Project Name
: Supply & Install of Civil 1 Way Upvc Pipe 12 Core Fiber And Termination Job For YTL : Yumeina Power Sdn.Bhd : Material For Fiber Optic Cabling & Splicing Description Uom
m m Ea Ea m m m Ea Ea Ea
Rate
2.00 60.00 6.00 350.00 46.00 6.80 12.50 2,100.00 0.25 0.20
Qty
100 12 88 1 4 150 12 1 20 100
Amount
200.00 720.00 528.00 350.00 184.00 1,020.00 150.00 2,100.00 5.00 20.00 5,277.00
Supply of 1 way 40mm subduct Supply of 1 way 100mm GI pipe Supply of 1 way 100mm Upvc Pipe Supply of ODF tray 1 u 19" 12 core with Sc fiber connector Supply of patch cord sc_sc 2m length ( duplex ) Supply of 12 core OFC Ug sm cable loose tube Supply of 4" cable trunking Supply of JC9 manhole with the square cover Supply of taging Supply of cable tie
Rate
2.80 12.80 55.00 55.00 680.00 2.70 120.00 1,500.00 0.25 3,000.00 9.00 30.00 2,000.00
Qty
150 12 12 88 1 100 2 1 20 1 100 800 1
Amount
420.00 153.60 660.00 4,840.00 680.00 270.00 240.00 1,500.00 5.00 3,000.00 900.00 24,000.00 2,000.00 38,668.60
Install 12 Core OFC UG SM cable loose tube Install of 4" cable trunking Install 1 way 100mm GI pipe Install 1 way 100mm Upvc pipe Install JC9 Install 1 way subduct 40mm Coring of wall Hacking of floor and make good of site Install of taging To get the local authority approval ( excluding deposit ) Road cutting on asphalt surface Mill & Pave Mobilization and demobilization
Sub Title No
1 2
Rate
30.00 35.00
Qty
12 24
Amount
360.00 840.00
Testing OTDR 12 core OFC Prepare end term and splicing of OFC single core
1,200.00
45,145.60
Project Name
: Supply & Install of 12core IB cable on pole include termination Job For YTL
: Yumeina Power Sdn.Bhd : Material For Overhead IB Loose Fiber & Splicing Description Uom
m Ea Ea Ea Ea Ea Ea m Ea Ea
Rate
7.80 380.00 28.00 200.00 70.00 51.00 350.00 12.50 1.00 0.20
Qty
100 4 1 2 4 8 1 12 10 100
Amount
780.00 1,520.00 28.00 400.00 280.00 408.00 350.00 150.00 10.00 20.00 3,946.00
Supply of 12 Core loose IB sm Supply of TM Iron pole 7 .6m Supply dead end clamp for 12 Ofc IB on wall Supply GI Pipe 50mm to iron pole Supply stay clutch on iron pole Supply strut 7.6m iron pole Supply of ODF tray 1U 19" 12 core with sc fiber connector Supply of 4" cable trunking Supply of taging Supply cable tie
Rate
2.00 12.80 185.00 68.00 10.00 5.80 120.00 1,500.00 3,000.00
Qty
100 12 4 2 8 4 2 1 1
Amount
200.00 153.60 740.00 136.00 80.00 23.20 240.00 1,500.00 3,000.00 6,072.80
Install 12 core loose IB SM cable Install 4" Cable trunking Install of iron pole include the transport charges Install of GI pipe on pole Install of stunt on the iron pole Install of stay clutch core bore on the wall Hacking on the floor and make good on site |T|o get the local authority approval (excluding deposit)
Rate
30.00 35.00
Qty
18 24
Amount
540.00 840.00
Testing OTDR 12 core OFC IB Prepare end term and splicing of OFC single core
1,380.00
11,398.80