URAIAN PEKERJAAN
VII
SAT
1
2
3
4
5
6
7
8
9
10
10
11
12
13
M3
M3
M1
M1
M2
M2
M2
M2
Ttk
Ttk
M1
M1
Ls
M1
14
15
16
16
17
18
List Plank+Cat
Ban2an
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka)_sopi-sopi atas
Plafound (Luar) +Cat
Atap luar (galvalum-Genteng)
Kolom struktur beton bertulang uk. 11 / 11 cm
M1
M1
M1
M2
M2
Ttk
HARGA
SATUAN
( Rp )
VOL
1.34
1.34
6.70
6.40
11.00
2.00
1.00
SUB JML
HARGA
( Rp )
JUMLAH
HARGA
( Rp )
18,000.00
280,000.00
525,000.00
564,000.00
200,200.00
57,300.00
113,220.00
150,000.00
80,294.84
235,620.00
2,835.00
6,500.00
47,400.00
99,000.00
32,562.00
506,520.00
0.00
5,101,380.00
1,729,728.00
0.00
1,681,317.00
0.00
216,796.06
0.00
0.00
0.00
63,990.00
0.00
48,900.00
20,000.00
245,000.00
57,300.00
150,000.00
80,294.84
0.00
0.00
0.00
0.00
0.00
0.00
Jumlah
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
RUANG KM
Galian tanah pondasi
Pondasi batu kali 1 pc : 5 ps (uk. Tgg 50 / Lb 50 La-30)
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka, H=3,4 m)
Sloof-Bata-Ringbalk-Plester Aci-Cat (muka luar depan-dalam, H=3,4 m)
Plat-Dak
Plafound+Cat
Urugan Sirtu-Rabat-Keramik
Atap (galvalum-Genteng)
Kolom struktur beton bertulang uk. 11 / 11 cm
Kolom struktur beton bertulang uk. 11 / 30 cm
Cat Plint lantai
List Plafound
Instalasi Listrik + Air (Cadangan-Air Panas dan Closet Duduk)
Stop kontak Air Panas
Keramik List KM
Instalasi Listrik + Air (Cadangan-Air Panas)
Balok Gantung 15 / 30
List Plank
Ban2an
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka)_sopi-sopi
Plafound (Luar)+Cat
14 Atap luar (galvalum-Genteng)
15 Keramik Teras Belakang
Atap luar (galvalum-Genteng)
M3
M3
M1
M1
M2
M2
M2
M2
Ttk
Ttk
M1
M1
Ls
bh
M1
Ls
M1
M1
M1
M1
M2
M2
M2
M2
0.93
0.93
4.67
2.55
2.55
4.08
2.00
4.67
4.67
1.00
1.00
4.67
1.00
21.13
2.64
18,000.00
280,000.00
400,502.62
425,053.02
286,000.00
57,300.00
113,220.00
150,000.00
93,170.00
235,620.00
2,835.00
6,500.00
570,000.00
153,000.00
65,000.00
220,000.00
99,000.00
22,696.20
353,052.00
2,524,968.80
0.00
0.00
197,255.25
389,759.85
826,200.00
251,559.00
0.00
17,873.26
40,979.25
769,500.00
206,550.00
409,792.50
297,000.00
0.00
48,900.00
20,000.00
175,000.00
57,300.00
150,000.00
113,220.00
0.00
0.00
0.00
0.00
4,278,825.00
403,516.08
0.00
8,793,211.06
URAIAN PEKERJAAN
Atap luar (galvalum-Genteng)
SAT
VOL
HARGA
SATUAN
( Rp )
SUB JML
HARGA
( Rp )
M2
JUMLAH
HARGA
( Rp )
0.00
16,500.00
0.00
Jumlah
646,900
0%
HARGA BANGUNAN T. 30 / m2
HARGA BANGUNAN T. 30 / UNIT
dibulatkan
646,900
19,406,990
19,406,000
Mengetahui
10,613,778.98
19,406,990.05
Deni Wibisono
Pemborong
Pekerjaan
Biaya Perubahan
1 Perubahan Desain
:
Keterangan
- Penambahan Ruang
10,613,779 - Letak KM dipindah
- Keramik Teras belakang
- inst. air panas & stop kontaknya
- keramik list- kamar mandi
- Perubahan dari atap menjadi Dak beton di atas KM
( kolomnya beruba lebih besar, Penambahan Ring Balk )
657,694
TOTAL
DIBULATKAN
:
:
11,271,473
11,271,000
Terbilang : ## Tujuh juta lima ratus lima puluh tiga ribu rupiah ##
Surabaya, 23Juli 2010
Menyetujui
.
Pemesan G/ 09
Deni Wibisono
Manager Unit