Vous êtes sur la page 1sur 2

For for more Sample Engineering Resumes go to ThinkEnergyGroup.

com
Sample Project Engineer Resume John Doe 123 Main Street City, State 12345 Phone: (123) 456-7890 JohnDoe@yahoo.com SUMMARY > Six years of experience in managing and implementing automated toner filling and packaging equipment projects. > Extensive knowledge of Allen-Bradley PLC5, SLC and MicroLogix family of PLCs as well as experience with various Modicon, GE and Square D PLCs. > Experience integrating and programming servo drives, AC variable speed drives and DC drive systems. WORK HISTORY 1996-Present Packaging Engineering Manager Company #1, City, State > Main responsibilities include managing packaging production operations, automation projects and new product enabling. > Direct management responsibility for three engineers and indirect management responsibility for 35 industrial work force operators. > Manage three shift production packaging operations which includes determining engineering and industrial work force staffing, capital equipment budgets, production planning strategies and equipment maintenance support. > Implemented over $2M of capital projects which includes automatic pick and place, auto-cartoning, auto-casepacking, vision systems, and robotic palletizing. 1993-1995 Senior Project Engineer Company #2, City, State > Main responsibilities included providing electrical controls engineering support for production start-up of three toner filling/packaging lines. > Provided electrical design and PLC programming support for start-up of four fill/packaging lines. > Implemented a robotic pick and place, auto-cartoning and auto-casepacking system. 1991-1992 Senior Project Engineer Company #3, City, State > Lead electrical controls engineer for the design, PLC programming and equipment specification of $4M automatic toner fill/packaging lines for new Oklahoma City Extruded Toner Plant. > Developed electrical drawings in AutoCad for electrical installation bidding and project documentation package.

> Managed the electrical installation and commissioning of the OKC Extruded Toner Plant packaging lines. 1985-1991 Senior Equipment Engineer Company #4, City, State > Specify and install production equipment. > Modify, retrofit and design equipment for special projects. > Provided PLC programming support for plant wide reverse-osmosis/de-ionized water system. EDUCATION State University, City, State, BSEE, May 1985. Another State University, City, State, BS Physics, May 1985. University of Large State, City, State, 20 hours of graduate classes towards MSEE, 1985-1991.

Vous aimerez peut-être aussi