Académique Documents
Professionnel Documents
Culture Documents
Web site:www.quarry.ae
(QC Engineer)
(Factory Manager)
( Tech.Manager)
(General Manager)
H W M R
: Hold point. : Witness point. : Surveillance/Monitoring point. : Review the documents/records produced.
Web site:www.quarry.ae
Element
Ref. Documents
Acceptance Criteria
DRAWING
Drawing List
RAW MATERIALS
Dimensional & Visual Inspection for any Damage, Proper Storage Verification of Heat/Cast No against test Certificates As per EN standards / Approved for Construction Drawing As per EN standards / Approved for Construction Drawing Material Summary Sheet & Mill test Certificates
1.
WELDING QUALIFICATION
Usage of approved WPS & PQR Review of Approved welder qualification certificate As per EN ISO 15614-1 As per EN ISO 15614-1 WPS & PQR Records WPQR (Welder performance qualification record)
1.
2.
As per BS EN 287-1
As per BS EN 287-1
Web site:www.quarry.ae
Element
Ref. Documents
Acceptance Criteria
FABRICATION
1.
Fit up check
Inspection Report
2.
Preheat ( If Required )
Inspection Report
3.
Welding
Approved for Construction Drawing / WPS As per code EN 25817 / Approved for Construction Drawing
Approved for Construction Drawing / WPS As per code EN 25817 / Approved for Construction Drawing
Inspection Report
4.
Final inspection
Inspection Report
Web site:www.quarry.ae
Element
Ref. Documents
Acceptance Criteria
1.
2.
Final release
Release certificate
3.
Final document
Final MRB