Vous êtes sur la page 1sur 25

ICSC - PLUSNETWORK 2008 Biennial Conference

Durban, South Africa

Implementation, Monitoring and Feedback : Building Intelligence in the Planning Process Creating Places that Work !
Sep 15/19th 2008

Summary
The Role of Implementation, Monit & Feed in the Planning Process Building Inteligence for Sustainability Curitibas Experience

Sep 15/19th 2008

Curitiba
432 km2 1,788,559 inhab.
GDP Curitiba: US$ 8 billion
(6th GDP in Brazil)

Location

Budget U$ 1,3 billion

Metropolitan Region
15,622,33 km2 3,261,168 inhab.
Growth rate: 2.4% 26 municipalities

Sep 15/19th 2008

Scenarios

IMPLEMENTATION, MONITORING AND FEEDBACK

I dont know...

Sep 15/19th 2008

Planning Cenrios

Sep 15/19th 2008

The Planing Cycle

Sep 15/19th 2008

IMPLEMENTATION , MONITORING AND FEEDBACK SCHEME (IMF)


Assessment Event Assessment Event

STRATEGIC

ASSESSMENT

IMPLEMENTATION

INDICATORS

PUBLIC PARTICIPATION
TARGETS COMPONENT OBJECTIVES

Input + Output

Input + Output

FEEDBACK

CONTINUOUS OUTPUT

MONITORING (systematic)

BUILDING INTELLIGENCE

Sep 15/19th 2008

Key Aspects
Building Inteligence
Learning by doing (implementation)

Building Awareness
Participation

Building Permeability to Reality


Continuous assessment

I think I know
Sep 15/19th 2008

Curitibas Experience on IMF


What went right
Learning by doing- public transport and land use Technocratic visioning for 30 years Integrated planning system

What went wrong


Drift to comfort line, distant from re-visioning Reducing PT demand in Curitibas corridors Metropolitan integration Self assuring planning process Integrated planning system at risk

Sep 15/19th 2008

1966 TOD Concept


Rapid lane Bus lane Rapid car lane

Sep 15/19th 2008

Land Use Today

South

West

271.869 inhabitants Business activities: 14.684

Sep 15/19th 2008

Down Town
Loss of Resident comunity

Sep 15/19th 2008

High Density Corridors

Challenge
Less than 20% of Residents use Public Transport

Sep 15/19th 2008

Transit Led Development

Challenge
Gentrification of land available for social housing

Sep 15/19th 2008

PT Implementation

earning by oing. Challenging ransport rends Monitoring

ittle nnovation fter 98

Sep 15/19th 2008

Implementation

Laudelino Ferreira Lopes

Theodoro Makiolka

Waldemar Loureiro de Campos

Binrio Itacolomi / Itatiaia

Anita Garibaldi

Mascarenhas de Moraes

Praa Tiradentes

Generoso Marques

Alagoas

Sep 15/19th 2008

Public Transport Main Achievements


Private bus companies operate according to zones Systems high accessibility - Network Fast pre paid boarding Low risk, low cost Transit Oriented Development Single fare trips up to 25 km. Sunday fare half price Centralized Public management 2,4 million pass/day in network

Sep 15/19th 2008

South Corridor Peak Hour

Only physical Integration concentrates excessive demand on interchange terminals

Direct Line
Sep 15/19th 2008

Biarticulated Peak Time

South Corridor Peak Hour

Inadequate relation between form and function

Direct Line
Sep 15/19th 2008

Excessive use of tube shape

Sep 15/19th 2008

Green metropolitan
Lacks metropolian Integration

Inter American Bank II Green Line

Sep 15/19th 2008

Green Metropolitan
Missing Links with metropolitan Public Transport

Sep 15/19th 2008

Byke lanes revival


Mainly leasure Discontinued for 20 years

Sep 15/19th 2008

Integrated mobility system


TRNSITO USURIO TRANSPORTE COLETIVO
Controle de Terminais de Integrao e Paradas Controle da Operao do Transporte Coletivo Controle da Frota de nibus Sistema de Segurana

CTA
Controle de Trfego em rea

SIU
Sistema de Informao ao Usurio

CTI

CFTV
Circuito Fechado de Televiso Sistema de Fiscalizao Eletrnica e Controle de Infraes de Trnsito Sistema de Controle de Estacionamento Regulamentado Sistema de Fiscalizao e Operao do Trnsito

STE
Sistema de Telefonia de Emergncia Centro Integrado de Monitoramento Eletrnico de Curitiba

COTC CFO

SFECI

CIMEC

m ro on t f ni n ta o p i s Di lic ub p

ESTAR SFT

SSEG

TRANSPORTE COMERCIAL

CCO
Centro de Controle Operacional

Controle da Operao e Fiscalizao do Transporte Comercial

COF

Mdulo de Comando e Comunicao

Mdulo de Gerenciamento de Ocorrncia

Mdulo de Gerenciamento da Base de Dados

Mdulo de Gesto de Cenrios

Sep 15/19th 2008

The Future

Sep 15/19th 2008

Vous aimerez peut-être aussi