Académique Documents
Professionnel Documents
Culture Documents
Contents
Inverter ................................................................................................................................................ 10
Electric Wires...................................................................................................................................... 10
5. Marketing Strategy.................................................................................................................................. 24
5.1. Marketing Mix 7 Ps ( Product – Price – Place – Promotion- Packaging – Positioning – People) ... 25
Product ................................................................................................................................................ 25
Price .................................................................................................................................................... 25
Promotion ............................................................................................................................................ 26
Positioning .......................................................................................................................................... 27
Packaging ............................................................................................................................................ 27
People.................................................................................................................................................. 27
9. Financial Plan.......................................................................................................................................... 36
Utility Expense.................................................................................................................................... 46
EXECUTIVE SUMMARY
Vietsun Joint Stock Company is a company that imports and distributes the high quality product called
Solartricity, which generates electricity from solar power. Solartricity is proven to be environmentally
friendly and safe to human health. In the short run, we will market our product in Ho Chi Minh city, and
expand to other parts of Vietnam, as well as Mekong region, in the next 10 years. This business plan
provides an analysis of the solar power market in Vietnam and a description of our product, production
plan, marketing plan, as well as financial plan.
Due to the severe shortage of electricity in Vietnam nowadays, it is in urgent need of a more sufficient
and stable electricity source. Moreover, the stable and intensive radiation throughout the year will make
the implementation of solar power generation system in Ho Chi Minh city the most feasible.
To target the Ho Chi Minh city market, we identify two major segments for our product, which are
medium and high income individual households and medium and large offices because they will be able
to afford our product for its convenience and manufacturing purpose.
Our two main competitors are Selco Vietnam and Redsun. However, their products are expensive
because they import solar cells from Germany and France. For us, to lower the cost, we decided to import
from China, which is regarded as the cheapest producer of solar cells in the world yet its quality is
guaranteed for up to 25 years.
SOLARTRICITY P a g e |6
households and buildings. It is capable of creating electricity directly Solartricity comes with
numerous system options
by using the energy of solar radiation. Solartricity system consists of
to match with user’s
the following components: demand during black-hours
and even in non black-
hours. It can come with
small and medium demand
from 240 Wp to 1kWp,
which are able to generate
up to 5 kWh per day. For
larger demand like in
office, user can install a
bigger system for instance
3 kW, which supply 15 kWh
per day. The scale of the
system can be easily
modified and designed in
accordance to user desire
and demand
2.2 FEATURES
Durability: Solar panels is perceived as a Security of Supply: Sunlight is free and
durable material with the warranty up to 25 abundant. Hence, Solartricity can offer
years. Their deterioration is incredible stable virtually guaranteed access to electric power
in the long run: the efficiency only decrease continuously
10% after 30 years of Little Maintenance
working SOLARTRICITY Required: Solartricity can sustain all
Lifetime Cost Saving: kind of weather and conditions from
although the up-front cost snowy winter to hot summer. Little
of Solartricity is high, in a effort is put during operation period.
long run, it has proved to Periodic maintenance can be held
become more economical every 5 years to ensure the proper
than other power generators Key Features: working of the system and lifespan of
Environment the battery
High Quality Guarantee
Friendliness: It is an for more than 30 years No noise generation: during
extremely clean energy Lifetime Cost Savings the process of generating electricity,
Unlimited Power
resource, and few other Source
Solartricity does not use any
power-generating Zero Pollution Emission mechanical power to start up so it
technologies have as little Zero Noise Generation does not create any sound or noise.
Easy To Install and
environmental impact as Operate The user can enjoy a comfortable and
Solartricity. As it quietly Friendly To quite environment and constant supply
Environment
produces electricity from of electricity at the same time.
Little Maintenance
light, Solartricity produces Required Slim and elegant design:
no air pollution, no solar panels of Solartricity will be
hazardous waste and no emission of design to match your house or building
carbon dioxide. Moreover, it does not aesthetic requirement. The natural and
consume liquid or gaseous fuels, which will dark blue colors may even enhance your
save natural resources property’s appearance.
High Flexibility: Solar panels can be easily Full access control features: smart
installed almost any place which expose to solar control panels is employed to
the sunlight. It has been widespread in monitor the charging and discharging of
remote and rural areas and shows impressive the solar panels, which will
success automatically ensure your house or
SOLARTRICITY P a g e |9
2.5 PRODUCTION
This section will give more details on how our product is manufactured and delivered.
SOLAR BATTERY
SOLAR PANELS
Battery is purchased from local
Solartricity‘s solar panels are made
suppliers (E.g Dong Nai Battery Company)
from Monocrystalline – the most effective
with the guarantee up to 10 years.
material for solar cell nowadays. We will
SUPPORTING FRAMES
import from China suppliers in Guangzhou
province, which is very close to Vietnam Vietnam is rich of iron source especially
with the cheap price and transportation fees. in Southern provinces. The Iron Triangle in
It will be shipped from Shenzhen port to Ho Saigon River will provide cheap and high
Chi Minh City port.. quality iron to construct frame for the
system.
INVERTER
3. MARKET OPPORTUNITY
Darkness becomes familiar with all together with darkness, hotness and stuffiness throughout the
the family in the big cities day.
Novemb…
Septem…
Annual…
Decemb…
February
August
October
March
January
April
June
July
May
4
3 March
2
1 Hanoi (kWh/m2/day)
0
Da Nang (kWh/m2/day)
Ho Chi Shanghai New York
Minh City Ho Chi Minh City (kWh/m2/day)
From figure, the Southern region for instance Ho Chi Minh City has the most stable and
constant solar radiation compared to the other two regions. This stable and intensive radiation
ambient throughout the year will make the implementation of solar power generation in Southern
provinces such as Ho Chi Minh City the most feasible.
Both two main electricity generations in Vietnam: conventional thermal and hydroelectric source are
generating high toxin and pollutant, which threatens the nature environment and community health.
Conventional thermal source has been emitting toxic elements such as SO2, NO2, CO2, dirty smokes
into environment for many years, which results in a crisis in Vietnamese health status. The establishment
and construction of hydroelectric plants and dams contribute significantly to the damage of natural
resources and environments in Vietnam and Mekong region.
Current electricity generation methods, as a result, should be replaced with a new, green and
sustainable source of power to alleviate the burden on environment and risk on human health.
SOLARTRICITY P a g e | 15
Government announced its support to the implementation of the affordable Solartricity. In the
National Energy Policy Draft (2000-2020 period), it stated that the government “encourages development
of various forms of renewable energy and develops an effective energy sector in parallel with
environmental protection”.
In an international conference held at Hoa Lac Hi-tech Park, Ha Noi in November 2011, solar power
has been raised as a feasible and ultimate source of power in Vietnam. Benefits of installing solar power
system as well as its innovative features were presented at this event. Mr. Nguyen Van Lang, the Prime
Minister of the Ministry of Science and Technology, reinforced that Vietnam government will focus on,
direct and support projects and research which utilize the green energy such as solar power 1. At the
moment, government has allowed green technology and products to receive special tax exempts and
subsidy to encourage its development in Vietnam.
Moreover, according to Mong (2010), Vietnam is striving to reach the goal of cutting 20 to 30%
energy spending in the next 5 to 10 years and calling upon businesses to participate in investing in
renewable energy sources to minimize bad influences on the environment.
In conclusion, with the serious electricity shortage, disadvantages of traditional electricity generation
accompany with the strong support from government; greener and more sustainable alternative electricity
sources such as Solartricity should be developed so that problems above can be thoroughly solved.
1
http://www.baomoi.com/My-se-chuyen-giao-cong-nghe-nang-luong-mat-troi-vao-VN/53/3822589.epi
SOLARTRICITY P a g e | 16
4. MARKET ANALYSIS
The following market research is based on both primary and secondary research. For primary research
reference, please refer to appendix 10.2 and 10.3.
business field, Ho Chi Minh City stands out to be a promising land for metropolitan area in
Solartricity. As a result, we will implement the business model in Ho Vietnam with 9 million
Chi Minh City first, and then expand our market to other Southern people. It is the economic
provinces and the whole Vietnam. Finally, our long term target will be and financial center of
other countries in Mekong region such as Laos, Thailand, Cambodia, Vietnam, with the highest
GDP per capita 2,899 USD
Myammar, etc.
in 2009
DEMOGRAPHIC GROUPS
Individual households: medium and high income household owners who want to have a sustainable
electricity source during black hours to high-income customers.
SOLARTRICITY P a g e | 17
Offices: which are able to invest initial installation payment in return for gaining partial
independence from the electricity company to avoid higher future prices or sudden power
interruptions.
Next, we will investigate more about these two types of targeted customers in Vietnam and Ho Chi
Minh City.
According to Le and Khai (2011), power cuts in Vietnam have occurred as frequently as twice a week
especially in big cities like Ho Chi Minh. Moreover, the total power cuts can be within the maximum 5-
hour-per-day limit. Therefore, in a week, citizens can suffer from 10 hours of power cuts at
maximum. From that number, we can see how inconvenient individual households are now.
General Statistics Office of Vietnam Above medium and high income households
(2009), there are 1,824,822 Low and medium households
households, in which 339,245 strong
19%
and solid houses whose owners are
considered affluent. It constitutes to 81%
19% of the total households number in
Ho Chi Minh City.
SOLARTRICITY P a g e | 18
.
In big cities like Hanoi, Da nang, Nha Trang or Ho Chi
Minh City, the number of offices are rising now. Therefore,
electricity demand from these offices will be increasing the
Ho Chi Minh city offices statistics near future.
Medium and big Small
For Ho Chi Minh City, there are 450,000 offices now.
However, only 57,800 of them are medium and big offices,
which can afford our system. According to our survey, a
13%
typical office demands 14,904 Wh a day during black hours.
87%
To supply enough electricity during black hours, it needs to
install a 3 kW system, which may cost 13,470 USD (refer to
(Appendix 10.3) If all the prospective offices install the
equivalent system, we can estimate that offices in Ho Chi
Minh city would have a value of more than 778 millions
USD. The market of offices in Ho Chi Minh City for
Solartricity would be very large
4.4 MARKET GROWTH
Current Needs Seek an alternative and stable Can invest initial installation payment
source of electricity Want to gain partial independence from
Wish to satisfy their needs during the electricity company
black hours Avoid higher future prices or sudden
power interruptions
Characteristics Small and medium scale system Medium and large scale system
Cheap and reasonable price Can invest high up-front cost
Market Value in Ho 763 millions 778 millions
Chi Minh City (USD)
According to Burgerrmeister (2009), China’s government announced support for its photovoltaic
companies so that they can be the first suppliers of solar power at just $0.1/kWh. Moreover, as mentioned
in the government support part, Vietnam’s government started doing the same thing as well. Recently, the
Germany’s government also offered incentives to foster the installation of solar power in Vietnam with
long-term support2. Therefore, we can believe that the price of our product will decrease in the future.
On July 21, 2011, the Prime Minister of Vietnam approved the national power development plan for
the period of 2011 – 2020 with the vision to 2030, which strongly emphasized on renewable energy
development (Nguyen, 2011). Below is the chart of power capacity generated from different kinds of
resources by 2020 and 2030.
Projected power capacity in Vietnam from 2020 to 2030. Source: Mondaq (2011)
From the chart, we can see that power capacity generated by renewable energy, including solar power
will have increased to 9.4% by 2030. Therefore, the market for solar panel will be growing very fast. As
compared to 2009 when the total installed capacity of solar panels in Vietnam was 650 kW3, in 2011, it
increased to 1.6 – 1.8 MW4. Hence, it can be seen that the solar panel market in Vietnam is in the growth
stage of development. To sum up, the solar panel market opportunities for the future are very potential.
Thus, we can leverage these opportunities to expand our business.
2
http://www.eco-business.com/news/vietnam-plans-bright-future-for-solar-energy/
3
http://www.reegle.info/policy-and-regulatory-overviews/VN
4
http://www.eco-business.com/news/vietnam-plans-bright-future-for-solar-energy/
SOLARTRICITY P a g e | 20
COMPETITION OVERVIEW
Our two main direct competitors in Vietnam are Selco Vietnam and Red Sun and many other small
ones such as Bith Energy, Devi Renewable, Greenfield, New Energy, etc.
Factor Vietsun Selco Redsun
oducts Solar system Solar system Solar system
Electric products, Electric products using
Hot water solar system solar power
Solar hot water system
Price Households: <$4,500 Household: $20,000 Household: 5,000 USD
Offices: 13470 USD for
3kW
Importing Material Solar panel, inverter, Solar cells from Germany and France Local factory
battery from China
Lifetime of the 30 years 30 years 30 years
system
Company Start-up US-based company 3 year old company
Reputation
Location Ho Chi Minh city Ho Chi Minh city Ho Chi Minh city
Product Image Commercial name: No commercial name No Commercial name
Solartricity
Strengths Cheaper price 100% foreign-owned Under a governmental
Different targeted Experienced due to long time body
market working in the industry Has own a solar cell
Has relationships with world panel factory
leading solar equipment
manufacturers
Weakness Limited Capital Too expensive Young, has just been
Start-up company Focus more on electric products established since 2007
Lack of reputation and hot water solar system Relatively high price
Focus more on electric
products, hot water
SOLARTRICITY P a g e | 21
solar
PRODUCT COMPARISON
Compared to other electricity generators in the market, Solartricity has many extraordinary
characteristics as shown below:
Features Solartricity Diesel/Fuel Power Generator Inverter
Source of power Solar Radiation Diesel and fuel Electricity
Scale of system Varies from high to Varies from high to low Low and not for high power
low demand
Electricity mode Direct current Alternating current 50 /60 Hz Nearly alternating current,
50/60 Hz
Household utilities All household All household utilities Only some specific types of
utilities utilities
Ambient noise None High None
Toxic gases None High Medium
Risk of explosion None High Medium
Maintenance Every 5 years Every month 3 – 4 months
Instruction Easy – Automatically Difficult – usually need to Easy – turning on the inverter to
turn on start up by hand or by use
machine at first
5
Fees 4,500 USD/ 1 kwh >800 USD/ unit 300 USD/ unit
Life Span 30 – 35 years 7 -8 years 3-4 years
Lifetime Cost - - 3900 -14,400
Saving6(USD)
Although the up-front cost of Solartricity is higher than the other power generators, Solartricity is
far more economical than other power generators due to its key features such as high durability ( up to 35
years of life span), minimum maintenance, non-toxin emission, no noise generation, no risk of explosion,
high fire safety and ultimate source of power. This has become the main reasons why products such as
5
For a typical household demand, refer to Appendix 10.2
6
Comparing other power generator with Solartricity. Refer to Appendix 10.3
SOLARTRICITY P a g e | 22
Solartricity starts to attract a number of users in other countries such as the United State, Germany,
Japan, Spain, etc. Therefore, our product quality and competitive price, along with good marketing
strategies and customer service will be one of the most competitive edges we take advantage of to
compete with other competitors.
Moreover, we also realize that solar panel market is difficult to enter because there is proprietary
know-how in terms of technology. In addition, distribution channels are restricted since this is not
convenience product. Therefore, it can be concluded that entry barriers can benefit us while stopping
others in our tracks.
Although there are no official statistics in terms of Vietnam’s solar power market share, from 1997 to
2000, Selco Vietnam dominated the whole solar energy market (Nguyen, 2009). On the contrary, as
Redsun has just joined the solar energy market since 2007, it takes time for Redsun to become a strong
competitor like Selco Vietnam. Therefore, we should take advantage of these facts to obtain sufficient
market share for our new business.
STRATEGIC OPPORTUNITIES
Since both Selco Vietnam and Redsun have narrow markets and high price products, we will focus on
these two weaknesses and make them become our competitive edges. Their main markets are households,
whereas we are trying to target offices as well. In addition to, their major product is hot water solar
system not photovoltaic as in our company. This strategy will help us to exploit the potentials of office
market because their demand is huge for their business and their ability to pay is high. Furthermore, their
products are expensive because they import solar cells from Germany and France. For us, to lower the
SOLARTRICITY P a g e | 23
cost, we decided to import from China, which is regarded as the cheapest producer of solar cells in the
world yet its quality is warranty up to 25 years. Therefore, we can compete with Selco Vietnam and
Redsun in terms of price.
4.6.SWOT ANALYSIS
STRENGHT WEAKNESS
Guarantee sustainable local power
Limited capital.
supply at low prices.
Lack of local material sources.
Specialized in solar energy for
sustainable development with dynamic,
talented staffs with good educational
background.
Deliver high quality maintenance and
customer services.
Provide green, renewable energy which
does not release any harmful carbon
dioxide or other pollutants.
OPPORTUNITIES THREATS
Great solar energy potential to be
Price competition.
exploited.
High initial installation payment.
Huge demand and market for power.
Gain support from government for
producing green, low-carbon energy.
SOLARTRICITY P a g e | 24
5. MARKETING STRATEGY
W-T strategies
S-T strategies
Improve efficiency in cost
Make high quality as a unique control
selling point Set up stable technology
Build an efficient Customer transfer
Relationship Management to
retain customers
SOLARTRICITY P a g e | 25
PRODUCT
PRICE
For households: price of installation fees and annual maintenance for solartricity is 4,500 usd/1 kw
system.
For offices: discounts also apply if the owner installs more than 2 kw solartricity. For any additional
kw solartricity system installed, 10 usd discount will be given. Price will be calculated based on the
demand of building. The below table is the example of buying options for building owner
SOLARTRICITY P a g e | 26
PLACE( DISTRIBUTION)
Online Marketing: since today is an information age, we will leverage internet for our new
business. An official website, named www.solartricity.com, will be launched to provide information
about product, as well as new promotions and discounts. Moreover, this platform will also be used
for b2b e-commerce between us and companies in office buildings. Besides, social media platforms
and forums will be adopted to generate greater consumer awareness.
Email Newsletters: email newsletters will be sent to emails of companies in Ho Chi Minh city.
These newsletters will provide more information to companies in office buildings.
POSITIONING
We will position ourselves as a product with affordable price, high quality and good customer
service.
PACKAGING
We design logos for our company and product to deliver a message of passion, vibrancy and
environmental friendliness.
PEOPLE
For Households: we will train our part-time marketers as Solartricity’s representatives, who
will develop a long-term relationship with us so that our brand will be enhanced in the community. They
will go directly to every household to market and be paid based on their performance (number of products
sold). In addition, we will also place sample products at local electric stores so that customers who go
there to buy electricity generators can also know about our products. These local distributors will also be
commissioned based on their performance.
For Offices: we also have a group of part-time marketers and telemarketers to approach
companies. Like those household marketers, they will also be paid based on their performance.
SOLARTRICITY P a g e | 28
MARKETING PLAN
3 Months 6 Months 9 Months 1 Year
Website 1
Number Of Pr Campaigns 1 2 3 4
Number Of Tv Reports 1
Number Of Tvcs 1 1 2
Number Of Distributors 1 2 2 3
MARKETING BUDGET
Quantity In 1 Year
Website 1 Us$ 5007
Pr Campaigns 4 Us$ 4,0008
Brochures 20,000 Us$ 3009
Trainings For Marketers 4 Us$ 1,00010
Print Ads 2 Us$ 6,50011
Tvcs 2 Us$ 3,00012
Instructional And Promotional Items For Distributors 3 Us$ 1,500
Trade Fair And Industrial Fair Participations 2 Us$ 1,500
Total Us$ 18,300
SALES GOALS
Since we are a new start-up company, we will rely on our staff of marketers to sell to households and
showrooms and websites to cater to companies in ho chi minh city in the first year. In 10 years, we will
venture into other parts of vietnam, as well as neighbouring countries such as laos and cambodia.
7
http://www.vinadesign.vn/dich-vu-thiet-ke-web/134-gia-thiet-ke-web-site.html
8
http://www.powerhomebiz.com/vol48/affordpr.htm
9
http://www.insieure.net/to-roi-gia-re.html
10
Trainings = trainers + materials + equipment
11
http://www.marketingvietnam.net/content/view/454/25/
12
http://www.vn-zoom.com/f173/quang-cao-tren-truyen-hinh-ton-khoang-bao-nhieu-381470.html
SOLARTRICITY P a g e | 30
o Account for 4.5% of electricity needs within cutting hours in households in ho chi minh city.
o Account for 10% of electricity needs within cutting hours in office buildings in ho chi minh
city.
o Have representative offices in other cities like ha noi, hai phong, da nang, can tho etc. And in
Laos and Cambodia.
o Build own factory in southern vietnam.
6. DEVELOPMENT STRATEGY
This section is a road map of how we are going to get from where we are now to where we want to be in
the future. It includes all the steps that we need to accomplish to get the business up and running. It also
mentions the risks the we might encounter during the implementation.
Work remained to launch our company and products are listed below:
Time Line Work
2012 September Register The Business
Contact With Media, Newspaper For Advertising
Prepare Brochures For Marketing Strategy
Look For Office Location In Ho Chi Minh City
October And Recruit Salers And Electrical Engineering
November Look For A Warehouse For Solar Panels
Look For Chinese Suppliers In Guangzhou For Purchase Of Solar Panels And Controller
Look For Local Suppliers For Other Components Of System: Battery, Frames, Electricity
Wires
Look For With Marine Transportation Company
Contact Showroom And Local Distributors About The Solartricity Sale
December Acquire Utilities: Computers, Logo Brand, Office Accessories
Acquire Transportation Means: A Small Truck
Provide Training For Salers
2013 January Complete The Preparation Phases
Business Commences
The outstanding risks associated with the plan are transportation risk and technological risk.
Transportation risk is the damage of solar panels while handling from guangzhou port to ho chi minh city
SOLARTRICITY P a g e | 31
port. Because solar panel is very expensive, to mitigate the risk, we will insure solar panels with the
transportation company along the way. As from the factory to the port, Chinese suppliers will warranty
the quality of products.
Technological risk is associated with the malfunction of system after installation. Special attention is
concentrated on it because company’s reputation can be easily damaged if it receives negative feedbacks
from users about the inadequate system. To avoid the risk, we will employ an experienced head electrical
engineering to design the system and survey carefully customer’s house or office in order to come up with
the most sustainable system. Components such as solar panels, battery and controllers always come with
the warranty; hence if there are defects, the customers can return the products within stated time for
instance solar panels has 25 year of warranty from china factory.
Our company has a board of executive consists of top three major directors who are in charge of
managing and controlling company. Besides, we have a board of advisors which will consult us during
the operation of business. The following organization flow chart will illustrate our organization structural.
President
Customer Service
Human Resource Assitance Electrical Engineer
PR/Mass Media
Assitance
Marketer
Mr. Le Hong Vu
8. OPERATION PLAN
Mobillization Phase
• Import Components
• Transportation Vechile: Small Truck
Design Phase
Installation Phase
•Install system
•Check and Inspect
Maintenance Phase
•Defect Report
•Customer Service
Components of solartricity are imported from china and acquired from local suppliers. The inventory will
be kept in warehouse. The inventory strategy principle is first in first out to alleviate the risk of having
inventory of company because cost of goods sold is highly expensive for our product.
Design, technical and mechanical teams will be responsible for calculating and designing the system to
sustain customer’s needs. The design teams with 2 electrical engineers will choose the most sustainable
system for customer’s demand and design the system to minimize its impact on the appearance of
buildings and houses.
All devices and solar panel will be stored and modified in one of our warehouse to follow the plan of
design and technical departments. The finished products will be packaged in the paper box with the
company and product’s logo. The packaging process may need 1 or 2 workers only.
By our market research, the total size of our market at ho chi minh city is estimated as follow:
As the market in ho chi minh city is highly potential, in 5 years we only focus on ho chi minh city market with the % market cover of 2 targeted
customers:
SOLARTRICITY P a g e | 37
SALE BOTTOM UP
Based on our market analyses, 1 distributor can sell 15 power generator systems per month on average. As we are a start up company, in our conservative
calculation, we estimate 1 distribute in the beginning of year 1 will sell 3 system per month and gradually increase throughout the year because he has
gain experience. At the end of year 1, we will recruit 3 salers in total and at the end of year 5 there will be 7 distributors.
2013
Facts: An individual household
needs 864 Wh/day during black
hours => needs to install a system
with minimum power of 0.24 kW
An office needs 14904 Wh/day
during black hours => needs to
install a system with minimum
power of 3 kW
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
No. of distributors 1 1 1 1 2 2 2 2 2 3 3 3
# of units sold for households per
distributor 3 4 5 8 10 and 3 12 and 4 14 and 4 13 and 5 13 and 5 13,5,2 14,5,3 16,5,3
Total # of units sold for households 3 4 6 8 13 16 18 18 18 20 22 24 170
Total # of kW system sold for
households 0.72 0.96 1.44 1.92 3.12 3.84 4.32 4.32 4.32 4.80 5.28 5.76 40.80
Selling price per kW (USD) 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500
Revenue for households products
(USD) 3,240 4,320 6,480 8,640 14,040 17,280 19,440 19,440 19,440 21,600 23,760 25,920 183,600
# of units sold for offices per
distributor 1 2 2 2 2 and 1 3 and 1 5 and 2 3 and 2 3 and 2 4,3,1 4,3,1 5,4,2
Total # of units sold for offices 1 2 2 2 3 4 7 5 5 8 8 11 58
Total # of kW system sold for
offices 3.00 6.00 6.00 6.00 9.00 12.00 21.00 15.00 15.00 24.00 24.00 33.00 174.00
Selling price for the first two kW
(USD) 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500
Selling price for the third kW
installed onwards (USD) 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490 4,490
Revenue for offices products (USD) 13,490.00 26,980.00 26,980.00 26,980.00 40,470.00 53,960.00 94,430.00 67,450.00 67,450.00 107,920.00 107,920.00 148,390.00 782,420.00
Revenue (USD) 16730.00 31300.00 33460.00 35620.00 54510.00 71240.00 113870.00 86890.00 86890.00 129520.00 131680.00 174310.00 966020.00
SOLARTRICITY P a g e | 39
REVENUE SCENARIOS
We also calculate sales based on 3 scenarios of market movements: base case, upside case and downside case.
We estimate the growth rate of 3 market scenarios
Forecasts
D&A/Sales % 4% 2% 6%
Interest Expense 5 5 5
We have very optimistic sales forecast even in the most preservative scenarios.
SOLARTRICITY P a g e | 43
COMMISSION TO DISTRIBUTORS
Commissions To Distributors
We ensure that our distributors will commit highly to the company by giving them higher commission fees than these of other alternative products. By
distributing solatricity, each sale agent earns 225 usd for each system they sold, which is higher commission than other products.
SOLARTRICITY P a g e | 44
MARKETING EXPENSES
In 1 Year
Quantity Total
(Usd)/Unit
Website 1 500 500
Pr Campaigns 4 2,000 4000
Brochures 20,000 0.02 300
Trainings For Marketers 5 200 1000
Print Ads 2 3250 6500
Instructional And Promotional Items For Distributors 3 500 1500
Trade Fair And Industrial Fair Participations 2 750 1500
Tvcs 2 750 1500
Total 16800
SOLARTRICITY P a g e | 45
UTILITY EXPENSE
WATER
ELECTRICITY
LABOUR COSTS
Usd Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Per
Year
Management &
Administration
Chief Executive
Officer 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 1,250.0 15,000.0
Vice President
833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 10,000.0
Chief Financial
Officer 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 8,000.4
Legal (Outsourced)
833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 833.3 10,000.0
Accountant(S)
366.7 366.7 366.7 366.7 366.7 366.7 366.7 366.7 366.7 366.7 366.7 366.7 366.7 4,400.0
Office Admin
166.7 166.7 166.7 166.7 166.7 166.7 166.7 166.7 166.7 166.7 166.7 166.7 166.7 2,000.0
Mgmt & Admin
Salaries Per Month 4,116.7 49,400.4
SOLARTRICITY P a g e | 48
Production R&D
R&D Manager
666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 8,000.0
Electrical
Engineer(S) 500.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 1,000.0 12,000.0
R&D Salaries
1,166.7 20,000.0
Sales/ Distribution
Sales Manager
666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 8,000.0
Direct Sales Agent
(Outsourced)
Distributors
(Outsourced)
Marketing
Marketing Manager
666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 8,000.0
Customer Service
266.7 266.7 266.7 266.7 266.7 266.7 266.7 266.7 266.7 266.7 266.7 266.7 266.7 3,200.4
SOLARTRICITY P a g e | 49
Marketer(S)
266.7 533.4 533.4 533.4 533.4 533.4 533.4 533.4 533.4 533.4 533.4 533.4 533.4 6,400.8
Pr/Mass Media
416.7 416.7 416.7 416.7 416.7 416.7 416.7 416.7 416.7 416.7 416.7 416.7 416.7 5,000.0
Sales And
Marketing Salaries 1,616.7 22,601.2
-
Warehouse Salaries
Purchase Manager
666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 666.7 8,000.0
Additional
Logistics/Guard 333.3 333.3 333.3 333.3 333.3 333.3 333.3 333.3 333.3 333.3 333.3 333.3 333.3 4,000.0
Warehouse Salaries
12,000.0
Total Salaries Per
Month 8,300.1
Total Salaries Per
Year 112,001.6
SOLARTRICITY P a g e | 50
9.3 INVESTMENT
Usd
Buidings And Plants
46,571.43
Utilities
13,197.77
Staffing&Salary Year 1
8,300.07
Total Cost Of Good Sold Year 1
609,343.73
Initial Variable Capital
100,000.00
Total
777,412.99
Owner Equity
500,000.00
Loans
500,000.00
Total 1,000,000.00
SOLARTRICITY P a g e | 51
Operating Expense
10. APPENDIX
- Solartricity system: 0.24KW cost 1080 USD / produce 1,2 kWh/day and light weight
- total hour cut: 5h ( from 9:30 am - 11am and 2:30pm - 5 pm )
- total day shortage per month for 1 household: 2 x4 = 8
- Diesel/Fuel Generator for household: price: 522.5 USD (source: http://sieuthimayvanphong.com/sanpham/7591/M%C3%A1y%20ph%C3%A1t%20%C4%91i%E1%BB%
- to produce 1,2 kWh/day, fuel needed: 0.53 l, fuel price = 1usd/l. discount rate = 8%
- fuel fees per year = 0.53 x 2 x 4 x 12 = 51 USD
- electricity price = 0.08 c/1 kwh
- an average inverter: price: 285 USD ( source: http://www.dodung.net/default.asp?tab=detailproduct&zone=40&id=74&Product=57&path=kich-dien-teknos-1000w
- to produce 1,2 kWh/day, an inverter need to charge the electricity beforehand, which cost: 0.20 USD => in 1 year it cost: 0.20 x 2x 4x12 = 19.2 USD
- solar hour: 5.4 hours ( south) but taking into account weather unexpectation , solar power used here is 5 hour
Y24
Annual Electricity Fees
Y25 30 25 5 346 -51 25 -8 -19 25 -122
Annual Electricity Fees
Y26 30 26 4 350 -51 26 -7 -19 26 -131
Annual Electricity Fees
Y27 30 27 4 354 -51 27 -7 -19 27 -142
Annual Electricity Fees
Y28 30 28 4 358 -51 28 -6 -285 28 -2277
Annual Electricity Fees
Y29 30 29 3 362 -522.5 29 -61 -19 29 -166
Annual Electricity Fees
Y30 30 30 3 365 -51 30 -5 -19 30 -179
Annual Electricity Fees
Y31 30 31 3 368 -51 31 -5 -19 31 -193
Annual Electricity Fees
Y32 30 32 3 370 -51 32 -5 -285 32 -3097
Annual Electricity Fees
Y33 30 33 3 373 -51 33 -4 -19 33 -225
Annual Electricity Fees
Y34 30 34 2 375 -51 34 -4 -19 34 -243
Annual Electricity Fees
Y35 30 35 2 378 -51 35 -4 -19 35 -263
Annual Maintenance Fees
Y1-Y35 -10 35 -1 377
P Value -703 -1748 -13566
SOLARTRICITY P a g e | 57
Refrigerator 80 1 19 1520
Fan 25 1 19 475
Per Year: 277 Kwh, 0.24 Kw System Sp
Total 2887 Produce 1.2 Kwh/Day => Saving: 0.03 Usd
SOLARTRICITY P a g e | 58
Avearge
Appliance Power No. Hrs/Day Average Wh/Day Column1 Column2
Light 11 4 11 484
Tv 60 1 10 600
Computer 60 1 3 180
Refrigerator 80 1 24 1920
Fan 25 1 24 600
Per Year: 908.16 Kwh, Use System In The
Non-Blackhours Days, Save: = 23.04 Usd
Total 3784 Per Year
System Size
To install 4.5 kW Solartricity System need: 4.5 kW/ 240 W = 18.75 panels
Each panel has dimension as 1080 x 1580 x 45 mm, surface area needed is: 31.9 m2
Number Of Cells 98
Voltage (V) 12
SOLARTRICITY P a g e | 63
Lifetime ( Year) 10
10. REFERENCE
Burgermeister, J. (2009, May 22). China’s New Focus On Solar. Renewableenergyworld. Retrieved On February 25 From
Http://Www.Renewableenergyworld.Com/Rea/News/Article/2009/05/Chinas-New-Focus-On-Solar?Cmpid=Wnl-Wednesday-May27-2009
Dapice (2008). Rate Of Growth Of Electricity Demand In Vietnam. Retrieved On January 17 From Http://Www.Fetp.Edu.Vn/Index.Cfm
Dinh, H. (2010). List Of Projects In Hanoi Which Continue To Be Carried Out. Retrieved February 18 From Http://Khudothimoi.Com/Tintuc/Dau-Tu-
Quy-Hoach/3586-Danh-Sach-Cac-Du-An-Tai-Ha-Noi-Tiep-Tuc-Duoc-Trien-Khai.Html
General Statistics Office Of Vietnam (2009). Vietnam’s Census. Retrieved On February 18 From
Http://Www.Gso.Gov.Vn/Default_En.Aspx?Tabid=515&Idmid=5&Itemid=10799
Hai, C. (2010). Da Nang: Buildings Will Destroy City Space. Retrieved On February 18 From Http://Www.Baomoi.Com/Da-Nang-Nha-Cao-Tang-Se-
Pha-Hong-Khong-Gian-Do-Thi/148/5768757.Epi
Hung, S. (2011). Electricity Shortage Will Be Serious In 2011. Retrieved On February 18 From Http://Danviet.Vn/29031p1c24/Nam-2011-Se-Thieu-
Dien-Tram-Trong.Htm
Le, C. H., (2009). Solar Energy And Solar Photovoltaics In Vietnam. Retrieved On November 1 From
Http://Www.Berlin.De/Imperia/Md/Content/Asienpazifikforum/Apw/Apw2009/Praesentationen/Prof._Le_Vietnam.10.2009.Ppt
Le, S. & Khai, Q. (2011). Businesses Scramble To Prepare For Power Cuts. Retrieved On February 18 From
Http://English.Vietnamnet.Vn/En/Business/6327/Businesses-Scramble-To-Prepare-For-Power-Cuts.Html
Mong, B. (2010). Vietnam Sets The Goal Of Reducing 20 To 30% Energy Spending. Retrieved On February 18 From Http://Klvn.Vn/Home/Kinh-Te-
Viet-Nam/24755-Viet-Nam-Dat-Muc-Tieu-Giam-20-30-Chi-Phi-Nang-Luong.Html
SOLARTRICITY P a g e | 65
Nguyen, D. (2011, September 1). Vietnam Power Development Plan For The 2011-2020 Period. Mondaq. Retrieved On February 26 From
Http://Www.Mondaq.Com/X/144632/Renewables/Vietnam+Power+Development+Plan+For+The+20112020+Period
Nguyen, T. T. B. (2009). Evaluation Of Franchising Business Model Applied To Solar Energy Market In Vietnam [Data File]. Retrieved From
Https://Publications.Theseus.Fi/Handle/10024/6800?Locale=Lsv&Author=
Thanh (2011). Electricity Demand In Vietnam In 5 Years Is Expected To Increase By 15%. Retrieved On January 17 From
Http://Vietnam.Vn/C1004n20110628111128531/Nhu-Cau-Dien-Nang-Tai-Viet-Nam-5-Nam-Toi-Du-Kien-Tang-15.Htm
Vietnam Electricity (2011). Electricity Shortage In Dry Season 2011. Retrieved On February 18 From Http://Lichcatdien.Info/Lich-Cat-Dien-Mien-
Nam/Lich-Cat-Dien-Dong-Nai/Tinh-Hinh-Thieu-Dien-Mua-Kho-Nam-2011.Html