Wellhead platform options have been identified MOPU/FSO development solution in progress
-
has potential to be a competitive solution with full field capabilities seven rigs identified all fit for purpose five immediately available indicative day rate of circa US$100,000/day
Development criteria Water depth 140 ft Initial production early 2010 Minimum oil rate of 20,000 BOPD Minimum water rate of 20,000 BWPD Gas lift on initial completion Water injection on initial completion
Preliminary engineering is continuing on a possible wellhead support structure in association with a FPSO and a freestanding conductor supported structure if the MOPU is used
Vessel 1
Cargo Storage Volume Processing Capacity Max. Liquid Rate Max. Oil Rate Max.Water Rate Max. Gas Rate Gas Compression Pressure Water Injection Pressure BBLS BPD BOPD BWPD MMCF/D MMCF/D psig BWIPD psig 625,000 121,000 57,000 100,000 20 20 2,475 70,000 4,170
Vessel 2
510,000 25,000 20,000 12,500 10 7 1,800 15,000 2,500
Cost efficiencies Speed Higher specification than a new-build Fit for purpose
Flexible drilling schedule Does not require a lift barge Immediate access to produced fluid from wellhead Savings on well support structure Savings on flowlines Easier & more cost effective to expand for a full field development
10
Storage capacity 1,300,000 bbl Spread Moored DPR approved Fiscal metering unit Helideck Tank heating (if required) Accommodation 32 persons Delivery time 8 months
11
12
13
WSS
14
Gas solution
D1 70scf/stb D2 315scf/stb
Requirements for gas Gas lift gas for all producing wells
-
Fuel gas requirement for FPSO power generation Ebok-4 has been T&Ad with a mud-line suspension
-
will be used to re-inject any surplus gas to comply with Government regulations.
At this point in time it is considered unlikely that there will be any spare gas for re-injection
15