NO DIG Technologies for pipes and tanks

Know How Technology Quality - Innovation

The company

Headquater Ownership General Manager Employees Turnover Business areas AUSTRIA Altenberg/Linz Family Rabmer Mag. Ulrike Rabmer-Koller 256 39,7 Mio EUR Cleaning, Inspection, and Rehabilitation of pipes, tank and reservoir systems with NODIG methods Sales of Pipe Rehabilitation Technologies and Equipment r.tec GmbH) Construction

Locations
The Rabmer Group is located with own subsidiaries in Austria (Altenberg/Linz) Czech Republic (Sobeslav, Pilsen) Slovakia (Bratislava) Hungary (Kerecsend) Romania (Bucharest, Craiova) Ukraine (Lviv) Turkey (Istanbul) Poland (Bydgoszcz) Germany (Munich) Croatia (Zagreb)

and has Partner Companies worldwide

Rabmer Group
Rabmer Holding GmbHsterreich Rabmer Rohrtechnik GmbH Betriebssttten: Rabmer Rohrtechnik GmbH & Co. KG Merkezi Istanbul/Trkei Rabmer Rohrtechnik GmbH & Co. KG Austria Sucursala Romania Bucharest/Rumnien Rabmer Rohrtechnik GmbH & Co. KG - Bydgoszcz/Polen Umwelttechnik kft- Ungarn

Rabmer sanace potrubi Spol sro - Tschechien

Rabmer Slovakia sroSlovakei

Rabmer Konstruktija d.o.oKroatien

Rabmer Rohrtechnik GmbH - sterreich

Rabmer Romania SrlRumnien

Rabmer Bautechnologie GmbH&CoKG - sterreich

Rabmer Ukraina GmbHUkraine

r&r Holzbau GmbH sterreich

Rabmer Hochbau GmbH sterreich

Rabmer Rohrsanierungs GmbH - Deutschland

r.tec GmbH - sterreich

Rabmer Polska Sp. zooPolen

Rabmer Erdbewegungen u. Transporte GmbH sterreich

Milestones

Start Up
1963: Foundation of Rabmer 1972: Start of sewer construction activities 1984: First pipe inspection with modern TV camera equipment 1988: Start of no dig pipe rehabilitation projects in Austria

Internationalisation with affiliated companies


1992 Hungary 1994 Czech Republic 1999 Italy 2001 Romania 2002 Slovakia 2003 Ukraine 2004 Turkey 2007 Croatia, Germany 2009 Poland

r.tec Rabmer Technology


2008 founding of r.tec GmbH Partner Companies Worldwide

Milestones

Technologies
1984 TV camera equipment 1989 Close Fit sewage, pressure pipes 1990 CIPP sewage and pressure pipes. 1993 Short liner system 1996 Digikan Software 2007 r.tec liners for water, sewage, gas, industry 2008 Horizontal drilling, ploughing 2009 Cutting Robot for Slots 2010 r.tec high pressure Liner, r.tec Stand Alone Liner

Big projects (extract)


2004 Budapest 2004 Istanbul 2005 Craiova (RO) 2007 Bydgoszcz (PL) 2008 Wroclaw (PL) 2009 Deva, Brasov, 2010 Gradiska

NODIG Pipe Rehabilitation


Know How Technology Quality - Innovation

The problem of the current infrastructure



High age of the existing pipeline network High rate of losses Static Problems Corrosion Roots in the pipe Difficult situation for digging in cities because of the traffic Collapsing of lines due to natural aging material quality etc.

Non registered tapping points (pressure mains) Non registered laterals (gravity mains)

Advantages of No-Dig Technologies


No (or only small) construction work use of existing sewage manholes or small building pits for pressure pipes for installation Significant reduction of traffic jams and resultant environmental pollution, as far as roads do not have to be blocked Extremely short project duration 150 250 m a day can be rehabilitated in average, but installation lengths up to 500 m and more are possible No deposit material with regular digging, deposit material such as soil, old pipe material, etc. would have to be transported to deposit sites.

Advantages of No-Dig Technologies


No damages to infrastructure and surrounding facilities etc. - cost intensive rebuilding activities can be avoided No damage to other underground cable lines, pipes, etc. Economic efficiency due to the significant shorter project duration and reduction of construction works, the costs are in average lower than those of normal excavation based projects, especially in cities

Applications

Potable Water Sewerage Gas Industrial pipe systems Oil-/hydrocarbon pipelines

Costs of strategies for maintenance of pipes

Repair Occurence Maintenance Inspection Administration

Fire Department

Precaution

Maintenance

ConditionMaintenance oriented Maintenance

Technologies
Know How Technology Quality - Innovation

Products and Services

Cleaning Leakagedetection

TV-inspection Data Management

No DIG Pipe Rehabilitation, Renewal Construction

Concepts Pipe data management GIS

Pipe Cleaning

Pressure Cleaning

Pig Cleaning

High Pressure Cleaning

Inspection

TV-Inspection

Data Management
Rehabilitation concepts, Pipe Information System, GIS

Rehabilitation / Renewal

Robot Technology Pipe Replacement Technology Pipe Bursting Relining (Pipelining) Long Pipe Relining Short Pipe Relining Close Fit Pipes Cured in Place Pipes (CIPP) High Pressure Liner (HPL) Coating Technology Spot Repair Technologies
No Dig building and maintenance of pipelines

Construction

Rehabilitation / Renewal

Robot technology

Robot Technology

House Conections

Incrustations

Roots

Robot technology
Technology An automotive robot with a camera is put into the pipe It is positioned on the location where the pipe is harmed with the help of a camera Exchangeable attachments for milling, pressing, priming are used for the rehabilitation of the pipe Removal of obstacles or roots Spot repairs of single damages like (bushings, cracks) Reopening of Laterals after Rehabilitation Applications All kinds of pipes with DN 200 DN 800 mm

Robot technology
Rehabilitation of pipes with slotted drains

Technology Modern cutting system for opening the slotted drains after the pipe rehabilitation Rehabilitation with r.tec S CIPP with Epoxy resin Precise cutting by laser-surveying and software program Cut to the existing contour Collecting of the cut pieces in the existing pipe No residues in the rehabilitated pipe Applications Drainage systems for airports, parking lots, highways DN 200 up to DN 1400mm

Robot technology
Rehabilitation of pipes with slotted drains

Major properties Short site equipment costs due to the compact system Compact plant with its own power supply no external supply needed Smooth inner surface Precise cutting

Long Pipe Relining

Long Pipe Relining

Technology The old pipe is cleaned, calibrated and inspected Excavation of installation pits Regular Pipes are used (up to 150 mm on coils, all dimensions above single pipes have to be welded) Installation of the welded pipes with a winch Quite big Reduction of Diameter Annulare gap between host pipe and new pipe Applications For almost all materials DN 80 - >1000 mm Major properties Up to Do 160mm as bundled coil available Mechanical and chemical properties of PE-Pipes Reduction of cross section Requires a big excavation pits and big space for laying out of welded pipes

Short Pipe Relining

Short Pipe Relining

Technology The old pipe is cleaned, calibrated and inspected Regular Pipes are used Installation through manholes or installation pits Connection of the pipes in manhole/pit Connected Pipes are pulled/pushed into the old pipe Reduction of the Diameter Applications For almost all materials DN 80 - 2000 mm Major properties Reduction in cross section Annulare gap between host pipe and new pipe Installation of big dimensions requires big excavations

Close-Fit Pipe

DN 100 bis 400 mm

Close Fit: r.tec CF Liner

Technology
Use of a pre deformed PE pipe with reduced diameter. The Close Fit liner is inserted in the old pipe through existing pits or a small trench excavation pit. Reforming of the Close Fit Liner with temperature and pressure to a round pipe. The new pipe is pressed close fit on the existing pipe. The r.tec CF Liner is connected to the existing network with PE fittings.

Applications
Drinking water, gas, industrial, oil, sewer For almost all pipe materials Diameter DN 80 400 mm Installation length limited with drum capacity

Close Fit: r.tec CF Liner

Major properties
PE100 pipe SDR17, SDR 26 or SDR 32 PN 10 bar for water- and PN 6 bar for gas pipes. SDR 26 or 32 for sewer pipes. Standard product is black with blue or orange coloured stripes for water or gas. (totally coloured liner on request) Packaging: coiled on a drum

Close Fit: r.tec CF Liner

Advantages
Just little reduction in cross-sectional area (wall thickness of the pipe) Static and mechanical properties comparable with the properties of a new PE Pipe No / just minimal digging Extremely long and no-dig installation possible (e.g. 956 m in one installation, Italy 2005 ) No welding seams and perfect inner surface. Good chemical and physical resistance Bends up to 15possible without excavation.

Close Fit: r.tec CF Liner

Connection Technology Basically the connection is done with Electro fusion Fittings! Electro Fusion Fittings: There are two types of electro fusion fittings which are used for the CF- Liner, standard E- fittings or relining transition fittings. (Depending on Dimension)

Close Fit: r.tec CF Liner

Expander Supported Welding / Steel-Rings


To weld the CF-Liner with the Electro Fusion Fitting a Expander supported Welding is required to keep the liner on the correct diameter and support the liner during the welding procedure. The Expander is a hydraulic press which put the CF-Liner up to the required diameter and keeps is in that position during the whole welding- and cooling time! At low-pressure gas pipes special steel rings can be inserted into the ends to support the Liner during the welding. After the welding the rings remain in the pipe. (no expander must support the pipe during welding procedure)

Close Fit: r.tec CF Liner

Connection to the system After the extended cooling time the expander is put out of the CFLiner. At the standard edge or into the second side of the transition coupler standard PE fittings can be installed.. Connect section with standard PE-pipes or weld on a PE-loose flange and install further armatures.

Close Fit: r.tec CF Liner

Connection of junctions To connect junctions to the Close Fit Liner a small pit is required The pipe must be opened in the area of the connection before the CF-liner is pulled in! To realize connections special Fittings and a Top Loading Equipment is used.

CIPP - Technology

DN 80 bis 1800 mm

CIPP Technology General


Applications according to the medium Drinking water Process water Sewage pipes Gas and oil Industrial pipes

Range of Dimension Presssure Pipes: W2 and W3V1: W4: Sewage Pipes: r.tec S CIPP (pull-in or water) 80 1200 mm 150 1400 mm

80 1400 mm 1400 1800 mm

CIPP Technology General


Technology A flexible and multilayered liner will be impregnated with reaction resin (f.e. EP resin, Polyester resin) Through a special reversion machine the liner is brought into the old pipe The liner is pressed to the wall of the old pipe The resin is hardend with steam,

CIPP Technology General

The existing pipe is cleaned and inspected

The Liner is impregnated with Resin

The liner is brought into the pipe through with special reversion machine

The resin is cured

CIPP Technology General


Major properties

Also applicable for special profiles A smooth surface of the installed system Long installations possible High chemical and mechanical resistance No corrosion No welding seams Smooth inner surface No (or just a little) reduction in cross section (wall thickness of the liner) No / just minimal digging

CIPP - Technology Sewage Pipes r.tec S with Epoxy Resin


Specifications: System for gravity pipes with high mechanical and chemical resistance Internal Lining with bonding to the existing pipe as sealing of leakages and static support for the pipe. According to the condition of the existing pipe the wall thickness can be designed to bear all external loads.

Composition: Needle felt hose with a Polyolefin - coating. The wall thickness can be design with various felt layers. Epoxy Resin with very high mechanical properties.

CIPP - Technology Sewage Pipes r.tec S with Epoxy Resin


Connections and Finishing Works

After Rehabilitation the house connections are opened with a cutting robot. Because of the high bonding between liner and old pipe no additional works are required. The liner is cut in the shaft and adapted to the existing pipe/channel. Because of the bonding with the existing pipe no additional sealing or protection is required

CIPP - Technology Sewage Pipes r.tec S with Epoxy Resin

Advantages Epoxy resin

Very good adhesion on almost all surfaces, even when wet very low shrinkage while curing (no mass lost) -> no ring gap Opening of side connections through a robot without additional sealing No stress Cracks because of the ductile behaviour High mechanical and chemical properties good environmental compatibility (resins with drinking water approval available!) Epoxy liners are impregnated near the site very flexible project management possible no problem with the storage of pre-impregnated Liners

CIPP - Technology Sewage Pipes r.tec S with Polyesther/Vinylesther Resin

Materials: Needle felt hose with a Polyolefin coating and a Preliner Foil. Pre-impregnated with Polyesther or Vinylesther Resin The wall thickness can be design with various felt layers according to the condition of the existing pipe Specifications: Liner with a Preliner Foil is inverted into the old pipe with a special drum Curing with Steam or Hot water Internal Lining without bonding to the existing pipe Gap between old pipe and liner House connections have to be sealed with hut systems After cutting the liner special sealing required in the manholes

CIPP Technology Sewage Pipes - GRP Liner with UV or Steam - Curing

Materials: Liner made of Glass layers Pre impregnated with Polyester or Vinylester Resin

System: Pull In System with Preliner foil Curing with UV light or steam

Properties: High mechanical properties (E-modulus) No bonding with the existing pipe Additional sealing required for house connections and in manholes

CIPP Technology - Pressure Pipes

Systems for pressure pipes: r.tec W2 and G2 Coating/Sealing r.tec W3 V1 Semi-structural r.tec W4 Stand-alone

CIPP - Technology Pressure Pipes r.tec W2/G2 Coating, Sealing


Specifications: System for pressure pipes with drinking water and gas approval Internal Lining with a high bonding to the existing pipe as corrosion protection and sealing of fine holes and leaking joints No ring stiffness all external and internal loads must be absorbed from the existing pipe

Materials: Seamless round woven textile hose of polyester fibres and coating according to the medium (water, gas, oil). Felt layer as additional carrier material for the resin Epoxy Resin with a very high bonding value.

CIPP - Technology Pressure Pipes r.tec W3V1 Semi-structural

Specifications: System for pressure pipes with drinking water approval Internal Lining as corrosion protection and sealing of gaps, holes and leaking joints Ring stiffness is possible. Depending on the design, the system is able to bear a part of, or all external loads. The systems is able to resist the internal pressure on defined openings and holes. (size depending on the design)

Materials W3V1: Round woven textile hose of polyester fibres with special coating (depending on the medium). Felt layer as additional carrier material for the resin Wall thickness according to the static calculation. Epoxy Resin with an high E-modulus.

CIPP - Technology Pressure Pipes r.tec W4 Stand Alone


Specifications: System for pressure pipes with drinking water approval. Internal Lining as a new stand alone pipe. Ring Stiffness is possible. The system is able to bear external loads and internal pressure. (possible loads and pressure depends on the design of the system)

Composition: Symmetric construction of fibre glass- and felt layers. Wall thickness according to the static calculation. Special Epoxy resin for the impregnation of fibre glass layers with an high E-modulus. Preliner is used

CIPP - Technology Pressure Pipes Connections


Connections/Finishing works Because of the high bonding value to the existing pipe actually no additional sealing or protection is required. But usually internal protection rings against mechanical damage, (for example during cleaning works) are installed. The connection to the existing system is done with regular jointing technology. House Connections are opened with a Cutting Robot. Because of the high bonding normally no additional works are required. As additional protection or for bigger connecting pipes special internal-sealing couplings are used.

r.tec High Pressure Liner

Drum Winch

r.tec High Pressure Liner

Technology r.tec high pressure liner is a flexible woven textile Liner with very high tensile strength. The Liner is outside and inside PE coated. The Liner is inserted into the existing pipe with a winch. If the Liner is totally pulled-in it is blown up with compressed air. So a new pressure resistant hose So the pressure resistant hose lays close fit in the existing pipe as a new high-pressure pipe.

Application
High pressure pipes (water, gas, oil) For almost all pipe materials DN 150 500 mm

r.tec High Pressure Liner

Major properties
r.tec high pressure liner shows a high flexibility in combination with a material strength, that is known of steel pipes so far Wall thickness ~ 6 mm Pressure class 16 bar; 25 bar; (40bar on request) Packaging: coiled on a drum

Advantages
Installation length up to 2.000 m Just little reduction in cross-sectional area (wall thickness of the liner) Round bends up to 15are possible No welding seams and perfect inner surface. Good chemical and physical resistance No / just minimal digging

r.tec High Pressure Liner

Limitations
DN 150 500 Bends with more than 15must be removed House connections in the section not possible only for transport mains No ringstiffnes external loads must be taken by the existing pipe.

Connection Technology
The end transition is done by a special flange which is fixed to the liner. With the flange the liner is connected to the existing pipes.

Pipe Replacement r.tec Berstlining Technology

Applications
Drinking water, gas, industrial, oil. For not-reinforced concrete, AZ-, PVC-, GG- and vitrified clay pipes Diameter DN 80 500 mm

Major properties:
New pipe: Special crack resistant PE pipes New diameter can be bigger than existing pipe Pipes can be inserted as long pipe- or short pipe relining

Advantages: New pipe also proper for very deteriorated pipes. No cleaning required Raise in dimension possible Limitations: Installation length depending on the soil and diameter. No bends are possible. At connecting pipes, excavation required

Pipe Replacement r.tec Berstlining Technology

Technology
A new pipe is pulled with an hydraulic equipment into the existing pipe. During the pull-in the existing pipe is cracked with an special cracking head or cut with slice wheels. The new pipe can be on dimension bigger than the existing pipe The new pipe is connected to the existing network with standard fittings.

Sure Grip Lining


Technology Plastic plates (Sure Grip BSP) are installed in sections with the help of casings and then filled with concrete Because of the special anchors the plate is fixed to the mortar. The plates are connected together with extruder - welding Application Water and sewer pipes > DN 800 mm Manholes, tanks Major properties Very good abrasion resistance Very good chemical resistance Very smooth surface, UV resistant High flexibility and expansion characteristics

Coating
Technology Mechanical application of the coating material (mineral) eg. with squirling lances or high pressure injectors Application Drinking water, wastewater and district heating pipelines with a diameter of DN 150 up to DN 1000 mm Tanks and resarvoirs for water and industry, also for petrochemistry Major properties Acitv corrosion protecion for metallic pipelines, as well as for other surfaces No transfer of the static loads

Quick Lock
Technology Quick-Lock is an partial, infinitely variable rehabilitation system working on the basis of compression The stainless steel pressure sleeves are rolled narrower than the pipe to be rehabilitated The sleeve is surrounded by a seamless, finished compression sealing The overlapping rubber gasket provides a secure seal Two gear mechanisms integrated into the stainless steel sleeve allow the sleeve to emerge through the expanding with a QuickLock offset packer and prevent a return of the sleeve

Quick Lock
Applications Gravity pipes Due to the a high corrosion and heat resistance the system is well suitable for industrial pipework Diameter DN 150-800 mm According to the length of the damage pattern, the Quick-Lock sleeves can be arranged in endless rows Major properties Highly efficient system with an intelligent offset procedure Minimum pre-handling of the old pipe No / just minimal digging

Partliner System
Technology Localization of damaged spots in the pipe line Placement of a flexible with epoxy resin impregnated tube on the damaged spot With the help of a packer and TV camera the flexible tube is fed through existing control shafts and is positioned at the defective area and pressed onto the existing pipe wall Application Sewage pipes Major properties Highly efficient system for punctual rehabilitation Easy to apply, quick method

Repair r.tec Seal Ring

Technology
Localization of damaged spots in the pipe line Placement of rubber sleeves on the inner wall of the damaged spot of the pipe Tension up and fix the ring with steel - straps

Application
Water pipes > DN 800 mm

Major properties
Highly efficient system for punctual rehabilitation Easy to apply, quick method

NO Dig Construction
Construction Technologies of Rabmer

Horicontal Drilling Piping Plow System

No Dig building and maintenance of pipelines

Construction

Rehabilitation / Renewal

Horicontal Drilling

Technology Pilot drilling from the surface or a pit Use of a cement suspension for further stabilisation Expansion of the tunnel with pull back technology and simultaneous installation of the new pipe

Application Drinking water, wastewater, Gas, Industry with a diameter of up to DN 600 mm

Major properties Installation lengths up to 500 meters possible Good controllability, bends are possible

Piping Plow System

Technology A narrow slit is drawn by the cabling plow in the soil Simultaneously the pipe is placed

Application Drinking water-, gas-, sewage- and industrial pipes, cables up to a dimension of DN 355 mm

Major properties for endless piping plow system Installation lengths up to 8.000 m in one day are possible For cables and HD-PE pipes up to DN 225 mm

Piping Plow System


Major properties for rocket piping plow system Excavation pits are prepared at intervalls of 200 - 250 m Installation lengths up to 2.500 - 3.000 m in one day are possible For cables and HD-PE pipes up to DN 225 mm and 350 mm For steel pipes up to DN 250 mm

Manhole and Tank Rehabilitation


Know How Technology Quality - Innovation

Manhole and Tank Rehabilitation


Before Rehabilitation We have several methods for the Rehabilitation of Manholes and tanks:

Lining with Sure Grip System Rehabilitation with Repair Injection Rehabilitation with Coating After Rehabilitation

Sure Grip Plates


Technology Plastic plates (Sure Grip BSP) are installed in the concrete with the help of casings and then filed with concrete Application For concrete based on tank sytems Manholes, structures, tanks Major properties Very good abrasion resistance Very smooth surface, UV resistant High flexibility and expansion characteristics Very good chemical resistance Impermeable for almost every material

Repair Injection
Technology Localization of the damaged spot in the pipe/Manhole Drilling and fixing the packers nearby the crack(s) Sealing of the damaged spot with local injection through the packers Application Walkable sewage pipes (from DN 600 mm) Manhole, construction work Major properties Sealing against penetration of ground water Force-fit crack- and gap closing

Coating
Technology Preparation of the underground (sandblasting or high pressure water jet) Apply corrosion protection to the concrete reinforcement Primer coat and/or profiling with HS mortar Coating with polymer modified mortar or polyurethane based coating material Coating can be done manually, with centrifugal - coating or spray technology. Application Manhole, construction work Major properties Sealing against penetration of ground water Good chemical resistance Seamless coating

Manhole Coverage
Technology The lowering machine cuts a slot in the required height and lowers the manhole cover at the same time. For sealing, the pipe formwork is placed and inflated between the bottom edge and the top edge Mortar is poured after 5min. the formwork can be removed After 30 min the manhole can be used in normal traffic conditions

Major properties A system, that can lower or lift manhole covers without cutting and asphalt coating works

Quality & References


Know How Technology Quality - Innovation

Quality
We use only approved products and systems Abstract of the existing approvals DVGW German certificate for gas pressure pipe rehabilitation based on inliner technology (DIN 30658-1) VGW Austrian certificate for the use of Close-Fit products for drinking water- and gas-tubes BNQ Canadian certificate for drinking water tube rehabilitation with inliners WRAS British certificate for drinking water tube rehabilitation with inliners (BS 6920) ICECON Romanian certificate for the use of Corropipe (protective system for tanks) ISO Certificate 9001:2000 SCC ** Certificate

References
In the past 20 years we have rehabilitated more than 1000 km of pipes in different markets and different cities worldwide The following charts show only a short extract of projects

References - Sewage systems


Linz AG

- Location: Town of Linz (Austria) - DN 300 Egg 70/105 (mm) - Rehabilitation of approx. 15 km with r.tec CIPP Technology

References - Sewage systems


Craiova Sewerage Refurbishment & Extension - Location: Town of Craiova (Romania) - Inspection and cleaning of 130 km damaged and contaminated sewage pipes - Rehabilitation of approx. 20.000 m with r.tec CIPP and r.tec Close Fit Technology - Project duration: 2,5 years

References - Sewage systems


Oslo, Norway

- Location: Town of Oslo, Norway - DN 100 500 (mm) - Since 2002 - Rehabilitation of approx. 16 km pipe line with r.tec CIPP and Close Fit Technology - Project preparation and planning

References - Sewage and Water systems


Sewage Network Bayrampasa Region, Turkey

Location: Bayrampassa Region in Instanbul DN 150 300 (mm) Project duration: 4 years Inspection and cleaning of 360 km pipe lines Rehabilitation of approx. 50 km pipe line with r.tec CIPP and Berstlining Technology Project preparation and planning

References - Sewage systems


Festung Hohensalzburg - Austria

Location : Salzburg, Austria DN 30/50 400 (mm) Rehabilitation of pipe line with r.tec CIPP Technology Project preparation and planning Project duration : 1 day (plus finishing) Challanges: Reachability of the shaft Quick commissioning Incline of pipe

References - Water systems


Salinen Austria AG Industry Water Ebensee, Austria

Location : Ebensee Sulzbach, Austria DN 200 (mm) Project duration: 3 Jahre Rehabilitation of approx. 30 km pipe line with Close Fit and Long Pipe Relining Technology Project preparation and planning

References - Potable water systems


Taglio di Po, Italy

- Location: Taglio di Po, Italy - DN 315 (mm) - World record: rehabilitation of 950 m as one piece - Rehabilitation with Close-Fit liner technology - Operation pressure: 4 bar

References - Potable water systems


Bydgoszcz, Polen - Location: Bydgoszcz, Polen - DN 450 1000 (mm) - Rehabilitation of over 20 km with r.tec CIPP technology - Inspection, cleaning & rehabilitation of corroded cast iron and iron pipes - Project duration: 3 years

References - Potable water systems

Budapest

Water Company

- Location: Budapest, Hungary - DN 450 1200 (mm) - Rehabilitation of 20 km transmission lines with r.tec CIPP technology

References - Potable water systems


Vienna Water Works

- Location: Vienna (Austria) - DN 200 1000 (mm) - Rehabilitation of 9 km transmission lines with r.tec CIPP technology

References - Industry pipe systems


Voest Alpine - 20 km industrial waste water pipes - DN 300 Egg 70/105 (mm) - Inspection, Cleaning and rehabilitation with r.tec CIPP Technology

RAG Austria - 7 km Hydro - Carbonate Pipelines DN 100-280 mm - Inspection, Cleaning and Rehabilitation with r.tec CIPP- , Close Fit- and Relining systems

References - Industry pipe systems

Agrana, Tulln Austria

- Location: Tulln, Austria - Inspection, Cleaning and rehabilitation of approx. 10 km pipe line with r.tec CIPP and Close Fit Technology - Project duration : 2 months

References - Gas pipe systems


Wien Energie Gas - DN 80 400 (mm) - Cleaning and rehabilitation of 18 km with r.tec CIPP and Close Fit Technology

EVN, Austria - DN 150- 300 mm - Cleaning and rehabilitation of 3 km with r.tec CIPP and Close-Fit Technology

References - Gas pipe systems


O Ferngas

- Location: Gmunden (Austria) - DN 100 250 (mm) - Rehabilitation of 4 km with r.tec CIPP and Close Fit Technology

References - Airports
Airport Rome - Fiumicino - Rehabilitation of rainwater pipes - DN 500 mm - Inspection, Cleaning and rehabilitation with CIPP Technology Airport Budapest - Rehabilitation of rain water pipes - DN 500 DN 800 mm - Inspection, Cleaning and rehabilitation with CIPP Technology Airport Prague - Rehabilitation of rain water pipes - DN 250 DN 500 mm - Inspection, Cleaning and rehabilitation with CIPP Technology

References - Airports

Airport Vienna - Schwechat Rehabilitation of defrosting pipes DN 250 mm Inspection, Cleaning and rehabilitation with Close Fit Technology Airport Cologne Rehabilitation of rain water pipes and slotted drains DN 200/300 mm and DN 300 mm Inspection, Cleaning and rehabilitation with CIPP Technology and Laser Robot System

Thank you for your attention


www.rabmer.com www.r-tec.at