April11,2011
Presenters
Steve Norris
Tom Carlson
Director, Fuels
4/11/2011
Agenda
Loads and Resources Fuel and Purchase Power Planned Maintenance Activities Emergency Preparedness & Contingency Planning Conclusions
4/11/2011
Grand Canyon
Yuma
4/11/2011
4/11/2011
Renewable Resources
Peak Contribution Resource Aragonne Mesa Wind 16.1 High Lonesome Wind 11.6 Salton Sea CE Turbo 10.0 SWMP Biomass 24.5 Glendale Landfill Biogas 2.6 Solar Generation 2.9 Total (MW) 67.7 Capacity 90.0 97.0 10.0 24.5 2.8 6.0 230.3
4/11/2011
Generation Resources
Existing Generation Long-term Contracts PacifiCorp Exchange SRP - Firm Reliability Purchases Demand Response Contract Market Contracts for ED3 Renewable Contracts Subtotal
Capacity (MW)
6,294
Total Resources
8,635
4/11/2011
6,936MW Actual
1.6%
2009
2010
2011
4/11/2011
Planned Reserve Margin to manage uncertainties: 1. Load forecast uncertainties (weather, economy) 2. Multiple generator outages 3.Transmission outages
1585MW=18%
8,635 MW 7,050MW
Resources
PeakLoad
4/11/2011
Actual 11,489
Actual 11,322
2009
2010 Capability
2011 Load
10
4/11/2011
3.7%
404MWActual 406MW Forecast
415MW Forecast
2009
2010
2011
4/11/2011
11
YumaAreaMaximum LoadServingCapability
MW
565 Forecast 431 600 Forecast 406 600 Forecast 415
Actual 404
Actual 431
2009
2010 Capability
2011 Load
4/11/2011
12
Tom Carlson
Director, Fuels
4/11/2011
13
APS Generation
Base Load, Nuclear
Farmington NM Page
Palo Verde
Joseph City
Phoenix
4/11/2011
14
RenewableResources
1. 2. 3. 4. Aragonne Mesa,90MW(Wind) SaltonSea,10MW(Geothermal) PrescottAirport,2.9MW(Solar) STARCenter,1.8MW(Solar) 5. 6. 7. 8. Saguaro,1MW(Solar) Snowflake,25MW(Biomass) GlendaleLFG,2.8MW HighLonesome,100MW (Wind)
5 Tucson
4/11/2011
15
4/11/2011
16
4/11/2011
17
Coal Supply
Four Corners Power Plant Mine mouth plant with BHP Navajo Mine Contract term currently runs through 2016 60-70 days of reserves
Cholla Power Plant Fuel Source: El Segundo mine near Grants, NM Contract commitments in place through 2024 45-60 days of reserves
4/11/2011
18
4/11/2011
19
4/11/2011
20
Morgan-Pinnacle Peak 500/230kV double-circuit line New Pinnacle Peak 500kV substation with new 500/230kV transformers
4/11/2011
21
4/11/2011
22
Transmission corridor bulk clearing, 69 kV and above Distribution line-clearing: trim and strategic removal 2011 Fire Season above normal fire potential
4/11/2011
23
4/11/2011
24
4/11/2011
25
4/11/2011
26