PROJECT CYCLE
3.Getting Approval
PPs shall get written approvals of voluntary participation from DNA of each party involved, including host party. PPs may get written approval in step 1,2 or even 4
4.Validation
Validation is the process of independent evaluation of a project activity against the requirement of the CDM
5.Registration
PPs collect and archive all relevant data necessary for calculating GHG emission reduction by a CDM project activity in accordance with the monitoring plan in the PDD
Verification is a Periodic independent review and expost determination of the monitored GHG emission reduction. Certification is the written assurance by a DOE that a project activity achieved the reductions in GHG emissions as verified.
8.Issuance of CERs
The EB will issue CERs equal to the verified amount of GHG emission reductions. Among issued CERs,2% will be deducted for the share of proceed to assist developing countries to meet cost of adaptation
9.Distribution of CERs
ADDITIONALITY TEST
Revenue from the carbon offsets must be a primary driver for project implementationavailability of a financially more viable alternative that would have led to higher emissions
Local resistance, lack of know-how, institutional or technological barrier -existence of a less technologically advanced alternative involving lower risks in terms of performance or market share and at the same time leading to higher emissions Employ technology that is not very commonly used-prevailing practice or existing regulatory or policy requirements would have led to implementation of a technology with higher emissions CDM concept additionality Project participants have to demonstrate to a validator that the project activity would otherwise not be implemented due to the existence of one or more barriers in order to prove that it is additional to what would have occurred in the absence of the CDM A TOOL IS AVAILABLE TO HELP!
Clean Development Mechanism Baseline Establishing a baseline The amount of emission reduction, obviously, depends on the emissions that would have occurred without the project. The construction of such a hypothetical scenario is known as the baseline of the project. The baseline may be estimated through reference to emissions from similar activities and technologies in the same country or other countries, or to actual emissions prior to project implementation. The partners involved in the project could have an interest in establishing a baseline with high emissions, which would yield a risk of awarding spurious credits. Independent third party verification is meant to ameliorate this potential problem.
Co2 database
Table S-1: Weighted average emission factor, simple operating margin (OM), build margin (BM) and combined margin (CM) of all grids for FY 2007-08 (inter-Grid and cross-border electricity transfers included), in tCO2/MWh
Grid Average OM BM CM
Average is the average emission of all stations in the grid, weighted by net generation. OM is the average emission from all stations excluding the low cost/must run sources(only thermal excludes hydro and nuclear). BM is the average emission of the 20% (by net generation) most recent capacity addition in the grid. CM is a weighted average of the OM and BM (here weighted 50 : 50). The baseline emission factor which is to be used for calculating CDM Benefits by the supercritical technology based power projects has also been calculated by Central Electricity Authority as 0.941 tCO2/MWh for the year 2007-08 in accordance with CDM Executive Board approved methodology ACM0013. The National average has hence been revised to 0.82 tCO2/MWh as of 2009
Calculation of Carbon Credits from a typical energy efficiency project in a fertilizer unit in Karnataka state
Project Profile
SECTION A. General description of the small-scale project activity A.1. Title of the small-scale project activity: Energy efficiency measures at Fertilizer unit of XYZ factory in Karnataka A.2. Description of the small-scale project activity: Purpose of the project activity: The main purpose of the project is to carryout energy efficiency measures, at all possible consumption points in the chemical process units at XYZ faxtory, so as to reduce electricity consumption. Reduced consumption of energy will lead to displacing equivalent amount of energy, thus, reducing the consumption of fossil fuel in the power generation in grid. Hence, reducing the GHG emissions due to the burning of fossil fuel. A Total of seven initiatives have been considered under the scope of this CDM project. The projects can be broadly categorized as: 1. Lighting related initiatives 2. Variable Frequency Drives 3. Efficient Motor related Initiatives 4. Other energy efficiency related initiatives
Ref No
Project Measure
Difference in Energ y
Savings
Savings
Emission factor
Emission
(Kwh) P
(Kwh) Q
(kwh) R=P-Q
hrs S
(kwh)/year T=R*S
(mwh)/yr U=T/1000
tCO2/Mwhr V
tCO2/year W=U*V
CDM1A
125
70
4380
CDM1B
Replacement 250 watt HPMV lamps by 150 watt metal halide lamps:
250
150
4380
CDM2
40
28
4380
CDM3
100
75
4380
CDM4
Installation of variable frequency drive: Replacement of EFF 3 motors with EFF 1: Replacement of higher capacity (150 kw) motors by optimum capacity motor (100 Kw):
500
430
7200
CDM5
1000
700
6700
CDM6
150
100
6200
CDM7
Reduction in power consumption by replacing the existing aluminium blades in cooling tower fan by FRP blades
100
95
5600
B.
Weighted
Emission Fact or
C.
(C=A*B)
Solution
Baseline Ene rgy Con sum ptio n Projected ener gy Con sum ptio n Difference in Ener gy Hours of Ope ratio n Per year Emission fact or
Ref No
Project Measure
Savings
Savings
Emission
(Kwh) P
(Kwh) Q
(kwh) R=P-Q
hrs S
(kwh)/year T=R*S
(mwh)/yr U=T/1000
tCO2/Mwhr V
tCO2/year W=U*V
CDM1A
125
70
55
4380
240900
240.9
0.72
173.448
CDM1B
Replacement 250 watt HPMV lamps by 150 watt metal halide lamps:
250
150
100
4380
438000
438
0.72
315.36
CDM2
40
28
12
4380
52560
52.56
0.72
37.8432
CDM3
100
75
25
4380
109500
109.5
0.72
78.84
CDM4
Installation of variable frequency drive: Replacement of EFF 3 motors with EFF 1: Replacement of higher capacity (150 kw) motors by optimum capacity motor (100 Kw): Reduction in power consumption by replacing the existing aluminium blades in cooling tower fan by FRP blades
500
430
70
7200
504000
504
0.72
362.88
CDM5
1000
700
300
6700
2010000
2010
0.72
1447.2
CDM6
150
100
50
6200
310000
310
0.72
223.2
CDM7
100
95
5600
28000
28
0.72
20.16
B.
Weighted
Emission Fact or
0.72
C.
(C=A*B)
2658.9312