ATTACHMENT VII TO ANNEXURE A REQUIREMENTS OF CONSTRUCTION QUALITY MANAGEMENT/ QUALITY CONTROL

INDICATIVE INSPECTION & TEST PLAN FOR REFRACTORY LINING

Attachment VII_ Annexure A

Jacobs HPCL, MUMBAI LSTK CONTRACT - 3 44 LK 51 00

ATTACHMENT VII TO ANNEXURE A INDICATIVE INSPECTION & TEST PLAN FOR REFRACTORY LINING
INDEX

PART I SECTION 6.0 Page 2 of 4

Sl. No 1

Description

Format No

No. of Sheets 2

Revision

Refractory Lining.

5100/QAP.Constn/R/01

Attachment VII_ Annexure A

Jacobs HPCL, MUMBAI LSTK CONTRACT - 3 44 LK 51 00


1.0 Refractory Lining :

ATTACHMENT VII TO ANNEXURE A INDICATIVE INSPECTION & TEST PLAN FOR REFRACTORY LINING

PART I SECTION 6.0 Page 3 of 4

Format No.

5100/QAP.Constn/R/01

Rev

SL. NO.

ACTIVITY
PRIOR TO START OF LINING. a. Test certificates from suppliers. b. Field and approved laboratory tests. DURING LINING. a. WITH INSULATING FIRE BRICKS. i. Clearance of structural work including cleats / lugs anchor / hooks etc. ii. iii. iv. v vi. vii. viii. ix. x xi. xii. Cleanliness of the surface to be lined / surface preparation for painting. Painting DFT. Insulating layer application, wherever applicable. Metal foil application wherever applicable. Checking of bricks for their soundness (Squareness, cracks and for any other damages) Mix Proportion Laying of bricks as per specifications. Line and verticality. Gap at expansion joints. Filling expansion joints, wherever applicable. Finishing works.

CONTRACTOR

PMC

WC WC

Rw Rw

WC WC WC WC WC WC WC

S W W S S S S S S S S S

WC WC WC WC WC

Attachment VII_ Annexure A

Jacobs HPCL, MUMBAI LSTK CONTRACT - 3 44 LK 51 00

ATTACHMENT VII TO ANNEXURE A INDICATIVE INSPECTION & TEST PLAN FOR REFRACTORY LINING

PART I SECTION 6.0 Page 4 of 4

SL. NO.

ACTIVITY
b. WITH INSULATING CASTABLE CONCRETE. i. Clearance of structural steel work including cleats / support lugs anchors / hooks etc. ii. iii. iv. v vi. vii. viii ix x. xi xii xiii Cleanliness of the surface to be lined / surface preparation for painting. Painting DFT. Insulating layer application, wherever applicable. Metal foil application wherever applicable. Fixing of wire mesh. Fixing of shuttering / scaffolding and providing Pockets for pouring mortar. Mix Proportion Identifying location of expansion joints. Ramming of mortar for achieving uniform density. Filling expansion joints, wherever applicable. Wetting of previous layer prior to casting the construction joints. Pointing.

CONTRACTOR

PMC

WC WC WC WC WC WC WC WC WC WC WC WC WC WC HP

S W W S S S S W S S S S S S Rw

xiv Curing Inspection and Test Documents Review Test and Inspection Documents.