Bi STAR LiMiTED

264 P.H./Aba Expressway, Port Harcourt, Nigeria

S/N
A 1

DESCRIPTION
MOBILIZATION/DEMOBILIZATION & SITE PREPARATIONS Allow for all mobilization costs, including but not limited to mobilization of Rig, equipment, tools, labour including PPE, and first aid facilities Set up temporary site office, site storage, locate and pay for workers accommodation site for the duration of contract. Allow for operating costs including transportation of workers, supervision, office equipment, telecommunications, stationeries etceteras. Allow for community relations Drill and produce water required for drilling operations and electricity supplies for the works. Clear site of grasses and shrubs and remove all debris from site. Design and construct reinforced insitu concrete plus timber pad for rig placement Allow for mud pit digging floor channelling to connect to mud tanks for the drilling operations. Demobilize equipment, tools, and personnel from site at project completion. Total

UNIT OTY

RATE

AMOUNT

1,000,000.00

100,000.00

3 4 6 7 8 9 10

400,000.00 1,000,000.00 120,000.00 50,000.00 100,000.00 150,000.00 500,000.00 3,420,000.00

B 1 2 3

DRILLING OPERATIONS Allow for pilot hole drilling to a depth of 1000 ft using 6'' drill bit to allows enable logging operations Allow for logging operations Drill hole size 20" diameter commencing from existing ground level to depth of 40ft and install conductor casing Drill a hole size 8 1/2" commencing from 40ft below ground level and average dept not exceeding 1000ft. Provide & Install 6'' casing Install Sand Screens Allow for drilling chemicals, fluid and additives Total

1000

2,500.00 L/S

2,500,000.00 700,000.00

ft

40

8,000.00

320,000.00

5 6 7 9

ft ft ft

960 1000 150

2,500.00 4,500.00 7,000.00

2,400,000.00 4,500,000.00 1,050,000.00 800,000.00 12,270,000.00

Bi STAR LiMiTED
264 P.H./Aba Expressway, Port Harcourt, Nigeria

D 1 2 3 4 5 6 7 8 9

WELL DEVELOPMENT, PUMP & PUMPTESTING Develop boreholes by airlifting and surging to optimum output till clear water exists. Clean out the screen from all mud with a jetting tool till the entire screen is free of debris Carry out stage pump test and Continuous pump test for the well. Provide and Install 7.5hp Groundfos pump Supply and install 50-70 mm cable to connect the pump to a power source. Jointing kits. Install 15kva Generator Clean site and make good Carry out microbiological and heavy metal test on water sample Total

250,000.00 150,000.00 150,000.00 500,000.00 ft 200 L/S 250.00 50,000.00 10,500.00 1,300,000.00 50,000.00 75,000.00 2,535,500.00

SUMMARY A B C Mobilization/Demobilization & Site Preparations Drilling Operations Well Development, Pump & Pumptesting Grand Total Naira 3,420,000.00 12,270,000.00 2,535,500.00 18,225,500.00