Vous êtes sur la page 1sur 19

1

JMN Work Plan, October 08 – September 09


S. Indicator Present Status Target Out Comes Probable Qualitative Result
No.
1. Birth registration Not registered F-8, 100% registration of F- 20+100% newly • PVCHR committee will lead for birth
of children M-12, T-20, the 8, M-12, T-20 + newly born children in
between the age registration is started born baby in model model village. certificate themselves.
of 0-1 year in Ayar, Bhaithauli. village. Instead of this • The issue of birth registration will be
There is no the certificate has been
knowledge of issued in other 4 Blocks raised under Bunkar Dastkar Adhikar
certificate in other 18 of PVCHR. Manch.
village, 4 city locality,
weaver locality • (Three Village-Aayer, Aura, Khanda in
Harhua, Five Area-SaraiMohana,
Singwar, Doshipura, Dharkar Basti,
Sarang Talab, Hukulgang of
Chiraigaon, Five Village Committee
Raitara, Kharuapur, Ramaipur, Dalit
basti of Pindra, Four Village
Committee-Lakhmipur, Ahirani,
Kuwar, Ghamahapur) will raise the
issue of birth registration.
• The member of PVCHR committee and
Bunkar Dastkar Adhikar Manch will
make Concept on Birth Registration.
2. Birth registration T-1151 children in Certificate has will has Effective action • The members of PVCHR Village
2

of children model village. been issued to children will be taken by committee, block and district level will
between the age of model village central and state
lead for the demand of registration for
of 1-10 years between the age of 1-10 government on the
years birth certificate of children of the age between 1-10 years.
T-1151. children between
The birth certificate the children
The issue of certificate the age of 1-10
to children between the years. between the age of 1-10 years will
age of 1-10 years of 4
become issue.
blocks of PVCHR and
weaver locality, will has
been raised.
3. To assure the 100% vaccination is 100% in three model 100% newly born • The member of PVCHR committee will
vaccination of all being done among all village. children.
the children children in model stability of vaccination. supper vise the vaccination in model
village but only polio 6 village committee in village
drop is being given in Badagaon,
the name of 4 village committee in • The understanding for the vaccination
vaccination in other Harahua. will be made in other village.
villages. 3 village committee in
Chiraigaon. • The member will supervise themselves
5 village committee in on the issue of health in PVCHR
Pindra.
The initiation will start village committee after knowing about
on vaccination through the situation.
understansing.
Issue and initiation of
vaccination in other
PVCHR committee.
4. To assure the • 100% vaccination 100% in three model 100% in model • On the issue of corruption the members
vaccination of all is being done in village. Along with this village.
the pregnant the awareness will In other village will complain and initiate, so that
model village.
women • There is lack of increase on vaccination there is regular leading role will be established.
3

knowledge in other in 17 Village, 4 city vaccination and • The practice of gherao and question-
PVCHR locality and 3 weavers’ supervision of
committee. locality. PVCHR ANM and ICDS answer in village committee will
committee will initiate workers. become faster.
on corruption. The initiation will
start against
corruption by
PVCHR
committee.
5. • Activation • There are 7 ICDS • PVCHR committee • Supervision of • To initiate themselves by PVCHR
of ICDS centre in model will supervise ICDS PVCHR will be
committee on the issues of supervision
centres village which are centre in model held over 7
and to partially active. village. ICDS centre of of ICDS centre and corruption, and on
raise the • Demand is being • The PVCHR model village.
demand, the demand at block level and,
demand raised for 8 ICDS committee will take • Initiation will
for new centres. proposal for demand be held on due to public hearing and concept
ICDS • There are no of 8 ICDS centres, demand for 8 building the understanding for the child
centres malnourished they also will initiate ICDS centre.
• To secure children of IV on demand and the • No III, IV death and mother death and the reason
the life of grade. protest will be held grade of death of the children 0-5 years, will
malnouris • Malnourished at block level at 4 malnourished
hed children have been Blocks. children will be developed and pressure will be
children marked in other • In one block of remain in exerted over administration.
and to village of PVCHR PVCHR the process model village.
raise the and the compliance will take speed by • The issue of • The PVCHR committee will be come
issue in is started with raising demand. malnourishmen strong.
PVCHR those children. • Children will be free t will be raised
village • Malnourished from the in other • The issues of ICDS centre,
and children are in malnourishment of PVCHR
weaver malnutrition’s, Janani Suraksha Yojna,
grade III, IV in III and IV grade in village.
area other village of model village. NRHM will be expanded. The pressure
4

PVCHR. • The compliance and at block, Tahsil and district level will be
• The card is made initiation will start in increased.
available to the PVCHR and
family of weavers area for • The pressure on the workers and
malnourished malnourished
assistants of ANM, ICDS and ASHA
children in children.
weaver’s locality will be increased.
after compliance.
• The compliance of malnourished
• Child death is
found in 2 model children of weaver area, the struggle
village.
will be strengthen on issue.
• The
administration has • The malnutrition will be come the issue
been made aware
at state level.
about
malnourishment
in weaver locality.
6. To lessen non- • Non institutional 40% 40% The awareness in PVCHR committee on
institutional delivery being Janani Suraksha Yojana will increase and
delivery. taken place in
model village in the compliance on the matter of corruption
the presence of will increase. The activity of ASHA will
trained nurses.
• Janani suraksha increase.
yojna is being
available on the
birth of 10 infants.
7. Activation of • Doctor, ANM are • The public 2 SC, 1 Ayurvedic, Against the corruption rampant in SC, PHC,
SC,PHC,CHC, sitting regularly compliance will be 2 PHC 1 District
government hospital and on demand
Ayurvedic sub on baghwanala held to repair the hospital and 1
center, district sub center but the threadbare building Divisional hospital increase resources (doctor, and material),
5

hospital and building is of sub centre in will remain in the the compliance will be strong and concept
divisional threadbare. Baghwanala. process of
will increase due to knowledge of PVCHR
hospital. • The demand for • Demand of activation.
allopathic allopathic medicine about weaver area.
medicine is being at Shivrampur The access of deprived community will
raised at Ayurvedic centre.
Shivrampur The PVCHR increase and question will be raised
Ayurvedic centre. committee will accountability.
• ANM sits at compile on demand.
Belwa Sub Centre • Doctor must sit once • Along with the health of infant child,
once in a month in a week at Belwa pregnant the general right to health will
but there is no sub centre and
resources. resources must be be protected.
• The pressure has increased. The • The issue of health will be expanded
been increased PVCHR committee
due to public will raise for all.
hearing and public compliance on this
issue by exerting • The question of budget of health centre
struggle on
Pindra, Block and district will be raised.
Lohta(KVP), level pressure.
Badagaon, PHC, • The pressure and
Distrioct hospital compliance will be
and divisinol increased by
hospital. It has PVCHR committee
become partial on Pindra,
active. Badagaon,
Kashividyapeeth,har
ahua, PHC, district
hospital and
divisional hospital.
8. Activation of • It is partially The process will start in 2 model village • There will be discussion on the Ritghts
Panchyat Health active in other 2 village of will become
6

committee. Shivrampur. The PVCHR. active. of Gram-Sabha, Gram-Panchayat.


member of • Harahua-Aura
committee are the • The question will be raised on the
• Pindra-1
member of • Chiraigaon- accountability of panchayat members,
PVCHR saraimohana
committee. improving knowledge about
• Badagaon-
• The member of accountability. The issue will be
Lakhmipur,Kunwar
Belwa fear to talk
expanded.
PVCHR members
due to pressure of
village head.
Interaction is not
possible due to
pressure of village
head.
• There is no
awareness among
the members of
other village of
PVCHR.
9. Activation of • Ration being • The supervision and • Supervision • The issue about the great haste in ration
ration card available pressure of PVCHR will be held on
distribution system and irregularity will
regularly at fix committee will activation of
prise and fix remain in three three model be strengthening widely.
weight in 3 model model village and village.
• The pressure will be made on the issue
village. the compliance will • Initiation will
• Grains are not held to make be held on of PDS at block, Tahsil, and district
available at available the grains activation in 9
on instalment. level.
instalment. other PVCHR
• There is • To speed up the area and one • The initiation and leadership of
irregularity in supervision and area of BDAM.
compliance by members of PVCHR committee and
7

Ration PVCHR members weaver-artisan right forum will be


distribution and members of
come faster.
system in 9 other Bunkar Dastkar
village of Adhikar Manch in 9
PVCHR. village and 1 city
• There is locality
irregularity in a (ayar, Puari,
city locality. Bhaitauli,Dharkar
• BPL Antyoday Basti (city),
Card had been Saraimohana,
made one month Pindra, Lakhmipur,
ago in Dhannipur. Ghamhapur,
Kunwar, Nathaipur,
Dhannipur)
Right of development
10. Activation of • two primary • To activate • Two • The leadership of PVCHR members
primary school school has completely the school completely
and middle will increase.
become active in in Shivrampur. active primary
school. Shivrampur. • To activate a primary school in • All the children will remain annex with
• There are two school in Belwa Shivrampur.
education.
primary school in badepur. • One active
Belwa. • PVCHR member will primary school • Child leadership and child participation
• The schools of come in full role and in Belwa.
will become drastic.
Belwa are supervise and • 4 child labour
partially active compile. (F-2,M-2)of • The access of governmental scheme
and there is Belwa will be
irregularity also. associated with will be assured in the school.
education. • The committee will be strengthen on
the complaint about violation.
11. Compliance to Public interest A compliance will be Primary school • Making the issue non aviability of land
open school in litigation has been held to open a primary will be accepted
8

Baghwanala filed in High Court school and district for governmental primary school in
for demand of magistrate will be
city, will be policy wise interference.
primary school in surrounded(Gherao) by
Baghwanala. PVCHR committee.
12. To annex the The right to 13 children • At least the marginalized children of
child labour with education of children
education under will be assured under last door mat will annexed completely
special campaign. the fellowship with education. So that the child rights
programme of
AHRC. of children will be protected.
13 100% enrolment • All children are • 100% enrolment and 100% enrolment • On the issue of qualitative education,
and retention in nominated in retention in model and retention in
primary school. primary school of PVCHR committee will make pressure
Shivrampur village.
• Nomination • Initiation among model village. directly on school, BRC, Tahsil and
processor for new PVCHR committee district level.
children is being on this issue.
continued in all
the three village.
14. Activation of • It is partially The process will start in Active committee • There will be discussion on the rights
Panchyat active in village of PVCHR. in Shivrampur.
of Gram-Sabha, Gram-Panchayat.
Education Shivrampur. The • Harahua-Aura
committee. member of • Pindra-1 • The question will be raised on the
committee are the • Chiraigaon-
member of accountability of panchayat member. I
saraimohana
PVCHR • Badagaon- am proving knowledge about the
committee. Lakhmipur,Kunwar accountability. The issue will be
• The member of • Activation in
Belwa fear to talk Shivrampur and expanded.
PVCHR members Belwa.
due to pressure of
village head.
9

Interaction is not
possible due to
pressure of village
head.
• There is no
awareness among
the members of
other village of
PVCHR.
15. Assuration of • Due to corruption, The struggle of deprived • The committee will be active due
governmental politics, influence will be speeded up on
development corruption and anti initiation on collective and personal
of anti public
scheme. policy in all the people policy at Village, collective and demand by members of
schemes, it is not Block, Tahsil and District
level. PVCHR and Bunkar Dastkar Adhikar
assessable to
deprive. Manch. Along with strengthening result
• The compliance the clearly of situation will be
has been started
on broad level expanded with self experience.
demand by • The struggle against the corruption,
PVCHR
committees and question-answer will become drastic.
Bunkar Dastkar
Adhikar Manch
for Red card,
residence,
pension, road and
hand pump.
Right of Protection
16. Child labour free • Shivrampur • Shivrampur village 2 • Two model areas will completely free
village village became became child labour
from child labour.
10

child labour village. • Child right will be protected.


village. • Belwa will become
• 4 children in completely child
Belwa are still labour free village.
associated with
child labour
17. Strength of Due to meetings and • Complete activation 105 village • Due to making fast practices of
community initiatives of total of PVCHR committee committee and 4
organization. 105 PVCHR village Block committee leadership of PVCHR committee
at village level.
committee, 21 Local • To bring into will become strong members, the organizational strength
Committee and 4 activation process to and active.
Block committee the and independence of committee will
PVCHR committee of
effort for leadership Araziline block. start to make.
practice is
increasing.
18. Extension of There are of total • 20 new PVCHR 20 village • The member of new deprived group
community 105 PVCHR village committee will be set committee
organization. committee, 21 Local will be attached with organizational
up in 4 Blocks.
Committee and 4 • The committee of structure.
Block committee. Araziline will be
strengthened.
19. Demand for • There are 42 The pressure will be • Along with compliance by PVCHR
allotment of land landless family in exerted on administration
to landless through Gherao on members and other members the
Belwa.
people. • There are 153 demand for land demand for allotment of land to
landless family in allotment.
landless family, the pressure will be
Shivrampur.
• Demand for exerted for demand.
allotment of land
(residential and
agricultural
11

board) has been


increase in
PVCHR
committee. The
initiation has been
started.
20. Demand to The livelihood is in To raise question on The PVCHR • There will be initiation on issue in state
declare skill danger due to non skillfull work of members of 4
wages to availability of work agriculture, law relating Blocks will raise committee of PVCHR.
agricultural work and minimum wages to division, safety for campaign along
along with and anti public weavers, debt. with trade union
minimum vages, policy, which and other public
farming, directly violets all organization.
NAREGA, to children’s right.
inforce the law Children are insecure
relating to and it results into
divisnal infant death, child
agriculture, to death,
strengthen the malnourishment,
demand to illiteracy, child
increase subsidy, labour and child
to increase marriage.
struggle and
compliance on
the problem of
lively hood of
weavers.
21. Compliance for According to the To stabilised demand on • To establish a demand with PVCHR,
fundamental right report of Sacchar issue with PVCHR,
of most deprive committee at Bunkar Dastkar Adhikar Bunkar Dastkar Adhikar Manch and
group. national level the Manch and other other organization on the report of
position of minority organization at district
12

community in level on nation level national level by expending the concept


respect to education, report by extending it at
and knowledge at village level to
health and basic village level concept and
rights, is worse than awareness. district level. The demand will become
Dalit community. Initiation on all the
strong with the compliance of demand
incidents happening in
PVCHR district at district level about the odd
committee and the odd
circumstances of Musahar and nut
condition of Musahar-
Nut community, community, community exploitation,
community exploitation
and discrimination.
and discrimination.
22. To lessen the The members of To lessen the pain of Initiation on all • Communal bitterness will be less. The
incident of PVCHR and other deprived – exploited events happening
community organization are community through in PVCHR struggle will be strengthen due to
exploitation and suffering from discussion on the events committee. compliance-about matter of violation,
discrimination exploitation and of exploitation and
discrimination from discrimination. discussion, interference. The pressure
all around the on administration will be exerted.
traditional society
and system.
23. Interference on The sexual violence To build a concept on the Initiation on all • The discussion will be expanded on
the events of against children are incidents of child sexual events happening
child sexual being committed but violence. in model village. child sexual abuse.
violence. no open discussion
can be conducted.
24. Supervision and There is irregularity • To extend discussion To pass a proposal • There will be policy wise interference.
compliance over and violation in through awareness in PVCHR
J.J. Act enforcing J.J. Act. committee from The compliance will increase along
on JJ Act in 4 Blocks.
• To mark the children Gram Sabha so with QIC-AC.
of odd circumstances. that children in
• To held compliance need of care will
13

on the matter of be looked after in


violation. Panchyat at the
place of institution.
25. To lessen child The children below To lessen the child • The decision not to marry below the
marriage the age of 16 years marriage events in three
are being married in model areas. To held age of 14 years will get strength in
Nut, Musahar discussion in other three model village.
community. In other PVCHR village
communities committee.
marriage are being No marriage will be
solemnised after 16 solemnised below the age
years but it could not of 14 years.
be done at the ideal
age after 18 years.
Right To Child Participation
26. To build concept • Bal Panchyat has Prospective building of Three active Bal • Three will be discussion on Bal
on child been setup in JMN workers and Panchyat
participation. PVCHR secretary. Panchayat between the model village of
three model
village. It is not PVCHR and other committee.
active in Belwa.
• There is no clear
concept on
children
participation.
27. Prepration for • Bal Panchyat of 24 streat play by • Different dimensions created by
street play among Baghwanala will play children.
Bal Panchyat children will get recognition.
12 street play.
Members and • Bal Panchyat of • The child member will understand
presentation in Shivrampur will play
Panchyat. election procedure as well as they will
12 street play.
under stand practice of competition by
14

in creasing understanding over


responsibility.
28. Publication of A child magazine is Two magazine of Bal 2 Magazine • The children will understand the
child magazine published recently Sansad will be published
by children. in this year. situation review of other Panchatyat by
analytical exercise.
29. Strength of Bal Bal Panchyat Child conference will be 3 • JMN activist will be responsible for Bal
Panchyat members are held in three working
practicing for area in which children Panchayat.
leadership. will elect their • The leader ship capacity of member of
representative.
Bal Panchayat will develop with
exercise.
• Bal Panchayat will become strong.
30. Exposure visit of Children are Three members of Bal 3 • The representative of bal panchayat
representative of reviewing the Panchyat will increase
Bal Panchyat. position of their their analysing capacity will understand the situation of other
village. by going to other Panchayat by exposure visit.
Panchyat.
31. Valuation of JMN Panchyat members The Bal Panchyat 3 • Along with analysis and evaluation the
workers by are understanding member will valuate the
children the work done by works of JMN workers in leadership will increase among
JMN workers. their working area ad children.
their outlook towards
children.
32. Initiation through • Children are The initiation will be held 3 • The child leadership will come in focus
leadership by marking their through leadership by
children on their children on problems of in three working area.
problems.
problems. • The situation of children in three working
children have area.
15

been changed
after the initiation
of children in
some special
cases.
33. Activation of The capacity among All workers will become All JMN workers • The quality of work will increase due to
workers. workers to valuate active and skilful to 90%.
their work, to make work review, evaluation, capacity of
advance scheme and next plan.
to present their work,
is undeveloped.
16

Target based work plan October 08 – September 09


Strategic Milestone for one year

Sl. Right to Survival


No.
1. Birth registration on 0-10 years • 100 % birth certificate for the children of 0 – 1 years in three model village and will be started
children in 10 village of 4 block of PVCHR.
• The birth certificate of the children between the age of 1–10 years will start.
The proceedings running in the model village will be continued. The demand will be raised after
discussion among committee in 10 villages of 4 block of PVCHR and a public compliance and
public campaign will be raised in relation to wide issues of citizenship along with Bunkar Dastkar
Adhikar Manch.
17

2. Vaccination of children and Assuring 100% vaccination of pregnant women and children the initiation will be taken in 17
pregnant women and activation villages. The Aanganwadi and ANM which are associated with health centre, are directly
of ICDS and ANM responsible, in the same time due to finishing of livelihood then is malnourishment of child and
children and mothers are dying due to delivery by untrained nurses. In a report of stat planning
commission and UNICEF the position of U.P. is deteriorating and dangerous in the world in the
matter of death by malnutrition. In this scenario to raise the demand about the analysis coming
from work of model village, at other organization, PVCHR committee and weaver artisan right
forum and in last to raise the public struggle to activate the dibber ant program of health and
Aanganwadi by public hearing so that the health committee of village can be held accountable for
this. The procedure will be carried completely by gathering of self governance, administration and
government in public hearing.
3. Activation of Ration Shop • To activate by supervision of ration shop by PVCHR committee in three model village on the
basis of indicator and to carry it in other PVCHR committee (index is annexed). Having made
understanding on ration distribution system, the activation of procedure and supervision
committee to be made by them.
Right of development
4. People initiative for qualitative • Having assured 100 % enrollment in the next series of procedure for activation of middle
education school will be continued along with the activation of two primary Schools. Due to not opening
of school after filing a writ petition in September for demand of government school in
Bagwanala, the people of Bal Panchayat and PVCHR committee will run a campaign on
“Ghera Dalo - dera dalo” (to besiege – to encamp), the public initiation will be started on the
issue of education in the other PVCHR committee. The trust has Observed that the position of
18

Muslim on the issue of education is more deteriorating than Dalits. A workshop of PVCHR,
weaver Artisan right forum, JMN and vision, will be organized to make understanding over
the report of Sacchar committee.
Right to Protection
6. Demonstration on livelihood of The livelihood of weave and artisan is being snatched due to attack on imperialism. On which the
weaver struggle is being increased by making PVCHR committee with deprived group in condense area.
And in other areas the weaver artisan right forum in being raised as a trade union. Who will raise
struggle in collaboration with PVCHR. A district wide protest will be organized by developing the
outlook of imperialism attack in the meeting of PVCHR and weaver-artisan after finding out their
problem.
7. Demonstration of unorganized The members of PVCHR are mostly landless, farmer, weaver, and the person working for share.
workers Due to problem of livelihood their children have to do work. In the same time most of the people
of proletariat are suffering from communal exploitation due the communal residue of Indian
landlord system. The people will be organized on the issue of land and the people working for
share (Bataigiri) by protesting communal exploitation. By making the issue of completely
successful implementation of Narega enforced by central government and improving the unity of
deprived and proletariats, child right will be assured.
Right of Participation
Strengthen of Bal Panchyat • There will be block level conference by attaching all the children of village actively with Bal
Panchayat made in three model village. So that other children may associate with child
parliament and the understanding on participation procedure may be developed. BY extracting
the issue from out look of children through Bal Panchayat, and for expanding the problems
and issues through street play, cartoon and magazine, they will send their magaxine to
19

administration and meet with the district level officers. To raise their leadership by the
children of Bal Panchayat and to strengthen the Panchayat, they will go to in dude their issues
in PVCHR Committee.

Vous aimerez peut-être aussi