 45 PT-401A, and 45 PT-401B Temperature transmitters (result passed): 45 TT-401A, and 45 TT-401B Differential pressure transmitters (result passed): 45 FT-401A, 45 FT-401B, 45 FT-401C, 45 FT-401D, Density transducer (result passed): 45 QT-404A and 45 QT-404B Flow computer ISO 5167 (result passed): 45 UR-401A, and 45 UR-401B Flow computer integration check (result passed): 45 UR-401A, and 45 UR-401B Orifice plate check (not done, as directed by client)

CONCLUSION: The validation exercise was carried out by KROHNE and witnessed by NLNG, SPDC Asset, and SPDC corporate metering personnel. The reports for the validated instruments were signed by NLNG, SPDC and KROHNE, and handed over to SPDC Asset team. RECOMMENDATION: Flow computer Integration check and ISO 5167 calculation on Flow computers 45UR-101A, 45UR-101B, 45UR-201A and 45UR-201B require site investigation before the next validation.

Unavailable calibration gas needs to be procured prior to next validation.

Report compiled by: Ime Archibong KROHNE Oil & Gas Nig. Ltd.

KROHNE
KROHNE OIL & GAS NIG. LTD. 43 OROMA OKOCHA STREET RUMUIGBO, PORT HARCOURT, NIGERIA

KROHNE Oil & Gas Nigeria Ltd. 43 Oroma Okocha Street, Rumuigbo, Port Harcourt, Nigeria www.krohne-ng.com

(2/2)

Vous aimerez peut-être aussi