Curriculum Vitae of Eric MORAUD


Site Project Manager 09/23/1960

Over 30 years experience in construction engineering industrial, energy, oil & gas where I have acquired multi discipline technical expertise and leadership to manage complex projects, interact efficiently with all disciplines involved, addressing any issue to senior management with solution and proposal about corrective action in the respect of ethic and professional code of conduct. CERTIFICATION ISO / IEC 17024
-

Professional Engineer certified in Industrial Development by SNIPF # 25679 French National Accreditation Committee COFRAC (IAF member) - 2011 Project Management Professional certified by PMI # 1331905 ANSI accreditation body (IAF member) -2010

EDUCATION
-

Quality Management by Cegos Paris - 2010 Graduate certificate in Project Management - Boston university (2009 - 2010) by distance learning Certificate in management of occupational, industrial, Atex risks in petroleum production plant GIES II & ATEX - GIPHISE [validity 2013] Data mining and BN knowledge modelling course - Paris 2009 Cause tree Analysis course by FARAL - Norway 2006 Engineering improvement courses at IFP-Training school (piping layout and installation, pipe supporting, codes & norms, petroleum material, pressure vessel, subcontracting preparation, cost control & estimate) - Paris 1994 Vocational diploma in Boiler Making at technical school of Le Havre and Bordeaux (1974-1977)

LANGUAGE French mothers tongue English fluent Russian: begineer

COMPUTER LITERACY
-

MS Office pack MS Project & primavera P3

emoraud@hotmail.com www.eric-moraud.com

2 of 4

Site Project Manager, seconded to Ponticelli Ltd, by Alpha consulting for the upgrade of OML58 Obagi flow gas station project consisting to increase capacity of gas production from 10 to 15 Millions of cmN / day. EPSCC contract of 490 M$ performed through SPD consortium Nigeria - (08/2010 - 10/2011)

Manage overall Contractor construction engineering sites and services department [HSE, security, quality, planning, HR, community affairs, local stakeholders, construction, field engineering, IT & communication, warehouses, logistics, procurement, subcontracting, facilities, hospitality, clinics]. Manage site workforce of 1800 personnel direct 700 executing personnel and lead multi discipline staff of 70 expatriates. Reinforce HSE dept. by setting training school and program to comply with project stake I develop and implement an innovative drop object protective structure to preserve integrity, of live plant when erecting thousands tons of structure, pipe-racks, material and equipment. Construction works performed in SIMOPS w/o damages & production stoppages where 10 Millions man-hours project were reached w/o LTI - 650 micro piles and CFA drilled within existing underground live networks - 15 000 m3 of soil were manually excavated in 3 months - 4000 m3 of concrete reinforced foundation poured - 1500 T of pipe rack erected and 1000 T of piping & material erected I resolve conflict, maintain social environment among workforce fostering site stability, implement and preserve good communication among local stakeholders and local authority, interact with TOTAL project representative and JV production manager on HSE, security, organization and contractual matter.
Project Risk Manager, seconded to GDF-SUEZ jv TOTAL by ITA Overseas Consulting on the construction project of new LNG Terminal of Fos Cavaou in France - EPCC contract of 610 M$ - (09/2008 - 12/2009) Management of project risks related to technical, quality, construction, operational, performance, industrial and occupational in response to major technical issues occurred during engineering and execution phases jeopardizing project achievement and LNG import commercial agreements. Implement and lead project risk management process in coordination and collaboration with contractors, project performing team, End-User. Take part to weekly and monthly management meetings; provide risk management input to JV audit committees and issue close out mission report to project Director. Technical Manager, seconded to SNPC by International Office Technical Assistance for studying onshore oil surface deployment related to the development of Kundji & Bindi reservoirs. Republic of Congo - (09/2007- 02/2008) Develop engineering alternatives regarding to drilling platforms, access road, early production, oil treatment, logistic services, interconnecting pipeline or flexible, export pipeline or tie in back to existing network crossing swamp; build schedule as per project drilling philosophy and project development phases; estimate resources, cost and determine investment budget [CAPEX 130 M$]; prepare project execution plan.

emoraud@hotmail.com www.eric-moraud.com

3 of 4

Company Site Representative, seconded to TOTAL EP by ECM consulting to Moho Bilondo SPS package - EPIC contract of 220 M$ - (09/2006 - 07/2007) In charge of coordination of Contractors activities, supervision and validation of system integration tests of subsea production systems in Norway related to manifold, suction anchor pile, termination heads, dog houses, hook-up and function tests of Riser Control Module System, production & injection x-tree, ROV intervention, tooling, umbilical / TH install, thermal insulation performance tests. Coordination of offshore installation and drilling assistance teams in Congo interacting with affiliates drilling regarding to operation scheduling and with logistic and marine about offloading vessels, loading out barges, install equipments setting, marine survey for sail away, sign off equipment acceptance certificate, handover to contractor installation team Site Manager seconded to SAIPEM by Saria Technologies consulting (03/2000 07/2006) for managing:

Fabrication and Load out of subsea umbilical riser flowline structures of TOTAL EP Rosa and EXXON Kizomba A&B projects in Angola - EPIC contracts >400 M$ (01/2004 to 07/2006) Construction and setting of new deep sea yard, workshop 5000 sqm and facilities Manage staff of 30 engineers and production workforce of 500 pers. Implement SHE policy and training program as per OHSAS 18001 Implement welders and fitters training school and boiler making on-job-training Buoyancy tanks, suction piles, bundle tower, flow-lines PIP, riser base spools & connectors, PLets, FLets Fabrication SURF totalling a weight of 8000 Tons on the period. Extension of crude oil terminal of SONATRACH at Mesdar in Algeria - works performed in SIMOPS - EPC contract of 42 M$ - 02/2002 to 03/2003 Manage construction engineers staff [20p]and subcontractors [300 p] performing civil engineering, mechanical, electrical and instrumentation works (piping, turbo pumps and power generation, marshalling, SCC). Implement QHSE management system, making sure that risks mitigation measures are in place and rules respected, coordinating with operator and subcontractor about SIMOPS works. Weekly construction meeting with subcontractors and client; monthly meeting about progress status review and approval. Manage base camps and interface in security management. Commissioning of compression gas station of SONATRACH Gassi Touil in desert area in Algeria - EPC contract 28 M$ - (10/2001 to 01/2002) Auditing construction completion and conformity of Plant being achieved; Preparation commissioning systems with engineering & process; Punch out meeting with vendors SNCC and turbine compressor supplier; writing instructions manual operator; commissioning scheduling and organisation. Assistance to SONATRACH for commissioning operation Setting out & commissioning of refined storage plant and distribution centre of NAFTAL at Tizi-Ouzou in Algeria - EPC contract of 20 M$ - 03/2000 to 02/2001 To assist the Owner in upgrading and achieving construction and commissioning of the storage and plant installations partially built for years; technical audit, engineering coordination, interfaces vendors and suppliers

Project & Operation Manager AXYS ENGINEERING & ETS 04/2001 - 09/2001

emoraud@hotmail.com www.eric-moraud.com

4 of 4

Replacement of SCNL sealine from anchored platform in wouri river to shore valve chamber at Douala port, Cameroon a EXXON Mobil jv TOTAL Outre-mer project. I perform project feasibility studies regarding to bathymetry, soil sampling analysis, hydro jetting survey along the projected route plan and estimate resource and cost define budget, make proposal and negotiate lump sum Engineering-ConstructionInstallation-Commissioning contract when assisting client for procurement and delivery of incorporated - I perform engineering studies, work & services subcontracting, lead construction, manage marine operations about launching, laying and burying 3,5 meters below river bed the new concrete weight 12 inches x-65 pipe and installing riser to offloading platform and shore valves. Despite downgraded weather conditions, project is a success at the satisfaction of SCNL and JV, getting final acceptance certificate further to pigging, pressure, isolation performances tests and third party installation assessment (mines and port authority). 60 days of diving work no fluvial traffic stoppage no LTI
Project Engineer consultant 1995 -1999

Engineering studies [basic design] of bitumen blending plant projected by TOTAL Product of Specialty Division for producing 240 000 MT per year of product in different grades dedicated to industry application. 1999

Engineering studies related to storage general arrangement, piping layout, pipe-in-pipe design and supervision of the construction of heated pipeline for loading bitumen from port to storage tank of ADDAX & ORYX and SBEG in Guyana at Cayenne and from Tiper refinery to coasters at the new jetty built at Dar-Es-Salaam in Tanzania. (1996, 1997) Engineering studies of process utilities standardization and supervision of the installation of 8 pharmaceutics units of IPM-UPSA & BIOLUZ dedicated to the production each of 15 Millions doses of 500 ml per year of intravenous injectable solute in Ethiopia at Addis Abeba, in Lebanon at Gdita, in Ukraine at Lougansk, Kiev, Lvov, Zaparoge EPC 25 M (1995, 1996, 1999)

IFP-Training school Paris - 1994 Engineering improvement courses in Piping Layout, Pipe Supporting [stress analysis, piping flexibility], Codes & Norms, Petroleum Material, Pressure Vessel, Contracting Works, Cost Control & Estimate.
Piping Supervisor KVAERNER, (1992-1993) for the rebuilt recovery black liquor boiler house of CDRA at Tarascon and building ones of new pulp & paper mill built operated by international paper at Saillat sur Vienne - EPC contracts of 20 M and 50 M. Supervise prefabrication and erection works and manage subcontractors regarding HSE, quality, planning, scope, weekly meeting and reporting. Technical and cost controller AXEL JOHNSON, (1990-1991) for auditing and verifying changes and deviations which occurred in prefabrication and erection phases and impacted on piping, insulation, mechanical, electrical, instrumentation during the construction of the recovery black liquor boiler house of new pulp & paper mill of StGaudens. EPC contract of 50 M performed in joint venture with boiler manufacturer [Gtaverken energy].
emoraud@hotmail.com www.eric-moraud.com

5 of 4

Experience Construction background in industry, petroleum, energy (19771989)


-

Black product fabrication plants and storages, France - (1988-1989) Recovery black liquor boiler house, France - 1986 Living quarters and production module on UIE yard, France - 1985 Water treatment plant in Saudi Arabia - 1984 Tripod at UIE Cherbourg yard and Jacket at ETPM yard Gabon (1982-1983) Nuclear power station of Le Blayais, France (1979-1981) Refinery Elf Nangis, France - 1978 (1974 to 1977).

Vocational diploma in Boiler Making at Technical School - Le Havre and Bordeaux