The noise exposure monitoring results for different areas of GSK-CH SONEPAT are presented in Table form & also given in layout form, to differentiate zone as per the noisy area for some workplace. A review of the data in the table reveals that there is high noise in common service area, DG area, Boiler area, Coal yard, Mix-13.5 meter, QEE area, Spray & some misc. area are found noise more than the 85 dB (A), which is above the criterion level of the FA-1948, ACGIH guidelines & GSK-CH technical guidelines-709.
94.1 dB(A)
87.8 dB(A)
PHE Area
Air compressor
93.8 dB(A)
MCC Penal
78.2 dB(A)
Control room
75.9 dB(A)
94.8 dB(A)
DH Pump
AH Pump 3 1 2 3
MCC Penal
Turbine room
95.2 dB(A)
Tool Room
90.5 dB(A)
87.9 dB(A)
Drinking water
Main entry
Noise Area Monitoring Plant Identification:Utility Area Location:Boiler LEVEL IN mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 8 mtr 8 mtr 8 mtr 8 mtr 0 mtr 0 mtr SPL in dB(A) 2 3 81.8 82.5 80.4 80.3 85 82.1 85.5 69.3 86.3 91.5 81.2 81.9 81.3 85.5 81.4 86.7 70.1 85.9 90.4 81.3 83.1 80.1
SR NO.
AVERAGE 82.1 82.4 81.1 80.3 84.9 81.5 84.3 68.2 84.8 90.3 80.4 81.3 80.4
RECOMMENDATION
3 Boiler section (Near Ash Silo) 4 Boiler section ( near compresor area) 5 Boiler section ( Air compresor area) 6 Boiler area ( Control room) 7 Boiler area ( Entrance -At end of Stair case) Boiler area ( Feeding Hopper-Electromegnetic Hopper 8 hammer ) 9 Boiler area ( near above stair) 10 Diesel Boiler area ( near machinery ) 11 Diesel Boiler area ( near blower fan )
Maintenance of machinery should be done 85.1 regular manner 81.6 85.5 Enclose cabin should be provide 69.5 85.3 Enclosure provide at electromegnetic 91.1 hammer 81.0 82.3 80.5
Diesel yard
80.5 dB(A)
80.3 dB(A)
Boiler
Air compressor
85.5 dB(A)
90.3 dB(A)
92.3 dB(A)
86.7 dB(A)
91.5 dB(A)
MCC Penal
69.5 dB(A)
Control Room
Main entry Tool table
Penal Room
MCC Penal
Noise Area Monitoring Plant Identification:Utility Area Location:WTP Area LEVEL IN mtr 0 mtr SPL in dB(A) 2 3 78.1 75.1
SR NO.
1 74.2
4 74.2
AVERAGE 75.4
RECOMMENDATION
0 mtr
98.3
95.9
98.3
96.8
1. Enclose cabin should be provide at pump 97.3 2. Wear ear muff while entering in the area
MCC Penal
WTP Office
MCC Penal
67.8 dB(A)
Salt Room
Loading Unloading
74.5 dB(A)
98.3 dB(A)
85.8 dB(A)
68.7 dB(A)
Acid storage tank
1 2
78.8 dB(A)
Water Clarifier tank Storage tank
2
75.7 dB(A)
Noise Area Monitoring Plant Identification:Utility Area Location:DG House LEVEL IN mtr SPL in dB(A) 2 3 104.8 103.9 106.9 105.8 105.4 103.8 105.9 104.8 103.5 102.6 75 74.3 70 76.1 83 81.9
SR NO. 1 DG-1 2 DG-2 3 DG-3 4 DG-4 5 DG-5 6 At 33 kv area 7 Out side control room 8 Control room
AREA
AVERAGE RECOMMENDATION 104.6 106.7 1. Maintenance of machinery should be 104.9 required in regular mennar 105.7 2. Proper enclosure should be provided 103.4 3. Wear ear muff while entering the area 74.4 74.6 82.8
103.4 dB(A)
105.7 dB(A)
104.9 dB(A)
106.7 dB(A)
104.6 dB(A)
DG
DG Display 102.3 dB(A) 100.4 dB(A)
DG
DG Display 101.6 dB(A)
MCC Penal
Battery storage Drinking water
MCC Penal
Board
82.8 dB(A) Display for DG
Control Room
76.5 dB(A)
MCC Penal
71 dB(A)
33 KV Yard Room
78.4 dB(A) 71.9 dB(A)
MCC Penal
Tool table
MCC Penal
Board
33 Kv
Main entry
Noise Area Monitoring Plant Identification:Utility Area Location:Coal Yard LEVEL IN mtr SPL in dB(A) 2 3
SR NO.
AREA
AVERAGE
RECOMMENDATION
0 mtr
85.6
86.2
84.3
84.9
1. Maintenance of machinery should be done regularly 85.3 2. Wear ear muff while entering in the area Provide mechanical hammer for breaking 85.0 instead of manually & provide enclosure 84.4 94.7 Maintenance of machinery should be done 88.3 regularly
2 Coal yard ( Coal breaking activity) Outer Coal yard near conveyer system (Nr Dust collector of 3 BC-2 conveyor) 0 mtr 4 Blower of Dust collector (BC-1 Conveyor) 0 mtr 5 Walk way from Coal Yard to boiler (Foot Path) 0 mtr
Noise Area Monitoring Plant Identification:Utility Area Location:Fire Pump House LEVEL IN mtr 0 mtr 0 mtr 0 mtr 0 mtr SPL in dB(A) 2 3 102.8 84.3 85.4 84.3 103.4 85.1 84.9 83.5
SR NO.
AREA 1 Fire pump house ( diesel pump ) 2 Fire pump house ( Hydrant pump ) 3 Fire pump house ( Jocky Pump) 4 Fire pump house ( Sprinkler system)
AVERAGE
RECOMMENDATION
102.6 84.8 1. Maintenance of machinery should be done 85.2 in regular manner 84.1 2. Wear ear muff while entering the area
Noise Area Monitoring Plant Identification:Utility Area Location:RM ware house LEVEL IN mtr SPL in dB(A) 2 3
SR NO.
AREA
AVERAGE
RECOMMENDATION
1 RM ware house (MB dumping 1st room) 2 RM ware house (MB dumping 2nd room) 3 RM ware House ( WF dumping) 4 RM ware house ( SMP dumping) 5 Opposite RM ware house ( near cooling tower)
1. Maintenance of machinery should be done in regular manner 85.6 2. Wear ear muff while entering the area 81.0 75.9 75.8 84.5
Noise Area Monitoring Plant Identification:Utility Area Location:FG Ware House LEVEL IN mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr SPL in dB(A) 2 3 72.3 72.1 70.3 70.4 77.2 78.3 77.6 72.8 62.5 61.9
SR NO.
AREA 1 F.G Warehouse ( sealing area) 2 F.G Warehouse (storage area) 3 F.G Warehouse (Near loading of drum Via forklift) 4 F.G Warehouse ( Inside entrence) 5 Security office (inside cabin)
Noise Area Monitoring Plant Identification:Utility Area Location:ETP Area
RECOMMENDATION
AREA
LEVEL IN mtr
1 72.1 91.8
AVERAGE RECOMMENDATION 68.3 70.0 92.3 91.1 Provide enclosure to whole workplace
Noise Area Monitoring Plant Identification:Utility Area Location:Misc. Area LEVEL IN mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 8 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr 0 mtr SPL in dB(A) 2 3 86.3 91.3 87.5 70.2 65.8 78.3 80.4 61.8 63.5 66.9 59.1 59.6 54.1 56.5 64.2 67.2 64.3 55.6 86.2 90.2 86.9 73.4 65.5 78.1 81.8 62.5 67.3 67.9 59.4 59.2 53.9 57.8 65.3 68.3 73.9 53.8 84.9 89.3 85.3 78.5 68.5 77.5 82.2 61.9 65.4 68.5 59.7 58.9 52.8 58.3 63.8 67.5 74.2 54.3
SR NO.
AREA
4 85.2 88.4 86.3 78.1 67.3 80.1 81.3 62.1 64.8 67.4 58.6 59.1 53.4 54.2 64.6 64.9 64.1 52.4
AVERAGE
RECOMMENDATION
1 Mittal & Work shop 2 Grass cutting machine 3 Hand Trolly 4 Incinerator ( Insulation material store) 5 Scrap yard (Inside) 6 Drum washing area ( near washing with water) 7 Drum washing area ( While transfer the drum ) 8 Security office (inside cabin) 9 Main gate 10 Central Lab (1st room ) 11 Central Lab (2nd room) 12 Administrative building 13 Reception Building 14 Dispensary 15 Canteen Area (Inside entrance area) 16 Canteen Area (Near cooking area) 17 Weigh bridge area 18 Driver Rest room
1. Isolation of the work place 85.7 2. wear ear muff while entering the area 89.8 Proper maintanance of the machine 86.5 Provide rubber line on the wheel 75.1 66.8 78.5 81.4 62.1 65.3 67.7 59.2 59.2 53.6 56.7 64.5 67.0 69.1 54.0
Noise Area Monitoring Plant Identification:Process Location:Mix Prepration LEVEL IN mtr 0 mtr 0 mtr SPL in dB(A) 2 3 79.8 79.1 82.8 80
SR NO.
AREA 1 Mix prep room ( Me area) 2 Mix prep room ( Masher area)
1 79.6 81.3
Recommendation
3 QEE pump room 4 Entance door (To Mix Area) 5 Mix (down stair ) 6 Mix (up stair) 7 LIW room 8 Control room (MIS Room) 9 Conc. Pre heating area 10 QEE 11 QEE 12 QEE entrance 13 Mix Preparation entrance
0 mtr 8 mtr 8 mtr 8 mtr 8 mtr 8 mtr 8 mtr 3 mtr 13.5 mtr 8 mtr 13.5 mtr
94.5 75.2 75.1 74.7 66.1 58.3 89.8 90.4 90.4 88.3 72.3
96.3 76.1 74.1 81.7 66.6 57.9 80.4 89.4 89.4 87.8 74.5
95.2 75.5 76 75.2 65.8 58.9 78.9 90.1 90.1 88.4 76.5
1. Maintenance of motor should be required in regular mennar 2. Proper enclosure should be provided 95.3 3. Wear ear muff while entering the area 75.3 75.0 77.2 66.0 58.5 83.6 89.8 90.2 88.4 73.8 1. Maintenance of machinery should be required in regular mennar 2. Proper enclosure should be provided 3. Wear ear muff while entering the area
87.1 91.6
87.5 91.7
86.2 91.8
87.2 92.3
1. Maintenance of machinery should be required in regular mennar 87.0 2. Wear ear muff while entering the area 91.9 1.Provide enclose cabin to the machinery
Extractor
87.2 dB(A)
Storage silo
87.5 dB(A)
Sugar
76.5 dB(A)
86.2 dB(A)
W heat Flour
Malted Barley
72 dB(A)
Noise Area Monitoring Plant Identification:Process Location:Dry Blending LEVEL IN mtr 0 mtr 0 mtr 8 mtr 8 mtr 8 mtr 8 mtr 11.5 &13 mtr 19 mtr 19 mtr 28 mtr SPL in dB(A) 2 3 78.5 79.4 71.9 71.2 89.8 91.3 92.9 81 89.3 91.8 95.1 81.2 91.3 93.1 93.3 74.5 88.5 92.1 94.8 82.3
SR NO.
AREA 1 Spray dryer ( Mill room) 2 spray dryer (CIP /DH room) 3 spray dryer ( entrance) 4 spray dryer ( EFBD & IFBD) 5 spray dryer ( Hepa filter) 6 spray dryer ( vibration sifting room) 7 spray dryer ( entrance) 8 spray dryer ( entrance)
AVERAGE 77.9 78.6 70.3 71.1 92.4 92.7 93.8 82 88.3 94.3 93.9 84.1 90.7
RECOMMENDATION
11 spray dryer (Near DH blower) 12 spray dryer (Top of Drier Chamber-Atomizer) 13 spray dryer ( Fine filter) 14 Spray dryer
1. Maintenance of machinery should be required in regular mennar 91.8 2. Proper enclosure should be provided in dryer 93.3 3. Wear ear muff while entering the area 79.4 89.1 1. Maintenance of machinery should be required in regular manner 93.0 2. Proper enclosure should be provided in dryer & at pneumatic hammer 94.8 3. Wear ear muff while entering the area 82.8 91.9 1. Maintenance of machinery should be required in regular manner 2. Proper enclosure should be provided in dryer 91.5 3. Wear ear muff while entering the area 79.9 92.8 Proper enclosure should be provided
Tool table
DH Blower
92.1 dB(A) 92.3 dB(A)
Walk way
Acid tank
Noise Area Monitoring Plant Identification:Process Location:Dry Blending LEVEL IN mtr 13.5 mtr 13.5 mtr 13.5 mtr 8 mtr 8 mtr 8 mtr 0 mtr 0 mtr 0 mtr 8 mtr 19 mtr SPL in dB(A) 2 3 76.2 77.3 91.2 81.3 76.7 80.8 83.9 96 96.2 81.1 64.6 86.2 92.4 79.9 80.1 79.2 81 98.3 95.1 80.9 62.8 87.3
SR NO.
AREA 1 Dry blending ( near entrance) 2 Dry blending ( Inside vacuum pump room) 3 Dry blending ( vitamin dumping) 4 Dry blending ( near entrance) 5 Dry blending ( vacuum air suction) 6 Dry blending ( air incoming)
1 75.3 91.7 78.1 76.8 81.7 84.3 95.9 96.4 81.8 63.4 85.6
AVERAGE 78.2 76.8 92.3 78.2 80.2 78.3 82 97 95.2 76.4 63.5 85.4
RECOMMENDATION
1.Provide enclose cabin to the motor 91.9 2. wear ear muff while entering the area 79.4 78.5 80.0 82.8 1. Provide rubber line at drum filling stand 96.8 2. Provide handle which is fit to the drum 95.7 3. Wear ear muff while entering the area 80.1 63.6 86.1 Proper enclosure should be provided
7 Dry blending ( drum fillig area) 8 Dry blending ( drum sealing area) 9 Dry blending ( FP pick up hopper) 10 Dry blending (Inside lab) 11 Dry blending(inside room)
Recommendation
To minimize the risk of noise-related adverse effects on health and safety of employees, contract workmen and on the local community the following hierarchy is followed at the site: Eliminate or reduce noise at source wherever feasible. Where noise levels are still excessive, apply engineering measures to reduce exposures wherever feasible. Minimize any remaining risks through the use of administrative control measures e.g. restricted entry. Provide personal hearing protection only after all other feasible controls have been applied or as an interim measure until more effective controls can be implemented. The noise levels are monitored before and after applying feasible control and its records are kept with EHS department. Personnel Protective equipments for noise are provided at the required places. Personal hearing protection is maintained in good condition and that it is used, cleaned and stored correctly. All the high noise level area is marked properly. All persons who perform work in this area are properly trained and informed about the risk associated with high noise. Health surveillance, including the audiometric test, of all the employees who are exposed to high noise area, is done periodically and the results of which are communicated to the individual employees.