RENCANA ANGGARAN BIAYA

PEMBANGUNAN RUMAH TYPE . 30 (G09) GRAND PALM


THE GREEN TAMANSARI SURABAYA
30
19,406,000
NO

URAIAN PEKERJAAN

VII

SAT

1
2
3
4
5
6
7
8
9
10
10
11
12
13

RUANG UTAMA (DALAM)


Galian tanah
Pondasi
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka)
Sloof-Bata-Ringbalk-Plester Aci-Cat (muka luar depan-dalam)
Plat-Dak
Plafound+Cat
Urugan Sirtu-Rabat-Keramik
Atap (galvalum-Genteng)
Kolom struktur beton bertulang uk. 11 / 11 cm
Kolom struktur beton bertulang uk. 11 / 30 cm
Cat Plint lantai
List Plafound
Instalasi Listrik + Air (Cadangan)
Balok Gantung 15 / 30

M3
M3
M1
M1
M2
M2
M2
M2
Ttk
Ttk
M1
M1
Ls
M1

14
15
16
16
17
18

List Plank+Cat
Ban2an
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka)_sopi-sopi atas
Plafound (Luar) +Cat
Atap luar (galvalum-Genteng)
Kolom struktur beton bertulang uk. 11 / 11 cm

M1
M1
M1
M2
M2
Ttk

HARGA
SATUAN
( Rp )

VOL

1.34
1.34
6.70
6.40
11.00
2.00

1.00

SUB JML
HARGA
( Rp )

JUMLAH
HARGA
( Rp )

18,000.00
280,000.00
525,000.00
564,000.00
200,200.00
57,300.00
113,220.00
150,000.00
80,294.84
235,620.00
2,835.00
6,500.00
47,400.00
99,000.00

32,562.00
506,520.00
0.00
5,101,380.00
1,729,728.00
0.00
1,681,317.00
0.00
216,796.06
0.00
0.00
0.00
63,990.00
0.00

48,900.00
20,000.00
245,000.00
57,300.00
150,000.00
80,294.84

0.00
0.00
0.00
0.00
0.00
0.00
Jumlah

VII
1
2
3

4
5
6
7
8
9
10
11
12
13

RUANG KM
Galian tanah pondasi
Pondasi batu kali 1 pc : 5 ps (uk. Tgg 50 / Lb 50 La-30)
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka, H=3,4 m)
Sloof-Bata-Ringbalk-Plester Aci-Cat (muka luar depan-dalam, H=3,4 m)
Plat-Dak
Plafound+Cat
Urugan Sirtu-Rabat-Keramik
Atap (galvalum-Genteng)
Kolom struktur beton bertulang uk. 11 / 11 cm
Kolom struktur beton bertulang uk. 11 / 30 cm
Cat Plint lantai
List Plafound
Instalasi Listrik + Air (Cadangan-Air Panas dan Closet Duduk)
Stop kontak Air Panas
Keramik List KM
Instalasi Listrik + Air (Cadangan-Air Panas)
Balok Gantung 15 / 30

List Plank
Ban2an
Sloof-Bata-Ringbalk-Plester Aci-Cat (2 muka)_sopi-sopi
Plafound (Luar)+Cat
14 Atap luar (galvalum-Genteng)
15 Keramik Teras Belakang
Atap luar (galvalum-Genteng)

M3
M3
M1
M1
M2
M2
M2
M2
Ttk
Ttk
M1
M1
Ls
bh
M1
Ls
M1
M1
M1
M1
M2
M2
M2
M2

0.93
0.93
4.67

2.55
2.55
4.08
2.00
4.67
4.67
1.00
1.00
4.67
1.00

21.13
2.64

18,000.00
280,000.00
400,502.62
425,053.02
286,000.00
57,300.00
113,220.00
150,000.00
93,170.00
235,620.00
2,835.00
6,500.00
570,000.00
153,000.00
65,000.00
220,000.00
99,000.00

22,696.20
353,052.00
2,524,968.80
0.00
0.00
197,255.25
389,759.85
826,200.00
251,559.00
0.00
17,873.26
40,979.25
769,500.00
206,550.00
409,792.50
297,000.00
0.00

48,900.00
20,000.00
175,000.00
57,300.00
150,000.00
113,220.00

0.00
0.00
0.00
0.00
4,278,825.00
403,516.08
0.00

8,793,211.06

RENCANA ANGGARAN BIAYA


PEMBANGUNAN RUMAH TYPE . 30 (G09) GRAND PALM
THE GREEN TAMANSARI SURABAYA
30
19,406,000
NO

URAIAN PEKERJAAN
Atap luar (galvalum-Genteng)

SAT

VOL

HARGA
SATUAN
( Rp )

SUB JML
HARGA
( Rp )

M2

JUMLAH
HARGA
( Rp )
0.00

16,500.00

0.00
Jumlah

Harga NETTO T.30 / m2


FOH 10%

646,900
0%

HARGA BANGUNAN T. 30 / m2
HARGA BANGUNAN T. 30 / UNIT
dibulatkan

646,900
19,406,990
19,406,000

Surabaya, 01 April 2010


Menyetujui

Mengetahui

Deni Wibisono, ST, Msip


Manger Realty Unit TGTS

10,613,778.98
19,406,990.05

Ir. Made S poliani


Deputi Manager

Deni Wibisono

Pjs. Kasi Operasi

Pemborong

REKAPITULASI BIAYA PERUBAHAN DESAIN


Blok
: G / 09
Atas Nama : .
No

Pekerjaan

Biaya Perubahan

1 Perubahan Desain
:

Keterangan

- Penambahan Ruang
10,613,779 - Letak KM dipindah
- Keramik Teras belakang
- inst. air panas & stop kontaknya
- keramik list- kamar mandi
- Perubahan dari atap menjadi Dak beton di atas KM
( kolomnya beruba lebih besar, Penambahan Ring Balk )

657,694

TOTAL
DIBULATKAN

:
:

11,271,473
11,271,000

Terbilang : ## Tujuh juta lima ratus lima puluh tiga ribu rupiah ##
Surabaya, 23Juli 2010
Menyetujui

.
Pemesan G/ 09

The Green Tamansari Surabaya

Deni Wibisono
Manager Unit

Vous aimerez peut-être aussi