15 / 10 / 2011 1 OF 6
Client : (A.P.R.C) Project No : 564/A/00/12100 Project : Construction of water storage tank (7000)m3 Item : Tank Tag No. : W5 Applicable Code : API 650
INSPECTOR EMC INSPECTOR. CLIENT INSPECTOR THIRD PARTY(CMRDI) INSPECTION POINT HOLD POINT WITNESS POINT REPORT REVIEW
SYMBOL
TYPE OF TEST OR WORK VISUAL & DIMENSIONALEXAM. RADIOGRAPHIC EXAM. ULTRASONIC EXAM. MAGNETIC PARTICLE EXAM. PENETRANT TEST HYDROSTATIC TEST VACUUM BOX TEST
SYMBOL
1 2 3
SYMBOL
VT&DT RT UT MT PT HT VBT
H W R
Rev.
0
Description
Original Issue
Prepared
Eng. Walid elserafy
Date
15 / 10 / 2011
Approved
Date
Date Sheet
: :
Revision :
15/10/2011 2 OF 6 0
Item: Tank
Third Party 3 Sign Date Remarks Or Non Conformance
Process Description
APPROVAL
Acceptance Criteria
Fabrication drawings
Type
1
H H
Review of drawing. Review of Inspection & Test Plan Review of WPSs & PQRs Review of WPQs
Review weld maps Review of NDT Procedure Review of hydro-test Procedure.
ASME IX ASME IX
H H
H H H
VT H
BOTTOM PLATE
9 10 11 12 13 14 15 FIRST COARSE REPAIR BY LAP-WELDED PATCH 16 17 Cutting plates & surface preparation Fit up first course with bottom
APPROVED DRAWINGS
Coating the underneath plates (DF4) Cutting bottom plates & surafce prepration
Fit up bottom plates
W.P.S & Approved drawings Approved drawings W.P.S & Approved drawings API 650
H H H H H
VT &DT
Date Sheet
: :
Revision :
15/10/2011 3 OF 6 0
Item: Tank
Third Party 3 Sign Date Remarks Or Non Conformance
Process Description
Fit up (inner) welded patch with shell and bottom Fit up angle with bottom and lap-welded patch Complete weld Q.C visual inspection FINAL INSPECTION
Acceptance Criteria
APPROVED DRAWINGS
Type
VT&DT
1
H
22 23 24 25 26
Final dimensional check Final visual check. 10% PT for lap-welded patch & angle welds Vacuum box test for bottom welds Hydrostatic test
DT VT PT VBT HT
H H H H H