Thank you for your interest in Kawasaki Gas Turbine packaged power plants.

To allow us to tailor our proposal to your site requirements, please provide us with the following information:

Preliminary Proposal Requirement Sheet


I. Administrative
Customer Name and Address/Addressee

II. Requirements
Customer Specification Attached: Type of Application: Cogeneration? Combined Cycle? The Project Has a Budget Customer Schedule: Date of RFP Due Date of Bid Expected Order Date Date Required on Site Date of Commercial Operation Required kWs - Unit Size: Yes No Standby Emergency Total Power Required: Yes Base Load Peak Load No

Scope of supply: Equipment Only Furnish & Install

Ship to address:

III. Site Information


Location Site Altitude Design / average Ambient Temperature Summer Temperature Range (max/min) Winter Temperature Range (max/min) Is water available for cooling? If Yes, attach specification If Yes, quantity available: Yes No

Seismic Requirements: Voltage and Frequency Hz : Power Factor (P.F.) Black Start Capability: Breaker required: High Side or Low Side? Yes Yes No No

IV. Performance
Duty Cycle Fuel(s) to be used: Peaking Base Load Natural Gas Available pipeline Pressure (psig) #2 Diesel Dual Fuel Other fuels? Gas Analysis Attached Emission Requirements: Yes NOx CO SOx Particulates UHC Other Emissions control: Prefer DLE combustion system Emissions control: Prefer steam or water injection Noise Requirements Near Field dBa at 1 Meter No

V. Equipment Required
KAWASAKI Gas Turbine Models: Nominal rating @ ISO conditions w / inlet & exhaust duct losses: 600 Kws 600 kWs 1500 kWs 1500 kWs 2900 kWs 2900 kWs 5400 kWs 5300 kWs 6600 kWs 6550 kWs 7700 kWs 7600 kWs 17,500 kWs 17,400 kWs Other equipment: Fuel Gas Booster Compressor? (Fuel gas supply pressure to the GT starts at 200 psig) GT Inlet air chilling ? GT Inlet air pulse filters? Remote Human Machine Interface? (HMI) MCC and Output Breaker on skid? Auto Synchronization to grid? D = dry low emissions system GPB06 GPB06D GPB15 GPB15D GPB30 GPB30D GPB60 GPB60D GPB70 GPB70D GPB80 GPB80D GPB180 GPB180D

IF THIS IS A SIMPLE CYCLE APPLICATION, STOP HERE.

VI. Waste Heat Equipment Required


General Questions Existing site ? Yes No

New Site ? Does water exist at site ? Does the customer desire simple cycle installation first with future cogeneration/combined cycle add-on? If yes, what is the phased timing?

Yes Yes Yes

No No No

Heat Recovery Steam Generator (HRSG) or Waste Heat Recovery Unit (WHRU) Number of Pressure Levels One Two Three Steam Flow (pounds per hour) Steam Temperature(s) (0F) Steam Pressure (psig) Deaerating Heater (DA) required? For Cogeneration sites: Absorption steam chillers? Water Evaporators?

Thanks for your information KGTA Houston Texas