Vous êtes sur la page 1sur 9

ELEMENT Existing land use Topography y y y y Flat Slope Valley Mines

Types of data

Sources

Purpose

Method of data collection Primary Observe Snap Picture Secondary Slope Analysis Cross-Section

Outcome

Primary and Secondary

JUPEM y Base Map Site study y Survey y Observe

To identify whether the surface of the Earth at the site suitable for development

Determine the terrain of the Earth can support the development that are purposed. Identify types of development such as Housing, Commercial, Industry and Utilities & Facilities.

Soil y y y y Sand Laterite Clay Peat Primary And Secondary To describe whether the particles of the soil is suitable for development that are purposed on the site Primary Observe Snap Picture Soil sampling Secondary The soil samples were taken will be zoned according to the appropriate development To determine the particles of soils is suitable for the future development

Department of Minerals and Geo Science Malaysia y Information on soil types in the study area

Site study y Survey y Observe

Hydrology Water Resources Lake River Swamp Primary And Secondary To ensure the water shed at the study site does not interrupt the development purposed to avoid from land slide and soil erosion. To avoiding pollution Primary Snap picture Observe Secondary Map of Water Run-off Can know otherwise the flow of water disrupt the development purpose

Department of Irrigation and Drainage The information of the water flow and the water resources Study site y Survey y Observe

Accessibility Trail Paved Road Non paved road Main road Highway Primary and secondary Jabatan Kerjaraya (JKR) Map of Existing road Get a map of the study area for existing accessibility Site Study y Take Photo y Survey y Observation For the easiness for public users To avoid from traffic conjunction. To avoid from development clashing with existing road at the site. Primary Snap picture Observe Secondary Existing road map Define the existing trail for accessibility. Define strategic access to the site. Determine the arrangement of the development more well-organise.

Flora and fauna Type of flora Type of fauna

Primary And secondary

Perak forestry department Information of Existing Forestry and wildlife at the site. Site Study y Observation

To restrict cutting tree widespread. Conserve flora and fauna from extinction. Avoid from climate change.

Primary Observe Take a picture Secondary Map of Vegetation

Can prevent from overuse cutting of trees and protect the flora and fauna from extinct.

Aesthetic View Primary River Mountain Hill Forestry Site Study y Observe y Survey To identify the own characteristic of the site which can attract the client. To produce development that is more beautiful and sustainable.

Primary Observe Take a picture Scenery picture

To convinces the client that the development purpose at the area has its own privileges and its own special characteristic.

Geology Secondary Information of underground rocks.

Secondary From the Department of Minerals and Geo Science Malaysia. Get information of underground rocks.

To support of the development. To aware of the possibility of potential found in the study area.

The potential of site area may make the develop area more outstanding in the future.

Surrounding Land use Component of Development Housing  Detached  Semi detached  Terrace  Apartment  Condominium Commercial  Shop house  Supermarket  Hypermarket Industries  Factory (heavy / light) JPBD Surrounding Land use map Primary And Secondary Site study y Survey y Observe Primary Take a picture Observe Survey

Secondary Surrounding land use map

Know the linkages between the development and surrounding. Can identify the component of the development at the surrounding land use which can affect the study site.

To study the connection and the linkages between the study site and the surrounding area.

Recreation  Park  Lake  Water fall  Forest

Infrastructure and Utilities Road Electrical Substation Detention Pond Oxidation Pond Water Tank Open Space

Primary And Secondary

JPBD Get information about infrastructure and utilities Site study y Survey y Observe

For meet the needs of users in their daily lives

Primary Take a photo Observe Secondary Policy of infrastructure and utilities

Know the linkages between the development and surrounding Can identify the component of the development at the surrounding land use which can effect the site study

Service and Amenities Police Station Fire Station Health Care Centre Petrol Pump Post Office Bus Station School Bank Shopping complex Parking Mall centre Mosque Surau Library Gymnasium Recreation centre Restaurant centre

JPBD Get information about services and amenities Primary and secondary Site study y Survey y Observe

Meet the needs of users in their daily lives

Primary Take a photo Observe

Know the linkages between the development and surrounding Can identify the component of the development at the surrounding land use which can effect the site study

Secondary Policy of services and amenities

Circulation Highway Main road Local road Service road

Primary and secondary

Jabatan KerjaRaya (JKR) Get information about circulation and circulation plan. Site study y Survey y Observe

As a accessibility for the residential area.

Primary Take a photo Observe Secondary  Policy of circulation  Map of existing circulation.

Easier for the residential as a accessibility

Population y Occupation y Lifestyle y Ratio (Residential) y Activities

Primary and secondary

Jabatan Perangkaan Malaysia Get information about the population for the area. Site study y Survey y Observe

Looked at the life style in a residential.

Primary  Take a photo  Observe Secondary  The population at the site study.

Identify the life style at the residential area .

Market Demand

Primary Site study y Survey y Observe

To ensure that the requirements of users reached

Primary  Take a photo  Observe

Ensure the residential to get what their wants or ensure that the requirements of users reached.

Potential

Constraint

Vous aimerez peut-être aussi