User Manual

Dual Band Line Amplifier

User Manual
(Dual Band Line Amplifier AM-40-1821-NF)
Manual Version 1.1

No part of this documentation may be excerpted, reproduced, translated, annotated or duplicated. In any form or by any means Without the prior written permission of NETOP Technology Co., Ltd

Copyright 2009 NETOP Technology Co., Ltd. All rights reserved. Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

User Manual
Dual Band Line Amplifier

Contents
Chapter 1................................................................................................. 4
Safety instructions .......................................................................... 4

Chapter 2................................................................................................. 5
Product Overview ............................................................................ 5 Main Functions................................................................................ 6
Complete Frequency Range ..........................................................................6 Excellent RF performance.............................................................................6 Powerful CPU module ..................................................................................6 Flexible Remote Control & Monitoring Options .................................................7 Reliable Mechanical Design...........................................................................7 Product Outline Drawing ..............................................................................7 Product Function Structure...........................................................................8

Chapter 4................................................................................................. 9
Engineering Installations .................................................................. 9
Overview...................................................................................................9 Equipment Installation and Commissioning Flow..............................................9

Before Installation......................................................................... 12
Choosing a site location ............................................................................. 12 Power supply ........................................................................................... 12 Installation tools and accessories ................................................................ 12 Installation Procedures .............................................................................. 13

Installation................................................................................... 14
Mounting to the wall ................................................................................. 14 Installing onto a pole ................................................................................ 14

Commissioning ............................................................................. 15
Connect Serial Cable ................................................................................. 16 Check the System..................................................................................... 16 Setup steps ............................................................................................. 16 Line amplifier status.................................................................................. 17

System Maintenance ..................................................................... 17


Maintenance and repair caution .................................................................. 18
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-2-

User Manual
Dual Band Line Amplifier

Emergency situation handling ..................................................................... 18

Chapter 5............................................................................................... 19
System Monitor ............................................................................ 19
Remote Monitor and Control ....................................................................... 19

Specifications ........................................................................................ 22

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-3-

User Manual
Dual Band Line Amplifier

Chapter 1
Safety instructions
It is important to read safety instructions before installing LA equipment. These instructions are supplementary to any local safety regulations in place. In case of any conflict, local safety regulations shall prevail. Installation personnel should have preliminary knowledge about safety operations and must have received training on NETOP equipment installation, maintenance and operations. Some important safety instructions are discussed in the chapter. NETOP shall not bear any liabilities incurred by violation of universal safety operation requirements, or violation of safety standards for designing, manufacturing and equipment usage.

1. Line Amplifier must follow system requirements with proper grounding & thunder-proof facilities.

2. Power supply voltage must satisfy safety requirements. Anybody who operates Line Amplifier must cut off power supply first. Only certified maintenance staff can operate with power-on.

3. Line Amplifier radiates electromagnetic wave, which will cause damage to human body. People other than maintenance staff please keep away.

4. Do not expose yourself long time to the Line Amplifier system in working condition because the electromagnetic field emitted by Line Amplifier may do harm to your health.

5. If installed at height (onto the pole), the Line Amplifier shall be securely fixed to prevent body injuries from dropping parts.

6. Line Amplifier must be away from fire, as electronic components may explode upon fire.

7. Static electricity produced by human body can damage sensitive components on the circuit board, such as large integrated circuits (ICs).Line Amplifier must be away from fire, as electronic components may explode upon fire.
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-4-

User Manual
Dual Band Line Amplifier

Chapter 2
Product Overview
NETOP Dual Band Line Amplifier is combined with base stations, used for amplifying DCS1800 and WCDMA signals. It effectively enhances the shadow signals in urban areas like hotel, office buildings, shopping centers, apartment complexes as well as basements. Refer to the application diagram in figure 1, Line Amplifier gets the signal source from feeder cable via coupler or splitters, then amplifies and distributes the signal to coverage antenna sub-systems.

Figure1 Line Amplifier Applications NETOP Line Amplifier has remote control and monitoring function, and it can be self-diagnosis. In case of an external power off, Amplifier can keep sending alarm message to network management center for four hours, facilitating monitoring, configuring and maintenance. NETOP Dual Band Line Amplifier is modular design, users can deploy diversified RF output rate and power supply options for various projects. That provides a low-cost and highly-capable solution of mobile communication network optimization. The Dual Band line amplifier is a new kind of BTS coverage extension system to improve the signal in large building. It can support both DCS1800 and WCDMA system. It is composed of two amplification links for uplink and downlink
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-5-

User Manual
Dual Band Line Amplifier

Figure 2 Dual Band Line Amplifier diagram

Main Functions
Complete Frequency Range
NETOP Dual Band Line Amplifier can cover full band DCS1800 and WCDMA frequency band..

Excellent RF performance
NETOP Line amplifiers optimized RF design has ensured a transparent and trouble-free up and down link RF path through the delicacy of balancing & control over parameters like noise figure, up/downlink power output and link budget, out of band rejection, self-oscillation, ACPR and time delay etc.

Powerful CPU module


The powerful CPU module enables setting up, query and monitoring of various line amplifier info and parameters. Imbedded backup batteries for the CPU module enable alarms to be sent out continuously for two hours when there is power off. LEDs on control panel of Line Amplifier indicate the status and door alarm convenient for onsite installation and maintenance. CPU module can also be connected through RS232 serial interface locally.
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-6-

User Manual
Dual Band Line Amplifier

Flexible Remote Control & Monitoring Options


A GSM wireless modem is imbedded in NETOP line amplifier, supporting SMS communication, for point to point remote control and monitoring, between line amplifier site and Operating & Maintenance Center through NETOP line amplifier OMT software..

Reliable Mechanical Design


Having adopted IP65 die-cast aluminum casing designed for tough weather conditions outdoor and indoor, suiting temperature from -25 to +55, together with its reasonable and compact modules layout, the Line Amplifier has proven to have good heat dissipation performance through rigorous thermal simulation and temperature testing. The mould case was nickel-plated to give good EMC and anticorrosion performance. Multiple lightning-proof measures are adopted at the power supply, antenna and feeder cable. The MTBF of the Line Amplifier is ensured no less than 50,000 hours.

Product Outline Drawing

Figure 3 Line Amplifier Outline


Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-7-

User Manual
Dual Band Line Amplifier

Product Function Structure


Figure 4 shows the function structure of Dual Band line amplifier. It is compose of DCS and WCDMA PAs, DCS and WCDMA Duplexers, DCS and WCDMA Combiners DCS LNA, Power Supply, CPU and cable assembly.

Figure 4 Dual Band Line Amplifier Function Structure

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-8-

User Manual
Dual Band Line Amplifier

Chapter 4
Engineering Installations
Overview
This chapter introduces installation and commissioning flow of line amplifier equipment to help installation personnel understand the entire process. Brief introduction to some physical parameters of line amplifier, such as size, weight, humidity and temperature is also included in this chapter.

Equipment Installation and Commissioning Flow


Normal and reliable operation of line Amplifier is based on the quality of installation project. It is important to establish a set of systematic and standardized installation and commissioning procedures. Workflow for installation, debugging, acceptance and handing over of the equipment is shown in Figure 1. The installation and commissioning workflow is as follows: 1. Engineering survey Inspect the suggested site environment to provide related data for design and engineering. 2. Engineering design Planning department shall design according to the engineering inspection results and make out relevant design comments and drawings. 3. packing acceptance After equipment delivery at the site, construction team is responsible to specify the unpacking time according to engineering preparations. The construction team, the operator, the engineering team and NETOP shall all be present at the time of unpacking inspection. If any damage to equipment or shortage in shipment is found during unpacking by a single party, only the unpacking party shall bear all the liability. 4. Hardware installation

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

-9-

User Manual
Dual Band Line Amplifier

Qualified engineering personnel shall supervise the whole installation process, including positioning, base installation, BSC rack installation, BSC board installation, DC power installation, and connection of internal and external cables. 5. System and power-on check Conduct necessary check and power-on the equipment after installation. 6. Parameters settings Set related parameters after installation. 7. System test Test the system to check if the system operates normally. If it fails the test, adjust the system to meet the requirements. 8. Trial run In the first few months after equipment commissioning, the equipment remains in trial run stage. NETOP is responsible for offering full technical support to the user. 9. Final acceptance It means that operation of the equipment is stable and meets all requirements. The user and NETOP together agree upon this and sign the final acceptance certificate.

Note: Refer to the related contract terms for details about project survey, engineering design,

trial run and final acceptance

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 10 -

User Manual
Single Band Line Amplifier

Start

Engineering Survey

Engineering Design

Unpacking Acceptance

Hardware Installation

Check and Power On

Parameter settings

System Tests

Preliminary Acceptance Test


Y

Project Completed

Trial Run
Y

Final Acceptance

End

Figure 5 Equipment Installation and Commissioning Flow

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 11 -

User Manual
Single Band Line Amplifier

Before Installation
Choosing a site location
Make sure access is restricted to qualified personnel Install the product where power supply and feeder cable are accessible. Site location should be far away from heat source and damp environment. Line amplifier should be put in a well-ventilated work area. It should be hung on the wall or the pole to ensure being ventilated. If the line amplifier is mounted on the wall, there should be at least 50cm away from the ceiling and a 100cm height space shall be left empty between the line amplifier and the ground.

Power supply
Power supply of this product is normally AC, that is 165~285VAC/505Hz. Connect the fans power connector to the fan power supply port.

Installation tools and accessories


No. 1 parts Expansion Bolt Hexagonal Screws Model M10 X 100 Quantity 4 Comments To fix rack onto the wall

M14 X 150

To fix rack onto the pole

Inner Hex Bolt

Preinstalled in holes in corners of Line Amplifier cabinet Preinstalled in corners of cabinet front door To tighten or loose hex bolts Drill holes on the wall

Fixing Nuts (Non-standard) L Wrench Electric drill

M8 X 10

5 6

1 1

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 12 -

User Manual
Single Band Line Amplifier

Installation Procedures
Mounting Rack Sizes

Figure 6 Mounting Rack

Main Controller Panel

Figure 7 Main Controller Panel

1. BTS PortDT 4. Service Antenna PortMT


Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

2. Backup port 5. Power Supply

3.Backup port 6. Fans power supply

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 13 -

User Manual
Single Band Line Amplifier

Installation
Mounting to the wall

Items 1 2 3 4 5 6 7 Door Class

Name

Upper Bracket Upper Bracket M10x 100 Expansion Bolts Wall M8/M10 x 35 HEX Socket Cap Screws

Figure 8 Install to a wall 1. 2. Fix the mounting rack on the wall with the 4 expansion bolts. Fix the Line Amplifier cabinet onto the mounting rack by tightening the Inner Hex bolts GB7085- M8/M10 x 35preinstalled in four corners to the holding poles on mounting rack using L shape wrench. Make sure the Line Amplifier is tightly fixed to the mounting rack 3. Close the front door; tighten the four fixing nuts to lock the Line Amplifier cabinet using L wrench.
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 14 -

User Manual
Single Band Line Amplifier

Installing onto a pole

Items 1 2 3 4 5 6 7 8 9 10 11 Door Casting Box

Name

Upper Bracket Upper Bracket I Type Bracket M14 Nuts and Spring Washer Pole U-shape clamps M8/M10 x 35 HEX Socket Cap Screws M14 x 150 Hexagonal Screws M14 Flat Washer

Figure 9 Installing onto a Pole 1. Use the mounting rack to locate the position of the two U-shape clamps and fasten the mounting U-shape clamps onto a pole 2. Lift the Line Amplifier and hang it onto the holding groove on the rack. Use L Wrench to tighten the two hex bolts (GB70-85- M8/M10 x 35) in the upper corners to fasten the chassis onto the rack. 3. 4. Open the front door of the Line Amplifier using the L wrench. Tighten the rest two hex bolts in the lower corners against two fixing nuts (M8) to fasten Line Amplifier to the mounting rack using 6# T Hex Wrench. 5. Tighten the four fixing bolts on front door using L wrench. Fix the grounding lead to the grounding bolt and installation is completed.
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 15 -

User Manual
Single Band Line Amplifier

Commissioning
Connect Serial Cable
Open the cabinet, connect RS232 serial interface of line amplifier to RS232 serial interface of pocket computer with the RS232 cable that fit out the line amplifier, and then we can commission the line amplifier locally. Attention: Please turn off the power supply of line amplifier before inserting or pulling out RS232 cable.

Check the System


Before turning on the line amplifier, the following items shall be checked: 1. 2. Check carefully whether connection of RF signal is correct. Check the input power supply. Make sure voltage of power supply is in the range of rated working voltage of the line amplifier. 3. Check antenna rack, feed cable and the host is grounded. Grounding impedance shall be 5 ohm. 4. 5. 6. 7. Check the echo loss of the antenna and feed system. Standing ratio < 1.5. The build and pole must be lightning proof. Entrance wire of power supply must pass lightning switch. Antenna and cable must pass lightning switch

Caution: Please strictly follow the instructions above to do the commissioning of line amplifier ; Please check the power cable connection and voltage before switch on the line amplifier ; Make detailed records according to the fact.

Setup steps
1. 2. 3. Use the RS232 cable to connect PC and serial port on the device. Start PC and run the OMT. Set location and maintenance parameter on OMT. Set alarms and monitoring on OMT.
Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

- 16 -

User Manual
Single Band Line Amplifier

4. 5.

Test whether strength of downlink signal are compliant with the requirement. Adjust gain of downlink to make the output power of downlink are compliant with the design requirement.

6. 7.

Adjust gain of uplink to max. Finished setup

Caution: When commissioning the line amplifier, always connect the 30db attenuator to

the output of line amplifier. This is to protect both the line amplifier and the Spectrum Analyzer. Never turn on the line amplifier without proper termination or load. And in case of changing the antenna, turn off the line amplifier first.

Line amplifier status


The status of the line amplifier can be observed through 3 LED on the CPU board. A. Status of LED as follows: Alarm LED Run LED Power LED OFF Red OFF Blinking OFF Green Device no alarm Device has alarm Device do not working Device working normal Device no DC power DC power is normal

System Maintenance
We recommend operator do half year routine examination to make sure equipment running stability, contents comprised: 1. 2. 3. Please do examine for the antenna, comprised directional angle, position, bolt stability and water-proof adhesive tape aging or not. Please do examine for cable connection and position. Output power examination: indicator should light on and equipment output power enough or not.

If operator find out any malfunction issues, please document everything on file, and fill in correlation sheet.
Netop Technology Co., Ltd
B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707 Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 17 -

User Manual
Single Band Line Amplifier

Maintenance and repair caution


Dissemble the equipment:
4. 5. 6. Turn off the external air switch Pull of the line amplifier power plug Do not operate under thunder storm

Cleaning:
1. 2. 3. 4. Turn off the outside air switch Pull of the channelselective line amplifier power plug Do not use liquid to clean the equipment to prevent from short circuit. Use dry cloth to clean.

Grounding:
Use plug with grouding pin.

Power:
Check whether the voltage and frequency of power supply is fit for the requirement of line amplifier.

Parts replacement:
User should not attempt to repair or replace the parts. Person may get electric shock when opeing the equipment. Only the authorized specialist can repair and replace the parts.

Waterproof and dampproof :


Do not turn on or off the equipment in damp enviroment.

Emergency situation handling


In the following condition: the equipment should be turned off: 1. 2. 3. 4. 5. 6. 7. Power supply doesn't work properly Liquid flow into line amplifier Doesn't work properly (overheating, release of flavor and junk matter) Damage of case Performance degradation Near the fire source Flooding

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 18 -

User Manual
Single Band Line Amplifier

Chapter 5
System Monitor
Operation & maintenance terminal (OMT) interact with the Line Amplifier to set and lookup its status and RF parameters. It can display alarms real-time. OMT can set local connection, SMS connection with the device for operation and maintenance at any time, or at any location.

OMT and Line Amplifier connection topology showed as Figure 10:

OMT
Computer RS232

OMT
Computer RS232 SMS

Line Amplifier

Line Amplifier

Laptop Local mode

Laptop

Remote mode

Figure 10 OMT and Line Amplifier Connection Topology

Alarm Monitor and Control


Device Information
0x0003 0x0004 0x0005 0x0007 0x0008 0x000A 0x00A5 0x0101 0x0102 Device Type Model Number Product SN Longitude Latitude FW Version FW Release Date Device ID Equipment Number
Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

Monitoring Information

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

- 19 -

User Manual
Single Band Line Amplifier

0x0111 0x0112 0x0113 0x0114 0x0115 0x0120 0x0140 0x01A1 0x01A2 0x01A3 0x0201 0x0202 0x0204 0x0206 0x020A 0x020D 0x0212 0x0213 0x0214 0x02A8 0x02A9 0x02AA 0x0301 0x0302 0x0304 0x0306 0x030A 0x030D 0x0312 0x0313 0x0314 0x03A8 0x03A9 0x03AA 0x0401 0x0440 0x0441 0x0451 0x0455 0x0456 0x04A2

Control Center Phone No. 1 Control Center Phone No. 2 Control Center Phone No. 3 Control Center Phone No. 4 Control Center Phone No. 5 Report Phone No.1 Remote Communication Mode Report Phone No.2 Control Center Phone No. Check Alarm Check Enable Master Power Failure Enable Power Module Alarm Enable Battery Power Low Alarm Enable Over Temp. Alarm Enable UL LNA Failure Enable DL PA Failure Enable DL Over O/P Alarm Enable DL Low O/P Alarm Enable DL PA VSWR Alarm Enable M/S Module Comm. Failure Enable FAN1 Alarm Enable FAN2 Alarm Enable Master Power Failure Power Module Alarm Battery Power Low Alarm Over Temp. Alarm UL LNA Failure DL PA Failure DL Over O/P Alarm DL Low O/P Alarm DL PA VSWR Alarm M/S Module Comm. Failure FAN1 Alarm FAN2 Alarm Output Signal Switch UL Att. DL Att. System Temp. Limit DL Low O/P Limit DL Over O/P Limit DL ALC Limit
Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

Alarm Enable Parameters

Alarm Parameters

Control Parameters

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

- 20 -

User Manual
Single Band Line Amplifier

0x04A3 0x0501 0x0503 0x0504 0x0507 0x0508 0x0509 0x050A 0x050B 0x050C

UL ALC Limit DL PA Temp. DL O/P UL Max. Gain Mobile Network Code Location Area Code BTS ID ARFCN/ CH No. RSSI Cell ID

Active Parameters

Please refer to Operation/Maintenance Terminal OMT Software User Manual in the CD for the details

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 21 -

User Manual
Single Band Line Amplifier

Specifications
Electrical Specifications
Frequency range Output power Gain Gain control range Ripple in band Noise Figure VSWR Transmission delay Spurious emission 9KHz1GHz 1GHz12.75GHz Intermodulation 3rd order ACLR (WCDMA only) EVM (WCDMA only) PCDE (WCDMA only) Impedance Uplink Downlink 1710-1785/1920-1980MHz 1805-1880/2110-2170MHz 02dBm 402dBm 45 dB 45dB 0~20dB / 1dB step 0~20dB / 1dB step 3dB (P-P) 5 dB 1.5 1.5us -36dBm -30dBm -40dBc 45dBc/5MHz 50dBc/10MHz 12.5% -35dB 50 -25 to +55C 0 to 95% IP65 N female AC220V20%, 50Hz10% 610mm x 420mm x 230mm 47 kg 1 PCS in box

Environmental Specifications
Operating temperature range Relative humidity Environmental Standard

Mechanical Specifications
Connectors type (RF) Operating power Dimensions Weight Packing

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 22 -

User Manual
Single Band Line Amplifier

Revision Record
Title Document NO. Approved by
NETOP Dual Band Line Amplifier User Manual

Revision

Description

Date

Writer

V1.0

Dual Band Line Amplifier User Manual Release Dual Band Line Amplifier User Manual Adjustment

16-Jun-08

Ken

Marshal

V1.1

11-Sep-09

Ken

Marshal

Netop Technology Co., Ltd


B2, No.303 XinKe Rd, Qingpu Industrial Zone, Shanghai, China P.C: 201707

Tel: +86 21 6921 4567 Fax: +86 21 6921 3655 www.netop-technology.com

- 23 -

Vous aimerez peut-être aussi