Académique Documents
Professionnel Documents
Culture Documents
Pre-Sales, Physical Security and IT Questionnaires and Site Walk-thru Door Survey
Project Overview Goals and objectives Number of Doors Facility Square Footage Number of Buildings Bid Deadline Project Start Date Project Completion Date Company Name Address Name Title Phone Email Name Title Phone Email Name Title Phone Email
www.BlueWaveSecurity.com 13809 Research Blvd Suite 802.11 Austin, Texas 78750 Tel: 512-996-0635 Fax: 512-535-2707 Email: info@bluewavesecurity.com
Company
Primary Contact
Pre-Sales Questionnaire
1. How many doors, gates or other openings need access control? 2. Will all of the doors, gates or other openings be installed at once or in phases? 3. Is there an existing budget for this project? 4. Who can authorize and sign for this project? 5. What is the bid process? a. Who are the other bidders? b. When is the bid due? 6. What is the project start date, completion date? Are there any other important deadlines? 7. Are any other security related services required beyond access control such as CCTV or Intrusion Detection, etc? 8. Are there any special installation requirements or local codes to be aware of such as electrical needs, building or work 9. Do you require a bid for installation labor or do you have your own in-house maintenance or preferred out-side contractors 10. Is training for site personnel required? If so, how many people need to be trained and where will the training be held? 11. Does the site have operating hour restrictions for the installation? Will other contractors be on site during the installation?
that will complete some or all of the installation? permits, union contractors, or other site specific requirements, etc?
Construction Frame
Door
Locking device
Exit device
Reader Network
Power Notes