1. 2. 3. Project Title Area of Work Student Details Mandeep Singh Reg No: 080906071, Roll No: 56 Room No: 211,9th Block, MIT Hostels, Manipal Ph: 9742501050 Email: taurus89@ymail.com 4. Organisation where the project is being carried out with postal address : Sarvashreshtha chaudhary Reg No:080906420, Roll No: 91 301, Pratham apartments Manipal Ph: 9632094834 Email: sc.bairos@gmail.com : INTERIOR LIGHTING DESIGN : Energy Efficient Lighting Scheme

Dept of Electrical & Electronics, MIT Manipal, Manipal 576 104 Karnataka Ms Namratha Pai Guide Designation, Dept of Electrical & Electronics, Manipal Institute of Technology, Manipal - 576 104 Ph: 0820 2925121, 09886351284 (M) Email: namratha.pai@manipal.edu 16 weeks 10th Jan

5.

Guide Details

6. 7. 8. 9.

Project Duration Date of commencement Student Signature Guide Signature

: : : :

Project Work / Practice School (2011 2012)

Dept of Electrical & Electronics Engg

Manipal Institute of Technology

1. Objective of work
The main objective of this project is to study the existing lighting scheme in a sports complex. For our purpose, we have selected MARENA, which is an indoor sports complex under Manipal University. The next objective includes simulation of certain sports using the software RELUX which will be done according to the lighting standards used world wide for a particular sport. After studying and simulating, comparative study will be made from the data obtained in order to point out any improvement which can be later implemented.

2. Motivation
Active users like players and referees need best lighting level to perform at their best.Players, referees and match officials must all be able to see clearly all that is going on in the playing area, so that they can produce their best performance or do their work efficiently. Passive users like spectators can see or follow the play without any difficulty in vision. Spectators should be able to follow the performance of the players and the action of the games in a pleasant, comfortable ambience. This means that they must be able to see not only the pitch, but also its immediate surroundings. Playing surfaces should appear to be almost uniformly illuminated, meaning that noticeably dark and light patches should be avoided. This ensures that there will be no contrast or visibility problems for the players and spectators, or sensitivity problems for the cameras. Now a days, sports are being played under artificial lights frequently. Most of these sports are played inside a building or hall. So the importance of indoor lighting increases as this gives the proper playing conditions for the players and better viewing conditions for refrees and spectators.

3. Target specifications if any


The main target of this project is to study the existing lighting scheme used in the indoor sports complex. And then carry out the simulation part for each sport individually according to the international standards.

Project Work / Practice School (2011 2012)

Dept of Electrical & Electronics Engg

Manipal Institute of Technology

To provide with a better simulation result in order to reduce glare and reflectance effect which will give much better lighting and thus improved visibility. It will also help in conserving energy and thus reducing cost.

4. Functional partitioning of project


The first part of the project includes a study of the existing lighting scheme which has been implemented for a particular sport. It involves collection of data like-getting details about the type of luminaire used for a particular sport, dimensions of the court and measurement of the lux level for the sport using a lux meter. The second part mainly concentrates on the simulation of individual sport according to the international standards.This simulation is done for a particular class of play. The data collected from the first part and details obtained from the second part will be compared to have a better understanding of the lighting scheme used. .5. Methodology The methodology which we adopted during this project work was divided into two phases The first phase dealt with the study of the existing scheme in which we measured the illuminance level for the three sports and collected various data related to the particular sport, for eg-data sheet of luminaires used and information about the playing area. The next phase includes simulation of some sports using the software RELUX which will be done according to the lighting standards used world wide for a particular sport.

6. Tools required
The tools required are the softwares DIALUX and RELUX..